Marvani Miller Estrella has over 15 years of experience as a project manager and engineer in telecommunications. She has successfully managed numerous projects for Globe Telecom involving the implementation of 2G, 3G, LTE, and other wireless networks. Her experience also includes access planning, engineering, quality assurance, and capacity management. She holds a Bachelor's degree in Electronics and Communications Engineering and is a licensed engineer and certified project manager.
Meltek infosystems is established by a term of experienced engineers in the year of 2000. The company provided complete technical solution for any type of satellite communication application. The services provided by the company include supply, installation and commissioning of Earth Station Antenna. The company also takes up services like installation, servicing and maintenance of satellite-based equipment of any make. A cluster of well-trained experienced and highly qualified team of engineers manages the total activity in above fields. Meltek infosystems has its hub station positioned at Pune for providing the test facilities for inspection and training towards operations, repairs and maintenance of entire earth station electronics.
Meltek infosystems is established by a term of experienced engineers in the year of 2000. The company provided complete technical solution for any type of satellite communication application. The services provided by the company include supply, installation and commissioning of Earth Station Antenna. The company also takes up services like installation, servicing and maintenance of satellite-based equipment of any make. A cluster of well-trained experienced and highly qualified team of engineers manages the total activity in above fields. Meltek infosystems has its hub station positioned at Pune for providing the test facilities for inspection and training towards operations, repairs and maintenance of entire earth station electronics.
PAKISTAN TELECOM COMPANY. (PTCL)
1 Terminations of Primary & Secondary Cable.
2 Method of Erection of Telephone Lines.
3 Line Fault Rectification Procedures.
BTC TELECOM COMPANY.KSA
1 Programming Procedure for Mobile & Handheld Radios.
2 Basic Installation Steps for Transmitter/Receiver Units.
3 Base Station & Mobile Vehicle Installation Procedures.
4 Basic Testing Method of Tx/Rx.
5 Optical Fiber Installation and testing with OTDR
1. Marvani Miller Estrella, PMP
Licensed Electronics & Communications Engineer
ECE No. 0032075 / PMI ID 4254781E1 / PMP 1861112
Employee ACE Awardee
Project Manager 2014 Awardee
Certified Lean Six Sigma / Certified Radiation Safety Officer
1791 G. Santiago Sto. Tondo Manila
Mobile: +639062592395/+639175889545/+6325000348
marvani.estrella@yahoo.com
OBJECTIVE
To use and practice my fullskills and potentials in contributing to the development of the company and maximize my field of w ork to
its mission of innovating and continuously learning, improving and developing myself.
WORK EXPERIENCE
March 1, 2008 to present Senior Expert / Project Manager GLOBE TELECOM (Network Technical Group).
Project Management:
Successfully managed different project/roll-out endorsed by engineering such as CSALES, Cellmax, BCFU,
operational w orkorders and engineering w orkorders.
Successfully managed the fullsite implementation (approximately 1,000 sites) roll-out that composes from
Radio Netw orkEngineering, Site Acquisition, Facilities Engineering, Civilw orks, Telecomw orks, NOCand Radio
Netw orkOptimization.
Successfully handed over and closure of allthe projects endorsed by engineering and business to netw ork
operations team.
Successfully managed 2G,3G,LTE,WIMAX,BAU,NEMESIS and U900 projects.
Handled & Managed multiple sub-contractors (5-12 contractors) including major vendors such as NSN,
Ericsson, Alcatel, & Huaw ei.
Communicated the reports to the higher management and monitor progress of the project at all times.
Supervises installation, commissioning, integration and optimization of new ly on-aired 2G/3G/Wimax/LTE/U900
sites.
Planned and conducted Frame Services Agreement for Cellmax Projects.
Planned and conducted Frame Services Agreement fromPhase 11 to Phase16 for Telecomw orks.
Successfully managed and implemented the augmentation of COW for Sea Games.
Successfully managed Frequency Shift Repeater and VSATroll-out in remote areas.
Successfully managed LAPD/EDGE/Trx activation for 2G BTS nationw ide.
Successfully managed different type of SWATsites nationw ide.
Sept 2004 to March 2008 Project Engineer GLOBE TELECOM (Network Technical Group).
Access Planning, Engineering and Implementation
Planned & Designed 2G/3G/SDR Footprint for Project Roll-out
Designed & Dimensioned the channel element capacity for 3G netw ork
Designed & Dimensioned the 2G capacity for GSM netw ork
Designed & Dimensioned the Iub and FE (Fiber Optic) solution
Planned & Designed Microw ave/CX Aggregator/ATM for FTIB roll-out
Planned the antenna changed-out from 2ports/4ports/triband type of antenna.
Designed telecom installation standards for different various cell sites such as GSM, NodeB, SDR, Wimax, &
Rectifier including the ancillaries.
Planned & Designed some relocation sites and additional sectors for 2G/3G as part of engineering and
business initiative to address the subscribers complaints.
Type-approved different kind of passive components and POC of different type of BTS equipment and
ancillaries. .
Planned and Designed BTS solution for Domestic Airport in the Philippines
2. Quality Assurance and Capacity Management:
Successfully managed and implemented the transmission requirement for 3G (Iub and FE)
Managed and implemented the 2nd
carrier upgrade for 3G (F2).
Managed and implemented the Channel Element upgrade to address subscribers demand and traffic grow th.
Managed and implemented the augmentation of cooper facilities to upgrade the existing E1’s in some Indoor
Building Sites.
Set the VSWR/DTF standards for 2G/3G/G18/WIMAX/LTE to ensure quality and good KPI/traffic.
Ensure the microw ave/sdh RSL are w ithin globe limits during the panning.
Made a report on RFS feeder cable and Battery for Outdoor Rectifier for evaluation in Globe Phase 12 project.
Responsible for pow erupgrade for additionalcapacity of Ascom, Empow er, Benning and Eltek rectifier to power
up the Node B 880 and 881.
Managed and implemented the TMA (Tow er Mounted Amplifier) for 2G BTS.
Familiar with the following telecom BTS/Transmission/Test equipment
Transmission Equipment: NEC Pasolink , NERA Compact link , VSAT, SRAL XD Siemens , DNT2M, Sunley,
COT, One-com Spacelink,
BTS Equipment: RBS Family, Nokia Talk Family, Huaw ei BTS / Site Master / Siemens NodeB,
Pow er Equipment: Eltek Rectifier, Benning Rectifier, Ascom Rectifier, Emerson Rectifier, Empow er,
January 2004 to Sept 20, 2004 ERICSSON PHILIPPINES 6th
flr. Octagon Bldg.,San Miguel Ave., Ortigas center., Pasig City
On-Job Training
Participated in different trainings in the field of Telecommunications (GSM, GPRS, EDGE, W-CDMA, MMS,
Bluetooth).
Have an actual training in installation, operation and maintenance of RBS (Radio Base Station), Transmission
System
Hands-on experience in computers and other office equipments
Research and develops updated information related to Telecommunications.
Act as a facilitator of equipments during field trips of various universities.
Jan 2003 to May 2003 AIR TRANSPORTATION OFFICE Air Facilities Complex Departmen Pasay City
On-Job Training
Assist on preventive maintenance, checking, and operating computers at Area Control Center and Air
Navigation System Station and assist on changing Dictaphone film recorder
Check and report lines having interference, intermittent and disturbances w ith other frequencies.
Reinstalled and reformat computers using UNIX operating system.
Check transmitter and receiver carrier at Domestic Airport.
Check the received signal coming from the pilot by using squelch.
EDUCATIONAL BACKGROUND
College : Mapua Institute of Technology
Muralla St. Intramuros, Manila
Degree : Bachelor of Science in Electronics and
Communication Engineering, 1999 - 2003
Graduated on Oct 14, 2003
Member : IECEP Philippines
Gov’t Exam. Taken : Licensure Examination for Electronics and
Communications Engineer (April 2004) Passed.