Michael "Justin" Carver
3228 Fall Branch Road
Mountain City, Tennessee 37683
(423)291-1554 - justin.carver83@yahoo.com
Detailed Project Experience as a Foreman Rock Remediation Technician
for
Ameritech Slope Constructors, Inc.
21 Overland Industrial Boulevard
Asheville, North Carolina 28806
August 2011
Flat Rock, NC - Fill Slope Stabilization: US 25/I26 Connector
Tennessee DOT
Install soil nails, install wire mesh over rip-rap slope
September 2011
Weston, WV - Rockfall Protection System: US 19
West Virginia DOT
140 hours rock scaling, 240 hours drilling with top hammer cage drill, install rolled cable
net and SPIDER wire system
December 2011
I40, NC - Rockfall Barrier: I40 EB, MM 16
North Carolina DOT
Install type 2 rockfall barrier, drill/grout micropiles and cable anchors, pour concrete
foundation pads, hand ring net panels with mesh backing
February 2012
Cocke County, TN - Landslide Remediation: I40, MM 451
Tennessee DOT
45 hours rock scaling
March 2012
Sevierville, TN - Birds Creek Road Widening Project
Tennessee DOT
Install 700 LF type 2 rockfall barrier
April 2012
Gatlinburg, TN - Slide Repair/Slope Stabilization: US 441
Tennessee DOT
83 hours rock scaling, install 1150 LF rock bolts, install 3631 SY of 3mm pinned drape
June 2012
Fancy Gap, VA - Slope Remediation: I77 NB, MM 5
Virginia DOT
371 hours rock scaling, 200 hours drilling for anchors and dynamite
July 2012
Carthage, TN - Cordell Hull Hydroelectric Power Plant
US Army Corps of Engineers
760 hours rock scaling, tree cutting, brush clearing, 50 hours drilling for dynamite,
plugger drilling for boulder buster
October 2012
Cabin Creek, WV - Right of Way Landslide Repair
American Electric Power
Rock scaling, install 1200 LF rockfall barrier, install SPIDER wire system over rock
outcropping, install/grout soil nails, install Tecco mesh over soil nails on 5 separate
landslides, 775 hours drilling with Gardner-Denver top hammer wagon drill, TEI
excavator drill, and TEI TD-50 drill
March 2013
Gatlinburg, TN - Rock Scaling/Pinned Drape Project
Tennessee DOT
105 hours rock scaling, tree clearing, install Tecco mesh with crane, drilling 500 LF with
TEI excavator drill and Word cage drill
June 2013
South Richmond, VA - Maintenance Scaling
Luckstone Quarry
60 hours rock scaling on quarry walls for maintenance and air bagging
August 2013
Bull Run, VA - Maintenance Scaling
Luckstone Quarry
140 hours rock scaling, drilling for cable anchors, install double twist mesh system
Conshohocken, PA - I76 Rock Wall Remediation
PennDOT
361 hours rock scaling, tree clearing
November 2013
Martin, KY - Slope Stabilization and Slide Repair
American Electric Power
Drilling, install tecco mesh
December 2013
Hazard, KY - AEP Installation Project
American Electric Power
300 LF drilling, install Malone anchors
January 2014
Haleiwa, HI - Slide Repair
Waimea Valley Adventure Park
180 hours rock scaling
Hendersonville, NC - Slide Repair
North Carolina DOT
3000 LF drilling with TEI excavator drill and Marini wagon drill, install Tecco mesh
system on 4 different slopes
February 2014
Ocoee Gorge, TN - Ocoee Gorge Scaling Phase I
Tennessee Valley Authority
120 hours rock scaling, 50 LF drilling with plugger for Boulder Buster
March 2014
Montreat, NC - Geobrugg Tecco System with Pattern Bolting
Private Party
Install Geobrugg Tecco system with pattern bolting
Ocoee Gorge, TN - Drape System
Tennessee Valley Authority
10 hours rock scaling, install ring net drape system, drill epoxy anchors
April 2014
Lexington, VA - Rock Anchor Tecco Netting Drape
Virginia Military Institute
Install rock anchor Tecco netting drape, 200 LF drilling with Marini wagon drill
May 2014
Knox County, TN - Raised Drape System
Tennessee DOT
Rock scaling, tree clearing, 300 LF drilling with Marini wagon drill, install raised drape
system
June 2014
Woburn, MA - Drape System and Rock Bolts
Herley Group
Install SPIDER Wire and rock anchors, 500 LF drilling with Marini wagon drill
September 2014
Jericho, VT - Bridge Stabilization Project Phase I
Vermont Agency of Transportation
Install tensioned rock bolt anchors, 240 LF drilling with Marini wagon drill above the
river to allow stable slope for bridge abutment
October 2014
Princeton, WV - Norfolk Southern Project
Norfolk Southern
160 LF drilling with Marini wagon drill and plugger, removing trees, rock scaling, trim
blasting, netting, and Shotcrete
January 2015
Knox County, TN - Raised Drape System
Tennessee DOT
Drilling with Marini wagon drill, rock scaling, hanging mesh
April 2015
Mount Airy, NC - Geobrugg Rockfall Barrier
North Carolina DOT
Rockfall barrier installation, 300 LF drilling with TEI excavator drill
May 2015
(F) Jericho, VT - Bridge Stabilization Project Phase II
Vermont Agency of Transportation
Install tensioned rock bolt anchors and rock dowels, 500 LF drilling with Marini wagon
drill above the river to allow stable slope for bridge abutment
(F) Hibbing, MN - Scranton Barge Protection
Hibbing Taconite
110 hours rock scaling, plugger drilling for Boulder Buster, drilling for rock splitter
(F) Elizabethton, TN - Roadway Scaling
Aggregates USA
40 hours rock scaling
June 2015
(F) Princeton, NJ - Tecco Mesh Pinned Drape System
New Jersey DOT
Install 1000 LF Tecco mesh, install 200 LF rock bolts, 300 LF drilling with Marini wagon
drill for cable anchors
July 2015
(F) Philadelphia, PA - Slope Stabilization for Parking Lot Issues
CVS Pharmacies
200 hours rock scaling, plugger drilling for Boulder Buster, splitting with rock splitter, air
bagging
(F) Harrisburg, PA - Tecco Mesh Drape/Pinned Drape System
PennDOT
120 hours tree cutting, 180 hours rock scaling, over 1000 LF drilling with Marini wagon
drill, Marini pallet drill, and Word hydraulic platform drill, install over 3000 LF
Tecco
mesh, drill 40 Shotcrete dowels
(F) Leesburg, VA - Tecco Pinned Drape System
Luckstone Quarry
60 hours rock scaling, 120 hours drilling with Marini pallet drill, install 720 LF Tecco
mesh
* (F) - Denotes Foreman position *
Total Career Rock Scaling Experience
3,000+ hours
Total Career Drilling Experience
1,400+ hours and 7500+ LF
Total Career Rope Experience
10,000+ hours
General Equipment Operation Experience
Excavator, Boom Lift, Materials Handler, Skid-steer Loader, Boulder Buster/Magnum Buster,
Hydraulic Rock Splitter
Down the Hole Hammer Drill Operation Experience
Marini Pneumatic Pallet Drill, Marini Pneumatic Wagon Drill, TEI Hydraulic Excavator Drill, TEI Hydraulic
TD-50 Drill, Word Hydraulic Platform Drill, Word Hydraulic Wagon Drill,
Word Hydraulic Cage Drill, Skid-steer Hydraulic Drill
Top Hammer Drill Operation Experience
Gardner-Denver Pneumatic Top Hammer Wagon Drill, Cage Pneumatic Top Hammer Drill,
Platform Pneumatic Top Hammer Drill
Other Trade-Specific Skills
Ability to operate testing equipment and read dial gauges for rock bolt anchors, cable anchors, and
tesioned rock bolt anchors.
Current Specialized Training
- SPRAT Rope Access Technician: Level I
- 30 Hour OSHA: Construction Safety and Health
- CPR/AED and Standard First Aid from the American Heart Association
- US Army Corps of Engineers and Naval Facility Engineering Command Training
Course #784: Construction Quality Management for Contractors
- Mine Safety and Health Administration Training (Pit Specific Certification)
- Class 7 Rough Terrain Forklift Training
- Aerial Work Platform - Boom Lift Training
- Signal/Rigger Qualifying
- Williams Hollow Bar Installation Training
- Fall Protection Certification
- Union Pacific Railroad Safety Training
- Norfolk Southern Railroad Safety Training
Current Specialized Training
- SPRAT Rope Access Technician: Level I
- 30 Hour OSHA: Construction Safety and Health
- CPR/AED and Standard First Aid from the American Heart Association
- US Army Corps of Engineers and Naval Facility Engineering Command Training
Course #784: Construction Quality Management for Contractors
- Mine Safety and Health Administration Training (Pit Specific Certification)
- Class 7 Rough Terrain Forklift Training
- Aerial Work Platform - Boom Lift Training
- Signal/Rigger Qualifying
- Williams Hollow Bar Installation Training
- Fall Protection Certification
- Union Pacific Railroad Safety Training
- Norfolk Southern Railroad Safety Training

More Related Content

What's hot

Resume_Jonathan-Iley_GetHired
Resume_Jonathan-Iley_GetHiredResume_Jonathan-Iley_GetHired
Resume_Jonathan-Iley_GetHired
Jonathan Iley
 
pdf CURRICULUM VITAE FOR MATTHEW LAWSON
pdf CURRICULUM VITAE FOR MATTHEW LAWSONpdf CURRICULUM VITAE FOR MATTHEW LAWSON
pdf CURRICULUM VITAE FOR MATTHEW LAWSON
Matthew Lawson
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
Guntur Rudy
 
Derek Deamer Resume Aug 08-4
Derek Deamer Resume Aug 08-4Derek Deamer Resume Aug 08-4
Derek Deamer Resume Aug 08-4
Derek Deamer
 
History Document
History DocumentHistory Document
History Document
Joe Wagner
 
Adam J. Crank Resume June 2013
Adam J. Crank Resume June 2013Adam J. Crank Resume June 2013
Adam J. Crank Resume June 2013
adam crank
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.
brian timpson
 
JKBernard_Resume_Dec16_doc
JKBernard_Resume_Dec16_docJKBernard_Resume_Dec16_doc
JKBernard_Resume_Dec16_doc
John Bernard
 
Commercial Diving Resume
Commercial Diving ResumeCommercial Diving Resume
Commercial Diving Resume
Ed Lewis
 
JKBernard_Resume_July15_doc
JKBernard_Resume_July15_docJKBernard_Resume_July15_doc
JKBernard_Resume_July15_doc
John Bernard
 
MacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger DogmanMacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger Dogman
Scott MacKay
 

What's hot (15)

Pile load test & Pile foundation works
Pile load test & Pile foundation worksPile load test & Pile foundation works
Pile load test & Pile foundation works
 
Resume_Jonathan-Iley_GetHired
Resume_Jonathan-Iley_GetHiredResume_Jonathan-Iley_GetHired
Resume_Jonathan-Iley_GetHired
 
pdf CURRICULUM VITAE FOR MATTHEW LAWSON
pdf CURRICULUM VITAE FOR MATTHEW LAWSONpdf CURRICULUM VITAE FOR MATTHEW LAWSON
pdf CURRICULUM VITAE FOR MATTHEW LAWSON
 
2010 Visual Resume - Robert Tonn
2010 Visual Resume - Robert Tonn2010 Visual Resume - Robert Tonn
2010 Visual Resume - Robert Tonn
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
 
Derek Deamer Resume Aug 08-4
Derek Deamer Resume Aug 08-4Derek Deamer Resume Aug 08-4
Derek Deamer Resume Aug 08-4
 
History Document
History DocumentHistory Document
History Document
 
Adam J. Crank Resume June 2013
Adam J. Crank Resume June 2013Adam J. Crank Resume June 2013
Adam J. Crank Resume June 2013
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.
 
JKBernard_Resume_Dec16_doc
JKBernard_Resume_Dec16_docJKBernard_Resume_Dec16_doc
JKBernard_Resume_Dec16_doc
 
Daniel-Brady
Daniel-BradyDaniel-Brady
Daniel-Brady
 
Commercial Diving Resume
Commercial Diving ResumeCommercial Diving Resume
Commercial Diving Resume
 
JKBernard_Resume_July15_doc
JKBernard_Resume_July15_docJKBernard_Resume_July15_doc
JKBernard_Resume_July15_doc
 
Dean Chapman_2015
Dean Chapman_2015Dean Chapman_2015
Dean Chapman_2015
 
MacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger DogmanMacKay Scott Advanced Rigger Dogman
MacKay Scott Advanced Rigger Dogman
 

Similar to Justin Updated 3.1.15

Resume - Ameritech Work Experience
Resume - Ameritech Work ExperienceResume - Ameritech Work Experience
Resume - Ameritech Work Experience
Matthew Kakos
 
Brent Golemiec resume march 2016
Brent Golemiec resume march 2016Brent Golemiec resume march 2016
Brent Golemiec resume march 2016
brent golemiec
 
Mark_A_Farmer (4)
Mark_A_Farmer (4)Mark_A_Farmer (4)
Mark_A_Farmer (4)
Mark Farmer
 
IanWalker CV 2015
IanWalker CV  2015IanWalker CV  2015
IanWalker CV 2015
Ian Walker
 
M. Lyons Resume to Present 6-4-2015
M. Lyons Resume to Present  6-4-2015M. Lyons Resume to Present  6-4-2015
M. Lyons Resume to Present 6-4-2015
Morgan Lyons
 

Similar to Justin Updated 3.1.15 (20)

(Silicoflex) Npe# 9601 2 Tallulah Gorge Bridge
(Silicoflex) Npe# 9601 2   Tallulah Gorge Bridge(Silicoflex) Npe# 9601 2   Tallulah Gorge Bridge
(Silicoflex) Npe# 9601 2 Tallulah Gorge Bridge
 
O&G Professonal CV
O&G Professonal CVO&G Professonal CV
O&G Professonal CV
 
Introduction to PT&P
Introduction to PT&PIntroduction to PT&P
Introduction to PT&P
 
larry fasnacht resume
larry fasnacht resumelarry fasnacht resume
larry fasnacht resume
 
Resume - Ameritech Work Experience
Resume - Ameritech Work ExperienceResume - Ameritech Work Experience
Resume - Ameritech Work Experience
 
Brent Golemiec resume march 2016
Brent Golemiec resume march 2016Brent Golemiec resume march 2016
Brent Golemiec resume march 2016
 
JDResume2015
JDResume2015JDResume2015
JDResume2015
 
Mark a farmer (4)
Mark a farmer (4)Mark a farmer (4)
Mark a farmer (4)
 
Mark_A_Farmer (4)
Mark_A_Farmer (4)Mark_A_Farmer (4)
Mark_A_Farmer (4)
 
Components for Pipe Support Deflection & Restraint
Components for Pipe Support Deflection & RestraintComponents for Pipe Support Deflection & Restraint
Components for Pipe Support Deflection & Restraint
 
Chris doran resume 03 08-16
Chris doran resume 03 08-16Chris doran resume 03 08-16
Chris doran resume 03 08-16
 
Stephen Milroy_Resume
Stephen Milroy_ResumeStephen Milroy_Resume
Stephen Milroy_Resume
 
Stephen Milroy_Resume
Stephen Milroy_ResumeStephen Milroy_Resume
Stephen Milroy_Resume
 
Chris' Resume2
Chris' Resume2Chris' Resume2
Chris' Resume2
 
IanWalker CV 2015
IanWalker CV  2015IanWalker CV  2015
IanWalker CV 2015
 
TUF-BAR Canada Fiberglass Rebar Company Overview
TUF-BAR Canada Fiberglass Rebar Company OverviewTUF-BAR Canada Fiberglass Rebar Company Overview
TUF-BAR Canada Fiberglass Rebar Company Overview
 
ASCEMLSTPRESENTATION 05-06-03.PPT
ASCEMLSTPRESENTATION 05-06-03.PPTASCEMLSTPRESENTATION 05-06-03.PPT
ASCEMLSTPRESENTATION 05-06-03.PPT
 
ASDSO NE Regional 2009 Presentation
ASDSO NE Regional 2009 PresentationASDSO NE Regional 2009 Presentation
ASDSO NE Regional 2009 Presentation
 
M. Lyons Resume to Present 6-4-2015
M. Lyons Resume to Present  6-4-2015M. Lyons Resume to Present  6-4-2015
M. Lyons Resume to Present 6-4-2015
 
Jermantown Vehicle Services Maintenance Facility Upgrades
Jermantown Vehicle Services Maintenance Facility UpgradesJermantown Vehicle Services Maintenance Facility Upgrades
Jermantown Vehicle Services Maintenance Facility Upgrades
 

Justin Updated 3.1.15

  • 1. Michael "Justin" Carver 3228 Fall Branch Road Mountain City, Tennessee 37683 (423)291-1554 - justin.carver83@yahoo.com Detailed Project Experience as a Foreman Rock Remediation Technician for Ameritech Slope Constructors, Inc. 21 Overland Industrial Boulevard Asheville, North Carolina 28806 August 2011 Flat Rock, NC - Fill Slope Stabilization: US 25/I26 Connector Tennessee DOT Install soil nails, install wire mesh over rip-rap slope September 2011 Weston, WV - Rockfall Protection System: US 19 West Virginia DOT 140 hours rock scaling, 240 hours drilling with top hammer cage drill, install rolled cable net and SPIDER wire system December 2011 I40, NC - Rockfall Barrier: I40 EB, MM 16 North Carolina DOT Install type 2 rockfall barrier, drill/grout micropiles and cable anchors, pour concrete foundation pads, hand ring net panels with mesh backing February 2012 Cocke County, TN - Landslide Remediation: I40, MM 451 Tennessee DOT 45 hours rock scaling March 2012 Sevierville, TN - Birds Creek Road Widening Project Tennessee DOT Install 700 LF type 2 rockfall barrier April 2012 Gatlinburg, TN - Slide Repair/Slope Stabilization: US 441 Tennessee DOT 83 hours rock scaling, install 1150 LF rock bolts, install 3631 SY of 3mm pinned drape
  • 2. June 2012 Fancy Gap, VA - Slope Remediation: I77 NB, MM 5 Virginia DOT 371 hours rock scaling, 200 hours drilling for anchors and dynamite July 2012 Carthage, TN - Cordell Hull Hydroelectric Power Plant US Army Corps of Engineers 760 hours rock scaling, tree cutting, brush clearing, 50 hours drilling for dynamite, plugger drilling for boulder buster October 2012 Cabin Creek, WV - Right of Way Landslide Repair American Electric Power Rock scaling, install 1200 LF rockfall barrier, install SPIDER wire system over rock outcropping, install/grout soil nails, install Tecco mesh over soil nails on 5 separate landslides, 775 hours drilling with Gardner-Denver top hammer wagon drill, TEI excavator drill, and TEI TD-50 drill March 2013 Gatlinburg, TN - Rock Scaling/Pinned Drape Project Tennessee DOT 105 hours rock scaling, tree clearing, install Tecco mesh with crane, drilling 500 LF with TEI excavator drill and Word cage drill June 2013 South Richmond, VA - Maintenance Scaling Luckstone Quarry 60 hours rock scaling on quarry walls for maintenance and air bagging August 2013 Bull Run, VA - Maintenance Scaling Luckstone Quarry 140 hours rock scaling, drilling for cable anchors, install double twist mesh system Conshohocken, PA - I76 Rock Wall Remediation PennDOT 361 hours rock scaling, tree clearing November 2013 Martin, KY - Slope Stabilization and Slide Repair American Electric Power Drilling, install tecco mesh December 2013
  • 3. Hazard, KY - AEP Installation Project American Electric Power 300 LF drilling, install Malone anchors January 2014 Haleiwa, HI - Slide Repair Waimea Valley Adventure Park 180 hours rock scaling Hendersonville, NC - Slide Repair North Carolina DOT 3000 LF drilling with TEI excavator drill and Marini wagon drill, install Tecco mesh system on 4 different slopes February 2014 Ocoee Gorge, TN - Ocoee Gorge Scaling Phase I Tennessee Valley Authority 120 hours rock scaling, 50 LF drilling with plugger for Boulder Buster March 2014 Montreat, NC - Geobrugg Tecco System with Pattern Bolting Private Party Install Geobrugg Tecco system with pattern bolting Ocoee Gorge, TN - Drape System Tennessee Valley Authority 10 hours rock scaling, install ring net drape system, drill epoxy anchors April 2014 Lexington, VA - Rock Anchor Tecco Netting Drape Virginia Military Institute Install rock anchor Tecco netting drape, 200 LF drilling with Marini wagon drill May 2014 Knox County, TN - Raised Drape System Tennessee DOT Rock scaling, tree clearing, 300 LF drilling with Marini wagon drill, install raised drape system June 2014 Woburn, MA - Drape System and Rock Bolts Herley Group Install SPIDER Wire and rock anchors, 500 LF drilling with Marini wagon drill September 2014 Jericho, VT - Bridge Stabilization Project Phase I
  • 4. Vermont Agency of Transportation Install tensioned rock bolt anchors, 240 LF drilling with Marini wagon drill above the river to allow stable slope for bridge abutment October 2014 Princeton, WV - Norfolk Southern Project Norfolk Southern 160 LF drilling with Marini wagon drill and plugger, removing trees, rock scaling, trim blasting, netting, and Shotcrete January 2015 Knox County, TN - Raised Drape System Tennessee DOT Drilling with Marini wagon drill, rock scaling, hanging mesh April 2015 Mount Airy, NC - Geobrugg Rockfall Barrier North Carolina DOT Rockfall barrier installation, 300 LF drilling with TEI excavator drill May 2015 (F) Jericho, VT - Bridge Stabilization Project Phase II Vermont Agency of Transportation Install tensioned rock bolt anchors and rock dowels, 500 LF drilling with Marini wagon drill above the river to allow stable slope for bridge abutment (F) Hibbing, MN - Scranton Barge Protection Hibbing Taconite 110 hours rock scaling, plugger drilling for Boulder Buster, drilling for rock splitter (F) Elizabethton, TN - Roadway Scaling Aggregates USA 40 hours rock scaling June 2015 (F) Princeton, NJ - Tecco Mesh Pinned Drape System New Jersey DOT Install 1000 LF Tecco mesh, install 200 LF rock bolts, 300 LF drilling with Marini wagon drill for cable anchors July 2015 (F) Philadelphia, PA - Slope Stabilization for Parking Lot Issues
  • 5. CVS Pharmacies 200 hours rock scaling, plugger drilling for Boulder Buster, splitting with rock splitter, air bagging (F) Harrisburg, PA - Tecco Mesh Drape/Pinned Drape System PennDOT 120 hours tree cutting, 180 hours rock scaling, over 1000 LF drilling with Marini wagon drill, Marini pallet drill, and Word hydraulic platform drill, install over 3000 LF Tecco mesh, drill 40 Shotcrete dowels (F) Leesburg, VA - Tecco Pinned Drape System Luckstone Quarry 60 hours rock scaling, 120 hours drilling with Marini pallet drill, install 720 LF Tecco mesh * (F) - Denotes Foreman position * Total Career Rock Scaling Experience 3,000+ hours Total Career Drilling Experience 1,400+ hours and 7500+ LF Total Career Rope Experience 10,000+ hours General Equipment Operation Experience Excavator, Boom Lift, Materials Handler, Skid-steer Loader, Boulder Buster/Magnum Buster, Hydraulic Rock Splitter Down the Hole Hammer Drill Operation Experience Marini Pneumatic Pallet Drill, Marini Pneumatic Wagon Drill, TEI Hydraulic Excavator Drill, TEI Hydraulic TD-50 Drill, Word Hydraulic Platform Drill, Word Hydraulic Wagon Drill, Word Hydraulic Cage Drill, Skid-steer Hydraulic Drill Top Hammer Drill Operation Experience Gardner-Denver Pneumatic Top Hammer Wagon Drill, Cage Pneumatic Top Hammer Drill, Platform Pneumatic Top Hammer Drill Other Trade-Specific Skills Ability to operate testing equipment and read dial gauges for rock bolt anchors, cable anchors, and tesioned rock bolt anchors.
  • 6. Current Specialized Training - SPRAT Rope Access Technician: Level I - 30 Hour OSHA: Construction Safety and Health - CPR/AED and Standard First Aid from the American Heart Association - US Army Corps of Engineers and Naval Facility Engineering Command Training Course #784: Construction Quality Management for Contractors - Mine Safety and Health Administration Training (Pit Specific Certification) - Class 7 Rough Terrain Forklift Training - Aerial Work Platform - Boom Lift Training - Signal/Rigger Qualifying - Williams Hollow Bar Installation Training - Fall Protection Certification - Union Pacific Railroad Safety Training - Norfolk Southern Railroad Safety Training
  • 7. Current Specialized Training - SPRAT Rope Access Technician: Level I - 30 Hour OSHA: Construction Safety and Health - CPR/AED and Standard First Aid from the American Heart Association - US Army Corps of Engineers and Naval Facility Engineering Command Training Course #784: Construction Quality Management for Contractors - Mine Safety and Health Administration Training (Pit Specific Certification) - Class 7 Rough Terrain Forklift Training - Aerial Work Platform - Boom Lift Training - Signal/Rigger Qualifying - Williams Hollow Bar Installation Training - Fall Protection Certification - Union Pacific Railroad Safety Training - Norfolk Southern Railroad Safety Training