Kohinoor group established in 1961.
The founder of kohinoor group is Mr. Manohar Joshi Sir.
The chairman & managing director of kohinoor group is Mr. Unmesh Joshi sir.
Kohinoor group is divided into different sectors.
Such as education, hospitality, healthcare & real estate.
Kohinoor Planet Constructions Private Limited comes under the real estate sector.
Real estate sector is combination of constructions section, regulatory affairs section, & MEP
section.
Kohinoor business has grown into a well-diversified, multi-activity, multi-location group.
The Group believes in growing perpetually by empowering its students, employees,
customers, partners, associates, stakeholders and, most of all, society at large.
Kohinoor’s businesses are purported to fulfill important human needs – education,
comfortable living, gastronomic needs and healthcare.
Main office of kohinoor group is in Dadar .
Project Site name: -kohinoor city phase 2
Address:- kohinoor city, phase 2,kirol road, off LBS marg, Kurla (west).
 developer : kohinoor group
Name of owner:- Mr.unmesh Joshi
Project architect: Shirke& associates.
Structural Consultant : mone& associates
Total Value of Project : 3oo Crores
Total area: 36 Acres (whole kohinoor city)
No of Block : 2blocks contains 12 buildings, each blocks contains 6 buildings.
No of Dwelling Unit: 415
Type of Structure : residential building, 2 basements+ ground floor+10
 Date of Commencement :-30 june2010
 Date of Endup:- 30 march 2018
AGM(constructions):- Mr. Santosh shingare sir
AGM(MEP):-Mr. Shailesh naik sir
Project manager(constructions):- Mr.Anil bhosle sir
Project manager(MEP):-Mr.Sunil mali sir
Building contains:- 2BHK,3BHK,Penthouse,& duplex.
First to seventh floors having 2BHK flats.
Eighth &ninth floor having 3BHK flat+ duplex +refuse area.
Tenth floor having penthouse.
Cost of 2BHK & 3BHK approx. 2crores to 4 crores.
Cost of duplex& penthouse approx. 5crores to 9crores.
Green building concept used in construction. Such as Solar panels, STP Plant etc.
HIGHLIGHTS
OF PROJECT
Chembur
Monorail
station 4.6
KM
PHOENIX
MARKET
CITY 0.6 KM
ASIAN
HEART
INSTITUTE
3.8 KM
INTERNATIO
NAL
AIRPORT 4.3
KM
CLUB HOUSE
• CYCLING
TRACK
• JOGGING
TRACK
SWMMING
POOL
• POWER
BACK UP
• PARK
KIDS PLAY
AREA
• GYM
• SECURITY
Construction Process
Site Clearance &
Positioning
of Central
coordinate
and layout
Excavation
Laying of P.C.C. (Plain Cement Concrete)
Rock Anchoring & Grouting
Box type Shahabad Waterproofing
Raft Foundation
Construction of Footing
Layout of Columns :-
Check the location of columns from
the datum location. If any
deficiency take place within
permissible limits, made
adjustments accordingly, otherwise
reconstruction of column is done.
Filling of Starters :-
Starters makes the actual
positions for const. of column.
made of mortar or lean
concrete. Thickness varies
from 4-6mm. Make the base
to shuttering
Reinforcement of Columns :-
Reinforcement is done as per
given in drawings. Check
should be made to the splice
length. As the lateral ties
spacing varies along the
length of column hence
spacing should be properly
maintained
Shuttering of columns :-
Shuttering is either made of wooden
or steel.(Preferably steel). Verticality
of shuttering could be checked by
using plumb bob and thread. Cover
block must be provided for better
finishing of column
Concreting and curing :-
Casting of column is done by
boom placer. Vibrator should
be used for compaction and
finishing purpose. Shuttering
of column is removed after 3
days. Curing of column ids
made by hanging the gunny
bags or sprinkling the water
at regular interval.
Checking the level of column :-
After the construction of column of
column the level and height is
checked by means of measuring
tape and total station. It gives
actual level of column and floors
construction.
Formwork of beam and slab :-
Formwork of main beam is first
laid on the column, then secondary
beam shuttering is placed. After it,
slab formwork is laid. Shuttering is
supported by tubular scaffolding
which can be adjusted later on
Tower
crane
Concrete
pump
Concrete cutter Needle vibrator
Tilted drum mixer Various tools
Site
safety
Safety
helmets
Eye
protection
Protective
footwear
Ear
defenders
High
visibility
clothing
SUMMER INTERSHIP REPORT
SUMMER INTERSHIP REPORT

More Related Content

Similar to SUMMER INTERSHIP REPORT

Introduction to-site-ici
Introduction to-site-iciIntroduction to-site-ici
Introduction to-site-ici
Chan Yifung
 
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
kellyxc
 
ICI
ICIICI
Ici
IciIci
ICI Proposal
ICI ProposalICI Proposal
ICI Proposal
masonsth
 
Godrej vihaa Badlapur Project Details
Godrej vihaa Badlapur Project Details Godrej vihaa Badlapur Project Details
Godrej vihaa Badlapur Project Details
Anil menon
 
Report on stadium constructio2n
Report on stadium constructio2nReport on stadium constructio2n
Report on stadium constructio2n
LOKESH
 
Svp field training report final
Svp field training report finalSvp field training report final
Svp field training report final
Shubham Parab
 
Ppt on stadium construction
Ppt on stadium constructionPpt on stadium construction
Ppt on stadium construction
LOKESH
 
Suyog Leher Pune
Suyog Leher PuneSuyog Leher Pune
Suyog Leher Pune
CommonFloor.com
 
Newsletter Volume 4_Issue3_July
Newsletter Volume 4_Issue3_JulyNewsletter Volume 4_Issue3_July
Newsletter Volume 4_Issue3_July
Jagadeesh belchada
 
Brigade panorama
Brigade panoramaBrigade panorama
Brigade panorama
Ashish Kesarwani
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
mahmoud909178
 

Similar to SUMMER INTERSHIP REPORT (13)

Introduction to-site-ici
Introduction to-site-iciIntroduction to-site-ici
Introduction to-site-ici
 
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
 
ICI
ICIICI
ICI
 
Ici
IciIci
Ici
 
ICI Proposal
ICI ProposalICI Proposal
ICI Proposal
 
Godrej vihaa Badlapur Project Details
Godrej vihaa Badlapur Project Details Godrej vihaa Badlapur Project Details
Godrej vihaa Badlapur Project Details
 
Report on stadium constructio2n
Report on stadium constructio2nReport on stadium constructio2n
Report on stadium constructio2n
 
Svp field training report final
Svp field training report finalSvp field training report final
Svp field training report final
 
Ppt on stadium construction
Ppt on stadium constructionPpt on stadium construction
Ppt on stadium construction
 
Suyog Leher Pune
Suyog Leher PuneSuyog Leher Pune
Suyog Leher Pune
 
Newsletter Volume 4_Issue3_July
Newsletter Volume 4_Issue3_JulyNewsletter Volume 4_Issue3_July
Newsletter Volume 4_Issue3_July
 
Brigade panorama
Brigade panoramaBrigade panorama
Brigade panorama
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 

More from Aishwarya Phalke

Hydroponic technology
Hydroponic technology Hydroponic technology
Hydroponic technology
Aishwarya Phalke
 
Hdpe geomembrane
Hdpe geomembraneHdpe geomembrane
Hdpe geomembrane
Aishwarya Phalke
 
Introduction to artificial intelligence technique
Introduction to artificial intelligence technique Introduction to artificial intelligence technique
Introduction to artificial intelligence technique
Aishwarya Phalke
 
MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT
MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENTMATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT
MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT
Aishwarya Phalke
 
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERINGELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
Aishwarya Phalke
 
LABOUR LAWS AND FINACIAL ASPECTS
LABOUR LAWS AND FINACIAL ASPECTSLABOUR LAWS AND FINACIAL ASPECTS
LABOUR LAWS AND FINACIAL ASPECTS
Aishwarya Phalke
 
Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement
Aishwarya Phalke
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
Aishwarya Phalke
 

More from Aishwarya Phalke (8)

Hydroponic technology
Hydroponic technology Hydroponic technology
Hydroponic technology
 
Hdpe geomembrane
Hdpe geomembraneHdpe geomembrane
Hdpe geomembrane
 
Introduction to artificial intelligence technique
Introduction to artificial intelligence technique Introduction to artificial intelligence technique
Introduction to artificial intelligence technique
 
MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT
MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENTMATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT
MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT
 
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERINGELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
 
LABOUR LAWS AND FINACIAL ASPECTS
LABOUR LAWS AND FINACIAL ASPECTSLABOUR LAWS AND FINACIAL ASPECTS
LABOUR LAWS AND FINACIAL ASPECTS
 
Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 

Recently uploaded

AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 

Recently uploaded (20)

AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 

SUMMER INTERSHIP REPORT

  • 2. Kohinoor group established in 1961. The founder of kohinoor group is Mr. Manohar Joshi Sir. The chairman & managing director of kohinoor group is Mr. Unmesh Joshi sir. Kohinoor group is divided into different sectors. Such as education, hospitality, healthcare & real estate. Kohinoor Planet Constructions Private Limited comes under the real estate sector. Real estate sector is combination of constructions section, regulatory affairs section, & MEP section. Kohinoor business has grown into a well-diversified, multi-activity, multi-location group. The Group believes in growing perpetually by empowering its students, employees, customers, partners, associates, stakeholders and, most of all, society at large. Kohinoor’s businesses are purported to fulfill important human needs – education, comfortable living, gastronomic needs and healthcare. Main office of kohinoor group is in Dadar .
  • 3. Project Site name: -kohinoor city phase 2 Address:- kohinoor city, phase 2,kirol road, off LBS marg, Kurla (west).  developer : kohinoor group Name of owner:- Mr.unmesh Joshi Project architect: Shirke& associates. Structural Consultant : mone& associates Total Value of Project : 3oo Crores Total area: 36 Acres (whole kohinoor city) No of Block : 2blocks contains 12 buildings, each blocks contains 6 buildings. No of Dwelling Unit: 415 Type of Structure : residential building, 2 basements+ ground floor+10  Date of Commencement :-30 june2010  Date of Endup:- 30 march 2018 AGM(constructions):- Mr. Santosh shingare sir AGM(MEP):-Mr. Shailesh naik sir Project manager(constructions):- Mr.Anil bhosle sir Project manager(MEP):-Mr.Sunil mali sir Building contains:- 2BHK,3BHK,Penthouse,& duplex. First to seventh floors having 2BHK flats. Eighth &ninth floor having 3BHK flat+ duplex +refuse area. Tenth floor having penthouse. Cost of 2BHK & 3BHK approx. 2crores to 4 crores. Cost of duplex& penthouse approx. 5crores to 9crores. Green building concept used in construction. Such as Solar panels, STP Plant etc.
  • 4. HIGHLIGHTS OF PROJECT Chembur Monorail station 4.6 KM PHOENIX MARKET CITY 0.6 KM ASIAN HEART INSTITUTE 3.8 KM INTERNATIO NAL AIRPORT 4.3 KM
  • 5. CLUB HOUSE • CYCLING TRACK • JOGGING TRACK SWMMING POOL • POWER BACK UP • PARK KIDS PLAY AREA • GYM • SECURITY
  • 7. Site Clearance & Positioning of Central coordinate and layout Excavation
  • 8. Laying of P.C.C. (Plain Cement Concrete)
  • 9. Rock Anchoring & Grouting
  • 10. Box type Shahabad Waterproofing
  • 13. Layout of Columns :- Check the location of columns from the datum location. If any deficiency take place within permissible limits, made adjustments accordingly, otherwise reconstruction of column is done. Filling of Starters :- Starters makes the actual positions for const. of column. made of mortar or lean concrete. Thickness varies from 4-6mm. Make the base to shuttering
  • 14. Reinforcement of Columns :- Reinforcement is done as per given in drawings. Check should be made to the splice length. As the lateral ties spacing varies along the length of column hence spacing should be properly maintained Shuttering of columns :- Shuttering is either made of wooden or steel.(Preferably steel). Verticality of shuttering could be checked by using plumb bob and thread. Cover block must be provided for better finishing of column
  • 15. Concreting and curing :- Casting of column is done by boom placer. Vibrator should be used for compaction and finishing purpose. Shuttering of column is removed after 3 days. Curing of column ids made by hanging the gunny bags or sprinkling the water at regular interval. Checking the level of column :- After the construction of column of column the level and height is checked by means of measuring tape and total station. It gives actual level of column and floors construction.
  • 16. Formwork of beam and slab :- Formwork of main beam is first laid on the column, then secondary beam shuttering is placed. After it, slab formwork is laid. Shuttering is supported by tubular scaffolding which can be adjusted later on
  • 18. Concrete cutter Needle vibrator Tilted drum mixer Various tools