Personal Details:
Name: STANLEY MARIUS
Nationality: HAITIAN
Date of Birth: 18th DECEMBER 1981
Languages: French, English, Spanish, Creole
Cell: + (506)70701059
Email: stanleymarius1881@yahoo.com
Experience:
 Integration, configuration, expansion, migration and implementation of features,
RPPs, signalling in MSSs and BSCs at GSM/WCDMA Core Network.
 Configuration, integration, testing, verification and acceptance testing of APG40
APG43 212 55 and APZ 212 60 (MSC and HLRs, GSM R13-WCDMA R5 AXE
810).
 Integration of NODEB to RNC and RBS to BSC.
 Integration E-NODEB
Employment History:
Ericsson Costa Rica May 21st 2013 to Now
Sep-2016: VIVA REPUBLICA DOMINICANA
 New Site Integration Phase_1, 150 GSM sites
 Script preparations and preload
May-2016-Aug-2016: Claro Honduras Network Modernization PHASE2 MIXMODE
 New Site Integration 330 GSM sites
 New Site Integration 150 LTE sites
 RBS swapping 2000 to 6101
 Define the external UTRAN cells and handover relation
 Define minimum CPICH
 Define UTRAN measurement frequency information in all IRAT
2G cells
 Define relations between all IRAT 2G cells to external UTRAN
cells
 Define Load threshold in 2G cells for CS IRAT HO
 Add UTRAN data to System Information for 2G cells participating
in IRAT HO
May-2015-Aug-2015: Claro Honduras Network Modernization PHASE1 Mixmode & LTE
 New Site Integration 330 sites
 RBS swapping 2000 to 6101
 Define the external UTRAN cells and handover relation
 Define minimum CPICH
 Define UTRAN measurement frequency information in all IRAT
2G cells
 Define relations between all IRAT 2G cells to external UTRAN
cells
 Define Load threshold in 2G cells for CS IRAT HO
 Add UTRAN data to System Information for 2G cells participating
in IRAT HO
Oct-2014-Jan-2015 Digicel Jamaica - Core Modernization Phase 2
 Migration 500 sites
 Data transcript preparation ,application
 RAN Modernization project, IRAT Activation
2014- Digicel Surinam, St Lucia
 RAN Modernization project, IRAT Activation
 Define the external UTRAN cells and handover relation
 Define minimum CPICH Ec/No required for 2G to 3G HO
 Define UTRAN measurement frequency information in all IRAT
2G cells
 Define relations between all IRAT 2G cells to external UTRAN
cells
 Define Load threshold in 2G cells for CS IRAT HO
 Add UTRAN data to System Information for 2G cells participating
in IRAT HO
2014- Claro Salvador
 GSM rehoming 150 sites
 Data Transcript for Migration

2014- BTC Bahamas
 EPP parameter tuning, Features activation & parameters changes.
2013- Experience, Telefonica Guatemala
 10 BSCs Memory Expansion of Central Processor
2013- , Experience, Dominican Republic
 BSCs EGM Expansion of 25 GARP
2012- , Experience, Jamaica
 RNC parameters changes and O&M.
 BCCH frequency BCC and NCC changes
 Delete and recreate Utranrelation
 Apply NODEB licenses
 Apply and activate features in Node B
 Remote support for 1 node B integration in Curacao
 Node B Migration from one RNC to another
 DT preparation for migration RNC Directed Retry
 DT preparation for migration RNC External UtranRelations
(Rehomed Cells as Source)
 DT preparation for migration RNC Internal UtranRelations
(Rehomed Cells as Source)
 DT preparation for migration RNC Recreation of Utran Relation to
Rehomed Sites
 DT preparation for migration RNC Removal of Old Utran Relation
to Rehomed Sites
 DT preparation for migration BSC External Utrancell LAC and
RNC Change
 DT preparation for migration MSC Rehome SAI Creation
 DT preparation for migration MSC Rehome SAI Removal
 Leading 3G RAN New IP Plan implementation_94 sites.
 SPB board change in RNC
October 2008 –October 2012
RNC/BSC Engineer (Ericsson equipment)
Digicel Haiti
 BSS network design in cooperation with Core & Radio teams,
Node & interfaces dimensioning and identification of network
expansions in terms of new nodes or upgrade/expansions on
existing nodes.
 Design, Implement, Support of full IP environment in BSS
APZ21260/55, APG43 (NWI,A-over IP, GB-Over IP, A-bis Over
IP, MSC in Pool, SGSN in Pool etc.), RNC 3820.
 Monitoring of BSS & Core network performance, analysis of
statistics and optimization of network performance & resource
allocation.
 Functionality evaluation and implementation suggestions in
Company’s network.
 Handling of BSS operational activities (e.g. backups, BSC health
checks, BSC preventive maintenance, BSC SW updates, etc) and
BSS network troubleshooting (BSC, APG and first level of BTS
support).
 Configuration Management and data transcript generation
(Cell/Site definitions/expansions/re homing, BSC re-homing’s,
parameter modifications, BSC exchange data, etc)
 Testing (e2e), evaluation and rollout of GSM/BSS functionalities
and SW releases.
 Interworking testing with Multivendor MSC-MGW.
 HW testing & integration of new network elements/expansions.
 Act as a mentor for the team member
 Working as the key person in Ericsson BSS/TRC and GPRS
System. Attend 2nd line BSS operation & maintenance job in
network. Also ensure the smooth running of BSS operation.
 Leading 3G project and responsible for NODEB integration
network wide (utranrelation definition, IUB link definition,
apply NODEB licenses )
 Integration experience of Ericsson’s BSCs nodes with the rest of
the Core Network Nodes, prepare DT for integration/commission
BSC, Start-up, Testing and Integration of BSC HW and SW
packages, including verification of BSS features specific to the
BSC.
 On-Line & off line Data Transcript (DT) Preparations for
BSC/TRC/RBS.
 Guideline & supporting the Radio Planning/Optimization group
regarding coverage, capacity & frequency planning both in field
and in the BSC end for optimization of the network.
 Trouble shooting and fault tracing techniques, ability to lead and
drive complex technical problems to solution
 Handled Applications in Ericsson OSS RC (CNA, OPS, BSM and
SMO)
 ‘Business Object’ tool for data retrieval from OSS and data
retrieval directly from the ‘nodes’ and fulfilling other departments’
as well as own department’s requirement on this.
 Work with AXE 10, AXE 810 (APG40) platform in Ericsson.
 Analyzing existing process & scope of improvement of the
processes within the organization. Also analysis of network
statistics, Network audits and check BSS parameter. Processing
BSC performance data to analyze traffic event both proactively and
reactively and making recommendations on that.
 Evaluate integration of new technology in the network.
 Work with other departments to ensure the product development &
quality.
 Dimensioning of BSC for capacity and quality purposes.
 Maintain an important role for performance appraisal and reviews
for all employees within the BSS department.
October 2006 – October 2008
Core Engineer
Digicel Haiti
 Directly involved with the implementation and maintenance of MSC
and HLR Ericsson. Create data loads (new B number series, new
routes as example), perform preventive and corrective maintenance as
required. Responsible of Operation & Maintenance for MSC and HLR.
 Have been involved in several projects within the company including
(but not limited to): SS7 network optimization for Digicel Haiti,
implementation of a new National Dialing Plan (November 2008), new
AXE nodes acceptance tests.
 Responsible of APG40 and CP Back up every month.
 Participated to create the data transcript to integrate the central
building clock (CBC).
 Responsible of all expansion in the core with (IGATE-Voice mail-
MSC-BSC-other operators)
 Responsible of interconnection between DIGICEL and VOILA
 Responsible of interconnection between DIGICEL and HAITEL
 Organize information about MSC, HW inventory
 Cabling ODF, DDF, keep records updated
 Responsible of Network information updated (e.g., GT, Signaling.)
 Contribute in group activities like life line dumps, audits, HW
expansion, APT, SW
 PBX interconnection between DIGICEL and SOGEBANK
 PBX interconnection between DIGICEL and CANADIAN embassy
 PBX interconnection between DIGICEL and TEL INFO
 PBX interconnection between DIGICEL and GROUP BIDJO
 PBX interconnection between DIGICEL and TORTUGAIR
Education:
ESIH (Ecole superiuere D’infotroninque D’ Haiti)
Bachelors of engineering In Computer sciences (2006)
Professional Training:
 IP in GSM Radio Access Network
 BSC IP Infrastructure Operations and Configuration
 WCDMA RAN W11 Configuration
 WCDMA RAN W11 Operation
 OSS-RC6 Event Based Applications and TEMS Visualization
 ENIQ11 Statistics, Report Migration Workshop
 ENIQ11 System and Dataflow Administration
 ENIQ 11 Statistics, Operation (Products Report)
 APG43 OPERATION and MAINTENANCE
 GSM/WCDMA M-MGW R5 OPERATION and CONGIGURATION
 APZ 212 60 OPERATION and MAINTENANCE
 GSM WCDMA MSS R5 introduction
 GSM HLR R12/R13 OPERATION
 GSM MSC-S R12 configuration
 Veraz, I Gate 4000 pro
 AXE operations
 Alcatel,SS7 Signalization with Analyzer
 GSM Signaling in the Core Network
 GSM System Survey
 Axe Survey

Stanley marius RESUME

  • 1.
    Personal Details: Name: STANLEYMARIUS Nationality: HAITIAN Date of Birth: 18th DECEMBER 1981 Languages: French, English, Spanish, Creole Cell: + (506)70701059 Email: stanleymarius1881@yahoo.com Experience:  Integration, configuration, expansion, migration and implementation of features, RPPs, signalling in MSSs and BSCs at GSM/WCDMA Core Network.  Configuration, integration, testing, verification and acceptance testing of APG40 APG43 212 55 and APZ 212 60 (MSC and HLRs, GSM R13-WCDMA R5 AXE 810).  Integration of NODEB to RNC and RBS to BSC.  Integration E-NODEB Employment History: Ericsson Costa Rica May 21st 2013 to Now Sep-2016: VIVA REPUBLICA DOMINICANA  New Site Integration Phase_1, 150 GSM sites  Script preparations and preload May-2016-Aug-2016: Claro Honduras Network Modernization PHASE2 MIXMODE  New Site Integration 330 GSM sites  New Site Integration 150 LTE sites  RBS swapping 2000 to 6101  Define the external UTRAN cells and handover relation  Define minimum CPICH  Define UTRAN measurement frequency information in all IRAT 2G cells  Define relations between all IRAT 2G cells to external UTRAN cells  Define Load threshold in 2G cells for CS IRAT HO  Add UTRAN data to System Information for 2G cells participating in IRAT HO
  • 2.
    May-2015-Aug-2015: Claro HondurasNetwork Modernization PHASE1 Mixmode & LTE  New Site Integration 330 sites  RBS swapping 2000 to 6101  Define the external UTRAN cells and handover relation  Define minimum CPICH  Define UTRAN measurement frequency information in all IRAT 2G cells  Define relations between all IRAT 2G cells to external UTRAN cells  Define Load threshold in 2G cells for CS IRAT HO  Add UTRAN data to System Information for 2G cells participating in IRAT HO Oct-2014-Jan-2015 Digicel Jamaica - Core Modernization Phase 2  Migration 500 sites  Data transcript preparation ,application  RAN Modernization project, IRAT Activation 2014- Digicel Surinam, St Lucia  RAN Modernization project, IRAT Activation  Define the external UTRAN cells and handover relation  Define minimum CPICH Ec/No required for 2G to 3G HO  Define UTRAN measurement frequency information in all IRAT 2G cells  Define relations between all IRAT 2G cells to external UTRAN cells  Define Load threshold in 2G cells for CS IRAT HO  Add UTRAN data to System Information for 2G cells participating in IRAT HO 2014- Claro Salvador  GSM rehoming 150 sites  Data Transcript for Migration  2014- BTC Bahamas  EPP parameter tuning, Features activation & parameters changes. 2013- Experience, Telefonica Guatemala  10 BSCs Memory Expansion of Central Processor 2013- , Experience, Dominican Republic  BSCs EGM Expansion of 25 GARP 2012- , Experience, Jamaica  RNC parameters changes and O&M.
  • 3.
     BCCH frequencyBCC and NCC changes  Delete and recreate Utranrelation  Apply NODEB licenses  Apply and activate features in Node B  Remote support for 1 node B integration in Curacao  Node B Migration from one RNC to another  DT preparation for migration RNC Directed Retry  DT preparation for migration RNC External UtranRelations (Rehomed Cells as Source)  DT preparation for migration RNC Internal UtranRelations (Rehomed Cells as Source)  DT preparation for migration RNC Recreation of Utran Relation to Rehomed Sites  DT preparation for migration RNC Removal of Old Utran Relation to Rehomed Sites  DT preparation for migration BSC External Utrancell LAC and RNC Change  DT preparation for migration MSC Rehome SAI Creation  DT preparation for migration MSC Rehome SAI Removal  Leading 3G RAN New IP Plan implementation_94 sites.  SPB board change in RNC October 2008 –October 2012 RNC/BSC Engineer (Ericsson equipment) Digicel Haiti  BSS network design in cooperation with Core & Radio teams, Node & interfaces dimensioning and identification of network expansions in terms of new nodes or upgrade/expansions on existing nodes.  Design, Implement, Support of full IP environment in BSS APZ21260/55, APG43 (NWI,A-over IP, GB-Over IP, A-bis Over IP, MSC in Pool, SGSN in Pool etc.), RNC 3820.  Monitoring of BSS & Core network performance, analysis of statistics and optimization of network performance & resource allocation.  Functionality evaluation and implementation suggestions in Company’s network.  Handling of BSS operational activities (e.g. backups, BSC health checks, BSC preventive maintenance, BSC SW updates, etc) and BSS network troubleshooting (BSC, APG and first level of BTS support).  Configuration Management and data transcript generation (Cell/Site definitions/expansions/re homing, BSC re-homing’s, parameter modifications, BSC exchange data, etc)
  • 4.
     Testing (e2e),evaluation and rollout of GSM/BSS functionalities and SW releases.  Interworking testing with Multivendor MSC-MGW.  HW testing & integration of new network elements/expansions.  Act as a mentor for the team member  Working as the key person in Ericsson BSS/TRC and GPRS System. Attend 2nd line BSS operation & maintenance job in network. Also ensure the smooth running of BSS operation.  Leading 3G project and responsible for NODEB integration network wide (utranrelation definition, IUB link definition, apply NODEB licenses )  Integration experience of Ericsson’s BSCs nodes with the rest of the Core Network Nodes, prepare DT for integration/commission BSC, Start-up, Testing and Integration of BSC HW and SW packages, including verification of BSS features specific to the BSC.  On-Line & off line Data Transcript (DT) Preparations for BSC/TRC/RBS.  Guideline & supporting the Radio Planning/Optimization group regarding coverage, capacity & frequency planning both in field and in the BSC end for optimization of the network.  Trouble shooting and fault tracing techniques, ability to lead and drive complex technical problems to solution  Handled Applications in Ericsson OSS RC (CNA, OPS, BSM and SMO)  ‘Business Object’ tool for data retrieval from OSS and data retrieval directly from the ‘nodes’ and fulfilling other departments’ as well as own department’s requirement on this.  Work with AXE 10, AXE 810 (APG40) platform in Ericsson.  Analyzing existing process & scope of improvement of the processes within the organization. Also analysis of network statistics, Network audits and check BSS parameter. Processing BSC performance data to analyze traffic event both proactively and reactively and making recommendations on that.  Evaluate integration of new technology in the network.  Work with other departments to ensure the product development & quality.  Dimensioning of BSC for capacity and quality purposes.  Maintain an important role for performance appraisal and reviews for all employees within the BSS department. October 2006 – October 2008 Core Engineer Digicel Haiti  Directly involved with the implementation and maintenance of MSC and HLR Ericsson. Create data loads (new B number series, new routes as example), perform preventive and corrective maintenance as required. Responsible of Operation & Maintenance for MSC and HLR.
  • 5.
     Have beeninvolved in several projects within the company including (but not limited to): SS7 network optimization for Digicel Haiti, implementation of a new National Dialing Plan (November 2008), new AXE nodes acceptance tests.  Responsible of APG40 and CP Back up every month.  Participated to create the data transcript to integrate the central building clock (CBC).  Responsible of all expansion in the core with (IGATE-Voice mail- MSC-BSC-other operators)  Responsible of interconnection between DIGICEL and VOILA  Responsible of interconnection between DIGICEL and HAITEL  Organize information about MSC, HW inventory  Cabling ODF, DDF, keep records updated  Responsible of Network information updated (e.g., GT, Signaling.)  Contribute in group activities like life line dumps, audits, HW expansion, APT, SW  PBX interconnection between DIGICEL and SOGEBANK  PBX interconnection between DIGICEL and CANADIAN embassy  PBX interconnection between DIGICEL and TEL INFO  PBX interconnection between DIGICEL and GROUP BIDJO  PBX interconnection between DIGICEL and TORTUGAIR Education: ESIH (Ecole superiuere D’infotroninque D’ Haiti) Bachelors of engineering In Computer sciences (2006) Professional Training:  IP in GSM Radio Access Network  BSC IP Infrastructure Operations and Configuration  WCDMA RAN W11 Configuration  WCDMA RAN W11 Operation  OSS-RC6 Event Based Applications and TEMS Visualization  ENIQ11 Statistics, Report Migration Workshop  ENIQ11 System and Dataflow Administration  ENIQ 11 Statistics, Operation (Products Report)  APG43 OPERATION and MAINTENANCE  GSM/WCDMA M-MGW R5 OPERATION and CONGIGURATION  APZ 212 60 OPERATION and MAINTENANCE  GSM WCDMA MSS R5 introduction  GSM HLR R12/R13 OPERATION  GSM MSC-S R12 configuration  Veraz, I Gate 4000 pro  AXE operations
  • 6.
     Alcatel,SS7 Signalizationwith Analyzer  GSM Signaling in the Core Network  GSM System Survey  Axe Survey