1. Shaun RoweA: 14 Hibbertia Gardens, Busselton WA 6280
H: 08 9755 8575 | M: 0400 006 578
E: angandshaun@bigpond.com.au
PROFESSIONAL PROFILE
As a hardworking, proficient Structural Steel Boilermaker/ Welder I have over ten years’ experience in the
Construction Industry (both marine and land-based operations) and seven years in the heavy fabrication and
Structural Steel. Enjoying challenges and understanding the importance of time management whilst
maintaining a high safety culture, I am adept at working in adverse conditions, managing conflicting
deadlines and maintain a positive outlook.
My experience in boilermaking, welding extends to pipe fitting and spool installation; heavy structural
steel fabrication in stainless, aluminium and mild steel; tanks and plate fabrication; competent in the use of
MMAW, GWAW, FCAW, 3G, 4G and 6G to AS 1554; maintenance of mobile and fixed plant, and; have the
ability to read all workshop and site drawings.
Experienced in working in both remote FIFO environments and local appointments, I hold strong family
values and will happily work in either situation. Looking to join a challenging project where safety and a
positive culture are encouraged, I feel I would prove a valuable asset within a progressive company.
LICENCES AND QUALIFICATIONS
WA Drivers Licence | C and LR
Certificate of Trade Studies Engineering Trades Person (Fabrication) | 1998
Construction Induction Card | Blue Card
Maritime Security Induction Card | MSIC Security Card
TBOSIET
Mines Health Surveillance
Licence to Perform High Risk Work
ǀ DG: Dogging
ǀ RA: Advanced Rigging
ǀ WP: Elevated Work Platform
Confined Space Entry and Gas Tester
Working at Heights
Apply First Aid
2.2 Lock holder Training
FMG face to face
3G , 4G & 6G Coded Welder to Australian Standards 15
Boilermaker/Maintainer | FMG/Central Systems Nov ’15 - Present
NORTH STAR MAGNITITE PLANT/PORT HEDLAND, WA
2. RESUME AND PROFESSIONAL PROFILE SHAUN ROWE
Responsibilities
General Boilermaking duties, Structural Steel and fabrication.
Modification of systems/chutes for improvement of production and process.
Liase with engineers on various minor projects.
Routine Shut Maintenance of dry and wetend plant equipment ie: chutes, pumps, screens, conveyors
etc
Boilermaker | Saipan/Skilled Offshore Oct ‘15
CASTERONE PIPE LAYING VESSEL/DARWIN, NT
Responsibilities
General boilermaking and vessel maintenance.
Pipe weld repair and cutoffs.
Operation of systems on firing line.
Work efficiently in a team orientated environment within tight deadlines of gas pipeline installation
Compliance to all aspects of safety and guidelines within the offshore industry.
Boilermaker/Welder | Marine and Civil Construction Nov 14 - June ‘15
FREMANTLE TRAFFIC BRIDGE UPGRADE AND FENDER INSTALLATION PROJECT/FREMANTLE WA
AND APACHE FLOATING DECK WHARF EXPANSION/DAMPIER WA
Leading Hand/Barge Master
BUSSELTON JETTY EXPANSION Jan 09 - Dec 10
Responsibilities
Barge setup, modification and mobilization.
General Boilermaking/Welding duties eg: Heavy fabrication in structural steel.
Works in conjunction with Marine Ops for all Barge/Vessel movements within Marine Procedures
and operations.
Coded Welding 6G, 4G, 3G
Winch operations/Barge movement
Seafastening and decks trimmings.
Fabrication and installation of heavy structural steel barge components.
Comply to all Weld procedures in 6G, 4G Inner-shield and MMAW.
Pile-Jacket Installation; Dolphin Topsides.
Run Piling barge with 50 tonne Hitachi Crawler Crane i.e. crane mode and piling mode and
maintenance of flat-top barges & Structural Steel
Welded and fabricated all pile splicing and steel sections to code AS-1554 (4G)
Undertook all barge movements, winching and anchor position operations
Boilermaker/ Coded Welder| Leighton Contractors [SLC]
GORGON LNG JETTY & MARINE STRUCTURES PROJ | BARROW ISLAND WA Jul ’13 to Sep 14
M: 0400 006 578 | E: angandshaun@bigpond.com.au PAGE 2 OF 4
3. RESUME AND PROFESSIONAL PROFILE SHAUN ROWE
Responsibilities
Routine inspection, maintenance, fabrication and adhoc duties on the S.E.P Sirius (Jack-up) Barge
Fabrication, welding and prep work of jetty and topside structures, drill rig, drill equipment and
marine piles and structural steel.
Working with a SLR4500 Kobelco crane
Assist Barge Master and Marine Ops in Jacking process and barge movement
Actively participate in Emergency Response Drill: MOB; Fire; Muster; Evacuation; Casualty
Develop JHA’s, Take 5’s and risk assessment of all work task
Boilermaker/Maintainer | Monadelphous Jul ’12 to Jun ‘13
MAINTENANCE & PROJECT WORK | RIO TINTO’S PARKER POINT; EAST INNERCOURSE, AND; CAPE
LAMBERT WA;
WORSLEY Jul ’15 to Oct 15
Responsibilities,
Work within strict Shutdown/Breakdown time parameters
Carried out maintenance of various plants including chutes, screens, stackers, reclaimers, conveyors,
car dumpers, and crushers.
Carried out all facets of Boiler making/Welding to AS-1554 (4G) Flux core/Stick and Mig
Rigging and dogging of all site cranes: Franna, 70 to 250t. In the installation and removal of plant
components and structures
Compliance to site Permit to Work and Lock-out/Tag-out systems
Boilermaker/ Welder and Rigger | John Holland Group Jan ’11 to Jun ‘12
WORSLEY EXPANSION PROJECT | BHP’S COLLIE SITE WA
Responsibilities
Carried out all facets of Boilermaking/Welding to AS-1554 (4G)
Site welding, fabrication and maintenance of various plants and equipment ie: chutes, stackers,
reclaimers, conveyors, mills, screens and pressure vessels
Rigging and dogging; steel erection for plant structures such as stackers, buildings, train load-out,
tanks etc
Familiar with vast majority of site and workshop weld processes
Work within a high standard of safety.
Boilermaker/ Rigger | Capel Crane Hire and Constructions Feb ’08 to Jun ‘09
VARIOUS SITE AND LOCATIONS IN SOUTHWEST WA
Boilermaker/ Welder | CCR Group Sep ’06 to Jan ‘08
BHP’S FINUCANE ISLAND & CAPE LAMBERT WA | RIO TINTO’S RECLAIMER UPGRADE, KEMERTON WA,
VARIOUS LOCATIONS IN THE NORTH WEST
Minesite Boilermaker/Maintainer | Chandler Macleod Dec ’06 to Sep ‘07
CONTRACTED TO CABLE SANDS, LUDLOW WA
Workshop Boilermaker/ Welder | Fitti Steel Fabrication Jan ’06 to Jun ‘06
SPEARWOOD WA
Boilermaker/ Welder | Roche JR Construction Feb ‘05 to Sep ‘06
WODGINA EXPANSION PROJECT | VIA PORT HEDLAND WA; BLACK SWAN NICKEL PROJECT &
MCKOWNA BELLE | KALGOORLIE WA; RIO TINTO’S INSTALL CRUSHING PLANT & WEST ANGELAS
M: 0400 006 578 | E: angandshaun@bigpond.com.au PAGE 3 OF 4
4. RESUME AND PROFESSIONAL PROFILE SHAUN ROWE
EXPANSION PROJECT | WEST ANGELAS MINE WA; VARIOUS OTHER MINE SITES THROUGHOUT THE
PILBARA AND GOLDFIELDS OF WA
Workshop Boilermaker | Philips EngineeringJul ’04 to May ‘05
HENDERSON WA
Senior Maintainer/ Deck Supervisor | Servaas Group/Dipanes
REX JAY AND FRANCIS CRAY FISHING BOAT & SEALION TUNA LONG LINE |SOUTH WEST TO
CARNARVON WA Jan ’00 to Jul ’04
Responsibilities
Carry out corrective maintenance of hull and super structure
Service and maintain main engines and auxiliary systems
Carry out fishing operations
Design, construction and fabrication of industrial ice manufacturing plant
Design and construction of bait and fish processing facility
Manage supply, sales, delivery, process and manufacturing operations
1st
Mate including all facets of navigation and machinery monitoring.
Operate hydraulic winching systems.
Workshop Fabricator Welder | Image MarineOct ’99 to Jan ‘00
HENDERSON WA
Workshop Boilermaker Welder | Ocean Fast Marine May ’98 to Aug ‘99
HENDERSON WA
Apprentice Workshop Boilermaker Welder | Austal Ships Jan ’94 to Mar ‘98
HENDERSON WA
REFEREES
Warren Kingsley Sean London
Barge Supervisor Project Manager
BARROW ISLAND MARINE AND CIVIL
M| 0432 317 040 M[ 0407 377 707
Sean Johnson Jesus De Pedro
Marine Superintendent Supervisor
LEIGHTON CONTRACTORS [SLC] JOHN HOLLAND GROUP
M| 0427 989 412 M[ 0401 801 725
M: 0400 006 578 | E: angandshaun@bigpond.com.au PAGE 4 OF 4