1. Private & Confidential Resume of Stephen Milroy stephenmilroy13@gmail.com 0438 695 032
Page 1
FIFOConstruction Oil & Gas
7/164 West Coast Highway Scarborough WA 6019 stephenmilroy13@gmail.com 0438 695 032
Profile
I am currently seeking an opportunity to continue my progression in the Construction, Oil & Gas
sector. I have developed a strong focus on safe work practices through my meticulous work ethics
as an Advanced Rigger. I would like to continue to be a part of a team where I can utilize my skills
set and move forward with a progressive company.
LicencesCertificates Tickets
WA HR Drivers licence
High Risk: Advanced Rigging (RA)
High Risk: Slewing mobile crane (C6)
High Risk: Advanced Scaffolding (SA)
High Risk: Elevated Work Platforms (EWP)
High Risk: Forklift (LF)
Work at Heights
Confined Space
White card
Gas Test Atmospheres
IRATA Rope Access L1
BOSIET/CB-ABS
Mine Employees Health Surveillance card
Excavator
Front End Loader
Haul Truck
Offshore tickets and Rigging VOC
Skills Abilities
Advanced Rigger/Crane Operator experience
Highly experienced in Oil & Gas, Construction and Rope Access work
Adaptable to FIFO and remote locations
Communicates well in the workplace
Self-motivated, reliable and flexible
Able to cope with the physical demands of the job
Safety conscious
Fit for work
Stephen FIFOConstruction Oil & Gas
Milroy
AdvancedRigger
2. Private & Confidential Resume of Stephen Milroy stephenmilroy13@gmail.com 0438 695 032
Page 2
FIFOConstruction Oil & Gas
Referees
Brad Prior
Superintendent
Wenco
0432 251 674
Daniel Serofim
Supervisor
Geovert
0411 392 885
Albert Dunn
Supervisor
Central Systems
0414 877 665
Work History
August 2016 - Current
Advanced Rigger/Scaffolder/Rope Access
Geovert/Monadelphous/Cape
Shut Down Work: Rio Tinto, BHP, Boddington, BP Kwinana
Assist Level 3 with rigging, setting up ropes and rescue plans
Setting up pully systems, materials hoist, electric winch and various rigging techniques
Ascend/descend from several heights varying from 5 – 50 meters
Completing rope transfers safely ensuring 2 points of contact at all times
Changing wear plates on mine site crushing and screening area, using various pneumatic tools
Erecting and dismantling modular, tube and clip scaffolding
January 2014 – August 2016
Advanced Rigger/TA/Crane Operator/Leading Hand
Wenco Onshore Offshore Services
Beenyup Advanced Water Treatment Plant, Water Corporation, Ocean Reef, WA
Yara Ammonia Plant, Tan Burrup Project, Dampier, WA
Leading hand for nightshift commissioning and hydro testing. Assisting PIO with isolations.
Ensuring safe and efficient installation of membrane filters on RO and UF skids.
Carrying out detailed flange management steps and using the correct Torque/Tensioning
techniques.
Installation of high pressure steel and GRE pipework from 1/2” to 60” below and above ground.
Also installing and changing out various valves and victaulics.
Erecting structural steel racks and supports, using EWP, scissor lift and 15 – 20T Frana. Also
erecting tube and club scaffold in areas where need be
Use of chain blocks, come alongs, hoist and pulleys.
Assisting in pipework modifications, support fabrications and mechanical construction.
3. Private & Confidential Resume of Stephen Milroy stephenmilroy13@gmail.com 0438 695 032
Page 3
FIFOConstruction Oil & Gas
Work History
September 2011 – December 2013
Advanced Rigger/Crane Operator
Central Systems
Solomon FMG Project, Tom Price WA
Roy Hill Project, Samsung C&T WA
Sino Iron Project, MCC/CP Mining, Cape Preston, WA
Installing overhead conveyor modules weighing up to 60T each. Dogging dual lifts
Assembling and installing steel frame modules using turn buckle bracing to tie structural steel
Assisting mechanical fitters with general installation work
Installing stainless steel press fit water spray systems for dust suppression along conveyor
Erecting and installing 11 pre-cast concrete reinforced steel bridges
Carrying out lift studies and ensuring correct positioning of cranes
Installation of hand rails, grid mesh, access stairways and viewing platforms
Operation of 20T Franna and telehandler for small lifts and pick & carry duties
Operation of 20T Komatsu excavator to dig and install 13km of underground pipework
Assist pipefitters in fabrication, installation and testing of HDPE pipe
Installing agitator and storage tanks 18m high by 18m in diameter
Assembling 2 x 45m diameter product thickeners supplied in 6 sections each
Assisting with painting, blasting and hydro testing
U.K. Experience
Wood Group May 20010 – November 2011
BP Sullom Voe, Shetland Islands.
Rigger/TA
BAE Systems August 2008 – May 2010
Glasgow Ship Builder/Portsmouth Naval Base
Rigger/TA
4. Private & Confidential Resume of Stephen Milroy stephenmilroy13@gmail.com 0438 695 032
Page 4
FIFOConstruction Oil & Gas
Licences & Tickets
5. Private & Confidential Resume of Stephen Milroy stephenmilroy13@gmail.com 0438 695 032
Page 5
FIFOConstruction Oil & Gas
Licences & Tickets