Detailed Project Experience as a Foreman Rock Remediation Technician
for
Ameritech Slope Constructors, Inc.
21 Overland Industrial Boulevard
Asheville, North Carolina 28806
August 2011
Flat Rock, NC - Fill Slope Stabilization: US 25/I26 Connector
Tennessee DOT
Install soil nails, install wire mesh over rip-rap slope
September 2011
Weston, WV - Rockfall Protection System: US 19
West Virginia DOT
140 hours rock scaling, 240 hours drilling with top hammer cage drill, install rolled cable
net and SPIDER wire system
December 2011
I40, NC - Rockfall Barrier: I40 EB, MM 16
North Carolina DOT
Install type 2 rockfall barrier, drill/grout micropiles and cable anchors, pour concrete
foundation pads, hand ring net panels with mesh backing
February 2012
Cocke County, TN - Landslide Remediation: I40, MM 451
Tennessee DOT
45 hours rock scaling
March 2012
Sevierville, TN - Birds Creek Road Widening Project
Tennessee DOT
Install 700 LF type 2 rockfall barrier
April 2012
Gatlinburg, TN - Slide Repair/Slope Stabilization: US 441
Tennessee DOT
83 hours rock scaling, install 1150 LF rock bolts, install 3631 SY of 3mm pinned drape
2. June 2012
Fancy Gap, VA - Slope Remediation: I77 NB, MM 5
Virginia DOT
371 hours rock scaling, 200 hours drilling for anchors and dynamite
July 2012
Carthage, TN - Cordell Hull Hydroelectric Power Plant
US Army Corps of Engineers
760 hours rock scaling, tree cutting, brush clearing, 50 hours drilling for dynamite,
plugger drilling for boulder buster
October 2012
Cabin Creek, WV - Right of Way Landslide Repair
American Electric Power
Rock scaling, install 1200 LF rockfall barrier, install SPIDER wire system over rock
outcropping, install/grout soil nails, install Tecco mesh over soil nails on 5 separate
landslides, 775 hours drilling with Gardner-Denver top hammer wagon drill, TEI
excavator drill, and TEI TD-50 drill
March 2013
Gatlinburg, TN - Rock Scaling/Pinned Drape Project
Tennessee DOT
105 hours rock scaling, tree clearing, install Tecco mesh with crane, drilling 500 LF with
TEI excavator drill and Word cage drill
June 2013
South Richmond, VA - Maintenance Scaling
Luckstone Quarry
60 hours rock scaling on quarry walls for maintenance and air bagging
August 2013
Bull Run, VA - Maintenance Scaling
Luckstone Quarry
140 hours rock scaling, drilling for cable anchors, install double twist mesh system
Conshohocken, PA - I76 Rock Wall Remediation
PennDOT
361 hours rock scaling, tree clearing
November 2013
Martin, KY - Slope Stabilization and Slide Repair
American Electric Power
Drilling, install tecco mesh
December 2013
3. Hazard, KY - AEP Installation Project
American Electric Power
300 LF drilling, install Malone anchors
January 2014
Haleiwa, HI - Slide Repair
Waimea Valley Adventure Park
180 hours rock scaling
Hendersonville, NC - Slide Repair
North Carolina DOT
3000 LF drilling with TEI excavator drill and Marini wagon drill, install Tecco mesh
system on 4 different slopes
February 2014
Ocoee Gorge, TN - Ocoee Gorge Scaling Phase I
Tennessee Valley Authority
120 hours rock scaling, 50 LF drilling with plugger for Boulder Buster
March 2014
Montreat, NC - Geobrugg Tecco System with Pattern Bolting
Private Party
Install Geobrugg Tecco system with pattern bolting
Ocoee Gorge, TN - Drape System
Tennessee Valley Authority
10 hours rock scaling, install ring net drape system, drill epoxy anchors
April 2014
Lexington, VA - Rock Anchor Tecco Netting Drape
Virginia Military Institute
Install rock anchor Tecco netting drape, 200 LF drilling with Marini wagon drill
May 2014
Knox County, TN - Raised Drape System
Tennessee DOT
Rock scaling, tree clearing, 300 LF drilling with Marini wagon drill, install raised drape
system
June 2014
Woburn, MA - Drape System and Rock Bolts
Herley Group
Install SPIDER Wire and rock anchors, 500 LF drilling with Marini wagon drill
September 2014
Jericho, VT - Bridge Stabilization Project Phase I
4. Vermont Agency of Transportation
Install tensioned rock bolt anchors, 240 LF drilling with Marini wagon drill above the
river to allow stable slope for bridge abutment
October 2014
Princeton, WV - Norfolk Southern Project
Norfolk Southern
160 LF drilling with Marini wagon drill and plugger, removing trees, rock scaling, trim
blasting, netting, and Shotcrete
January 2015
Knox County, TN - Raised Drape System
Tennessee DOT
Drilling with Marini wagon drill, rock scaling, hanging mesh
April 2015
Mount Airy, NC - Geobrugg Rockfall Barrier
North Carolina DOT
Rockfall barrier installation, 300 LF drilling with TEI excavator drill
May 2015
(F) Jericho, VT - Bridge Stabilization Project Phase II
Vermont Agency of Transportation
Install tensioned rock bolt anchors and rock dowels, 500 LF drilling with Marini wagon
drill above the river to allow stable slope for bridge abutment
(F) Hibbing, MN - Scranton Barge Protection
Hibbing Taconite
110 hours rock scaling, plugger drilling for Boulder Buster, drilling for rock splitter
(F) Elizabethton, TN - Roadway Scaling
Aggregates USA
40 hours rock scaling
June 2015
(F) Princeton, NJ - Tecco Mesh Pinned Drape System
New Jersey DOT
Install 1000 LF Tecco mesh, install 200 LF rock bolts, 300 LF drilling with Marini wagon
drill for cable anchors
July 2015
(F) Philadelphia, PA - Slope Stabilization for Parking Lot Issues
5. CVS Pharmacies
200 hours rock scaling, plugger drilling for Boulder Buster, splitting with rock splitter, air
bagging
(F) Harrisburg, PA - Tecco Mesh Drape/Pinned Drape System
PennDOT
120 hours tree cutting, 180 hours rock scaling, over 1000 LF drilling with Marini wagon
drill, Marini pallet drill, and Word hydraulic platform drill, install over 3000 LF
Tecco
mesh, drill 40 Shotcrete dowels
(F) Leesburg, VA - Tecco Pinned Drape System
Luckstone Quarry
60 hours rock scaling, 120 hours drilling with Marini pallet drill, install 720 LF Tecco
mesh
* (F) - Denotes Foreman position *
Total Career Rock Scaling Experience
3,000+ hours
Total Career Drilling Experience
1,400+ hours and 7500+ LF
Total Career Rope Experience
10,000+ hours
General Equipment Operation Experience
Excavator, Boom Lift, Materials Handler, Skid-steer Loader, Boulder Buster/Magnum Buster,
Hydraulic Rock Splitter
Down the Hole Hammer Drill Operation Experience
Marini Pneumatic Pallet Drill, Marini Pneumatic Wagon Drill, TEI Hydraulic Excavator Drill, TEI Hydraulic
TD-50 Drill, Word Hydraulic Platform Drill, Word Hydraulic Wagon Drill,
Word Hydraulic Cage Drill, Skid-steer Hydraulic Drill
Top Hammer Drill Operation Experience
Gardner-Denver Pneumatic Top Hammer Wagon Drill, Cage Pneumatic Top Hammer Drill,
Platform Pneumatic Top Hammer Drill
Other Trade-Specific Skills
Ability to operate testing equipment and read dial gauges for rock bolt anchors, cable anchors, and
tesioned rock bolt anchors.
6. Current Specialized Training
- SPRAT Rope Access Technician: Level I
- 30 Hour OSHA: Construction Safety and Health
- CPR/AED and Standard First Aid from the American Heart Association
- US Army Corps of Engineers and Naval Facility Engineering Command Training
Course #784: Construction Quality Management for Contractors
- Mine Safety and Health Administration Training (Pit Specific Certification)
- Class 7 Rough Terrain Forklift Training
- Aerial Work Platform - Boom Lift Training
- Signal/Rigger Qualifying
- Williams Hollow Bar Installation Training
- Fall Protection Certification
- Union Pacific Railroad Safety Training
- Norfolk Southern Railroad Safety Training
7. Current Specialized Training
- SPRAT Rope Access Technician: Level I
- 30 Hour OSHA: Construction Safety and Health
- CPR/AED and Standard First Aid from the American Heart Association
- US Army Corps of Engineers and Naval Facility Engineering Command Training
Course #784: Construction Quality Management for Contractors
- Mine Safety and Health Administration Training (Pit Specific Certification)
- Class 7 Rough Terrain Forklift Training
- Aerial Work Platform - Boom Lift Training
- Signal/Rigger Qualifying
- Williams Hollow Bar Installation Training
- Fall Protection Certification
- Union Pacific Railroad Safety Training
- Norfolk Southern Railroad Safety Training