Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Persons at Risk (Groups) Risk Assessor Appointment Tel. No. Description of Task or Activity
A โ€“ One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 General carpentry activities including,
hanging doors, skirting, architrave, sheet
materials, flooring, windows, fitting of
kitchen units and worktops.
B โ€“ Contractors/Sub contractors 07900 160656
C โ€“ Tenants
D โ€“ Members of the public
Work Type Review Date
Routine July 2019
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
1)	 Manual
handling
Sprains and
strains, impact
injury, lacera-
tions
A,B,C,D S F M 1)	 Operatives are trained and
competent in the task
2)	 Safety footwear to be worn at
all times
3)	 Gloves available for use where
required to prevent splinters
and pinch injuries
4)	 Resources available for team
lifts where appropriate
5)	 Order timber in easy to handle
sizes and quantities where
possible
M 1)โ€‰โ€‰ 
Document operative training and
competence
2, 3)โ€‰โ€‰ 
PPE to be issued, recorded,
monitored and replaced where
appropriate
4)โ€‰โ€‰ 
Ensure correct resources are
allocated as required
1, 2, 3, 4, 5)โ€‰โ€‰ 
See SRA for manual
handling
L
Page 2
Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
2)	 Use of hand
tools
Cuts and
abrasions,
flying objects
A,B,C,D S F H 1)	 All tools to be maintained in
good condition
2)	 Tools to only be used for the
task intended in line with any
manufactures instructions
3)	 All tools to be inspected by the
user prior to use
4)	 All tools to be appropriately
stored to avoid damage
5)	 All damaged tools to be
removed from use immediately
6)	 Appropriate PPE to be supplied
and worn as identified
7)	 Prevent use of tools by
unauthorised persons
8)	 See SRA for hand and power
tools
M 1, 2, 3, 4, 5)โ€‰โ€‰ 
Condition and
appropriate use of
hand tools to be
checked during HS
inspections
6)โ€‰โ€‰ 
PPE to be issued, recorded,
monitored and replaced
where appropriate
L
Page 3
Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
3)	 Use of power
tools
Cuts and
abrasions,
flying objects,
entanglement
A,B,C,D S F H 1)	 All tools to be maintained in
good condition
2)	 Tools to only be used for the
task intended in line with any
manufactures instructions
3)	 All tools to be inspected by the
user prior to use
4)	 All tools to be guarded as per
manufacturerโ€™s instructions
5)	 Guards to be inspected
regularly
6)	 All tools to be covered under
an appropriate PAT schedule
7)	 All tools to be battery powered
or 110V
8)	 Ensure that all cables are
secured to avoid trip hazards
9)	 Ensure dust extraction is fitted
to all tools if required
10)	 Prevent use of tools by
unauthorised persons, to
include tenants and members
of the public
M 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14)
Condition and appropriate use of
hand tools to be checked during
HS inspections
11) 
PPE to be issued, recorded,
monitored and replaced where
appropriate
L
Page 4
Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
11)	 Appropriate PPE to be
supplied and worn as
identified
12)	 Allow sufficient space to work
safely
13)	 All tools to be appropriately
stored to avoid damage
14)	 All damaged tools to
be removed from use
immediately
15)	 See SRA for hand and power
tools
Page 5
Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
4)	 Hazardous
substances
Exposure
hazardous
substances,
including dust
and wood dust,
asbestos
A,B,C,D S F H 1)	 Consult COSHH inventory list
and control approach prior
to the use of or creation of
hazardous substances or
materials
2)	 Appropriate PPE to be supplied
and worn as identified
3)	 Consult appropriate
asbestos information for the
propertyโ€‰/โ€‰task
4)	 Hover up dust, donโ€™t sweep
5)	 Avoid the use of hard woods
and MDF where possible
M 2)	 PPE to be issued, recorded,
monitored and replaced where
appropriate
3)	 Stop work if unsure about
asbestos information provided
for the task and report to
supervisorโ€‰/โ€‰manager
See Contingency Item 4
L
5)	 Noise
Exposure to
high levels
leading to
occupational
hearing loss
A,B,C,D S P H 1)	 Most work is restricted to short
duration
2)	 Use self-dampening tools
where available
3)	 Appropriate PPE to be supplied
and worn as identified
M 1)	 Noise monitoring to be carried
out for tasks and equipment
that fall outside the scope of
short duration
2)	 Hearing protection to be worn
for all equipment that exceeds
levels of 85db
L
Page 6
Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
6)	 Hand arm
vibration
Exposure to
occupational
injuries to
blood vessels,
nerves and
joints
A S P H 1)	 Tools with built in HAV
dampener protection to be
used where available
2)	 Gloves to be worn when using
tools that generate vibration or
impact
M 1, 2) 
HAV questionnaires to be
completed for all operatives,
any existing conditions or new
symptoms to be referred to
occupational health adviso
L
7)	 Slips, trips
and falls
Trips on trailing
cables or
materials, Falls
from height
A,B,C,D S P H 1)	 All cables to be taped down,
covered or attached at a high
level to prevent trip hazards
2)	 All materials and waste to be
tidy or removed from site to
maintain good housekeeping
standards and prevent trip
hazards
3)	 Appropriate controls to be
implemented for all working at
height to prevent falls
M 1,2) 
To be monitored during HS
inspections
2) 
Regular waste collections to take
place in order to prevent build-
up of waste on site
3) See SRAโ€™s for working at height
L
Page 7
Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Hazard/Risk Groups at
Risk
Severity Probability Risk Level
before
Controls
Existing Controls Risk Level
with
Controls
Additional Controls Required Risk Level
with added
Controls
Actioned by
8)	 Contact with
electricity
Electrocution
A,B,C,D Cr O M 1)	 Timber or sheet materials to
be cut or drilled where the
presence of electrical cable is
unknown to be checked first
with cable protectors
2)	 Electrical supply to be isolated
where carpentry work is taking
place which presents a risk of
contact with live cables
M 2)	 safe isolation procedures
should be observed
See Contingency Item 2
L
9)	 Injury to
others
Injury to others
as a result of
work activities
including tenants
and members of
the public
A,B,C,D M O L 1)	 Ensure work areas in
communal areas are
appropriately cordoned off and
safety signage is in place
2)	 When working in occupied
properties ensure that tenant
is aware of works being under
taken and any associated risks
L 1)	 See working in communal areas
risk assessment
L
10)	Working at
Heights
Injury from
falls or being
struck by fall-
ing objects
A,B,C,D S F H 1)	 Ensure correct means of access
equipment or working platform
is identified for every task
M 1)	 See SRAโ€™s for working at height L
Page 8
Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Personal Protective Equipment required (PPE): Icon Glossary
HARD HAT
NO
SAFETY VISOR
YES
DUST MASK
YES
SAFETY FOOTWEAR
YES
EYE PROTECTION
YES
EAR PROTECTION
YES
HAND PROTECTION
YES
HIGH VIZ
NO
Page 9
Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable,
Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable
One Direct Maintenance Ltd
Safety Risk Assessment Carpentry
SRA 0001
Contingency Plan
Item
No
Hazard/Risk Occurrence Contingency/Action
1 Unauthorised entry to working area.
Violence and aggressionโ€‰/โ€‰public access
to restricted work area
1)	 Aggressive behaviourโ€‰/โ€‰damage to access equipment 1)	 Work would cease. Unauthorised visitors asked to leave One
Direct supervisor informed. Emergency services called if
required.
2)	 Lone working procedure in place.
2 Electricity failureโ€‰/โ€‰floodโ€‰/โ€‰pipe
leakโ€‰/โ€‰striking cableโ€‰/โ€‰pipework
Lighting failureโ€‰/โ€‰water in
premisesโ€‰/โ€‰electrocution
1)	 Severance of servicesโ€‰/โ€‰lighting failure. 1)	 Work would cease and client would be informed by One
Direct Supervisor so remedial work can be carried out in
order for the work to re-start.
3 Poor communicationโ€‰/โ€‰lack of contact
between direct labour and sub-
contractors
Poor standardsโ€‰/โ€‰work being carried out
in an inappropriate manner
1)	 Poor standard of workโ€‰/โ€‰low customer satisfaction /
violent and aggressive behaviour from customer
1)	 One Direct supervisor to keep all parties informed of work
procedures and standards, HS inspections to take place
4 Disturbance of asbestos containing
materials
Exposure to asbestos related illness
1)	 Lack of appropriate asbestos information supplied
for the propertyโ€‰/โ€‰task
2)	 Failure to comply with asbestos procedures
1)	 Implement emergency asbestos procedure.

More Related Content

Similar to sra0001_carpentry.pdf

Risk assessment for pitch
Risk assessment for pitchRisk assessment for pitch
Risk assessment for pitch
BethPotter4
ย 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
emeliacrocker
ย 
Risk assessment template.doc gilly
Risk assessment template.doc gilly Risk assessment template.doc gilly
Risk assessment template.doc gilly
DanielParushev
ย 
Risk assessment template.doc gilly
Risk assessment template.doc gilly Risk assessment template.doc gilly
Risk assessment template.doc gilly
DanielParushev
ย 
JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.doc
Ravithokal2
ย 
Risk assesment drew
Risk assesment drewRisk assesment drew
Risk assesment drew
LucyBurton13
ย 
Risk Assessment Template.doc
Risk Assessment Template.docRisk Assessment Template.doc
Risk Assessment Template.doc
ElliotDaroczy
ย 

Similar to sra0001_carpentry.pdf (20)

Risk Assessment Template.doc.docx
Risk Assessment Template.doc.docxRisk Assessment Template.doc.docx
Risk Assessment Template.doc.docx
ย 
Risk assessment for pitch
Risk assessment for pitchRisk assessment for pitch
Risk assessment for pitch
ย 
Risk assessment Barbering
Risk assessment Barbering Risk assessment Barbering
Risk assessment Barbering
ย 
Risk Culture.docx
Risk Culture.docxRisk Culture.docx
Risk Culture.docx
ย 
29. Hand tools HIRA.docx
29. Hand tools HIRA.docx29. Hand tools HIRA.docx
29. Hand tools HIRA.docx
ย 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
ย 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
ย 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
ย 
Risk assessment template.doc gilly
Risk assessment template.doc gilly Risk assessment template.doc gilly
Risk assessment template.doc gilly
ย 
Risk assessment template.doc gilly
Risk assessment template.doc gilly Risk assessment template.doc gilly
Risk assessment template.doc gilly
ย 
Risk assessment
Risk assessment Risk assessment
Risk assessment
ย 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
ย 
Risk assessment template (1)
Risk assessment template (1)Risk assessment template (1)
Risk assessment template (1)
ย 
JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.doc
ย 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
ย 
Risk assesment drew
Risk assesment drewRisk assesment drew
Risk assesment drew
ย 
Disaster-Risk
Disaster-RiskDisaster-Risk
Disaster-Risk
ย 
Acr mr equipment evaluation summary form and safety checklist with hilights
Acr mr equipment evaluation summary form and safety checklist with hilightsAcr mr equipment evaluation summary form and safety checklist with hilights
Acr mr equipment evaluation summary form and safety checklist with hilights
ย 
Risk Assessment Template.doc
Risk Assessment Template.docRisk Assessment Template.doc
Risk Assessment Template.doc
ย 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
ย 

More from Innocent Bhaikwa

Safety Moment-Unsafe Act and Unsafe Condition.pptx
Safety Moment-Unsafe Act and Unsafe Condition.pptxSafety Moment-Unsafe Act and Unsafe Condition.pptx
Safety Moment-Unsafe Act and Unsafe Condition.pptx
Innocent Bhaikwa
ย 
Safety Moment-Attitude and Safety.pptx
Safety Moment-Attitude and Safety.pptxSafety Moment-Attitude and Safety.pptx
Safety Moment-Attitude and Safety.pptx
Innocent Bhaikwa
ย 
Ergonomics-Z-Fold-Final-print-ready.pdf
Ergonomics-Z-Fold-Final-print-ready.pdfErgonomics-Z-Fold-Final-print-ready.pdf
Ergonomics-Z-Fold-Final-print-ready.pdf
Innocent Bhaikwa
ย 
EMS - Environmental Management Introduction Training Presentation.pdf
EMS - Environmental Management Introduction Training Presentation.pdfEMS - Environmental Management Introduction Training Presentation.pdf
EMS - Environmental Management Introduction Training Presentation.pdf
Innocent Bhaikwa
ย 
fireriskevaluationreductionlevels003-200630123652.pdf
fireriskevaluationreductionlevels003-200630123652.pdffireriskevaluationreductionlevels003-200630123652.pdf
fireriskevaluationreductionlevels003-200630123652.pdf
Innocent Bhaikwa
ย 
ZDH - Safety Culture Enhancement.pdf
ZDH - Safety Culture Enhancement.pdfZDH - Safety Culture Enhancement.pdf
ZDH - Safety Culture Enhancement.pdf
Innocent Bhaikwa
ย 

More from Innocent Bhaikwa (20)

StuRC8eCh17.ppt
StuRC8eCh17.pptStuRC8eCh17.ppt
StuRC8eCh17.ppt
ย 
ch11.ppt
ch11.pptch11.ppt
ch11.ppt
ย 
lecture9_contingency.ppt
lecture9_contingency.pptlecture9_contingency.ppt
lecture9_contingency.ppt
ย 
Safety Moment-Unsafe Act and Unsafe Condition.pptx
Safety Moment-Unsafe Act and Unsafe Condition.pptxSafety Moment-Unsafe Act and Unsafe Condition.pptx
Safety Moment-Unsafe Act and Unsafe Condition.pptx
ย 
Safety Moment-Attitude and Safety.pptx
Safety Moment-Attitude and Safety.pptxSafety Moment-Attitude and Safety.pptx
Safety Moment-Attitude and Safety.pptx
ย 
leadership_in_advising.pptx
leadership_in_advising.pptxleadership_in_advising.pptx
leadership_in_advising.pptx
ย 
FEM Psycological-Safety-Skeepers.pdf
FEM Psycological-Safety-Skeepers.pdfFEM Psycological-Safety-Skeepers.pdf
FEM Psycological-Safety-Skeepers.pdf
ย 
LiftingTechniques.ppt
LiftingTechniques.pptLiftingTechniques.ppt
LiftingTechniques.ppt
ย 
Near Miss vs Accident.pdf
Near Miss vs Accident.pdfNear Miss vs Accident.pdf
Near Miss vs Accident.pdf
ย 
Ergonomics-Z-Fold-Final-print-ready.pdf
Ergonomics-Z-Fold-Final-print-ready.pdfErgonomics-Z-Fold-Final-print-ready.pdf
Ergonomics-Z-Fold-Final-print-ready.pdf
ย 
EMS - Environmental Management Introduction Training Presentation.pdf
EMS - Environmental Management Introduction Training Presentation.pdfEMS - Environmental Management Introduction Training Presentation.pdf
EMS - Environmental Management Introduction Training Presentation.pdf
ย 
fire-safety.ppt
fire-safety.pptfire-safety.ppt
fire-safety.ppt
ย 
fireriskevaluationreductionlevels003-200630123652.pdf
fireriskevaluationreductionlevels003-200630123652.pdffireriskevaluationreductionlevels003-200630123652.pdf
fireriskevaluationreductionlevels003-200630123652.pdf
ย 
ZDH - Safety Culture Enhancement.pdf
ZDH - Safety Culture Enhancement.pdfZDH - Safety Culture Enhancement.pdf
ZDH - Safety Culture Enhancement.pdf
ย 
Hearing conservation.pdf
Hearing conservation.pdfHearing conservation.pdf
Hearing conservation.pdf
ย 
Hearing Loss Topic.pdf
Hearing Loss Topic.pdfHearing Loss Topic.pdf
Hearing Loss Topic.pdf
ย 
Hearing Protection Myths and Responses.pdf
Hearing Protection Myths and Responses.pdfHearing Protection Myths and Responses.pdf
Hearing Protection Myths and Responses.pdf
ย 
Hearing Protection Myths.pdf
Hearing Protection Myths.pdfHearing Protection Myths.pdf
Hearing Protection Myths.pdf
ย 
Hearing protection Noise toolbox talk.pdf
Hearing protection Noise toolbox talk.pdfHearing protection Noise toolbox talk.pdf
Hearing protection Noise toolbox talk.pdf
ย 
Hearing Protection.pdf
Hearing Protection.pdfHearing Protection.pdf
Hearing Protection.pdf
ย 

Recently uploaded

VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
SUHANI PANDEY
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Anamikakaur10
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
SUHANI PANDEY
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
SUHANI PANDEY
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
tanu pandey
ย 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
SUHANI PANDEY
ย 

Recently uploaded (20)

Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
ย 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
ย 
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
ย 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
ย 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 

sra0001_carpentry.pdf

  • 1. Page 1 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Persons at Risk (Groups) Risk Assessor Appointment Tel. No. Description of Task or Activity A โ€“ One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 General carpentry activities including, hanging doors, skirting, architrave, sheet materials, flooring, windows, fitting of kitchen units and worktops. B โ€“ Contractors/Sub contractors 07900 160656 C โ€“ Tenants D โ€“ Members of the public Work Type Review Date Routine July 2019 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 1) Manual handling Sprains and strains, impact injury, lacera- tions A,B,C,D S F M 1) Operatives are trained and competent in the task 2) Safety footwear to be worn at all times 3) Gloves available for use where required to prevent splinters and pinch injuries 4) Resources available for team lifts where appropriate 5) Order timber in easy to handle sizes and quantities where possible M 1)โ€‰โ€‰ Document operative training and competence 2, 3)โ€‰โ€‰ PPE to be issued, recorded, monitored and replaced where appropriate 4)โ€‰โ€‰ Ensure correct resources are allocated as required 1, 2, 3, 4, 5)โ€‰โ€‰ See SRA for manual handling L
  • 2. Page 2 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 2) Use of hand tools Cuts and abrasions, flying objects A,B,C,D S F H 1) All tools to be maintained in good condition 2) Tools to only be used for the task intended in line with any manufactures instructions 3) All tools to be inspected by the user prior to use 4) All tools to be appropriately stored to avoid damage 5) All damaged tools to be removed from use immediately 6) Appropriate PPE to be supplied and worn as identified 7) Prevent use of tools by unauthorised persons 8) See SRA for hand and power tools M 1, 2, 3, 4, 5)โ€‰โ€‰ Condition and appropriate use of hand tools to be checked during HS inspections 6)โ€‰โ€‰ PPE to be issued, recorded, monitored and replaced where appropriate L
  • 3. Page 3 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 3) Use of power tools Cuts and abrasions, flying objects, entanglement A,B,C,D S F H 1) All tools to be maintained in good condition 2) Tools to only be used for the task intended in line with any manufactures instructions 3) All tools to be inspected by the user prior to use 4) All tools to be guarded as per manufacturerโ€™s instructions 5) Guards to be inspected regularly 6) All tools to be covered under an appropriate PAT schedule 7) All tools to be battery powered or 110V 8) Ensure that all cables are secured to avoid trip hazards 9) Ensure dust extraction is fitted to all tools if required 10) Prevent use of tools by unauthorised persons, to include tenants and members of the public M 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14) Condition and appropriate use of hand tools to be checked during HS inspections 11) PPE to be issued, recorded, monitored and replaced where appropriate L
  • 4. Page 4 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 11) Appropriate PPE to be supplied and worn as identified 12) Allow sufficient space to work safely 13) All tools to be appropriately stored to avoid damage 14) All damaged tools to be removed from use immediately 15) See SRA for hand and power tools
  • 5. Page 5 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 4) Hazardous substances Exposure hazardous substances, including dust and wood dust, asbestos A,B,C,D S F H 1) Consult COSHH inventory list and control approach prior to the use of or creation of hazardous substances or materials 2) Appropriate PPE to be supplied and worn as identified 3) Consult appropriate asbestos information for the propertyโ€‰/โ€‰task 4) Hover up dust, donโ€™t sweep 5) Avoid the use of hard woods and MDF where possible M 2) PPE to be issued, recorded, monitored and replaced where appropriate 3) Stop work if unsure about asbestos information provided for the task and report to supervisorโ€‰/โ€‰manager See Contingency Item 4 L 5) Noise Exposure to high levels leading to occupational hearing loss A,B,C,D S P H 1) Most work is restricted to short duration 2) Use self-dampening tools where available 3) Appropriate PPE to be supplied and worn as identified M 1) Noise monitoring to be carried out for tasks and equipment that fall outside the scope of short duration 2) Hearing protection to be worn for all equipment that exceeds levels of 85db L
  • 6. Page 6 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 6) Hand arm vibration Exposure to occupational injuries to blood vessels, nerves and joints A S P H 1) Tools with built in HAV dampener protection to be used where available 2) Gloves to be worn when using tools that generate vibration or impact M 1, 2) HAV questionnaires to be completed for all operatives, any existing conditions or new symptoms to be referred to occupational health adviso L 7) Slips, trips and falls Trips on trailing cables or materials, Falls from height A,B,C,D S P H 1) All cables to be taped down, covered or attached at a high level to prevent trip hazards 2) All materials and waste to be tidy or removed from site to maintain good housekeeping standards and prevent trip hazards 3) Appropriate controls to be implemented for all working at height to prevent falls M 1,2) To be monitored during HS inspections 2) Regular waste collections to take place in order to prevent build- up of waste on site 3) See SRAโ€™s for working at height L
  • 7. Page 7 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Hazard/Risk Groups at Risk Severity Probability Risk Level before Controls Existing Controls Risk Level with Controls Additional Controls Required Risk Level with added Controls Actioned by 8) Contact with electricity Electrocution A,B,C,D Cr O M 1) Timber or sheet materials to be cut or drilled where the presence of electrical cable is unknown to be checked first with cable protectors 2) Electrical supply to be isolated where carpentry work is taking place which presents a risk of contact with live cables M 2) safe isolation procedures should be observed See Contingency Item 2 L 9) Injury to others Injury to others as a result of work activities including tenants and members of the public A,B,C,D M O L 1) Ensure work areas in communal areas are appropriately cordoned off and safety signage is in place 2) When working in occupied properties ensure that tenant is aware of works being under taken and any associated risks L 1) See working in communal areas risk assessment L 10) Working at Heights Injury from falls or being struck by fall- ing objects A,B,C,D S F H 1) Ensure correct means of access equipment or working platform is identified for every task M 1) See SRAโ€™s for working at height L
  • 8. Page 8 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Personal Protective Equipment required (PPE): Icon Glossary HARD HAT NO SAFETY VISOR YES DUST MASK YES SAFETY FOOTWEAR YES EYE PROTECTION YES EAR PROTECTION YES HAND PROTECTION YES HIGH VIZ NO
  • 9. Page 9 Severity Cโ€‰=โ€‰Catastrophic, Crโ€‰=โ€‰Critical, Sโ€‰=โ€‰Serious, Mโ€‰=โ€‰Minor, Probability Nโ€‰=โ€‰Negligible, Fโ€‰=โ€‰Frequent, Pโ€‰=โ€‰Probable, Oโ€‰=โ€‰Occasional, Rโ€‰=โ€‰Remote, Iโ€‰=โ€‰Improbable, Risk Tโ€‰=โ€‰Tolerable, Lโ€‰=โ€‰Low, Mโ€‰=โ€‰Medium, Hโ€‰=โ€‰High, Nโ€‰=โ€‰Intolerable One Direct Maintenance Ltd Safety Risk Assessment Carpentry SRA 0001 Contingency Plan Item No Hazard/Risk Occurrence Contingency/Action 1 Unauthorised entry to working area. Violence and aggressionโ€‰/โ€‰public access to restricted work area 1) Aggressive behaviourโ€‰/โ€‰damage to access equipment 1) Work would cease. Unauthorised visitors asked to leave One Direct supervisor informed. Emergency services called if required. 2) Lone working procedure in place. 2 Electricity failureโ€‰/โ€‰floodโ€‰/โ€‰pipe leakโ€‰/โ€‰striking cableโ€‰/โ€‰pipework Lighting failureโ€‰/โ€‰water in premisesโ€‰/โ€‰electrocution 1) Severance of servicesโ€‰/โ€‰lighting failure. 1) Work would cease and client would be informed by One Direct Supervisor so remedial work can be carried out in order for the work to re-start. 3 Poor communicationโ€‰/โ€‰lack of contact between direct labour and sub- contractors Poor standardsโ€‰/โ€‰work being carried out in an inappropriate manner 1) Poor standard of workโ€‰/โ€‰low customer satisfaction / violent and aggressive behaviour from customer 1) One Direct supervisor to keep all parties informed of work procedures and standards, HS inspections to take place 4 Disturbance of asbestos containing materials Exposure to asbestos related illness 1) Lack of appropriate asbestos information supplied for the propertyโ€‰/โ€‰task 2) Failure to comply with asbestos procedures 1) Implement emergency asbestos procedure.