SlideShare a Scribd company logo
1 of 4
Download to read offline
Page 1
SAUDI SALCO
Safety Risk Assessment
Waste Clearance
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Persons at Risk (Groups) Risk Assessor Appointment Tel. No. Description of Task or Activity
A – SALCO employees Ahmad Ali Khan H&S Manager 0506219441 Removal of rubbish generated by One
Direct activities
B – Contractors/Sub contractors
C – Tenants
D – Members of the public
Work Type Review Date
Routine Feb 2024
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
1) Manual
handling
Sprains
and strains,
impact injury,
lacerations
A S F H 1) Operatives are trained and
competent in the task
2) Appropriate levels of PPE to be
used, safety footwear and cut
protection gloves mandatory
M 1) Additional assistance should be
requested if required
2) See manual handling risk
assessment
L
2) Contact with
sharps
Needle stick
injuries
A S F H 1) If during waste clearance
operatives discover any sharps
they should stop
M 1) The services of specialist
contractors should be employed
to remove sharps
L
Page 2
SAUDI SALCO
Safety Risk Assessment
Waste Clearance
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
3) Hazardous
Substances
(including
asbestos)
Sprains
and strains,
impact injury,
lacerations
A S O M 1) Waste should be visually
scanned for any hazardous
substances prior to clearing up
2) If during waste clearance
operatives discover any bio
hazards they should stop
3) If during waste clearance
operatives discover any
material that they suspect may
contain asbestos they should
stop work, contain the area
and report it in line with the
asbestos emergency procedures
4) All other hazardous waste
should be handled and
disposed of in line with the
appropriate COSHH control
approach
L 2) The services of specialist
contractors should be employed
to remove bio hazards
Implement Contingency Plan 4
L
4) Security of
waste
Waste being
contaminated
with fly tipping
A S O M 1) Waste allocated for collection
should be left in a secure
location off the public
footpath/ highway
2) Load area of cage motors to
be securely locked when van is
unattended.
L L
Page 3
SAUDI SALCO
Safety Risk Assessment
Waste Clearance
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Personal Protective Equipment required (PPE): Icon Glossary
HARD HAT
NO
SAFETY VISOR
NO
DUST MASK
NO
Protective Clothing
YES
SAFETY FOOTWEAR
YES
EYE PROTECTION
NO
EAR PROTECTION
NO
HAND PROTECTION
YES
HIGH VIZ
YES
Page 4
SAUDI SALCO
Safety Risk Assessment
Waste Clearance
Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable,
Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable
Contingency Plan
Item
No
Hazard/Risk Occurrence Contingency/Action
1 Unauthorised entry to working area.
Violence and aggression/public access
to restricted work area
1) Aggressive behaviour/damage to access equipment 1) Work would cease. Unauthorised visitors asked to leave One
Direct supervisor informed. Emergency services called if
required.
2) Lone working procedure in place.
2 Electricity failure/flood/pipe
leak/striking cable/pipework
Lighting failure/water in
premises/electrocution
1) Severance of services/lighting failure. 1) Work would cease and client would be informed by One
Direct Supervisor so remedial work can be carried out in
order for the work to re-start.
3 Poor communication/lack of contact
between direct labour and sub-
contractors
Poor standards/work being carried out
in an inappropriate manner
1) Poor standard of work/low customer satisfaction /
violent and aggressive behaviour from customer
1) One Direct supervisor to keep all parties informed of work
procedures and standards, H&S inspections to take place.
4 Disturbance of asbestos containing
materials
Exposure to asbestos related illness
1) Lack of appropriate asbestos information supplied
for the property/task
2) Failure to comply with asbestos procedures
1) Implement emergency asbestos procedure.

More Related Content

More from AhmedAliKhan38 (6)

PP FOR Food Safety Campaign -Nov-18-2023.pptx
PP FOR Food Safety Campaign -Nov-18-2023.pptxPP FOR Food Safety Campaign -Nov-18-2023.pptx
PP FOR Food Safety Campaign -Nov-18-2023.pptx
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Traffic management PPT To enhance awareness.pptx
Traffic management PPT To enhance awareness.pptxTraffic management PPT To enhance awareness.pptx
Traffic management PPT To enhance awareness.pptx
 
iso-14001-2015-checklist lead auditor .pdf
iso-14001-2015-checklist lead auditor .pdfiso-14001-2015-checklist lead auditor .pdf
iso-14001-2015-checklist lead auditor .pdf
 
HEALTY LIFE IS A HAPPY LIFE StaffWellnessinECE-Nationalversion-YouMatter.pptx
HEALTY LIFE IS A HAPPY LIFE StaffWellnessinECE-Nationalversion-YouMatter.pptxHEALTY LIFE IS A HAPPY LIFE StaffWellnessinECE-Nationalversion-YouMatter.pptx
HEALTY LIFE IS A HAPPY LIFE StaffWellnessinECE-Nationalversion-YouMatter.pptx
 
safety gloves . power point presentation
safety gloves . power point presentationsafety gloves . power point presentation
safety gloves . power point presentation
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 

sra0022_Risk assessment waste_collection.pdf

  • 1. Page 1 SAUDI SALCO Safety Risk Assessment Waste Clearance Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Persons at Risk (Groups) Risk Assessor Appointment Tel. No. Description of Task or Activity A – SALCO employees Ahmad Ali Khan H&S Manager 0506219441 Removal of rubbish generated by One Direct activities B – Contractors/Sub contractors C – Tenants D – Members of the public Work Type Review Date Routine Feb 2024 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 1) Manual handling Sprains and strains, impact injury, lacerations A S F H 1) Operatives are trained and competent in the task 2) Appropriate levels of PPE to be used, safety footwear and cut protection gloves mandatory M 1) Additional assistance should be requested if required 2) See manual handling risk assessment L 2) Contact with sharps Needle stick injuries A S F H 1) If during waste clearance operatives discover any sharps they should stop M 1) The services of specialist contractors should be employed to remove sharps L
  • 2. Page 2 SAUDI SALCO Safety Risk Assessment Waste Clearance Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 3) Hazardous Substances (including asbestos) Sprains and strains, impact injury, lacerations A S O M 1) Waste should be visually scanned for any hazardous substances prior to clearing up 2) If during waste clearance operatives discover any bio hazards they should stop 3) If during waste clearance operatives discover any material that they suspect may contain asbestos they should stop work, contain the area and report it in line with the asbestos emergency procedures 4) All other hazardous waste should be handled and disposed of in line with the appropriate COSHH control approach L 2) The services of specialist contractors should be employed to remove bio hazards Implement Contingency Plan 4 L 4) Security of waste Waste being contaminated with fly tipping A S O M 1) Waste allocated for collection should be left in a secure location off the public footpath/ highway 2) Load area of cage motors to be securely locked when van is unattended. L L
  • 3. Page 3 SAUDI SALCO Safety Risk Assessment Waste Clearance Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Personal Protective Equipment required (PPE): Icon Glossary HARD HAT NO SAFETY VISOR NO DUST MASK NO Protective Clothing YES SAFETY FOOTWEAR YES EYE PROTECTION NO EAR PROTECTION NO HAND PROTECTION YES HIGH VIZ YES
  • 4. Page 4 SAUDI SALCO Safety Risk Assessment Waste Clearance Severity C=Catastrophic, Cr=Critical, S=Serious, M=Minor, Probability N=Negligible, F=Frequent, P=Probable, O=Occasional, R=Remote, I=Improbable, Risk T=Tolerable, L=Low, M=Medium, H=High, N=Intolerable Contingency Plan Item No Hazard/Risk Occurrence Contingency/Action 1 Unauthorised entry to working area. Violence and aggression/public access to restricted work area 1) Aggressive behaviour/damage to access equipment 1) Work would cease. Unauthorised visitors asked to leave One Direct supervisor informed. Emergency services called if required. 2) Lone working procedure in place. 2 Electricity failure/flood/pipe leak/striking cable/pipework Lighting failure/water in premises/electrocution 1) Severance of services/lighting failure. 1) Work would cease and client would be informed by One Direct Supervisor so remedial work can be carried out in order for the work to re-start. 3 Poor communication/lack of contact between direct labour and sub- contractors Poor standards/work being carried out in an inappropriate manner 1) Poor standard of work/low customer satisfaction / violent and aggressive behaviour from customer 1) One Direct supervisor to keep all parties informed of work procedures and standards, H&S inspections to take place. 4 Disturbance of asbestos containing materials Exposure to asbestos related illness 1) Lack of appropriate asbestos information supplied for the property/task 2) Failure to comply with asbestos procedures 1) Implement emergency asbestos procedure.