Drilling Department
Presented By: Muhammad Noman Khan s/o
Muhammad Hanif Khan
1
Presentation Synopsis
1. Pressure and fracture gradient determination
2. Calculation and selection of casing type (Proposed casing
programmed)
3. Cementing Plan
4. Mud Plan
5. Bit Plan
6. Well Head Housing
7. Rig selection
8. Drill time estimation 2
Casing Setting Depth Selection & Fracture Gradient Determination
• Formation pressure
• Depth
• Method used to determine
fracture gradient : Eaton’s
Method
3
For S/D and Poissons ratio
Conductor Casing Design
0
200
400
600
800
1000
1200
0 500 1000 1500 2000 2500 3000
Depth(ft)
Pressure (psi)
Burst Design
Load Line
Back up Line (psi)
Resultant Line (psi)
Design Line (psi)
#H-40
0
100
200
300
400
500
600
0 500 1000 1500 2000 2500 3000
Depth(ft)
Pressure (psi)
CollapseDesign
Load Line
Resultant Line (psi)
Design Line (psi)
#H-40
Casing Selection
#H-40
Round Thread (short)
1530
Collapse Resistance (psi)
520
Weight (lb/ft)
94
ID (inch)
18.936
0
100
200
300
400
500
600
700
800
900
1000
-100 0 100 200 300 400 500 600 700 800 900 1000
Depth(ft)
pressure (psi)
Tension Design
Tensional Design
Design line
Casing Selection
Surface Casing Design
Intermediate Casing Design
Type of
Casing
Casing Size,
in
Casing
Grade
Conductor 20 H40
Surface 13 3/8 J-55(I,II)
Intermédiate 9 5/8 H40(I,II)
Casing Program – Summary
12
Deviation well Design (2 & 3)
Lz
Lx
0
1000
2000
3000
4000
5000
6000
7000
-500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000
WELL 2
0
1000
2000
3000
4000
5000
6000
7000
-1000 0 1000 2000 3000 4000 5000 6000 7000
AxisTitle
Axis Title
WELL 3
Mud Planning
Seawater
Native
- Seawater +
Clay (Formation)
- Using Pre hydrated
bentonite to aid in hole
cleaning
- Dump and dilute method to
control mud weight and soild
contents
Hole Size, in Casing
Size
Mud
Weight,
ppg
Total Amount,
bbl
26’’ 20 9.06 328.3
17 ½’’ 13 5/8’’ 9.06 995.68
12 ½” 9 5/8” 9.06 1022.726bbl
Mud Plan
16
And Production Hole Required 1047.293bbl
Cement Classification
17
Cement Classification
18
Volumetric mixing controls. Q1 = mixwater
rate; Q2 = dry solids rate; Q3 = slurry rate
Tune Lite Mixing & Cement Head
22
Hole Size, in Bit Type Bit Size, in
20
Mill Tooth, Hole
Opener
26
13 3/8 Tricone Roller 17 1/2
9 5/8 TD506 PDC 12 1/4
Bit Planning
23
Bit Planning
24
Bit Planning
25
Well Head Housing
26
JACKUP RIG
Rigs
27
BOP SELECTION
Drilling Time Estimation
31
Operations Time estimate, days Depth (TVD), ft
Move rig floor to slot 0.5 0
Drill 26" hole 1.5 1000
Run 20" conductor casing 1.5 1000
run cement to sea bed 1 1000
Drill 17.5" hole 2.5 3100
Run 13.375" surface casing 2.5 3100
run cement to sea bed 1 3100
Run & Test BOP 1.5 3100
Drill 10.75" hole 4.5 6050
Log 10.75" hole 2 6050
Run 8.625" production Completion 4.5 6050
Run Cement 2 6050
well1 well2 well3
Lower
Section
13 3/8” 13 3/8” 13 3/8”
9 5/8” 9 5/8” 9 5/8”
Estimated
Time
(Days)
25 25 25
Total Time to Complete Top Section for all Wells – 75 days
25 days including Rig move and prepare to drill and Running BOP
Drilling Time Estimation
32
• Pipe Sticking
• Differential-Pressure Pipe Sticking
• Mechanical Pipe Sticking
• Loss of Circulation
• Drillpipe Failures
• Twistoff
• Fatigue
• Pipe-Failure Prevention
• Hydrogen-Sulfide-Bearing Zones and Shallow Gas
• Since we don’t have log data, we very much depend on the real time
drilling operations, Hence we have to be very careful about gas kick
or loss.
Drilling Challenge
33
• Fire-fighting equipment must be available for emergency use in the event of a fire
and should be provided in first-class working order.
• Unauthorized person should not be allowed to be on the rig at any time.
• Personnel who not involved directly in the particular operation should keep away
from operation site.
• Sea survival and offshore course is compulsory for all personnel.
Safety
34

More Related Content

What's hot

Points-to-recall-api653
 Points-to-recall-api653 Points-to-recall-api653
Points-to-recall-api653Kevin Obura
 
Summer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptSummer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptKeshar Saini
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentmkpq pasha
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation kaleem ullah
 
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationB3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationGEORG Geothermal Workshop 2016
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel designMASUKUMARA1
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluidsWajid09
 
Drilling fluid - Chapter 2
Drilling fluid  - Chapter 2Drilling fluid  - Chapter 2
Drilling fluid - Chapter 2Chairul Abdi
 

What's hot (15)

Points-to-recall-api653
 Points-to-recall-api653 Points-to-recall-api653
Points-to-recall-api653
 
Summer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptSummer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc ppt
 
Block 4 SP 14
Block 4 SP 14Block 4 SP 14
Block 4 SP 14
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
 
Casing design
Casing designCasing design
Casing design
 
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationB3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
 
Casing design
Casing designCasing design
Casing design
 
Storage vessel design
Storage vessel designStorage vessel design
Storage vessel design
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
 
Mud logging
Mud loggingMud logging
Mud logging
 
Superpave Mix Designs
Superpave Mix DesignsSuperpave Mix Designs
Superpave Mix Designs
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Drilling fluid - Chapter 2
Drilling fluid  - Chapter 2Drilling fluid  - Chapter 2
Drilling fluid - Chapter 2
 

Viewers also liked

Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Shaoor Kamal
 
Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project ReportNeel Patel
 
Rio oil and gas peregrino field development
Rio oil and gas   peregrino field developmentRio oil and gas   peregrino field development
Rio oil and gas peregrino field developmentStatoil
 
Bertam Field Development Project Major HUC Campaign
Bertam Field Development Project Major HUC Campaign Bertam Field Development Project Major HUC Campaign
Bertam Field Development Project Major HUC Campaign Mohd Syafiq Shawaludin
 
Aiding And Abetting Final Ver
Aiding And Abetting Final VerAiding And Abetting Final Ver
Aiding And Abetting Final Verredcedarmedia
 
Estrategia de marketing soget
Estrategia de marketing sogetEstrategia de marketing soget
Estrategia de marketing sogetElimar Carvajal
 
Wagner and King Ludwig
Wagner and King LudwigWagner and King Ludwig
Wagner and King LudwigEYE_KNEE
 
ข้อสอบ LAS ปี ๒๕๕๗ ภาษาไทย ป.5
ข้อสอบ LAS ปี ๒๕๕๗ ภาษาไทย ป.5ข้อสอบ LAS ปี ๒๕๕๗ ภาษาไทย ป.5
ข้อสอบ LAS ปี ๒๕๕๗ ภาษาไทย ป.5Khunnawang Khunnawang
 

Viewers also liked (20)

Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157
 
Final Report 4_22_15
Final Report 4_22_15Final Report 4_22_15
Final Report 4_22_15
 
MSc Group Project Presentation
MSc Group Project PresentationMSc Group Project Presentation
MSc Group Project Presentation
 
MSc group project presentation
MSc group project presentationMSc group project presentation
MSc group project presentation
 
Device X Field Report
Device X Field ReportDevice X Field Report
Device X Field Report
 
Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project Report
 
Rio oil and gas peregrino field development
Rio oil and gas   peregrino field developmentRio oil and gas   peregrino field development
Rio oil and gas peregrino field development
 
Attachment 3
Attachment 3Attachment 3
Attachment 3
 
Attachment 5
Attachment 5Attachment 5
Attachment 5
 
Bertam Field Development Project Major HUC Campaign
Bertam Field Development Project Major HUC Campaign Bertam Field Development Project Major HUC Campaign
Bertam Field Development Project Major HUC Campaign
 
آزمایش سختی
آزمایش سختیآزمایش سختی
آزمایش سختی
 
Aiding And Abetting Final Ver
Aiding And Abetting Final VerAiding And Abetting Final Ver
Aiding And Abetting Final Ver
 
آزمایش خزش
آزمایش  خزشآزمایش  خزش
آزمایش خزش
 
Web2 - jQuery
Web2 - jQueryWeb2 - jQuery
Web2 - jQuery
 
آزمایش فشار
آزمایش فشارآزمایش فشار
آزمایش فشار
 
آزمایش ضربه
آزمایش ضربهآزمایش ضربه
آزمایش ضربه
 
Màrqueting digital: integració de la botiga on - line amb l’estratègia de xa...
Màrqueting digital: integració de la botiga on - line amb l’estratègia de  xa...Màrqueting digital: integració de la botiga on - line amb l’estratègia de  xa...
Màrqueting digital: integració de la botiga on - line amb l’estratègia de xa...
 
Estrategia de marketing soget
Estrategia de marketing sogetEstrategia de marketing soget
Estrategia de marketing soget
 
Wagner and King Ludwig
Wagner and King LudwigWagner and King Ludwig
Wagner and King Ludwig
 
ข้อสอบ LAS ปี ๒๕๕๗ ภาษาไทย ป.5
ข้อสอบ LAS ปี ๒๕๕๗ ภาษาไทย ป.5ข้อสอบ LAS ปี ๒๕๕๗ ภาษาไทย ป.5
ข้อสอบ LAS ปี ๒๕๕๗ ภาษาไทย ป.5
 

Similar to FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT

Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewerFann Portento
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....IndraNathMishra2
 
PNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxPNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxstilliegeorgiana
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectJill Reeves
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectJill Reeves
 
FLSMIDTH-PROFILE
FLSMIDTH-PROFILEFLSMIDTH-PROFILE
FLSMIDTH-PROFILESarnath R
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputGaurav Singh Rajput
 
Segmental Lining Design Presentation
Segmental Lining Design PresentationSegmental Lining Design Presentation
Segmental Lining Design PresentationKeith Kong
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.pptExxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.pptssuseraa800d
 

Similar to FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT (20)

Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewer
 
SMHB
SMHBSMHB
SMHB
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
 
PNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxPNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docx
 
Casing_Design(1).ppt
Casing_Design(1).pptCasing_Design(1).ppt
Casing_Design(1).ppt
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Kellingray
KellingrayKellingray
Kellingray
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Prilling NP.PPTX
Prilling NP.PPTXPrilling NP.PPTX
Prilling NP.PPTX
 
FLSMIDTH-PROFILE
FLSMIDTH-PROFILEFLSMIDTH-PROFILE
FLSMIDTH-PROFILE
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
 
addition consideration in pile
addition consideration in pileaddition consideration in pile
addition consideration in pile
 
Segmental Lining Design Presentation
Segmental Lining Design PresentationSegmental Lining Design Presentation
Segmental Lining Design Presentation
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.pptExxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
Exxon-Limiter Redesign-Reaming and Hole Conditioning 09-14-19.ppt
 
Drilling operations
Drilling operationsDrilling operations
Drilling operations
 

Recently uploaded

Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257subhasishdas79
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 

Recently uploaded (20)

Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 

FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT

  • 1. Drilling Department Presented By: Muhammad Noman Khan s/o Muhammad Hanif Khan 1
  • 2. Presentation Synopsis 1. Pressure and fracture gradient determination 2. Calculation and selection of casing type (Proposed casing programmed) 3. Cementing Plan 4. Mud Plan 5. Bit Plan 6. Well Head Housing 7. Rig selection 8. Drill time estimation 2
  • 3. Casing Setting Depth Selection & Fracture Gradient Determination • Formation pressure • Depth • Method used to determine fracture gradient : Eaton’s Method 3
  • 4.
  • 5. For S/D and Poissons ratio
  • 6. Conductor Casing Design 0 200 400 600 800 1000 1200 0 500 1000 1500 2000 2500 3000 Depth(ft) Pressure (psi) Burst Design Load Line Back up Line (psi) Resultant Line (psi) Design Line (psi) #H-40 0 100 200 300 400 500 600 0 500 1000 1500 2000 2500 3000 Depth(ft) Pressure (psi) CollapseDesign Load Line Resultant Line (psi) Design Line (psi) #H-40
  • 7. Casing Selection #H-40 Round Thread (short) 1530 Collapse Resistance (psi) 520 Weight (lb/ft) 94 ID (inch) 18.936 0 100 200 300 400 500 600 700 800 900 1000 -100 0 100 200 300 400 500 600 700 800 900 1000 Depth(ft) pressure (psi) Tension Design Tensional Design Design line Casing Selection
  • 9.
  • 11.
  • 12. Type of Casing Casing Size, in Casing Grade Conductor 20 H40 Surface 13 3/8 J-55(I,II) Intermédiate 9 5/8 H40(I,II) Casing Program – Summary 12
  • 14. Lz Lx 0 1000 2000 3000 4000 5000 6000 7000 -500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 WELL 2 0 1000 2000 3000 4000 5000 6000 7000 -1000 0 1000 2000 3000 4000 5000 6000 7000 AxisTitle Axis Title WELL 3
  • 15. Mud Planning Seawater Native - Seawater + Clay (Formation) - Using Pre hydrated bentonite to aid in hole cleaning - Dump and dilute method to control mud weight and soild contents
  • 16. Hole Size, in Casing Size Mud Weight, ppg Total Amount, bbl 26’’ 20 9.06 328.3 17 ½’’ 13 5/8’’ 9.06 995.68 12 ½” 9 5/8” 9.06 1022.726bbl Mud Plan 16 And Production Hole Required 1047.293bbl
  • 19.
  • 20.
  • 21.
  • 22. Volumetric mixing controls. Q1 = mixwater rate; Q2 = dry solids rate; Q3 = slurry rate Tune Lite Mixing & Cement Head 22
  • 23. Hole Size, in Bit Type Bit Size, in 20 Mill Tooth, Hole Opener 26 13 3/8 Tricone Roller 17 1/2 9 5/8 TD506 PDC 12 1/4 Bit Planning 23
  • 28.
  • 30.
  • 31. Drilling Time Estimation 31 Operations Time estimate, days Depth (TVD), ft Move rig floor to slot 0.5 0 Drill 26" hole 1.5 1000 Run 20" conductor casing 1.5 1000 run cement to sea bed 1 1000 Drill 17.5" hole 2.5 3100 Run 13.375" surface casing 2.5 3100 run cement to sea bed 1 3100 Run & Test BOP 1.5 3100 Drill 10.75" hole 4.5 6050 Log 10.75" hole 2 6050 Run 8.625" production Completion 4.5 6050 Run Cement 2 6050
  • 32. well1 well2 well3 Lower Section 13 3/8” 13 3/8” 13 3/8” 9 5/8” 9 5/8” 9 5/8” Estimated Time (Days) 25 25 25 Total Time to Complete Top Section for all Wells – 75 days 25 days including Rig move and prepare to drill and Running BOP Drilling Time Estimation 32
  • 33. • Pipe Sticking • Differential-Pressure Pipe Sticking • Mechanical Pipe Sticking • Loss of Circulation • Drillpipe Failures • Twistoff • Fatigue • Pipe-Failure Prevention • Hydrogen-Sulfide-Bearing Zones and Shallow Gas • Since we don’t have log data, we very much depend on the real time drilling operations, Hence we have to be very careful about gas kick or loss. Drilling Challenge 33
  • 34. • Fire-fighting equipment must be available for emergency use in the event of a fire and should be provided in first-class working order. • Unauthorized person should not be allowed to be on the rig at any time. • Personnel who not involved directly in the particular operation should keep away from operation site. • Sea survival and offshore course is compulsory for all personnel. Safety 34