SUNRISE SOLUTIONS
Relocatable Housing Solutions for
Construction Worker Deployments
SCALABLE
RELOCATABLE
TRANSPORTABLE
COMFORTABLE
1521 Azalea Road, AL 36693 USA • 251.660.8582 • www.SunriseSolutions.org • pdwils.01@gmail.com
SUNRISE SOLUTIONS
Base Operations and Life Support • Facilities Mfg & Installation • Site Prep & Infrastructure
Power Generation • Information Technology Systems • Operations and Maintenance •
Mo
Flat-Pack Modules Housing Units
Kosovo Camp Project
Sumter Regional Hospital
Past Sunrise Projects
SUNRISE GLOBAL REACH
SELECTED PRIOR
SUNRISE GROUP O ECTS
USA IRAQ KOSOVO & BOSNIA OTHER U.S. OP’S
 FEMA – Hurricanes Katrina
& Rita Seven (7) First
Responder Support Camps
– 9000 PAX
 FEMA – Hurricane Ike Two
(2) First Responder
Support Camps – 2500 PAX
 FEMA – North Dakota
Floods First Responder
Support Camp – 500 PAX
 FEMA – Hurricane Katrina
Hospital Staff Modular
Housing Units – 100 PAX
 FEMA – Hurricane Sandy
Four (4) First Responder
Support Camps – 8000 PAX
 Nasiriya – Int’l Military
Coalition Mission Support
Facilities – 4600 PAX
 Basra – ENI Contingency
Operating Base Const’n
Workers Camp – 100 PAX
 Baghdad Airport Airfield –
Iraqi Intelligence Agency
Mission Support Camp –
500 PAX
 Adnan Palace & Ext’n Site –
Turn-Key Mission Support
Camps – 2000 PAX
 Basra & Tallil – Int’l
Military Coalition Mission
Support Camps – 1000 PAX
 Belo Poljie (Kosovo) –
Italian + NATO Military
Operations Camp (NATO
Maint & Supply Agency
[NAMSA]) – 3000 PAX
camp with expansion to
5000 PAX during 2 year
facilities program. All life
support facilities design,
mfr, installation and camp
operations & maintenance
services provided.
 Bosnia – NAMSA Three (3)
Peace-keeping operations
camps, including: Design,
Build, O&M Mgmt Services
– 2000 PAX
 DHS / USACE – Temporary
Housing Sites Infastructure
– Wastewater Treatment
Systems Design & Install
 FEMA – Temporary
Housing Sites Modular
Units Deployment and
Installation
 Sumter Regional Hospital
Authority – Fast-track
design build of 75,000 sf,
77-Bed, Full-service
hospital, including: OR, ER,
ICU, Trauma, MRI, Pre-Op,
Recovery, Exam, Dialysis,
Rehab, Lab, Central sterile,
etc.
SELECTED PRIOR
SUNRISE GROUP O ECTS
Workers Camp Kitchen Deployable Ablution Units
Sumter Regional Hospital
FEMA First Responders Support Camp Flat-Pack CHU Modules Set-Up
Workers Camp Dining Facility
First Responder Camp D’Fac
CHU’s w/ Transportable Utilities Mgmt Sys
SUNRISE SOLUTIONS, INC.
• Sunrise provides complete projects for all of your housing needs, from design
through procurement, manufacture, logistics, site preparation, engineering,
construction and operations.
• Sunrise has worked in some of the most challenging countries and
environments in the world, working for the US military, as well as, oil and gas
companies and major engineering and construction companies.
• Sunrise has experience in Latin America and ready to support HIA’s needs for
portable housing in South America and anywhere in the world.
RELOCATABLE WORK FORCE HOUSING PROGRAM
• Sunrise will design & build each relocatable housing
complex on the Owner provided site.
• Sunrise will evaluate & prepare prospective sites
and intermodal truck access to include
consideration for design / build of access roads and
camp structures.
• Sunrise will incorporate all Owner directed
structures & support services as needed,
including: Perimeter & Access Control,
Accommodations, Admin/Operations Ctr, Armory
& Munitions Storage, Kitchen / Dining Facility,
Medical Clinic, Ablutions, Laundry, Recreation
Ctr, Power Gen & Dist’n, Potable Water Provision
& Distribution, Wastewater Mgmt & Treatment,
Fuel Storage and Maint. & Workshop Fac’s.
• Sunrise will provide full on-going Camp
Operations & Maintenance services.
DESIGN,
DEPLOY,
BUILD,
OPERATE &
RELOCATE
k F e
Complex
IF YOU BUILD IT, THEY WILL COME!Movie: “Field of Dreams”
 Program Kick-Off and Mobilization (Equipment & Logistics Plan) – Phase 1
o Sunrise will work with the Owner/Prime Contractor to determine the complete scopes of supply,
scheduling and program execution parameters – Soft to Hard &/or Soft/Hard Hybrid Complex.
o Mobilization includes deployment of project executives, managers, supervisors & equipment.
 Site Evaluation, Access Road Construction/Re-build & Site Preparation – Phase 2
o As a component of mobilization, Sunrise will deploy a site evaluation team to develop best solutions &
best management practices approach(es) for the prospective sites & to vet prospective local suppliers,
vendors & subcontractors in order to establish reliable supply chains & project cost savings.
o Sunrise will develop & execute all necessary steps to construct/improve roads into each project site and
perform necessary excavation, fill & grading, etc., to prepare each site for installation of the Complex.
 Complex Design & Build – Phase 3
o Design, Manufacture & Acquisition of all Facilities Complex structures & support materials.
o Construction / Installation of all Facilities Complex structures, infrastructure & support materials.
 Operations & Maintenance Program – Phase 4
o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for
ongoing operations, maintenance and administration of the Complex and Owner required deliverables.
DESIGN, DEPLOY, BUILD & OPERATEPhased Program Approach
Phase 1 Phase 2 Phase 3 Phase 4 Relocation
Notification to
Proceed - Begin
Mobilization
Mobilization Ends
Construction
Begins
Construction of
Staff Camp
Construction
Phase Begins
Turnover
Phase
Begins
Operational
Phase
Begins
Demobilization
& Relocation
Program
Staff Arrives
Set Up DFAC
Receive Deliveries
Menus Approved
Prep all areas for
Phase 4
Food & Life
Support
Services and
Complex O&M
Demobilization,
Relocation
Completed,
O&M Restored
at New Site
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
 Program Kick-Off and Mobilization (Equipment & Logistics Plan) – Phase 1
o Sunrise will work with the Owner/Prime Contractor to determine the complete scopes of supply, scheduling and program
execution parameters – Soft to Hard Structures &/or Soft/Hard Hybrid Complex determinations.
 Design & Engineering Plan
o The Design Team will support the project from their home office & field sites incorporating our facilities in the U.S., Italy,
Switzerland and UAE. SSI and our Team Members have adequate design, engineering and support staff in our combined
operations offices to support the project.
o The Design Project Manager will coordinate and lead the Design Team effort, providing management, oversight, and
direction of the complete design. Upon notification of the award, we will finalize the engineering, architectural, and design
needs and identify and mobilize design team personnel that have already been identified to match their skills, capabilities,
experience, and availability with the requirements.
o The Design Project Manager (DPM) will coordinate all technical resources used to develop the design including Sunrise
Solutions key subcontractor personnel assigned to support the design. This integration will insure that our construction
approach, techniques and experience are incorporated throughout the design process and not only for our internal bidding,
construction, operation and environmental practices functions. All design resources will report to the DPM.
 Mobilization Plan
o Mobilization includes deployment of: Project executives, Managers, Supervisors & Equipment (construction & facilities).
 Logistics Program
o Our Logistics Plan ensures timely and value added acquisition, transportation, country clearance, and delivery of materials
required for the Project. One of the most important functions for program success, the logistics effort starts with the
contract award to Sunrise Solutions and terminates after the handover of the completed project to the client.
o The logistics manager, in Phase 2 (Construction) evaluates the scope of work with the project engineer to identify logistics
requirements and in Phase 4 the operation and maintenance phase the logistics manager evaluates the scope of work with
the camp manager to identify logistics requirements. Subsequent logistics analysis identifies the most efficient means to
deliver goods and materials to meet the mission milestones time line.
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
 Site Plan Approach
o As a component of a design charrette program to determine final project scopes of supply & program execution protocols,
we will develop solutions specific site plan(s).
o We will develop the best, most cost-effective solution approach for each Complex to include considerations for:
 Site Prep & Complex Installation Workers temporary Fly camp
 Complex facilities including all ‘Hard wall’ structures as necessary to meet the Program’s accommodations & life
support requirements.
 Consideration for integrating ‘Soft wall’ structures as appropriate to meet the Program’s accommodations & life
support requirements. It may be most cost-effective to deliver a mobile kitchen (including all food storage [dry,
refrigerated, frozen, etc.], preparation & storage equipment and soft-wall mobile dining structure.
 Many support structures such as: Dining, Laundry & Recreation, etc., could utilize soft membrane structures which
are designed, delivered & erected so as to reduce total facilities & operating costs. Such structures may be utilized
as a ‘Fly Camp’ to support the Site Preparation & Complex Construction Phase
o Because our modular units & support structures are scalable, we can develop a plan for expansion readiness.
o Following are several typical Construction Workers Camp Complex Site Plans for initial consideration.
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
 Sample Facilities / Structures
o As a component of a design charrette program we will develop function-specific structures to include:
 Accommodation Units – VIP (Single Occupant Units) & Worker (2-Person Units)
 Kitchen – Food storage, Meals preparation, Clean-up & Consumables storage space & equipment
 Laundry – Options may include: Clean & Fold Services and/or Self-Serve Facilities
 Medical Care – Complexes can be designed / built to offer care ranging from: First Aid to Triage Care, depending on
Owner designations
 Recreation Facilities – May be fitted with exercise equipment, relaxation areas (game tables, TV/Movie viewing, etc.)
 Administrative Support Areas – Owner offices, Complex operations offices, Occupant services, etc.
 Maintenance, Op’s & Security Personnel Support Areas – Supplies storage, Equipment shelters, Armory & Munitions,
Guard stations, Access Control Points, etc.
 Communications Support Facilities – Telecommunications, CCTV, WiFi, etc.
o Sample floor plans of Modular Complex Structures are provided on the following pages.
 Equipment List
o A list of equipment anticipated to prepare the site & install the facilities follows the Sample Structures Floor Plans.
o Equipment will be mobilized for specific construction tasks. When the task is completed, the equipment will be demobilized.
When the schedule dictates that a specific piece or group of equipment be held on site until it is needed for another task, a cost
analysis will be performed and provided to the Client / Owner.
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
Sample VIP (Single Occupant) Accommodation Modules
Sample Worker (Double Occupant) Accommodation Modules
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
Sample Kitchen & Dining Facilities Modular Structure – Designed for 100 PAX Complex, Expandable for 200 PAX
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
Sample Modular Laundry Facilities
Sample Medical Care Modular Facilities
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
Sample Recreation Facilities Structure
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
Sample Modular Administrative Support Facilities Structures
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
Sample Modular Storage & Support Facilities
Sample Modular Guard / ECP Bldg
Armory – Weapons Storage Unit May be Divided/Furnished As Nec’y
Ammunition Storage Unit May be Divided/Furnished As Necessary
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
Logistics Plan Flow Chart
PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics
Sample Camp Complex Program Deliverables List
PHASE 2 – Site Evaluation, Access & PrepInitial Construction Program
 Site Evaluation, Access Road Construction/Re-build & Site Preparation – Phase 2
o As a component of mobilization, Sunrise will deploy a site evaluation team to develop best solutions & best management
practices approach(es) for the prospective sites & to vet prospective local suppliers, vendors & subcontractors in order to
establish reliable supply chains & project cost savings.
o Site Survey: SSI will survey the proposed site, ensuring suitability of the land, and identifying the actual camp configuration.
This will then be diagramed into industry acceptable prints, so all parties associated can collectively review, contribute and
approve, again a systematic and uniformed approach, which will enable SSI to identify a viable material list, ensuring
accountability of material cost.
o Sunrise will develop & execute all necessary steps to construct/improve roads into each project site.
o Sunrise will perform necessary excavation, fill & grading, etc., to prepare each site for installation of the Complex.
o Procurement: All vendors will be vetted and be held accountability to DFAR’s and FAR regulations, ensuring that materials
meet Western / European construction standards. Procurement officers will provide verification and record applicable
documentation for auditing.
o Sunrise Solutions and our Affiliates are capable to perform many primary functions of the identified projects.
o We will integrate local vendors, subcontractors, suppliers & resources wherever possible in order to keep costs down while
maintaining compliance with Program QA/QC and Health, Safety & Environmental requirements.
PHASE 2 – Site Evaluation, Access & PrepInitial Construction Program
PROGRAM SITE EVALUATION, ACCESS & PREPARATION DELIVERABLES INCLUDE:
 Manufacture of Pre-Engineered & Rapidly Deployable Modular Structures – Hard &/or Soft Wall Systems
 Manufacture of Modular and Expandable Water Management Systems
o Potable Water Systems
o Wastewater Treatment & Effluent Disposal Systems (including containerized & larger package plants)
 Installation of Site Infrastructure Components in Compliance with Program Design Designations
o When both Client design and cost objectives are met with our proprietary products we will manufacture, deliver and install
them. In the event our own systems are not best suited for some or all of a specific project, Sunrise Solutions is prepared to
design, incorporate and install alternative systems in order to accomplish the Owner’s total best value of cost & facilities
systems.
PHASE 3 – Complex Design & BuildConstruction Program
 Design, Manufacture & Acquisition of all Facilities Complex structures & support materials.
o Role of Construction Team in the Design stage: Members of the Construction Team - the Project Site Manager,
Construction Managers, Quality Control Manager, SHE Manager, and principle subcontractors – are integrated into the
design effort. Their comments will be incorporated into the design prior to being submitted to the customer. Our Project
Site Manager/DB Manager, is responsible for this horizontal integration.
o The Design QC Manager holds primary responsibility for ensuring all customer and user review comments are captured and
incorporated into the design.
o The Sunrise Team will participate in Pre-work site visits and conferences, Design Charrette, and Design Review conferences.
o The Pre-Work conference will include key Using Agency points of contact as appropriate to participate in pre-design
discussion items.
o In the Design Charrette process, the Sunrise Team will conduct extensive interviews and problem solving discussions with
the individual users, base personnel, and customer representatives. This information will be documented and used by the
Design Team to review user options and discuss user needs, and finalize the design. Upon notification, our Design Build/Site
Project Manager will notify key project staff including the Construction Managers, Quality Control, Procurement and the
Design Team.
o Our Construction personnel work closely with the Design Team to identify cost and schedule drivers, especially “long lead
items” and to seek ways to streamline construction and efficiently manage our labor resources. Sunrise will implement an
optimized design which will result in a streamlined and shortened design period.
o The Design Project Manager, will coordinate, lead, and manage the complete design effort. He will provide instant access
throughout the design process for the Owner and the installation. He will lead all telephone conference meetings and face-
to-face meetings during the design phase when the scope and design are being discussed.
o The DPM will coordinate the appropriate discipline leads to address issues associated with the specific disciplines. These
leaders will attend our periodic reviews, as required to receive comments and articulate design thought.
o The Project Office and facility personnel will participate in regular, scheduled design review meetings to assure design
compliance and installation requirements are incorporated into the final design.
PHASE 3 – Complex Design & BuildConstruction Program
 Construction / Installation of all Facilities Complex structures, infrastructure & support materials
o Sunrise Solutions is ideally suited to perform the Project as our past performance demonstrates. We maintain a database
of skilled professionals available to ensure success. We are confident we can fulfill the requirements of this contract with
the highest quality personnel due to our proven ability to protect & empower our people for their Program role(s).
o Sunrise Solutions will mobilize selected team members and deploy to the Project Site as required. We will ensure our
personnel meet the following critical criteria:
 All required security and background checks are complete and acceptable.
 All personnel are medically and physically fit and have received all required vaccinations.
 All personnel have all necessary passports, visa, entry permits, and other documents required for contractor
personnel to enter and exit the foreign country, including those required for in-transit countries.
 All personnel have received personal security training.
 All personnel have received isolated personnel training.
 All personnel are registered with the U.S. Embassy.
o Sunrise will administer the day-to-day project management of the construction phase. These personnel will meet all the
requirements of the SOW.
o All personnel have extensive military and professional experience to perform the Project. They are experienced in
construction, ongoing life support and O&M services as well as project management to ensure Program timelines are met.
o Sunrise Solutions personnel will exceed the requirements of the SOW and the expectations of the Owner.
o Following is a sample Construction Phase Organization Chart which demonstrate our Project Management Approach.
PHASE 3 – Complex Design & Build Construction Program
Sample Construction Phase Organization Chart
OPERATIONS,
MANAGEMENT
& MAINTENANCE
SERVICES
Environmental
Quality Control
Quality Assurance
PHASE 4 – Operations & MaintenanceLife Support, Facilities Mgmt, Operations & Maintenance Program
 Operations & Maintenance Program Overview
o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for ongoing operations,
maintenance and administration of the Complex and Owner required deliverables. Our services include: Complex
Administration & Occupant Support, Facilities Maintenance, Utilities Supply (fuel, water, etc.), Waste Management
(handling & disposal of solid waste & wastewater, etc.), Cleaning & Housekeeping, Food service, Medical Clinic Staffing and
Owner Support Services.
o Facilities & Equipment Maintenance Services Will Include:
 Generator & electrical distribution equipment
 Fitness & Recreation facilities
 Water purification equipment / systems
 Communications systems – CCTV, WiFi / Ethernet, Voice & Data, etc.
 Wastewater treatment systems
o Complex Operations Support Services Will Include:
 Administration services, i.e., registration, check-in, check-out, badging, camp reports
 Food Preparation & Serving – Based on Owner approved menu program
 Janitorial services – Grounds-keeping & cleaning, etc.
 Housekeeping services – Cleaning & Sanitation, Re-stocking consumables, etc.
 Laundry services – Clean & fold worker clothing, linens & bedding, and/or Camp occupant self-serve facilities.
 Ablution (shower & toilet) facilities support – Soaps, detergents, supplies, etc.
PHASE 4 – Operations & MaintenanceLife Support, Facilities Mgmt, Operations & Maintenance Program
 Operations & Maintenance Program – Food Services Overview
o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for ongoing
operations, maintenance and administration of the Complex and Owner required deliverables.
o Sunrise Solutions provides healthy and consistent menu programs to suit any dietary requirement. Our services
feature culturally preferred meals and offer a variety of dishes and flavors to suit virtually any palate. Our meal
services also include a balanced diet of proteins, starches, dairy, fruits, vegetables and breads, all prepared to HAACP
standards.
o We are happy to customize the menu to suit Client requests and consistently offer Camp occupants outstanding,
healthy and flavorful foods meeting all local health codes & regulations.
o Our food services include a full-service kitchen providing 3 hot meals per day. Boxed/prepared lunches are also
available for occupants who are not in the camp during lunch hours.
o Each facility is operated in accordance with (IAW) USDA Food Codes. We provide and post a 14-day rotational menu.
A sample of this menu will be provided and may be adjusted to accommodate specific requests. A salad bar is
provided for all lunch & dinner menus.
o The food service program is overseen by trained chefs and food service supervisory personnel.
o All associated equipment to operate the kitchen and dining facility are provided.
o Equipment includes; refrigerated and dry storage, washing and preparation areas, baking areas and serving areas.
o Dining Facilities are also provided with hand washing stations, tables & chairs, doors, lights, fire prevention devices,
and climate controls. The flooring in the kitchen and dining facility meets FDA requirements.
o All associated equipment to operate the kitchen and dining facility are provided, including: place settings, condiments,
and napkins, etc.
o Kitchen & Dining Facilities are available for meetings during non-operational periods.
o 24-hour beverage service (coffee, juice, etc.), may also be provided, if requested.
o Both kitchen & dining facilities include hand washing stations & are stocked with soap and paper towels.
o Kitchen and Dining Facilities conform with 29 CFR 1910.6.
HOUSING &
LIFE SUPPORT
SOLUTIONS FOR
CONSTRUCTION
WORKER
DEPLOYMENTS

More Related Content

Viewers also liked

VIP Realty - Maximum Exposure Guide
VIP Realty -  Maximum Exposure GuideVIP Realty -  Maximum Exposure Guide
VIP Realty - Maximum Exposure GuideRichard Soto
 
中金关于金融危机的分析
中金关于金融危机的分析中金关于金融危机的分析
中金关于金融危机的分析sqhuang0328
 
Faith The Way To Happiness
Faith The Way To HappinessFaith The Way To Happiness
Faith The Way To HappinessAbdullah Baspren
 
Kasım\' 2010 İnci YAMAN-GENÇLİK KOROSU KONSERİ
Kasım\' 2010 İnci YAMAN-GENÇLİK KOROSU KONSERİKasım\' 2010 İnci YAMAN-GENÇLİK KOROSU KONSERİ
Kasım\' 2010 İnci YAMAN-GENÇLİK KOROSU KONSERİTangül Müdok
 
Wireless openflow with stratosphere experimenter
Wireless openflow with stratosphere experimenterWireless openflow with stratosphere experimenter
Wireless openflow with stratosphere experimenterHiroaki Kawai
 
2012 Rapid Response Roundtable ETA Region 1
2012 Rapid Response Roundtable ETA Region 12012 Rapid Response Roundtable ETA Region 1
2012 Rapid Response Roundtable ETA Region 1Timothy Theberge
 
Work personality
Work personalityWork personality
Work personalitysmoser3039
 
Kasim'2010 gençlik korosu
Kasim'2010 gençlik korosuKasim'2010 gençlik korosu
Kasim'2010 gençlik korosuTangül Müdok
 
Work Personality
Work PersonalityWork Personality
Work Personalitysmoser3039
 
Sneeuwklassen Terugkomdag Deel 2
Sneeuwklassen Terugkomdag Deel 2Sneeuwklassen Terugkomdag Deel 2
Sneeuwklassen Terugkomdag Deel 2sint.al.jo
 
WIA Bootcamp - Governance - Boards Only
WIA Bootcamp - Governance - Boards OnlyWIA Bootcamp - Governance - Boards Only
WIA Bootcamp - Governance - Boards OnlyTimothy Theberge
 
212bis.Ladivinacomediaparte3elparaiso.
212bis.Ladivinacomediaparte3elparaiso.212bis.Ladivinacomediaparte3elparaiso.
212bis.Ladivinacomediaparte3elparaiso.Gustavo Ramirez
 
3. Course Design Overview: The Big Picture
3. Course Design Overview: The Big Picture3. Course Design Overview: The Big Picture
3. Course Design Overview: The Big PictureISEAL Alliance
 
8. Evaluation of Student Performance
8. Evaluation of Student Performance8. Evaluation of Student Performance
8. Evaluation of Student PerformanceISEAL Alliance
 
Ijigsp v6-n2-6
Ijigsp v6-n2-6Ijigsp v6-n2-6
Ijigsp v6-n2-6Anita Pal
 
Dette Er Muhammad _ NORWEGIAN
Dette Er  Muhammad _ NORWEGIANDette Er  Muhammad _ NORWEGIAN
Dette Er Muhammad _ NORWEGIANAbdullah Baspren
 
100324 Jaw A Mx Tek Overview [1.0]
100324 Jaw   A Mx Tek Overview [1.0]100324 Jaw   A Mx Tek Overview [1.0]
100324 Jaw A Mx Tek Overview [1.0]Jim Walls
 

Viewers also liked (20)

VIP Realty - Maximum Exposure Guide
VIP Realty -  Maximum Exposure GuideVIP Realty -  Maximum Exposure Guide
VIP Realty - Maximum Exposure Guide
 
中金关于金融危机的分析
中金关于金融危机的分析中金关于金融危机的分析
中金关于金融危机的分析
 
Faith The Way To Happiness
Faith The Way To HappinessFaith The Way To Happiness
Faith The Way To Happiness
 
26us
26us26us
26us
 
Kasım\' 2010 İnci YAMAN-GENÇLİK KOROSU KONSERİ
Kasım\' 2010 İnci YAMAN-GENÇLİK KOROSU KONSERİKasım\' 2010 İnci YAMAN-GENÇLİK KOROSU KONSERİ
Kasım\' 2010 İnci YAMAN-GENÇLİK KOROSU KONSERİ
 
Wireless openflow with stratosphere experimenter
Wireless openflow with stratosphere experimenterWireless openflow with stratosphere experimenter
Wireless openflow with stratosphere experimenter
 
2012 Rapid Response Roundtable ETA Region 1
2012 Rapid Response Roundtable ETA Region 12012 Rapid Response Roundtable ETA Region 1
2012 Rapid Response Roundtable ETA Region 1
 
Work personality
Work personalityWork personality
Work personality
 
Kasim'2010 gençlik korosu
Kasim'2010 gençlik korosuKasim'2010 gençlik korosu
Kasim'2010 gençlik korosu
 
Work Personality
Work PersonalityWork Personality
Work Personality
 
Sneeuwklassen Terugkomdag Deel 2
Sneeuwklassen Terugkomdag Deel 2Sneeuwklassen Terugkomdag Deel 2
Sneeuwklassen Terugkomdag Deel 2
 
Islam Denounces Terrorism
Islam Denounces TerrorismIslam Denounces Terrorism
Islam Denounces Terrorism
 
CSC Leasing
CSC LeasingCSC Leasing
CSC Leasing
 
WIA Bootcamp - Governance - Boards Only
WIA Bootcamp - Governance - Boards OnlyWIA Bootcamp - Governance - Boards Only
WIA Bootcamp - Governance - Boards Only
 
212bis.Ladivinacomediaparte3elparaiso.
212bis.Ladivinacomediaparte3elparaiso.212bis.Ladivinacomediaparte3elparaiso.
212bis.Ladivinacomediaparte3elparaiso.
 
3. Course Design Overview: The Big Picture
3. Course Design Overview: The Big Picture3. Course Design Overview: The Big Picture
3. Course Design Overview: The Big Picture
 
8. Evaluation of Student Performance
8. Evaluation of Student Performance8. Evaluation of Student Performance
8. Evaluation of Student Performance
 
Ijigsp v6-n2-6
Ijigsp v6-n2-6Ijigsp v6-n2-6
Ijigsp v6-n2-6
 
Dette Er Muhammad _ NORWEGIAN
Dette Er  Muhammad _ NORWEGIANDette Er  Muhammad _ NORWEGIAN
Dette Er Muhammad _ NORWEGIAN
 
100324 Jaw A Mx Tek Overview [1.0]
100324 Jaw   A Mx Tek Overview [1.0]100324 Jaw   A Mx Tek Overview [1.0]
100324 Jaw A Mx Tek Overview [1.0]
 

Similar to Sunrise Solutions, Inc. Housing for Construction

Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resumeZade Couch
 
Resume David Young
Resume David YoungResume David Young
Resume David YoungDavid Young
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)Pinky Chan
 
Stonehaven Energy Resources
Stonehaven Energy ResourcesStonehaven Energy Resources
Stonehaven Energy Resourcesdsangster
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1JamesMoy7
 
Project PlanGroup 2The Data Center Project PlanProj.docx
Project PlanGroup 2The Data Center Project PlanProj.docxProject PlanGroup 2The Data Center Project PlanProj.docx
Project PlanGroup 2The Data Center Project PlanProj.docxbriancrawford30935
 
Thomas Murphy Resume - Clearance
Thomas Murphy Resume - ClearanceThomas Murphy Resume - Clearance
Thomas Murphy Resume - ClearanceThomas Murphy
 
PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)Terry Dixon
 
Ektron Synergy 2014 - Jazzing Up our Intranet with Ektron
Ektron Synergy 2014 - Jazzing Up our Intranet with EktronEktron Synergy 2014 - Jazzing Up our Intranet with Ektron
Ektron Synergy 2014 - Jazzing Up our Intranet with EktronEktron
 
CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10Jackie Ha
 
Valerie Craig CV Nov 2014
Valerie Craig CV Nov 2014Valerie Craig CV Nov 2014
Valerie Craig CV Nov 2014Valerie Craig
 

Similar to Sunrise Solutions, Inc. Housing for Construction (20)

new resume
new resumenew resume
new resume
 
Resume Ricardo Schiesser
Resume Ricardo SchiesserResume Ricardo Schiesser
Resume Ricardo Schiesser
 
Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resume
 
Shanmuganathan
ShanmuganathanShanmuganathan
Shanmuganathan
 
Mc PM Resume
Mc PM ResumeMc PM Resume
Mc PM Resume
 
Resume David Young
Resume David YoungResume David Young
Resume David Young
 
Fred_Resume Jun 2015
Fred_Resume Jun 2015Fred_Resume Jun 2015
Fred_Resume Jun 2015
 
William masson 2016-cv_a
William masson 2016-cv_aWilliam masson 2016-cv_a
William masson 2016-cv_a
 
Frank resume 11112015
Frank resume 11112015Frank resume 11112015
Frank resume 11112015
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Stonehaven Energy Resources
Stonehaven Energy ResourcesStonehaven Energy Resources
Stonehaven Energy Resources
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
Project PlanGroup 2The Data Center Project PlanProj.docx
Project PlanGroup 2The Data Center Project PlanProj.docxProject PlanGroup 2The Data Center Project PlanProj.docx
Project PlanGroup 2The Data Center Project PlanProj.docx
 
Dell
DellDell
Dell
 
Thomas Murphy Resume - Clearance
Thomas Murphy Resume - ClearanceThomas Murphy Resume - Clearance
Thomas Murphy Resume - Clearance
 
PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)
 
Ektron Synergy 2014 - Jazzing Up our Intranet with Ektron
Ektron Synergy 2014 - Jazzing Up our Intranet with EktronEktron Synergy 2014 - Jazzing Up our Intranet with Ektron
Ektron Synergy 2014 - Jazzing Up our Intranet with Ektron
 
CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10
 
Valerie Craig CV Nov 2014
Valerie Craig CV Nov 2014Valerie Craig CV Nov 2014
Valerie Craig CV Nov 2014
 

More from Jeff Pollard

FiltroGlobal LLC and Royal Dahlman FCCU filtration expertise
FiltroGlobal LLC and Royal Dahlman FCCU filtration expertiseFiltroGlobal LLC and Royal Dahlman FCCU filtration expertise
FiltroGlobal LLC and Royal Dahlman FCCU filtration expertiseJeff Pollard
 
Systecon overview2
Systecon overview2Systecon overview2
Systecon overview2Jeff Pollard
 
FILTROGLOBAL AND ROYAL DAHLMAN FILTER TECHNOLOGY
FILTROGLOBAL AND ROYAL DAHLMAN FILTER TECHNOLOGYFILTROGLOBAL AND ROYAL DAHLMAN FILTER TECHNOLOGY
FILTROGLOBAL AND ROYAL DAHLMAN FILTER TECHNOLOGYJeff Pollard
 
How to Keep Workers Happy on Your Toughest Jobsite
How to Keep Workers Happy on Your Toughest JobsiteHow to Keep Workers Happy on Your Toughest Jobsite
How to Keep Workers Happy on Your Toughest JobsiteJeff Pollard
 
Sunrise Solutions Inc.
Sunrise Solutions Inc.Sunrise Solutions Inc.
Sunrise Solutions Inc.Jeff Pollard
 

More from Jeff Pollard (6)

FiltroGlobal LLC and Royal Dahlman FCCU filtration expertise
FiltroGlobal LLC and Royal Dahlman FCCU filtration expertiseFiltroGlobal LLC and Royal Dahlman FCCU filtration expertise
FiltroGlobal LLC and Royal Dahlman FCCU filtration expertise
 
Systecon overview2
Systecon overview2Systecon overview2
Systecon overview2
 
Dahlman portfolio
Dahlman portfolioDahlman portfolio
Dahlman portfolio
 
FILTROGLOBAL AND ROYAL DAHLMAN FILTER TECHNOLOGY
FILTROGLOBAL AND ROYAL DAHLMAN FILTER TECHNOLOGYFILTROGLOBAL AND ROYAL DAHLMAN FILTER TECHNOLOGY
FILTROGLOBAL AND ROYAL DAHLMAN FILTER TECHNOLOGY
 
How to Keep Workers Happy on Your Toughest Jobsite
How to Keep Workers Happy on Your Toughest JobsiteHow to Keep Workers Happy on Your Toughest Jobsite
How to Keep Workers Happy on Your Toughest Jobsite
 
Sunrise Solutions Inc.
Sunrise Solutions Inc.Sunrise Solutions Inc.
Sunrise Solutions Inc.
 

Recently uploaded

💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋Sheetaleventcompany
 
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝thapagita
 
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579diyaspanoida
 
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...aakahthapa70
 
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 60009891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000teencall080
 
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaCall Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaDelhi Escorts Service
 
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...aakahthapa70
 
Call Girls | 😏💦 03274100048 | Call Girls Near Me
Call Girls | 😏💦 03274100048 | Call Girls Near MeCall Girls | 😏💦 03274100048 | Call Girls Near Me
Call Girls | 😏💦 03274100048 | Call Girls Near MeIfra Zohaib
 
KAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CKAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CNiteshKumar82226
 
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579diyaspanoida
 
Call Girl Rohini ❤️7065000506 Pooja@ Rohini Call Girls Near Me ❤️♀️@ Sexy Cal...
Call Girl Rohini ❤️7065000506 Pooja@ Rohini Call Girls Near Me ❤️♀️@ Sexy Cal...Call Girl Rohini ❤️7065000506 Pooja@ Rohini Call Girls Near Me ❤️♀️@ Sexy Cal...
Call Girl Rohini ❤️7065000506 Pooja@ Rohini Call Girls Near Me ❤️♀️@ Sexy Cal...Sheetaleventcompany
 
+91-9310611641 Russian Call Girls In New Delhi Independent Russian Call Girls...
+91-9310611641 Russian Call Girls In New Delhi Independent Russian Call Girls...+91-9310611641 Russian Call Girls In New Delhi Independent Russian Call Girls...
+91-9310611641 Russian Call Girls In New Delhi Independent Russian Call Girls...teencall080
 
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...Goa Call Girls Service Goa escort agency
 
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...riyasharma00119
 
Call Girls In Naraina (Delhi) +91-9667422720 Escorts Service
Call Girls In Naraina (Delhi) +91-9667422720 Escorts ServiceCall Girls In Naraina (Delhi) +91-9667422720 Escorts Service
Call Girls In Naraina (Delhi) +91-9667422720 Escorts ServiceLipikasharma29
 
Best VIP Call Girls Noida Sector 23 Call Me: 8700611579
Best VIP Call Girls Noida Sector 23 Call Me: 8700611579Best VIP Call Girls Noida Sector 23 Call Me: 8700611579
Best VIP Call Girls Noida Sector 23 Call Me: 8700611579diyaspanoida
 
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝thapagita
 
JABALPUR CALL GIRL 92628/71154 JABALPUR K
JABALPUR CALL GIRL 92628/71154 JABALPUR KJABALPUR CALL GIRL 92628/71154 JABALPUR K
JABALPUR CALL GIRL 92628/71154 JABALPUR KNiteshKumar82226
 
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Availablenitugupta1209
 

Recently uploaded (20)

💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
 
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
 
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
Best VIP Call Girls Noida Sector 24 Call Me: 8700611579
 
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
 
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 60009891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
9891550660 Call Girls In Noida Sector 62 Short 1500 Night 6000
 
Goa Call Girls 🥰 +91 9540619990 📍Service Girls In Goa
Goa Call Girls 🥰 +91 9540619990 📍Service Girls In GoaGoa Call Girls 🥰 +91 9540619990 📍Service Girls In Goa
Goa Call Girls 🥰 +91 9540619990 📍Service Girls In Goa
 
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaCall Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
 
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
Call Girls In {Laxmi Nagar Delhi} 9667938988 Indian Russian High Profile Girl...
 
Call Girls | 😏💦 03274100048 | Call Girls Near Me
Call Girls | 😏💦 03274100048 | Call Girls Near MeCall Girls | 😏💦 03274100048 | Call Girls Near Me
Call Girls | 😏💦 03274100048 | Call Girls Near Me
 
KAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CKAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA C
 
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
 
Call Girl Rohini ❤️7065000506 Pooja@ Rohini Call Girls Near Me ❤️♀️@ Sexy Cal...
Call Girl Rohini ❤️7065000506 Pooja@ Rohini Call Girls Near Me ❤️♀️@ Sexy Cal...Call Girl Rohini ❤️7065000506 Pooja@ Rohini Call Girls Near Me ❤️♀️@ Sexy Cal...
Call Girl Rohini ❤️7065000506 Pooja@ Rohini Call Girls Near Me ❤️♀️@ Sexy Cal...
 
+91-9310611641 Russian Call Girls In New Delhi Independent Russian Call Girls...
+91-9310611641 Russian Call Girls In New Delhi Independent Russian Call Girls...+91-9310611641 Russian Call Girls In New Delhi Independent Russian Call Girls...
+91-9310611641 Russian Call Girls In New Delhi Independent Russian Call Girls...
 
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
 
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
 
Call Girls In Naraina (Delhi) +91-9667422720 Escorts Service
Call Girls In Naraina (Delhi) +91-9667422720 Escorts ServiceCall Girls In Naraina (Delhi) +91-9667422720 Escorts Service
Call Girls In Naraina (Delhi) +91-9667422720 Escorts Service
 
Best VIP Call Girls Noida Sector 23 Call Me: 8700611579
Best VIP Call Girls Noida Sector 23 Call Me: 8700611579Best VIP Call Girls Noida Sector 23 Call Me: 8700611579
Best VIP Call Girls Noida Sector 23 Call Me: 8700611579
 
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
 
JABALPUR CALL GIRL 92628/71154 JABALPUR K
JABALPUR CALL GIRL 92628/71154 JABALPUR KJABALPUR CALL GIRL 92628/71154 JABALPUR K
JABALPUR CALL GIRL 92628/71154 JABALPUR K
 
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
 

Sunrise Solutions, Inc. Housing for Construction

  • 1. SUNRISE SOLUTIONS Relocatable Housing Solutions for Construction Worker Deployments SCALABLE RELOCATABLE TRANSPORTABLE COMFORTABLE 1521 Azalea Road, AL 36693 USA • 251.660.8582 • www.SunriseSolutions.org • pdwils.01@gmail.com
  • 2. SUNRISE SOLUTIONS Base Operations and Life Support • Facilities Mfg & Installation • Site Prep & Infrastructure Power Generation • Information Technology Systems • Operations and Maintenance • Mo Flat-Pack Modules Housing Units Kosovo Camp Project Sumter Regional Hospital Past Sunrise Projects
  • 4. SELECTED PRIOR SUNRISE GROUP O ECTS USA IRAQ KOSOVO & BOSNIA OTHER U.S. OP’S  FEMA – Hurricanes Katrina & Rita Seven (7) First Responder Support Camps – 9000 PAX  FEMA – Hurricane Ike Two (2) First Responder Support Camps – 2500 PAX  FEMA – North Dakota Floods First Responder Support Camp – 500 PAX  FEMA – Hurricane Katrina Hospital Staff Modular Housing Units – 100 PAX  FEMA – Hurricane Sandy Four (4) First Responder Support Camps – 8000 PAX  Nasiriya – Int’l Military Coalition Mission Support Facilities – 4600 PAX  Basra – ENI Contingency Operating Base Const’n Workers Camp – 100 PAX  Baghdad Airport Airfield – Iraqi Intelligence Agency Mission Support Camp – 500 PAX  Adnan Palace & Ext’n Site – Turn-Key Mission Support Camps – 2000 PAX  Basra & Tallil – Int’l Military Coalition Mission Support Camps – 1000 PAX  Belo Poljie (Kosovo) – Italian + NATO Military Operations Camp (NATO Maint & Supply Agency [NAMSA]) – 3000 PAX camp with expansion to 5000 PAX during 2 year facilities program. All life support facilities design, mfr, installation and camp operations & maintenance services provided.  Bosnia – NAMSA Three (3) Peace-keeping operations camps, including: Design, Build, O&M Mgmt Services – 2000 PAX  DHS / USACE – Temporary Housing Sites Infastructure – Wastewater Treatment Systems Design & Install  FEMA – Temporary Housing Sites Modular Units Deployment and Installation  Sumter Regional Hospital Authority – Fast-track design build of 75,000 sf, 77-Bed, Full-service hospital, including: OR, ER, ICU, Trauma, MRI, Pre-Op, Recovery, Exam, Dialysis, Rehab, Lab, Central sterile, etc.
  • 5. SELECTED PRIOR SUNRISE GROUP O ECTS Workers Camp Kitchen Deployable Ablution Units Sumter Regional Hospital FEMA First Responders Support Camp Flat-Pack CHU Modules Set-Up Workers Camp Dining Facility First Responder Camp D’Fac CHU’s w/ Transportable Utilities Mgmt Sys
  • 6. SUNRISE SOLUTIONS, INC. • Sunrise provides complete projects for all of your housing needs, from design through procurement, manufacture, logistics, site preparation, engineering, construction and operations. • Sunrise has worked in some of the most challenging countries and environments in the world, working for the US military, as well as, oil and gas companies and major engineering and construction companies. • Sunrise has experience in Latin America and ready to support HIA’s needs for portable housing in South America and anywhere in the world.
  • 7. RELOCATABLE WORK FORCE HOUSING PROGRAM • Sunrise will design & build each relocatable housing complex on the Owner provided site. • Sunrise will evaluate & prepare prospective sites and intermodal truck access to include consideration for design / build of access roads and camp structures. • Sunrise will incorporate all Owner directed structures & support services as needed, including: Perimeter & Access Control, Accommodations, Admin/Operations Ctr, Armory & Munitions Storage, Kitchen / Dining Facility, Medical Clinic, Ablutions, Laundry, Recreation Ctr, Power Gen & Dist’n, Potable Water Provision & Distribution, Wastewater Mgmt & Treatment, Fuel Storage and Maint. & Workshop Fac’s. • Sunrise will provide full on-going Camp Operations & Maintenance services.
  • 9. IF YOU BUILD IT, THEY WILL COME!Movie: “Field of Dreams”  Program Kick-Off and Mobilization (Equipment & Logistics Plan) – Phase 1 o Sunrise will work with the Owner/Prime Contractor to determine the complete scopes of supply, scheduling and program execution parameters – Soft to Hard &/or Soft/Hard Hybrid Complex. o Mobilization includes deployment of project executives, managers, supervisors & equipment.  Site Evaluation, Access Road Construction/Re-build & Site Preparation – Phase 2 o As a component of mobilization, Sunrise will deploy a site evaluation team to develop best solutions & best management practices approach(es) for the prospective sites & to vet prospective local suppliers, vendors & subcontractors in order to establish reliable supply chains & project cost savings. o Sunrise will develop & execute all necessary steps to construct/improve roads into each project site and perform necessary excavation, fill & grading, etc., to prepare each site for installation of the Complex.  Complex Design & Build – Phase 3 o Design, Manufacture & Acquisition of all Facilities Complex structures & support materials. o Construction / Installation of all Facilities Complex structures, infrastructure & support materials.  Operations & Maintenance Program – Phase 4 o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for ongoing operations, maintenance and administration of the Complex and Owner required deliverables.
  • 10. DESIGN, DEPLOY, BUILD & OPERATEPhased Program Approach Phase 1 Phase 2 Phase 3 Phase 4 Relocation Notification to Proceed - Begin Mobilization Mobilization Ends Construction Begins Construction of Staff Camp Construction Phase Begins Turnover Phase Begins Operational Phase Begins Demobilization & Relocation Program Staff Arrives Set Up DFAC Receive Deliveries Menus Approved Prep all areas for Phase 4 Food & Life Support Services and Complex O&M Demobilization, Relocation Completed, O&M Restored at New Site
  • 11. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics  Program Kick-Off and Mobilization (Equipment & Logistics Plan) – Phase 1 o Sunrise will work with the Owner/Prime Contractor to determine the complete scopes of supply, scheduling and program execution parameters – Soft to Hard Structures &/or Soft/Hard Hybrid Complex determinations.  Design & Engineering Plan o The Design Team will support the project from their home office & field sites incorporating our facilities in the U.S., Italy, Switzerland and UAE. SSI and our Team Members have adequate design, engineering and support staff in our combined operations offices to support the project. o The Design Project Manager will coordinate and lead the Design Team effort, providing management, oversight, and direction of the complete design. Upon notification of the award, we will finalize the engineering, architectural, and design needs and identify and mobilize design team personnel that have already been identified to match their skills, capabilities, experience, and availability with the requirements. o The Design Project Manager (DPM) will coordinate all technical resources used to develop the design including Sunrise Solutions key subcontractor personnel assigned to support the design. This integration will insure that our construction approach, techniques and experience are incorporated throughout the design process and not only for our internal bidding, construction, operation and environmental practices functions. All design resources will report to the DPM.  Mobilization Plan o Mobilization includes deployment of: Project executives, Managers, Supervisors & Equipment (construction & facilities).  Logistics Program o Our Logistics Plan ensures timely and value added acquisition, transportation, country clearance, and delivery of materials required for the Project. One of the most important functions for program success, the logistics effort starts with the contract award to Sunrise Solutions and terminates after the handover of the completed project to the client. o The logistics manager, in Phase 2 (Construction) evaluates the scope of work with the project engineer to identify logistics requirements and in Phase 4 the operation and maintenance phase the logistics manager evaluates the scope of work with the camp manager to identify logistics requirements. Subsequent logistics analysis identifies the most efficient means to deliver goods and materials to meet the mission milestones time line.
  • 12. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics  Site Plan Approach o As a component of a design charrette program to determine final project scopes of supply & program execution protocols, we will develop solutions specific site plan(s). o We will develop the best, most cost-effective solution approach for each Complex to include considerations for:  Site Prep & Complex Installation Workers temporary Fly camp  Complex facilities including all ‘Hard wall’ structures as necessary to meet the Program’s accommodations & life support requirements.  Consideration for integrating ‘Soft wall’ structures as appropriate to meet the Program’s accommodations & life support requirements. It may be most cost-effective to deliver a mobile kitchen (including all food storage [dry, refrigerated, frozen, etc.], preparation & storage equipment and soft-wall mobile dining structure.  Many support structures such as: Dining, Laundry & Recreation, etc., could utilize soft membrane structures which are designed, delivered & erected so as to reduce total facilities & operating costs. Such structures may be utilized as a ‘Fly Camp’ to support the Site Preparation & Complex Construction Phase o Because our modular units & support structures are scalable, we can develop a plan for expansion readiness. o Following are several typical Construction Workers Camp Complex Site Plans for initial consideration.
  • 13. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics  Sample Facilities / Structures o As a component of a design charrette program we will develop function-specific structures to include:  Accommodation Units – VIP (Single Occupant Units) & Worker (2-Person Units)  Kitchen – Food storage, Meals preparation, Clean-up & Consumables storage space & equipment  Laundry – Options may include: Clean & Fold Services and/or Self-Serve Facilities  Medical Care – Complexes can be designed / built to offer care ranging from: First Aid to Triage Care, depending on Owner designations  Recreation Facilities – May be fitted with exercise equipment, relaxation areas (game tables, TV/Movie viewing, etc.)  Administrative Support Areas – Owner offices, Complex operations offices, Occupant services, etc.  Maintenance, Op’s & Security Personnel Support Areas – Supplies storage, Equipment shelters, Armory & Munitions, Guard stations, Access Control Points, etc.  Communications Support Facilities – Telecommunications, CCTV, WiFi, etc. o Sample floor plans of Modular Complex Structures are provided on the following pages.  Equipment List o A list of equipment anticipated to prepare the site & install the facilities follows the Sample Structures Floor Plans. o Equipment will be mobilized for specific construction tasks. When the task is completed, the equipment will be demobilized. When the schedule dictates that a specific piece or group of equipment be held on site until it is needed for another task, a cost analysis will be performed and provided to the Client / Owner.
  • 14. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics Sample VIP (Single Occupant) Accommodation Modules Sample Worker (Double Occupant) Accommodation Modules
  • 15. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics Sample Kitchen & Dining Facilities Modular Structure – Designed for 100 PAX Complex, Expandable for 200 PAX
  • 16. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics Sample Modular Laundry Facilities Sample Medical Care Modular Facilities
  • 17. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics Sample Recreation Facilities Structure
  • 18. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics Sample Modular Administrative Support Facilities Structures
  • 19. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics Sample Modular Storage & Support Facilities Sample Modular Guard / ECP Bldg Armory – Weapons Storage Unit May be Divided/Furnished As Nec’y Ammunition Storage Unit May be Divided/Furnished As Necessary
  • 20. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics Logistics Plan Flow Chart
  • 21. PHASE 1 – Program Kick-Off & MobilizationDesign Charrette & Logistics Sample Camp Complex Program Deliverables List
  • 22. PHASE 2 – Site Evaluation, Access & PrepInitial Construction Program  Site Evaluation, Access Road Construction/Re-build & Site Preparation – Phase 2 o As a component of mobilization, Sunrise will deploy a site evaluation team to develop best solutions & best management practices approach(es) for the prospective sites & to vet prospective local suppliers, vendors & subcontractors in order to establish reliable supply chains & project cost savings. o Site Survey: SSI will survey the proposed site, ensuring suitability of the land, and identifying the actual camp configuration. This will then be diagramed into industry acceptable prints, so all parties associated can collectively review, contribute and approve, again a systematic and uniformed approach, which will enable SSI to identify a viable material list, ensuring accountability of material cost. o Sunrise will develop & execute all necessary steps to construct/improve roads into each project site. o Sunrise will perform necessary excavation, fill & grading, etc., to prepare each site for installation of the Complex. o Procurement: All vendors will be vetted and be held accountability to DFAR’s and FAR regulations, ensuring that materials meet Western / European construction standards. Procurement officers will provide verification and record applicable documentation for auditing. o Sunrise Solutions and our Affiliates are capable to perform many primary functions of the identified projects. o We will integrate local vendors, subcontractors, suppliers & resources wherever possible in order to keep costs down while maintaining compliance with Program QA/QC and Health, Safety & Environmental requirements.
  • 23. PHASE 2 – Site Evaluation, Access & PrepInitial Construction Program PROGRAM SITE EVALUATION, ACCESS & PREPARATION DELIVERABLES INCLUDE:  Manufacture of Pre-Engineered & Rapidly Deployable Modular Structures – Hard &/or Soft Wall Systems  Manufacture of Modular and Expandable Water Management Systems o Potable Water Systems o Wastewater Treatment & Effluent Disposal Systems (including containerized & larger package plants)  Installation of Site Infrastructure Components in Compliance with Program Design Designations o When both Client design and cost objectives are met with our proprietary products we will manufacture, deliver and install them. In the event our own systems are not best suited for some or all of a specific project, Sunrise Solutions is prepared to design, incorporate and install alternative systems in order to accomplish the Owner’s total best value of cost & facilities systems.
  • 24. PHASE 3 – Complex Design & BuildConstruction Program  Design, Manufacture & Acquisition of all Facilities Complex structures & support materials. o Role of Construction Team in the Design stage: Members of the Construction Team - the Project Site Manager, Construction Managers, Quality Control Manager, SHE Manager, and principle subcontractors – are integrated into the design effort. Their comments will be incorporated into the design prior to being submitted to the customer. Our Project Site Manager/DB Manager, is responsible for this horizontal integration. o The Design QC Manager holds primary responsibility for ensuring all customer and user review comments are captured and incorporated into the design. o The Sunrise Team will participate in Pre-work site visits and conferences, Design Charrette, and Design Review conferences. o The Pre-Work conference will include key Using Agency points of contact as appropriate to participate in pre-design discussion items. o In the Design Charrette process, the Sunrise Team will conduct extensive interviews and problem solving discussions with the individual users, base personnel, and customer representatives. This information will be documented and used by the Design Team to review user options and discuss user needs, and finalize the design. Upon notification, our Design Build/Site Project Manager will notify key project staff including the Construction Managers, Quality Control, Procurement and the Design Team. o Our Construction personnel work closely with the Design Team to identify cost and schedule drivers, especially “long lead items” and to seek ways to streamline construction and efficiently manage our labor resources. Sunrise will implement an optimized design which will result in a streamlined and shortened design period. o The Design Project Manager, will coordinate, lead, and manage the complete design effort. He will provide instant access throughout the design process for the Owner and the installation. He will lead all telephone conference meetings and face- to-face meetings during the design phase when the scope and design are being discussed. o The DPM will coordinate the appropriate discipline leads to address issues associated with the specific disciplines. These leaders will attend our periodic reviews, as required to receive comments and articulate design thought. o The Project Office and facility personnel will participate in regular, scheduled design review meetings to assure design compliance and installation requirements are incorporated into the final design.
  • 25. PHASE 3 – Complex Design & BuildConstruction Program  Construction / Installation of all Facilities Complex structures, infrastructure & support materials o Sunrise Solutions is ideally suited to perform the Project as our past performance demonstrates. We maintain a database of skilled professionals available to ensure success. We are confident we can fulfill the requirements of this contract with the highest quality personnel due to our proven ability to protect & empower our people for their Program role(s). o Sunrise Solutions will mobilize selected team members and deploy to the Project Site as required. We will ensure our personnel meet the following critical criteria:  All required security and background checks are complete and acceptable.  All personnel are medically and physically fit and have received all required vaccinations.  All personnel have all necessary passports, visa, entry permits, and other documents required for contractor personnel to enter and exit the foreign country, including those required for in-transit countries.  All personnel have received personal security training.  All personnel have received isolated personnel training.  All personnel are registered with the U.S. Embassy. o Sunrise will administer the day-to-day project management of the construction phase. These personnel will meet all the requirements of the SOW. o All personnel have extensive military and professional experience to perform the Project. They are experienced in construction, ongoing life support and O&M services as well as project management to ensure Program timelines are met. o Sunrise Solutions personnel will exceed the requirements of the SOW and the expectations of the Owner. o Following is a sample Construction Phase Organization Chart which demonstrate our Project Management Approach.
  • 26. PHASE 3 – Complex Design & Build Construction Program Sample Construction Phase Organization Chart
  • 28. PHASE 4 – Operations & MaintenanceLife Support, Facilities Mgmt, Operations & Maintenance Program  Operations & Maintenance Program Overview o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for ongoing operations, maintenance and administration of the Complex and Owner required deliverables. Our services include: Complex Administration & Occupant Support, Facilities Maintenance, Utilities Supply (fuel, water, etc.), Waste Management (handling & disposal of solid waste & wastewater, etc.), Cleaning & Housekeeping, Food service, Medical Clinic Staffing and Owner Support Services. o Facilities & Equipment Maintenance Services Will Include:  Generator & electrical distribution equipment  Fitness & Recreation facilities  Water purification equipment / systems  Communications systems – CCTV, WiFi / Ethernet, Voice & Data, etc.  Wastewater treatment systems o Complex Operations Support Services Will Include:  Administration services, i.e., registration, check-in, check-out, badging, camp reports  Food Preparation & Serving – Based on Owner approved menu program  Janitorial services – Grounds-keeping & cleaning, etc.  Housekeeping services – Cleaning & Sanitation, Re-stocking consumables, etc.  Laundry services – Clean & fold worker clothing, linens & bedding, and/or Camp occupant self-serve facilities.  Ablution (shower & toilet) facilities support – Soaps, detergents, supplies, etc.
  • 29. PHASE 4 – Operations & MaintenanceLife Support, Facilities Mgmt, Operations & Maintenance Program  Operations & Maintenance Program – Food Services Overview o Sunrise will deploy &/or hire local support personnel to manage & operate all life support functions for ongoing operations, maintenance and administration of the Complex and Owner required deliverables. o Sunrise Solutions provides healthy and consistent menu programs to suit any dietary requirement. Our services feature culturally preferred meals and offer a variety of dishes and flavors to suit virtually any palate. Our meal services also include a balanced diet of proteins, starches, dairy, fruits, vegetables and breads, all prepared to HAACP standards. o We are happy to customize the menu to suit Client requests and consistently offer Camp occupants outstanding, healthy and flavorful foods meeting all local health codes & regulations. o Our food services include a full-service kitchen providing 3 hot meals per day. Boxed/prepared lunches are also available for occupants who are not in the camp during lunch hours. o Each facility is operated in accordance with (IAW) USDA Food Codes. We provide and post a 14-day rotational menu. A sample of this menu will be provided and may be adjusted to accommodate specific requests. A salad bar is provided for all lunch & dinner menus. o The food service program is overseen by trained chefs and food service supervisory personnel. o All associated equipment to operate the kitchen and dining facility are provided. o Equipment includes; refrigerated and dry storage, washing and preparation areas, baking areas and serving areas. o Dining Facilities are also provided with hand washing stations, tables & chairs, doors, lights, fire prevention devices, and climate controls. The flooring in the kitchen and dining facility meets FDA requirements. o All associated equipment to operate the kitchen and dining facility are provided, including: place settings, condiments, and napkins, etc. o Kitchen & Dining Facilities are available for meetings during non-operational periods. o 24-hour beverage service (coffee, juice, etc.), may also be provided, if requested. o Both kitchen & dining facilities include hand washing stations & are stocked with soap and paper towels. o Kitchen and Dining Facilities conform with 29 CFR 1910.6.
  • 30. HOUSING & LIFE SUPPORT SOLUTIONS FOR CONSTRUCTION WORKER DEPLOYMENTS