SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Persons at Risk (Groups) Risk Assessor Appointment Tel. No. Description of Task or Activity
A – SALCO employees Ahmad Ali Khan H&S Manager 0506219441 SALCO operatives carrying out
commercial gas works including,
repairs and servicing.
B – Contractors/Sub contractors
C – Tenants
D – Members of the public
Work Type Review Date
Routine Feb 2024
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
1) Gas leaks
Fire, explosion,
asphyxiation
A,B,C,D S P H 1) Gas work to be carried out by
trained and competent operatives
in compliance with the Gas
Safety Installation and Use
Regulations 1998 and in line with
the commercial gas tasks being
undertaken
2) Ensure that all pre commissioning
checks are carried out
3) All works should be carried
out in line with manufacturers
installation instructions
4) Ensure that leak detection
equipment is used
M 1) Gas qualifications and gas safe
registration to be checked and
verified and records kept on file
4) Detection equipment to be
calibrated in line with testing
schedule and appropriate
records kept
L
Page 2
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
2) Carbon
Monoxide
Asphyxiation
A,B,C,D S P H 1) Ensure good ventilation and
boiler flue is checked
2) Test for the presence of CO2
using detection equipment
within the installation before
starting work
L 2) All Gas operatives to wear
personal carbon monoxide
detection devices
L
3) Contact with
hot parts
Burns
A S P H 1) Gloves with an appropriate heat
resistance level should be used
when handling hot parts
M 1) PPE to be issued, recorded,
monitored and replaced where
appropriate
L
4) Exposure to
hazardous
substances
A,B,C,D S P H 1) Consult COSHH inventory list
and control approach prior
to the use of or creation of
hazardous substances or
materials
2) Appropriate PPE to be supplied
and worn as identified
3) Consult appropriate asbestos
information for the property/
task
4) Hover up dust and soot, don’t
sweep
M 2) PPE to be issued, recorded,
monitored and replaced where
appropriate
3) Stop work if unsure about
asbestos information provided
for the task and report to
supervisor/manager
See Contingency Item 4
L
Page 3
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
5) Electric Shock
Electrocution,
burns, heart
failure
A,B,C,D Cr O H 1) Electrical work to be carried
out by trained and competent
operatives in line with the
Electricity at Work Regulations
1989 and the 17th
Edition IEE
Wiring Regulations
2) Where required, the boiler
should be switched off prior to
starting work and isolated from
the supply
3) Occupants of properties should
be made aware of the work
being undertaken
4) Testing equipment to be
calibrated by competent Person
in line with testing schedule
and records kept
5) Hand tools to be insulated to
1000v
6) Operatives to be in possession
of an appropriate fire
extinguisher
M 1) Electrical qualifications to be
checked and verified for all
operatives and records kept on
file
2) Safe isolation procedures
should be implemented
to prevent uncontrolled re
energisation of circuits
L
Page 4
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
7) Operatives should take care
when working in the presence
of live circuits and make dead
where possible
8) Operatives should be trained in
the emergency procedures of
dealing with electrical shock
8) Striking
services
Damage to
property,
electrocution
A,B,C,D S O H 1) Existing plans to be consulted
2) Detection equipment to be
used to scan prior to drilling,
cutting or digging holes
M 1) Existing plans to be confirmed
with detection equipment or by
exposing area in a controlled
manner
See Contingency Item 2
L
9) Hot Works A,B,C,D S P H 1) Hot works should only be
considered when other
alternatives have been
discounted i.e. mechanical
fixing, sawing, adhesives, push
fit, compression fixings
2) Low risk, routine operations
should be carried out in
accordance with the ‘hot works
standard operating procedure’
M 2) H&S inspections should
examine work to assess that
they are being carried out in
line with the standard operating
procedure
3) The permit to work should be
issued by a competent person
and recorded on a permit to
work register
L
Page 5
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
10) Injury to
others
Injury to
occupants or
operatives
A,B,C,D S O M 1) Ensure work areas in communal
areas are appropriately
cordoned off and safety signage
is in place
2) When working in occupied
properties ensure that tenant
is aware of works being under
taken and any associated risks
3) Good communication should be
maintained with other trades
with regards to specific gas
hazard
M 1) See working in communal areas
risk assessment
2) Specific gas hazards to be
covered in site induction where
appropriate
See contingency plan 3
L
11) Working in
confined
spaces
Musculoskeletal
injuries, cuts,
abrasions
A S P H 1) Take regular breaks by ensuring
task rotation
2) Limit to short duration works
where possible
3) Ensure appropriate levels of
task lighting
L 1,2) 
All working in confined spaces
other than short duration
works that can be controlled
by existing control measures
should be subjected to a
permit to work system
L
12) Plant Rooms
Injury to
operatives
A,B S O M 1) Commercial gas activities being
undertaken in plant rooms are
considered to be 2 man jobs
under One Direct lone working
arrangements
3) Appropriate levels of clothing
should be worn whilst still
maintaining safe levels of PPE,
regular breaks should be taken,
operatives should remain well
Page 6
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
2) Plant room doors should be
secure at all times in order to
prevent unauthorised access
3) Operatives should be aware
of potentially higher or lower
working temperatures within
plant rooms
4) Good housekeeping should be
maintained in all plant rooms,
all waste should be removed
as soon as practicably possible
in order to prevent trip and fire
hazards.
5) Care should be taken around
and biological hazards such as
rodent and bird/ other animal
bodily waste and appropriate
levels of PPE Should be worn
in line with appropriate COSHH
control approach
hydrated throughout the day,
restrict work to short durations
wherever possible
4) Any bulk waste should be
reported for removal
5) Significant levels of biological
waste should be removed by
specialist cleaning contractors
1 – 5) 
Joint inspections being
undertaken between HS
and commercial gas team to
identify potential hazards in
individual plant rooms
Page 7
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
13) Use of hand
tools
Cuts and
abrasions,
flying objects
A,B,C,D S F H 1) All tools to be maintained in
good condition
2) Tools to only be used for the
task intended in line with
3) Electrical tools to be insulated
to 1000v
4) All tools to be appropriately
stored to avoid damage
5) All damaged tools to be
removed from use immediately
6) Appropriate PPE to be supplied
and worn as identified
7) Prevent use of tools by
unauthorised persons
8) See SRA for hand and power
tools
M 1,2,3,4,5) Condition and
appropriate use of hand tools
to be checked during HS
inspections
6) 6) PPE to be issued, recorded,
monitored and replaced where
appropriate
L
14) Use of power
tools
Cuts and
abrasions,
flying objects,
entanglement,
electrocution
A,B,C,D S F H 1) All tools to be maintained in
good condition
2) Tools to only be used for the
task intended in line with any
manufactures instructions
3) All tools to be inspected by the
user prior to use
M 1,2,3,4,5,6,7,8,9,13,14) Condition
and appropriate use of hand
tools to be checked during HS
inspections
11) PPE to be issued, recorded,
monitored and replaced where
appropriate
L
Page 8
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
4) All tools to be guarded as per
manufacturer’s instructions
5) Guards to be inspected
regularly
6) All tools to be covered under an
appropriate PAT schedule
7) All tools to be battery powered
or 110V
8) Ensure that all cables are
secured to avoid trip hazards
9) Ensure dust extraction is fitted
to all tools if required
10) Prevent use of tools by
unauthorised persons, to
include tenants and members
of the public
11) Appropriate PPE to be supplied
and worn as identified
12) Allow sufficient space to work
safely
13) All tools to be appropriately
stored to avoid damage
14) All damaged tools to be
removed from use immediately
See SRA for hand and power
tools
Page 9
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
15) Slips, trips
and falls
Trips on trailing
cables or
materials, Falls
from height
A,B,C,D S P H 1) All cables to be taped down,
covered or attached at a high
level to prevent trip hazards
2) All materials and waste to be
tidy or removed from site
3) Maintain good housekeeping
standards and prevent trip
hazards
M 1,2) To be monitored during HS
inspections
2) Regular waste collections to
take place in order to prevent
build-up of waste on site
L
16) Working at
Heights
Injury from
falls or being
struck by falling
objects
A,B,C,D S F H 1) Ensure correct means of access
equipment or working platform
is identified for every task
M 1) Insulated WAH equipment
should be used
2) See SRA’s for working at height
L
17) Noise
Exposure to
high levels
leading to
occupational
hearing loss
A,B,C,D S P H 1) Most work is restricted to short
duration
2) Use self-dampening tools
where available
3) Appropriate PPE to be supplied
and worn as identified
M 1) Noise monitoring to be carried
out for tasks and equipment
that fall outside the scope of
short duration
2) Hearing protection to be worn
for all equipment that exceeds
levels of 85db
L
Page 10
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
18) Manual
handling
Sprains
and strains,
impact injury,
lacerations
A,B,C,D S F H 1) Operatives are trained and
competent in the task
2) Safety footwear to be worn at
all times
3) Gloves available for use where
required to prevent splinters
and pinch injuries
4) Resources available for team
lifts where appropriate
5) Order timber in easy to handle
sizes and quantities where
possible
M 1) Document operative training
and competence
2,3) PPE to be issued, recorded,
monitored and replaced where
appropriate
4) Ensure correct resources are
allocated as required
1,2,3,4,5) See SRA for manual
handling
L
19) Hand arm
vibration
Exposure to
occupational
injuries to
blood vessels,
nerves and
joints
A S P H 1) Tools with built in HAV
dampener protection to be
used where available
2) Gloves to be worn when using
tools that generate vibration or
impact
M 1,2) HAV questionnaires to be
completed for all operatives,
any existing conditions or new
symptoms to be referred to
occupational health advisor
L
Page 11
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Personal Protective Equipment required (PPE): Icon Glossary
HARD HAT
NO
SAFETY VISOR
NO
DUST MASK
NO
Protective Clothing
YES
SAFETY FOOTWEAR
YES
EYE PROTECTION
YES
EAR PROTECTION
YES
HAND PROTECTION
YES
HIGH VIZ
NO
Page 12
SRA 0023
SAUDI SALCO
Safety Risk Assessment
Commercial Gas
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Contingency Plan
Item
No
Hazard/Risk Occurrence Contingency/Action
1 Unauthorised entry to working area.
Violence and aggression/public access
to restricted work area
1) Aggressive behaviour/damage to access equipment 1) Work would cease. Unauthorised visitors asked to leave One
Direct supervisor informed. Emergency services called if
required.
2) Lone working procedure in place.
2 Electricity failure/flood/pipe
leak/striking cable/pipework
Lighting failure/water in
premises/electrocution
1) Severance of services/lighting failure. 1) Work would cease and client would be informed by One
Direct Supervisor so remedial work can be carried out in
order for the work to re-start.
3 Poor communication/lack of contact
between direct labour and sub-
contractors
Poor standards/work being carried out
in an inappropriate manner
1) Poor standard of work/low customer satisfaction /
violent and aggressive behaviour from customer
1) One Direct supervisor to keep all parties informed of work
procedures and standards, HS inspections to take place.
4 Disturbance of asbestos containing
materials
Exposure to asbestos related illness
1) Lack of appropriate asbestos information supplied
for the property/task
2) Failure to comply with asbestos procedures
1) Implement emergency asbestos procedure.

More Related Content

Similar to sra0023_Risk assessment for commercial_gas.pdf

21 Confined Space Working Risk Assessment Templates.docx
21 Confined Space Working Risk Assessment Templates.docx21 Confined Space Working Risk Assessment Templates.docx
21 Confined Space Working Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JESUSBASILIOANTONIO
 
2010 Fsp Overview W Objective Statements
2010 Fsp Overview W Objective Statements2010 Fsp Overview W Objective Statements
2010 Fsp Overview W Objective Statements
andrewwcwong
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&a
hijaziosama
 

Similar to sra0023_Risk assessment for commercial_gas.pdf (20)

Topic 8
Topic 8Topic 8
Topic 8
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
21 Confined Space Working Risk Assessment Templates.docx
21 Confined Space Working Risk Assessment Templates.docx21 Confined Space Working Risk Assessment Templates.docx
21 Confined Space Working Risk Assessment Templates.docx
 
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdfJHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
JHA06_Installation of Transversal beams in Flare Pipe Rack_Rev00.pdf
 
Core Risk Assessment for Office work.docx
Core  Risk Assessment for Office work.docxCore  Risk Assessment for Office work.docx
Core Risk Assessment for Office work.docx
 
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatme...
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatme...Procedure for Hazard Identification and Risk Assessment in Wastewater Treatme...
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatme...
 
Construction Safety Training_Session 03_Confined Spaces and Underground Works
Construction Safety Training_Session 03_Confined Spaces and Underground WorksConstruction Safety Training_Session 03_Confined Spaces and Underground Works
Construction Safety Training_Session 03_Confined Spaces and Underground Works
 
JSA of Radiography for Boiler A - Copy.pdf
JSA of Radiography for Boiler A - Copy.pdfJSA of Radiography for Boiler A - Copy.pdf
JSA of Radiography for Boiler A - Copy.pdf
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secure
 
HSE practicable Questions
HSE practicable Questions HSE practicable Questions
HSE practicable Questions
 
2010 Fsp Overview W Objective Statements
2010 Fsp Overview W Objective Statements2010 Fsp Overview W Objective Statements
2010 Fsp Overview W Objective Statements
 
Fire Risk Assessment October 26 to 28 2015
Fire Risk Assessment October 26 to 28 2015Fire Risk Assessment October 26 to 28 2015
Fire Risk Assessment October 26 to 28 2015
 
V18I06-11.pdf
V18I06-11.pdfV18I06-11.pdf
V18I06-11.pdf
 
Fire Safety Talk
Fire Safety TalkFire Safety Talk
Fire Safety Talk
 
Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...
 
Chemical response plan good
Chemical response plan goodChemical response plan good
Chemical response plan good
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
 
Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&a
 
Neboshimportantqa 130830213928-phpapp01
Neboshimportantqa 130830213928-phpapp01Neboshimportantqa 130830213928-phpapp01
Neboshimportantqa 130830213928-phpapp01
 
sra0028_Risk assessment for stress_management.pdf
sra0028_Risk assessment for stress_management.pdfsra0028_Risk assessment for stress_management.pdf
sra0028_Risk assessment for stress_management.pdf
 

More from AhmedAliKhan38 (7)

PP FOR Food Safety Campaign -Nov-18-2023.pptx
PP FOR Food Safety Campaign -Nov-18-2023.pptxPP FOR Food Safety Campaign -Nov-18-2023.pptx
PP FOR Food Safety Campaign -Nov-18-2023.pptx
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Traffic management PPT To enhance awareness.pptx
Traffic management PPT To enhance awareness.pptxTraffic management PPT To enhance awareness.pptx
Traffic management PPT To enhance awareness.pptx
 
iso-14001-2015-checklist lead auditor .pdf
iso-14001-2015-checklist lead auditor .pdfiso-14001-2015-checklist lead auditor .pdf
iso-14001-2015-checklist lead auditor .pdf
 
HEALTY LIFE IS A HAPPY LIFE StaffWellnessinECE-Nationalversion-YouMatter.pptx
HEALTY LIFE IS A HAPPY LIFE StaffWellnessinECE-Nationalversion-YouMatter.pptxHEALTY LIFE IS A HAPPY LIFE StaffWellnessinECE-Nationalversion-YouMatter.pptx
HEALTY LIFE IS A HAPPY LIFE StaffWellnessinECE-Nationalversion-YouMatter.pptx
 
safety gloves . power point presentation
safety gloves . power point presentationsafety gloves . power point presentation
safety gloves . power point presentation
 
sra0024-Risk assessment _manual_handling.pdf
sra0024-Risk assessment _manual_handling.pdfsra0024-Risk assessment _manual_handling.pdf
sra0024-Risk assessment _manual_handling.pdf
 

Recently uploaded

High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
Monica Sydney
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
HyderabadDolls
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
 

Recently uploaded (20)

High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
 
Call Girl Service in Wardha 9332606886 HOT & SEXY Models beautiful and charm...
Call Girl Service in Wardha  9332606886 HOT & SEXY Models beautiful and charm...Call Girl Service in Wardha  9332606886 HOT & SEXY Models beautiful and charm...
Call Girl Service in Wardha 9332606886 HOT & SEXY Models beautiful and charm...
 
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Your Budget Call Girls in Hassan 9332606886Call Girls Advance Cash On Delive...
Your Budget Call Girls in Hassan  9332606886Call Girls Advance Cash On Delive...Your Budget Call Girls in Hassan  9332606886Call Girls Advance Cash On Delive...
Your Budget Call Girls in Hassan 9332606886Call Girls Advance Cash On Delive...
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Deforestation
DeforestationDeforestation
Deforestation
 
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelCall Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Only Cash On Delivery Call Girls Service In Kanpur 🧿 6378878445 🧿 High Class...
Only Cash On Delivery Call Girls Service In Kanpur  🧿 6378878445 🧿 High Class...Only Cash On Delivery Call Girls Service In Kanpur  🧿 6378878445 🧿 High Class...
Only Cash On Delivery Call Girls Service In Kanpur 🧿 6378878445 🧿 High Class...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...
Premium Call Girls Nashik Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi...
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 

sra0023_Risk assessment for commercial_gas.pdf

  • 1. Page 1 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Persons at Risk (Groups) Risk Assessor Appointment Tel. No. Description of Task or Activity A – SALCO employees Ahmad Ali Khan H&S Manager 0506219441 SALCO operatives carrying out commercial gas works including, repairs and servicing. B – Contractors/Sub contractors C – Tenants D – Members of the public Work Type Review Date Routine Feb 2024 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 1) Gas leaks Fire, explosion, asphyxiation A,B,C,D S P H 1) Gas work to be carried out by trained and competent operatives in compliance with the Gas Safety Installation and Use Regulations 1998 and in line with the commercial gas tasks being undertaken 2) Ensure that all pre commissioning checks are carried out 3) All works should be carried out in line with manufacturers installation instructions 4) Ensure that leak detection equipment is used M 1) Gas qualifications and gas safe registration to be checked and verified and records kept on file 4) Detection equipment to be calibrated in line with testing schedule and appropriate records kept L
  • 2. Page 2 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 2) Carbon Monoxide Asphyxiation A,B,C,D S P H 1) Ensure good ventilation and boiler flue is checked 2) Test for the presence of CO2 using detection equipment within the installation before starting work L 2) All Gas operatives to wear personal carbon monoxide detection devices L 3) Contact with hot parts Burns A S P H 1) Gloves with an appropriate heat resistance level should be used when handling hot parts M 1) PPE to be issued, recorded, monitored and replaced where appropriate L 4) Exposure to hazardous substances A,B,C,D S P H 1) Consult COSHH inventory list and control approach prior to the use of or creation of hazardous substances or materials 2) Appropriate PPE to be supplied and worn as identified 3) Consult appropriate asbestos information for the property/ task 4) Hover up dust and soot, don’t sweep M 2) PPE to be issued, recorded, monitored and replaced where appropriate 3) Stop work if unsure about asbestos information provided for the task and report to supervisor/manager See Contingency Item 4 L
  • 3. Page 3 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 5) Electric Shock Electrocution, burns, heart failure A,B,C,D Cr O H 1) Electrical work to be carried out by trained and competent operatives in line with the Electricity at Work Regulations 1989 and the 17th Edition IEE Wiring Regulations 2) Where required, the boiler should be switched off prior to starting work and isolated from the supply 3) Occupants of properties should be made aware of the work being undertaken 4) Testing equipment to be calibrated by competent Person in line with testing schedule and records kept 5) Hand tools to be insulated to 1000v 6) Operatives to be in possession of an appropriate fire extinguisher M 1) Electrical qualifications to be checked and verified for all operatives and records kept on file 2) Safe isolation procedures should be implemented to prevent uncontrolled re energisation of circuits L
  • 4. Page 4 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 7) Operatives should take care when working in the presence of live circuits and make dead where possible 8) Operatives should be trained in the emergency procedures of dealing with electrical shock 8) Striking services Damage to property, electrocution A,B,C,D S O H 1) Existing plans to be consulted 2) Detection equipment to be used to scan prior to drilling, cutting or digging holes M 1) Existing plans to be confirmed with detection equipment or by exposing area in a controlled manner See Contingency Item 2 L 9) Hot Works A,B,C,D S P H 1) Hot works should only be considered when other alternatives have been discounted i.e. mechanical fixing, sawing, adhesives, push fit, compression fixings 2) Low risk, routine operations should be carried out in accordance with the ‘hot works standard operating procedure’ M 2) H&S inspections should examine work to assess that they are being carried out in line with the standard operating procedure 3) The permit to work should be issued by a competent person and recorded on a permit to work register L
  • 5. Page 5 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 10) Injury to others Injury to occupants or operatives A,B,C,D S O M 1) Ensure work areas in communal areas are appropriately cordoned off and safety signage is in place 2) When working in occupied properties ensure that tenant is aware of works being under taken and any associated risks 3) Good communication should be maintained with other trades with regards to specific gas hazard M 1) See working in communal areas risk assessment 2) Specific gas hazards to be covered in site induction where appropriate See contingency plan 3 L 11) Working in confined spaces Musculoskeletal injuries, cuts, abrasions A S P H 1) Take regular breaks by ensuring task rotation 2) Limit to short duration works where possible 3) Ensure appropriate levels of task lighting L 1,2) All working in confined spaces other than short duration works that can be controlled by existing control measures should be subjected to a permit to work system L 12) Plant Rooms Injury to operatives A,B S O M 1) Commercial gas activities being undertaken in plant rooms are considered to be 2 man jobs under One Direct lone working arrangements 3) Appropriate levels of clothing should be worn whilst still maintaining safe levels of PPE, regular breaks should be taken, operatives should remain well
  • 6. Page 6 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 2) Plant room doors should be secure at all times in order to prevent unauthorised access 3) Operatives should be aware of potentially higher or lower working temperatures within plant rooms 4) Good housekeeping should be maintained in all plant rooms, all waste should be removed as soon as practicably possible in order to prevent trip and fire hazards. 5) Care should be taken around and biological hazards such as rodent and bird/ other animal bodily waste and appropriate levels of PPE Should be worn in line with appropriate COSHH control approach hydrated throughout the day, restrict work to short durations wherever possible 4) Any bulk waste should be reported for removal 5) Significant levels of biological waste should be removed by specialist cleaning contractors 1 – 5) Joint inspections being undertaken between HS and commercial gas team to identify potential hazards in individual plant rooms
  • 7. Page 7 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 13) Use of hand tools Cuts and abrasions, flying objects A,B,C,D S F H 1) All tools to be maintained in good condition 2) Tools to only be used for the task intended in line with 3) Electrical tools to be insulated to 1000v 4) All tools to be appropriately stored to avoid damage 5) All damaged tools to be removed from use immediately 6) Appropriate PPE to be supplied and worn as identified 7) Prevent use of tools by unauthorised persons 8) See SRA for hand and power tools M 1,2,3,4,5) Condition and appropriate use of hand tools to be checked during HS inspections 6) 6) PPE to be issued, recorded, monitored and replaced where appropriate L 14) Use of power tools Cuts and abrasions, flying objects, entanglement, electrocution A,B,C,D S F H 1) All tools to be maintained in good condition 2) Tools to only be used for the task intended in line with any manufactures instructions 3) All tools to be inspected by the user prior to use M 1,2,3,4,5,6,7,8,9,13,14) Condition and appropriate use of hand tools to be checked during HS inspections 11) PPE to be issued, recorded, monitored and replaced where appropriate L
  • 8. Page 8 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 4) All tools to be guarded as per manufacturer’s instructions 5) Guards to be inspected regularly 6) All tools to be covered under an appropriate PAT schedule 7) All tools to be battery powered or 110V 8) Ensure that all cables are secured to avoid trip hazards 9) Ensure dust extraction is fitted to all tools if required 10) Prevent use of tools by unauthorised persons, to include tenants and members of the public 11) Appropriate PPE to be supplied and worn as identified 12) Allow sufficient space to work safely 13) All tools to be appropriately stored to avoid damage 14) All damaged tools to be removed from use immediately See SRA for hand and power tools
  • 9. Page 9 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 15) Slips, trips and falls Trips on trailing cables or materials, Falls from height A,B,C,D S P H 1) All cables to be taped down, covered or attached at a high level to prevent trip hazards 2) All materials and waste to be tidy or removed from site 3) Maintain good housekeeping standards and prevent trip hazards M 1,2) To be monitored during HS inspections 2) Regular waste collections to take place in order to prevent build-up of waste on site L 16) Working at Heights Injury from falls or being struck by falling objects A,B,C,D S F H 1) Ensure correct means of access equipment or working platform is identified for every task M 1) Insulated WAH equipment should be used 2) See SRA’s for working at height L 17) Noise Exposure to high levels leading to occupational hearing loss A,B,C,D S P H 1) Most work is restricted to short duration 2) Use self-dampening tools where available 3) Appropriate PPE to be supplied and worn as identified M 1) Noise monitoring to be carried out for tasks and equipment that fall outside the scope of short duration 2) Hearing protection to be worn for all equipment that exceeds levels of 85db L
  • 10. Page 10 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 18) Manual handling Sprains and strains, impact injury, lacerations A,B,C,D S F H 1) Operatives are trained and competent in the task 2) Safety footwear to be worn at all times 3) Gloves available for use where required to prevent splinters and pinch injuries 4) Resources available for team lifts where appropriate 5) Order timber in easy to handle sizes and quantities where possible M 1) Document operative training and competence 2,3) PPE to be issued, recorded, monitored and replaced where appropriate 4) Ensure correct resources are allocated as required 1,2,3,4,5) See SRA for manual handling L 19) Hand arm vibration Exposure to occupational injuries to blood vessels, nerves and joints A S P H 1) Tools with built in HAV dampener protection to be used where available 2) Gloves to be worn when using tools that generate vibration or impact M 1,2) HAV questionnaires to be completed for all operatives, any existing conditions or new symptoms to be referred to occupational health advisor L
  • 11. Page 11 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Personal Protective Equipment required (PPE): Icon Glossary HARD HAT NO SAFETY VISOR NO DUST MASK NO Protective Clothing YES SAFETY FOOTWEAR YES EYE PROTECTION YES EAR PROTECTION YES HAND PROTECTION YES HIGH VIZ NO
  • 12. Page 12 SRA 0023 SAUDI SALCO Safety Risk Assessment Commercial Gas Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Contingency Plan Item No Hazard/Risk Occurrence Contingency/Action 1 Unauthorised entry to working area. Violence and aggression/public access to restricted work area 1) Aggressive behaviour/damage to access equipment 1) Work would cease. Unauthorised visitors asked to leave One Direct supervisor informed. Emergency services called if required. 2) Lone working procedure in place. 2 Electricity failure/flood/pipe leak/striking cable/pipework Lighting failure/water in premises/electrocution 1) Severance of services/lighting failure. 1) Work would cease and client would be informed by One Direct Supervisor so remedial work can be carried out in order for the work to re-start. 3 Poor communication/lack of contact between direct labour and sub- contractors Poor standards/work being carried out in an inappropriate manner 1) Poor standard of work/low customer satisfaction / violent and aggressive behaviour from customer 1) One Direct supervisor to keep all parties informed of work procedures and standards, HS inspections to take place. 4 Disturbance of asbestos containing materials Exposure to asbestos related illness 1) Lack of appropriate asbestos information supplied for the property/task 2) Failure to comply with asbestos procedures 1) Implement emergency asbestos procedure.