This document outlines the duties of a job coordinator which include issuing purchase orders, handling concrete requests, submitting utility locate tickets, processing insurance certificates, assisting with clerical tasks like filing and copying, preparing bids, maintaining billing spreadsheets, providing payroll information, setting up new jobs in tracking systems, verifying equipment usage, attending meetings, and assisting management. Key responsibilities also involve maintaining job lists with status updates, a field employee spreadsheet, and producing invoices.
This above data is related with Sheet Metal fabricated product line.I have elaborated basic difference between Estimation & Costing with strategy for getting best pricing & calculations involved in Actual Spending.
Contract Costing is a difficult one for accounting.
Basics of which, can be seen in this PPT. I hope it will help to understand what is Contract Costing and how its accounting can be done. Please Like if it proves to be helpful for you.
How to start a construction company as a contractorAnusha Mona
This presentation describes you about the life cycle of how to start a construction industry as a contractor.
There is a case study of a sample civil furnishing work (BLOCK WORK) and explained everything starting from the tender work, to billing to payment process.
For our first ICI (Introduction to Industry) and ITD (Introduction to Drawing), in a group of six, we were to carry out a research on quantity surveyors and give a presentation about what is their job about and what they do.
This above data is related with Sheet Metal fabricated product line.I have elaborated basic difference between Estimation & Costing with strategy for getting best pricing & calculations involved in Actual Spending.
Contract Costing is a difficult one for accounting.
Basics of which, can be seen in this PPT. I hope it will help to understand what is Contract Costing and how its accounting can be done. Please Like if it proves to be helpful for you.
How to start a construction company as a contractorAnusha Mona
This presentation describes you about the life cycle of how to start a construction industry as a contractor.
There is a case study of a sample civil furnishing work (BLOCK WORK) and explained everything starting from the tender work, to billing to payment process.
For our first ICI (Introduction to Industry) and ITD (Introduction to Drawing), in a group of six, we were to carry out a research on quantity surveyors and give a presentation about what is their job about and what they do.
Microsoft Dynamics NAV Year-End Processing ChecklistJohn Stucky
You are not required by the program to close periods, however, there are many month-end activities that can be performed if you wish to do so. The following is a list of those procedures, which may or may not be necessary for your company.
1. SUMMARY:
Coordinates job activities and assists Estimating Director/Superintendents/VicePresident by
performing clerical work administrative and business detail by performing the following duties.
ESSENTIAL DUTIES INCLUDE:
Issuing purchase orders for job material
Handling all concrete requests, which includes placing, verifyingand updating ordersif
necessary
Submitting New Miss Utility ticketsand updates
Processing all certificate of insurance requests, this includes sending out all updated
certificates for jobsthat are still in progress(yearly)
Clerical duties filing, copying, notarizing, etc.
Totaling new bids before submittal
Creating and maintaining billing spreadsheets for contracts/tasks withincontracts, any
change in contract amount (change orders etc.)
Provide Payroll department with a copy of wage rates for each contract
Identifying which contracts requirecertified payroll, providingcontact info. Address and
number of copies to be sent
Setting up all new jobs on separate Excel spreadsheets, within Vista by Viewpoint and
T&M’s
Verifying Fleet hours
Attend & Contribute to weekly “Cash Flow” Meetings
Attend & Contribute to monthly Superintendent Meetings
Attend & Contribute to monthly “ProgressMeetings” at State Highway Admin. Office
Schedule and verify time and date of each monthly Superintendent Meeting
Assisting Rommel’s President, PM, Supers, Project Coordinator, Vice President with various
tasks
SHA Monthly payment verification reports
Research job numbers for each Miss-Utility ticket listed on Invoice(s) received
Producing an A/P report for Receptionist to complete monthly SHA payment verification
forms, by month, job/vendor/contract.
Pulling material certificatesthat are required by state highway
Assisting Guests that come in whenever reception is away fromdesk/unavailable
Filing
Maintain andupdate Job list which includes:
Job number/Contract Number
Location of task/job
Listing the contract owner
Identifying which super is handling each task or job
Received date, NTP, completion date and in some cases number of days to complete task
Specify contract termwhen applicable
County
Maintain and update job statuses (active, hold, redline, green line)
Maintain & update contract amounts, percentage complete
Update monthly: Notes, concerns, issues, etc. these notesare produced fromnotes taken
during each Super meeting
2. Maintain fieldEmployee spreadsheet:
Adding/Removing Employees
Updating employee number
Name abbreviation
Classification (Laborer, Operator, Foreman etc.)
Identifying the corresponding superintendent for each employee
Listing each employee’s date of hire
Billing:
Produce all invoices, breakdown for the invoice, cover sheet, and track stock material when
applicable.
Maintain Billing Files
Booking Invoice creditswhen necessary (this applies for debitinvoices as well)
Booking all invoicesinto Vista by Viewpoint, copying, scanning and mailing
Recording any/all change orders to any given contractor job in Viewpoint
Maintain record of each invoice in an Excel “Bill tracking” spreadsheet
Setting up all new REC jobs and T&M’s in Viewpoint
Provide a copy of each stock or “inventory withdrawal” spreadsheetfor any given invoice
when applicable
Verifying all billing cutoff datesare met when contracts specify a deadline per month
Completing AIA documents when contract specifies this type of billing