Index




Solaer: the company

Solaer: our references

Possible financial problems

Possible legal problems

Possible technical problems

Possible managing problems

Some tips for you




                              Problems related to big photovoltaic systems
Solaer: the company



  What?

 Our activities are focused on the design, development and installation of solar photovoltaic
plants

 Solaer Group is specialized in developing and producing engineering for turnkey projects

 Also in charge of the maintenance and production control of facilities  monitoring 365 days/year


   How?

 With more than 100 professionals with proven experience in renewable energies


Since when?                                                   Where?

 Founded in 2004                                       Based in …
                                                       with 5 offices and
                                                       15 franchises

                                 Present in Spain, Italy, Israel, EE.UU and
                                India




                                                                            Problems related to big photovoltaic systems
Solaer: our references




                             70 MW total power connected

More than 60 MW connected in Spain


9 MW connected in Italy (in collaboration with Zaragoza Group)


1 MW connected in Israel

                   Project portfolio for 2011  40 MW




                                                                 Problems related to big photovoltaic systems
Possible financial problems




    Big scale plants are financed under the model of PROJECT FINANCE  BANKS!!!!!

Constructor’s bank acceptance

The bank’s technical advisor will have to approve of the:
                      Project
                      Constructor choosen
                      Acceptance of the plant
                      O&M procedures
                      Performance

A bank guarantee is needed during both construction and guarantee period

Huge working capital needs (relationship with suppliers)

Bank bureaucracy




                                                                Problems related to big photovoltaic systems
Possible legal problems




 Loads and loads of paper work
 Administration procedures often very slow



 Lawyers requirements too strict
 Endless negotiations




                            Problems related to big photovoltaic systems
Possible technical problems




   Fixed ground installations          Tracker ground installations

 Material transportation (strikes,    Founding calculation
customs, shipping…)
                                       Shading calculation
 Land quality (geology, rivers,
arqueology, …)


 “Italian problems”


 Climatology conditions


 Surveillance




                                                  Problems related to big photovoltaic systems
Possible technical problems




                                      Rooftop installations

 Security (number of people working on               Space in rooftop for O&M
a roof)

                                                      Good calculation programs (better 90 at
 Risk prevention (lift of materials and             100% than 100 at 90%)
its distribution)
                                                      Series connecting direction
 Wiring in great powers
                                                      Invertor MPPT (maximum power point
 Weight calculation of the structure                tracking)




                                                                  Problems related to big photovoltaic systems
Possible managing problems




                    Complicated coordination of resources (human and material)
                  Big teams                                   Complicated planification

 Different areas involved (human, financial,         Long term planification
logistics, purchasing, …)
                                                      Bottlenecks identification
 Experienced human resources needed




               Use of technology                                      Specific profiles

 Permanent innovation                                Experience in mid tension
                                                      Purchasing department (relationship
                                                     with suppliers)
                                                      Engineers




                                                                        Problems related to big photovoltaic systems
Some tips for you


                         If you are a client, choose an EPC that…

1.   …has proven experience  experience saves money:
           Duplicity
           Oversizing
           Redesign


2.   … is “bankable”

                            If you are an EPC, remember to…

1.   Plan everything ahead of time (focus on planning!!)

2.   Have ready loads of working capital

3.   Watch out for high tension

                          Do not let lawyers lead the negotiations

                          Beware of banks


              When planning remember that everything you think may not happen,
              will happen…
                                                                      Problems related to big photovoltaic systems
Tel Aviv, 27th January 2011
Know more about Solaer




 Problems related to big photovoltaic systems
Know more about Solaer




 Problems related to big photovoltaic systems
Know more about Solaer




 Problems related to big photovoltaic systems
Know more about Solaer




 Problems related to big photovoltaic systems

More Related Content

Similar to מצגת חברת סולאיר

Energy Harvesting appliqué aux systèmes de surveillance de la pression des pn...
Energy Harvesting appliqué aux systèmes de surveillance de la pression des pn...Energy Harvesting appliqué aux systèmes de surveillance de la pression des pn...
Energy Harvesting appliqué aux systèmes de surveillance de la pression des pn...
Minnovarc
 
Rwm public-eng
Rwm public-engRwm public-eng
Rwm public-engSkolkovoMD
 
How to find a professional local partner in Ukraine
How to find a professional local partner in UkraineHow to find a professional local partner in Ukraine
How to find a professional local partner in UkraineDmitry Lukomskiy
 
Barrick simulation with mimic presentation
Barrick simulation with mimic presentationBarrick simulation with mimic presentation
Barrick simulation with mimic presentationMYNAH Technologies
 
Qp 020 12 Cleanergetic Solar Services Presentation V1
Qp 020 12 Cleanergetic Solar Services Presentation V1Qp 020 12 Cleanergetic Solar Services Presentation V1
Qp 020 12 Cleanergetic Solar Services Presentation V1
Antonio Bautista, Ph.D.
 
Chaos Engineering: Why the World Needs More Resilient Systems
Chaos Engineering: Why the World Needs More Resilient SystemsChaos Engineering: Why the World Needs More Resilient Systems
Chaos Engineering: Why the World Needs More Resilient Systems
C4Media
 
Using the COSMIC Method to Estimate Agile User Stories
Using the COSMIC Method to Estimate Agile User StoriesUsing the COSMIC Method to Estimate Agile User Stories
Using the COSMIC Method to Estimate Agile User Stories
Luigi Buglione
 
The Future of IT
The Future of ITThe Future of IT
The Future of IT
Stephen Lahanas
 
Utility Scale Pv 2011
Utility Scale Pv 2011Utility Scale Pv 2011
Utility Scale Pv 2011
james_brady
 
Cyber Security Awareness of Critical Infrastructures in North East of Italy S...
Cyber Security Awareness of Critical Infrastructures in North East of Italy S...Cyber Security Awareness of Critical Infrastructures in North East of Italy S...
Cyber Security Awareness of Critical Infrastructures in North East of Italy S...
Luca Moroni ✔✔
 
Hybriding CMMI and Requirement Engineering Maturity & Capability Models - App...
Hybriding CMMI and Requirement Engineering Maturity & Capability Models - App...Hybriding CMMI and Requirement Engineering Maturity & Capability Models - App...
Hybriding CMMI and Requirement Engineering Maturity & Capability Models - App...
Luigi Buglione
 
Utility Scale Pv 2011
Utility Scale Pv 2011Utility Scale Pv 2011
Utility Scale Pv 2011
james_brady
 
Smart grid-leaflet
Smart grid-leafletSmart grid-leaflet
Smart grid-leafletIntertek CE
 
BIPV- Business Case - Organext
BIPV- Business Case - Organext BIPV- Business Case - Organext
BIPV- Business Case - Organext Julie Leroy
 
Ambicales Solar Profile
Ambicales Solar ProfileAmbicales Solar Profile
Ambicales Solar Profile
Ambicales
 
Need for a New Facility Management Paradigm
Need for a New Facility Management ParadigmNeed for a New Facility Management Paradigm
Need for a New Facility Management Paradigm
Rob Watson
 
Shift left Observability
Shift left ObservabilityShift left Observability
Shift left Observability
Eric D. Schabell
 

Similar to מצגת חברת סולאיר (20)

Energy Harvesting appliqué aux systèmes de surveillance de la pression des pn...
Energy Harvesting appliqué aux systèmes de surveillance de la pression des pn...Energy Harvesting appliqué aux systèmes de surveillance de la pression des pn...
Energy Harvesting appliqué aux systèmes de surveillance de la pression des pn...
 
Rwm public-eng
Rwm public-engRwm public-eng
Rwm public-eng
 
How to find a professional local partner in Ukraine
How to find a professional local partner in UkraineHow to find a professional local partner in Ukraine
How to find a professional local partner in Ukraine
 
Barrick simulation with mimic presentation
Barrick simulation with mimic presentationBarrick simulation with mimic presentation
Barrick simulation with mimic presentation
 
Qp 020 12 Cleanergetic Solar Services Presentation V1
Qp 020 12 Cleanergetic Solar Services Presentation V1Qp 020 12 Cleanergetic Solar Services Presentation V1
Qp 020 12 Cleanergetic Solar Services Presentation V1
 
Chaos Engineering: Why the World Needs More Resilient Systems
Chaos Engineering: Why the World Needs More Resilient SystemsChaos Engineering: Why the World Needs More Resilient Systems
Chaos Engineering: Why the World Needs More Resilient Systems
 
Using the COSMIC Method to Estimate Agile User Stories
Using the COSMIC Method to Estimate Agile User StoriesUsing the COSMIC Method to Estimate Agile User Stories
Using the COSMIC Method to Estimate Agile User Stories
 
The Future of IT
The Future of ITThe Future of IT
The Future of IT
 
Utility Scale Pv 2011
Utility Scale Pv 2011Utility Scale Pv 2011
Utility Scale Pv 2011
 
Cyber Security Awareness of Critical Infrastructures in North East of Italy S...
Cyber Security Awareness of Critical Infrastructures in North East of Italy S...Cyber Security Awareness of Critical Infrastructures in North East of Italy S...
Cyber Security Awareness of Critical Infrastructures in North East of Italy S...
 
Ambicales Solar
Ambicales SolarAmbicales Solar
Ambicales Solar
 
Hybriding CMMI and Requirement Engineering Maturity & Capability Models - App...
Hybriding CMMI and Requirement Engineering Maturity & Capability Models - App...Hybriding CMMI and Requirement Engineering Maturity & Capability Models - App...
Hybriding CMMI and Requirement Engineering Maturity & Capability Models - App...
 
Utility Scale Pv 2011
Utility Scale Pv 2011Utility Scale Pv 2011
Utility Scale Pv 2011
 
Smart grid-leaflet
Smart grid-leafletSmart grid-leaflet
Smart grid-leaflet
 
Ambicales Solar
Ambicales SolarAmbicales Solar
Ambicales Solar
 
BIPV- Business Case - Organext
BIPV- Business Case - Organext BIPV- Business Case - Organext
BIPV- Business Case - Organext
 
Ambicales Solar Profile
Ambicales Solar ProfileAmbicales Solar Profile
Ambicales Solar Profile
 
Dr. alex bartzas
Dr. alex bartzasDr. alex bartzas
Dr. alex bartzas
 
Need for a New Facility Management Paradigm
Need for a New Facility Management ParadigmNeed for a New Facility Management Paradigm
Need for a New Facility Management Paradigm
 
Shift left Observability
Shift left ObservabilityShift left Observability
Shift left Observability
 

More from Tashtiot media

סקירה תקופתית - מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
סקירה תקופתית - מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראלסקירה תקופתית - מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
סקירה תקופתית - מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
Tashtiot media
 
הזמנה לכנס צרכני גז טבעי באזור ירושלים
הזמנה לכנס צרכני גז טבעי באזור ירושליםהזמנה לכנס צרכני גז טבעי באזור ירושלים
הזמנה לכנס צרכני גז טבעי באזור ירושלים
Tashtiot media
 
עקרונות ההליך התחרותי להקמת מתקנים סולאריים
עקרונות ההליך התחרותי להקמת מתקנים סולארייםעקרונות ההליך התחרותי להקמת מתקנים סולאריים
עקרונות ההליך התחרותי להקמת מתקנים סולאריים
Tashtiot media
 
Edison
EdisonEdison
סקירה תקופתית: מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
סקירה תקופתית: מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראלסקירה תקופתית: מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
סקירה תקופתית: מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
Tashtiot media
 
סופר אנ.ג'י עדכון לוחות זמנים רשת החלוקה
סופר אנ.ג'י עדכון לוחות זמנים רשת החלוקה  סופר אנ.ג'י עדכון לוחות זמנים רשת החלוקה
סופר אנ.ג'י עדכון לוחות זמנים רשת החלוקה
Tashtiot media
 
כיבוי אש מתקן גז טבעי דחוס
כיבוי אש מתקן גז טבעי דחוסכיבוי אש מתקן גז טבעי דחוס
כיבוי אש מתקן גז טבעי דחוס
Tashtiot media
 
מצגת סיכום גיבוש יעד לאומי
מצגת סיכום   גיבוש יעד לאומימצגת סיכום   גיבוש יעד לאומי
מצגת סיכום גיבוש יעד לאומי
Tashtiot media
 
מכתב ראש העיר לתעשיינים מכנס טלמניה
מכתב ראש העיר לתעשיינים מכנס טלמניהמכתב ראש העיר לתעשיינים מכנס טלמניה
מכתב ראש העיר לתעשיינים מכנס טלמניה
Tashtiot media
 
דורון הראל היתכנות טכנו כלכלית ליישום גנרצייה עצמית במפעלים
דורון הראל   היתכנות טכנו כלכלית ליישום גנרצייה עצמית במפעליםדורון הראל   היתכנות טכנו כלכלית ליישום גנרצייה עצמית במפעלים
דורון הראל היתכנות טכנו כלכלית ליישום גנרצייה עצמית במפעלים
Tashtiot media
 
שניב תאור פרויקט כנס קוגנרציה מאי 2015
שניב   תאור פרויקט כנס קוגנרציה מאי 2015שניב   תאור פרויקט כנס קוגנרציה מאי 2015
שניב תאור פרויקט כנס קוגנרציה מאי 2015
Tashtiot media
 
גיא זילברמן קוגנרציה ואופקים למשלוח
גיא זילברמן קוגנרציה ואופקים  למשלוחגיא זילברמן קוגנרציה ואופקים  למשלוח
גיא זילברמן קוגנרציה ואופקים למשלוח
Tashtiot media
 
38878 nga hdd guidelines rev. p0
38878   nga hdd guidelines rev. p0 38878   nga hdd guidelines rev. p0
38878 nga hdd guidelines rev. p0
Tashtiot media
 
סקירת השפעת עיכוב פיתוח מאגר לוויתן ותקלה בהזרמת הגז ממאגר תמר פברואר E
סקירת השפעת עיכוב פיתוח מאגר לוויתן ותקלה בהזרמת הגז ממאגר תמר   פברואר Eסקירת השפעת עיכוב פיתוח מאגר לוויתן ותקלה בהזרמת הגז ממאגר תמר   פברואר E
סקירת השפעת עיכוב פיתוח מאגר לוויתן ותקלה בהזרמת הגז ממאגר תמר פברואר E
Tashtiot media
 
Img 222163605
Img 222163605Img 222163605
Img 222163605
Tashtiot media
 
מכתב מרשות החשמל לבקרה אצל המחלק
מכתב מרשות החשמל לבקרה אצל המחלקמכתב מרשות החשמל לבקרה אצל המחלק
מכתב מרשות החשמל לבקרה אצל המחלק
Tashtiot media
 
תגובה לרשות החשמל
תגובה לרשות החשמלתגובה לרשות החשמל
תגובה לרשות החשמל
Tashtiot media
 
Iec accessibility 2014 (1)
Iec accessibility 2014 (1)Iec accessibility 2014 (1)
Iec accessibility 2014 (1)
Tashtiot media
 
שימוע בנושא אישור חחי למכור ולשווק עודפי גז טבעי
שימוע בנושא אישור חחי למכור ולשווק עודפי גז טבעישימוע בנושא אישור חחי למכור ולשווק עודפי גז טבעי
שימוע בנושא אישור חחי למכור ולשווק עודפי גז טבעיTashtiot media
 

More from Tashtiot media (20)

סקירה תקופתית - מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
סקירה תקופתית - מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראלסקירה תקופתית - מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
סקירה תקופתית - מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
 
הזמנה לכנס צרכני גז טבעי באזור ירושלים
הזמנה לכנס צרכני גז טבעי באזור ירושליםהזמנה לכנס צרכני גז טבעי באזור ירושלים
הזמנה לכנס צרכני גז טבעי באזור ירושלים
 
עקרונות ההליך התחרותי להקמת מתקנים סולאריים
עקרונות ההליך התחרותי להקמת מתקנים סולארייםעקרונות ההליך התחרותי להקמת מתקנים סולאריים
עקרונות ההליך התחרותי להקמת מתקנים סולאריים
 
Edison
EdisonEdison
Edison
 
סקירה תקופתית: מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
סקירה תקופתית: מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראלסקירה תקופתית: מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
סקירה תקופתית: מדיניות ורגולציה בתחומי הגז הטבעי והנפט בישראל
 
סופר אנ.ג'י עדכון לוחות זמנים רשת החלוקה
סופר אנ.ג'י עדכון לוחות זמנים רשת החלוקה  סופר אנ.ג'י עדכון לוחות זמנים רשת החלוקה
סופר אנ.ג'י עדכון לוחות זמנים רשת החלוקה
 
כיבוי אש מתקן גז טבעי דחוס
כיבוי אש מתקן גז טבעי דחוסכיבוי אש מתקן גז טבעי דחוס
כיבוי אש מתקן גז טבעי דחוס
 
מצגת סיכום גיבוש יעד לאומי
מצגת סיכום   גיבוש יעד לאומימצגת סיכום   גיבוש יעד לאומי
מצגת סיכום גיבוש יעד לאומי
 
מכתב ראש העיר לתעשיינים מכנס טלמניה
מכתב ראש העיר לתעשיינים מכנס טלמניהמכתב ראש העיר לתעשיינים מכנס טלמניה
מכתב ראש העיר לתעשיינים מכנס טלמניה
 
דורון הראל היתכנות טכנו כלכלית ליישום גנרצייה עצמית במפעלים
דורון הראל   היתכנות טכנו כלכלית ליישום גנרצייה עצמית במפעליםדורון הראל   היתכנות טכנו כלכלית ליישום גנרצייה עצמית במפעלים
דורון הראל היתכנות טכנו כלכלית ליישום גנרצייה עצמית במפעלים
 
שניב תאור פרויקט כנס קוגנרציה מאי 2015
שניב   תאור פרויקט כנס קוגנרציה מאי 2015שניב   תאור פרויקט כנס קוגנרציה מאי 2015
שניב תאור פרויקט כנס קוגנרציה מאי 2015
 
גיא זילברמן קוגנרציה ואופקים למשלוח
גיא זילברמן קוגנרציה ואופקים  למשלוחגיא זילברמן קוגנרציה ואופקים  למשלוח
גיא זילברמן קוגנרציה ואופקים למשלוח
 
38878 nga hdd guidelines rev. p0
38878   nga hdd guidelines rev. p0 38878   nga hdd guidelines rev. p0
38878 nga hdd guidelines rev. p0
 
סקירת השפעת עיכוב פיתוח מאגר לוויתן ותקלה בהזרמת הגז ממאגר תמר פברואר E
סקירת השפעת עיכוב פיתוח מאגר לוויתן ותקלה בהזרמת הגז ממאגר תמר   פברואר Eסקירת השפעת עיכוב פיתוח מאגר לוויתן ותקלה בהזרמת הגז ממאגר תמר   פברואר E
סקירת השפעת עיכוב פיתוח מאגר לוויתן ותקלה בהזרמת הגז ממאגר תמר פברואר E
 
Img 222163605
Img 222163605Img 222163605
Img 222163605
 
מכתב מרשות החשמל לבקרה אצל המחלק
מכתב מרשות החשמל לבקרה אצל המחלקמכתב מרשות החשמל לבקרה אצל המחלק
מכתב מרשות החשמל לבקרה אצל המחלק
 
תגובה לרשות החשמל
תגובה לרשות החשמלתגובה לרשות החשמל
תגובה לרשות החשמל
 
Iec accessibility 2014 (1)
Iec accessibility 2014 (1)Iec accessibility 2014 (1)
Iec accessibility 2014 (1)
 
205 ver-4
205 ver-4205 ver-4
205 ver-4
 
שימוע בנושא אישור חחי למכור ולשווק עודפי גז טבעי
שימוע בנושא אישור חחי למכור ולשווק עודפי גז טבעישימוע בנושא אישור חחי למכור ולשווק עודפי גז טבעי
שימוע בנושא אישור חחי למכור ולשווק עודפי גז טבעי
 

מצגת חברת סולאיר

  • 1. Tel Aviv, 27th January 2011
  • 2. Index Solaer: the company Solaer: our references Possible financial problems Possible legal problems Possible technical problems Possible managing problems Some tips for you Problems related to big photovoltaic systems
  • 3. Solaer: the company What?  Our activities are focused on the design, development and installation of solar photovoltaic plants  Solaer Group is specialized in developing and producing engineering for turnkey projects  Also in charge of the maintenance and production control of facilities  monitoring 365 days/year How?  With more than 100 professionals with proven experience in renewable energies Since when? Where?  Founded in 2004  Based in … with 5 offices and 15 franchises  Present in Spain, Italy, Israel, EE.UU and India Problems related to big photovoltaic systems
  • 4. Solaer: our references 70 MW total power connected More than 60 MW connected in Spain 9 MW connected in Italy (in collaboration with Zaragoza Group) 1 MW connected in Israel Project portfolio for 2011  40 MW Problems related to big photovoltaic systems
  • 5. Possible financial problems Big scale plants are financed under the model of PROJECT FINANCE  BANKS!!!!! Constructor’s bank acceptance The bank’s technical advisor will have to approve of the:  Project  Constructor choosen  Acceptance of the plant  O&M procedures  Performance A bank guarantee is needed during both construction and guarantee period Huge working capital needs (relationship with suppliers) Bank bureaucracy Problems related to big photovoltaic systems
  • 6. Possible legal problems  Loads and loads of paper work  Administration procedures often very slow  Lawyers requirements too strict  Endless negotiations Problems related to big photovoltaic systems
  • 7. Possible technical problems Fixed ground installations Tracker ground installations  Material transportation (strikes,  Founding calculation customs, shipping…)  Shading calculation  Land quality (geology, rivers, arqueology, …)  “Italian problems”  Climatology conditions  Surveillance Problems related to big photovoltaic systems
  • 8. Possible technical problems Rooftop installations  Security (number of people working on  Space in rooftop for O&M a roof)  Good calculation programs (better 90 at  Risk prevention (lift of materials and 100% than 100 at 90%) its distribution)  Series connecting direction  Wiring in great powers  Invertor MPPT (maximum power point  Weight calculation of the structure tracking) Problems related to big photovoltaic systems
  • 9. Possible managing problems Complicated coordination of resources (human and material) Big teams Complicated planification  Different areas involved (human, financial,  Long term planification logistics, purchasing, …)  Bottlenecks identification  Experienced human resources needed Use of technology Specific profiles  Permanent innovation  Experience in mid tension  Purchasing department (relationship with suppliers)  Engineers Problems related to big photovoltaic systems
  • 10. Some tips for you If you are a client, choose an EPC that… 1. …has proven experience  experience saves money:  Duplicity  Oversizing  Redesign 2. … is “bankable” If you are an EPC, remember to… 1. Plan everything ahead of time (focus on planning!!) 2. Have ready loads of working capital 3. Watch out for high tension  Do not let lawyers lead the negotiations  Beware of banks When planning remember that everything you think may not happen, will happen… Problems related to big photovoltaic systems
  • 11. Tel Aviv, 27th January 2011
  • 12. Know more about Solaer Problems related to big photovoltaic systems
  • 13. Know more about Solaer Problems related to big photovoltaic systems
  • 14. Know more about Solaer Problems related to big photovoltaic systems
  • 15. Know more about Solaer Problems related to big photovoltaic systems