The journey starts by with the first step:
Creating the Higher Ed Student Learning
Journey



 Dr Michael Sankey
 Program Manager: Learning Technologies & Environments
 USQ
Stolen from…

                           "A journey of a thousand
                            miles begins with a
                            single step."




Confucius (551-479BC)

                                     Lao-tzu (604 BC - 531 BC)
Teacher support

 Establish   a context
 The SLJ
 F2F strategies
 Online strategies
 Some examples
 Now its over to you
 Toowoomba
 Springfield
 Harvey Bay
 Stanthorpe
University of Southern Queensland

• Founded in 1967
• A distance ed provider since 1977
• Fully online programs since 1997
• 5 Faculties: Arts, Business & Law, Education, Sciences,
  Engineering & Surveying
• All faculties have external programs
• More than 200 under-grad and
  post-grad award programs
Enrolled students USQ

 • All students                    26,000
 • On-campus                        6,000
 • External/online                 20,000 (77%)
 • International                    7,400 (2,300 ONC)

 The vast majority of USQ students access
 information services online
 Most Students and Staff know what they’re getting
 themselves in for when they come to USQ 
Some current strategies

   Every student has a named person to contact
   Every course has an online presence
   Minimum standards for all courses
   Threshold standards – based in a eLearning framework
   Learning Innovation & Teaching Enhancement (LITE)
    teams
   Significant media enhancement available
   Strong focus on the Student Learning Journey (SLJ) and
    personal learning environment (PLE)
Some current trends
    Print – Progressively reducing but still wanted by some
     - but will be gone within 18 months

    Digital content – Increasingly more accessible &
     able to be used on mobile devices

    CDs – popular for many years but will also be gone
     within 18 months

    Physical spaces – Comfortable
     places to meet, study, eat, talk and
     recharge.

    BYOD – Closed       two computer labs
Discernable periods in SLJ

   Application &     The early       Continuing    Completing     Alumni
       offer          weeks            study         study


                     Student Learning Journey

   Decision to     Enrol     Experience of first   Unforseen    Graduation
     enrol                       semester           events


The SLJ is a series of interactions between students & the Uni.
Identified 9 student groups with some 150 individual points of
interaction.
Accessing the Student Voice

   Professor Geoff Scott in his report Accessing
    the Student Voice (2005) concluded that ‘it is
    the whole experience that matters to students.
    Students are not concerned about whether or
    not a particular interaction is academic or
    administrative, but they are concerned about the quality of
    the interaction. In this context, the quality of interactions in
    the pre-enrolment phase is just as important as the quality of
    face-to-face and/or virtual interactions in academic study or
    in completing study (including graduation ceremony and
    membership of the Alumni Network)’.
Key interaction points

   Decision to enrol
   Application and offer process
   Enrolment process
   The early weeks (orientation & first classes)   • Learning
   The experience of study in the 1st Semester       Centre
                                                    • Student
   Preparing for the next semester                   Services
                                                    • Library
   Continuing study the following years            • Careers &
   When things don't go as planned                   employment

   Completing study
SLJ Online Services
                                                                                 ENROL                              ORIENT & TRANSITION
          ENGAGE
                                                                                • Admission/Offer/Accept/Defer/            • Orientation on Moodle
                                                                                  Decline                                  • Access to StudyDesk
          • Enquiry Management (RightNow)                                       • Course re/Enrol (add, swap,              • Access to UConnect
          • Future Student Website                                                drop, edit)                              • UConnect Announc’s & Alerts
          • Application                                                         • View exemptions processing
          • Information in 8 languages                                                                                     • UMail activation and passwords
          • Open Day & Info Evening                                             • Create/Amend Study Plan                  • Oncampus timetable
                                                                                • View Class Enrolment                     • Personal SRO details
            Programs
          • Residential College Applications                Now                 • Enter/Update Personal details            • Student Services Videos
 Now      • Careers Resources                                                   • Enter/Update/Request Support    Now      • Tutorial Registration
          • Scholarships & Application Forms                                      –Disability                              • Res College Invoicing & Pmts
          • Disability Resources                                                • Fee Inv’s, calculator &
          • Student Representation                                                                                         • Fee Acc. Enquiries & CAS
                                                                                  payments                                   Forms
          • Web Campaign pages                                                  • Student ID Cards
          • New International website                                                                                      • Student Guild Website
          • New program Guide                                                   • Student Loans                            • Current students website
          • Chat for enquiries                                                  • Program Enrol (Cancel,                   • Online Forums – Clubs &
                                                           Coming                 Reinstate, Leave of Absence)               Societies



          •   Send/Update Profile form         • e-Newsletter
          •   Alpha list of Alumni Profiles    • Alumnus of the Year Awards
ALUMNI    •   Chapter listings                 • Personal, Professions and
          •   Chapter tool-kit                 bus.dev. opportunity listings
          •   New Chapter EOI form             •CareerHub Mentoring




                                                                                                                      LEARNING SUPPORT
          GRADUATE                                                       PROGRESS
                                                                                                                           • AWARE Program
                                                                               • Check Study Package Status                • ALS Online Resources (TLC)
                                                                               • View & Print Unofficial                   • Enquiry Management (RightNow)
           • Academic Dress ordering                                             Transcripts                               • Counselling Resources
           • Ceremony Registration                                             • Exam Timetables                           • Careers Counselling
           • Graduate Employment
 Now         Resources
                                                                               • View & Update Exam Centres
                                                                               • Results
                                                                                                                  Now      • Employment, WIL, Mentoring
                                                                                                                           • Intern. Stud. Assistance Line
           • CareerHub Jobs Database
           • Graduation Ceremony Videos                    Now                 • USQ Handbook
                                                                               • Policy Library
                                                                                                                           • Digital Learning @USQ site
                                                                                                                           • Wimba workshops in maths
                                                                               • View & Update Statistical Data            • Counselling & Health Promotion
                                                                               • Scholarships & Loans                      • Academic Intervention Form
                                                                               • Disability Support
                                                                               • Employer Speed-Networking
           • Online Payment for Graduations                                    • The Honk (Student Guild)                  • Personal Counselling
 Coming      & replacement Testamurs                                                                                       • Learning Centre web page update
                                                                                                                  Coming   • TLC in other languages
                                                          Coming               • CRM Retention Intervention                • Student Services CO Engagement
Some key things

    Student relationship officers
    Academic learning support
    Peer assisted learning
    USQ Retention strategy
    Communities of Practice (CoPs)
    Graduate skills and capabilities
    ePortfolios
    Closing the loop
    Alumni
Your SRO
Student Relationship Officer (SRO) Network

  STUDENT MANAGEMENT DIVISION
     Recruitment & Admissions – prospective and new students
     USQ International – prospective and new students
     Student Support & Retention – current and continuing students

  FACULTIES
     Student Support staff in each Faculty based at Toowoomba
      campus

  CAMPUSES
     Discipline based SROs based at Springfield & Fraser Coast
      campuses
Current Discipline Allocation for SRO’s within
Student Support


                                                        •Student Relationship Officers

                                                                  •Sciences
                          Student Support Coordinator   Roxanne Parker Lorraine Juliana
                             Shannon Svensen
                              (Raeleen Cahill)                 Business & Law
                                                           Deb Busiko Emma Goltz
                                                                 Clinton Bell
    Manager, Enrolments
    & Student Support

    Janelle Hartwig                                                  •Arts
                                                        Dana Eggleston Shani McCormack

                          Student Support Coordinator              Education
                              Deborah Sutton                   Maureen Crosisca
                               (Clinton Bell)             Jason Steinhardt Mary Reyes


                                                           Engineering & Surveying
                                                          Marg Kenny Damien Zekants
RELATIONSHIP FRAMEWORK




                           SUPPORT                     ADVICE               EXPERTISE
Individual or specific                                                        Individual academic
support (individual                                                             advice, career or
                                                                            personal counselling etc
students)

Specific or targeted
                                                    Course and program
support (specific
                                                    advice, retention etc
students)


                            Student support,
Must have (all
                            recruitment and
students)
                              retention etc
                                                    Available and common
                         Available and common       to specific student     Specific, individual
                         to all students and / or   cohorts and/or
                         cohorts
                                                                            advice and support
                                                    individuals
Proactive support
    Retention Management
        Introduction                             Dana

        Week 4
        Week 6                          Damien
        Week 10
        Week 15                                  Shani
        Week18

    Study Desk Inactivity

    Pilot Projects - Assignment Non-Submission
                        - Missed Exams
Academic learning support

  Online and face-to-face sessions for
    communication skills and maths:
   Individual or small group consultations
         face to face
         phone
         email
         online chat.
   Workshops
   Meet - Up
   Course-based assistance
Current home page
The Learning Centre




Also do:
• lectures on common problem areas
• embedded workshops in lectures in collaboration with
  academic staff
• and we have an online learning centre
Meet-Up
 54 Meet-Up groups meeting
 Sessions are different from tutorials as they are:
       led by students who have previously done the course
       responsive to your needs as a student
       interactive, informal and fun
       they encourage discussion
        and develop understanding
        of course content
       concerned with how to learn
        as well as what to learn
       supervised by qualified
        academic staff
Preemptive
New current students site
ASK USQ – Right Now
Social networking
Peer assisted learning

   We’re good at doing
    it for students
     Meet-Up student
      leaders
     Online student
      mentors
   For staff
     Learning Technologists in centralised units
     Faculty technology mentors
The role of the teacher

                           They are our
                            interface
                           In most cases
                            they want to
                           But are not
                            confident
                           And not overly
                            aware of what
                            others are doing
Example short course




   A Key: Get the staff using the same tools as
    the students (if it’s good for the students it’s good for us)
                    Image accessed 24 February 2012 from:
                     http://www.fusionhq.com/package/templates/0/eatingdogfood.jpg
ePortfolios
               Personal learning environment
  Outside      Artefact 1
environments
                                    View 1
               Artefact 2     For course assessments     Group 1
   Twitter
               Artefact 3

   Flickr       Skill 1                                  Group 2
                                    View 2
                              For potential employers
               Artefact 5
  YouTube
                                                        Individual 1
               Artefact 6
 Facebook       Skill 2             View 3
                               For parents or friends
                                                        Individual 2
               Artefact 8
Staff portfolio
 Professional
  portfolio
 Evidence for
  promotion
 Teaching tool
 Interest group
  interaction
 Linked with the LMS
 11,000 Portfolios – 24,000 pages
Supporting the staff
Communities of Practice

Groups of people who share a passion for
something that they know how to do and
who interact regularly to learn how to do it
better. CoPs provide an opportunity to
create a learning community around an
area of interest or practice, to share and develop practice and
build personal and professional knowledge and expertise.




21 + CoPs – e.g. CoP for Faculty technology mentors
Management or Facilitation
What we have had                      What is emerging
Traditional LMS                           LMS




                                            Activity4
    Activity1




                     EdCom/OER etc.
                                                        Activity1
    Activity2
                                          PLE
    Activity3                                           Activity2




                                            Activity3
    Activity4
Staff regularly use:
• Moodle LMS
• Mahara ePortfolio
• Equella repository
• Camtasia Relay/Studio
• Virtual Classroom
• Voice tools
• TurnItIn
• Remote Access Labs
• Video conferencing
• Discovery layer
• Cloud services
  (Skype, 2nd Life, etc.)
Defined minimum standards
1.   An introductory message, posted before the start of semester, which:
        welcomes students to the course;
        introduces the teaching team for the course;
        describes how the StudyDesk space will be used throughout the semester;
         and
        explains how students may obtain support by appropriately directing
         academic or technical. enquiries.
2.   Checking of discussions and other student access areas on at least
     three [3] working days per week in order to:
        monitor and moderate comments and discussion by students;
        manage course operation by responding to student enquiries and learning
         activities.
3.   Student requests for clarification or assistance should be responded to
     as soon as possible, but certainly within 48 hours during the working
     week.
Tools Matrix
Moving to mobile
Mobile theme
The ACODE Benchmarks
Currently 8
1.   Institution policy and governance for technology supported
     learning and teaching
2.   Planning for, and quality improvement of the integration of
     technologies for learning and teaching
3.   Information technology infrastructure to support learning and
     teaching
4.   Pedagogical application of information and communication
     technology
5.   Professional/staff development for the effective use of
     technologies for learning and teaching
6.   Staff support for the use of technologies for learning and
     teaching
7.   Student training for the effective use of technologies for learning
8.   Student support for the use of technologies for learning
Don’t forget!!!




          http://moodlemoot.org.au/
SLJ 6 2012

SLJ 6 2012

  • 1.
    The journey startsby with the first step: Creating the Higher Ed Student Learning Journey Dr Michael Sankey Program Manager: Learning Technologies & Environments USQ
  • 2.
    Stolen from…  "A journey of a thousand miles begins with a single step." Confucius (551-479BC) Lao-tzu (604 BC - 531 BC)
  • 3.
    Teacher support  Establish a context  The SLJ  F2F strategies  Online strategies  Some examples  Now its over to you
  • 4.
     Toowoomba  Springfield Harvey Bay  Stanthorpe
  • 5.
    University of SouthernQueensland • Founded in 1967 • A distance ed provider since 1977 • Fully online programs since 1997 • 5 Faculties: Arts, Business & Law, Education, Sciences, Engineering & Surveying • All faculties have external programs • More than 200 under-grad and post-grad award programs
  • 6.
    Enrolled students USQ • All students 26,000 • On-campus 6,000 • External/online 20,000 (77%) • International 7,400 (2,300 ONC) The vast majority of USQ students access information services online Most Students and Staff know what they’re getting themselves in for when they come to USQ 
  • 7.
    Some current strategies  Every student has a named person to contact  Every course has an online presence  Minimum standards for all courses  Threshold standards – based in a eLearning framework  Learning Innovation & Teaching Enhancement (LITE) teams  Significant media enhancement available  Strong focus on the Student Learning Journey (SLJ) and personal learning environment (PLE)
  • 8.
    Some current trends  Print – Progressively reducing but still wanted by some - but will be gone within 18 months  Digital content – Increasingly more accessible & able to be used on mobile devices  CDs – popular for many years but will also be gone within 18 months  Physical spaces – Comfortable places to meet, study, eat, talk and recharge.  BYOD – Closed two computer labs
  • 9.
    Discernable periods inSLJ Application & The early Continuing Completing Alumni offer weeks study study Student Learning Journey Decision to Enrol Experience of first Unforseen Graduation enrol semester events The SLJ is a series of interactions between students & the Uni. Identified 9 student groups with some 150 individual points of interaction.
  • 10.
    Accessing the StudentVoice  Professor Geoff Scott in his report Accessing the Student Voice (2005) concluded that ‘it is the whole experience that matters to students. Students are not concerned about whether or not a particular interaction is academic or administrative, but they are concerned about the quality of the interaction. In this context, the quality of interactions in the pre-enrolment phase is just as important as the quality of face-to-face and/or virtual interactions in academic study or in completing study (including graduation ceremony and membership of the Alumni Network)’.
  • 11.
    Key interaction points  Decision to enrol  Application and offer process  Enrolment process  The early weeks (orientation & first classes) • Learning  The experience of study in the 1st Semester Centre • Student  Preparing for the next semester Services • Library  Continuing study the following years • Careers &  When things don't go as planned employment  Completing study
  • 12.
    SLJ Online Services ENROL ORIENT & TRANSITION ENGAGE • Admission/Offer/Accept/Defer/ • Orientation on Moodle Decline • Access to StudyDesk • Enquiry Management (RightNow) • Course re/Enrol (add, swap, • Access to UConnect • Future Student Website drop, edit) • UConnect Announc’s & Alerts • Application • View exemptions processing • Information in 8 languages • UMail activation and passwords • Open Day & Info Evening • Create/Amend Study Plan • Oncampus timetable • View Class Enrolment • Personal SRO details Programs • Residential College Applications Now • Enter/Update Personal details • Student Services Videos Now • Careers Resources • Enter/Update/Request Support Now • Tutorial Registration • Scholarships & Application Forms –Disability • Res College Invoicing & Pmts • Disability Resources • Fee Inv’s, calculator & • Student Representation • Fee Acc. Enquiries & CAS payments Forms • Web Campaign pages • Student ID Cards • New International website • Student Guild Website • New program Guide • Student Loans • Current students website • Chat for enquiries • Program Enrol (Cancel, • Online Forums – Clubs & Coming Reinstate, Leave of Absence) Societies • Send/Update Profile form • e-Newsletter • Alpha list of Alumni Profiles • Alumnus of the Year Awards ALUMNI • Chapter listings • Personal, Professions and • Chapter tool-kit bus.dev. opportunity listings • New Chapter EOI form •CareerHub Mentoring LEARNING SUPPORT GRADUATE PROGRESS • AWARE Program • Check Study Package Status • ALS Online Resources (TLC) • View & Print Unofficial • Enquiry Management (RightNow) • Academic Dress ordering Transcripts • Counselling Resources • Ceremony Registration • Exam Timetables • Careers Counselling • Graduate Employment Now Resources • View & Update Exam Centres • Results Now • Employment, WIL, Mentoring • Intern. Stud. Assistance Line • CareerHub Jobs Database • Graduation Ceremony Videos Now • USQ Handbook • Policy Library • Digital Learning @USQ site • Wimba workshops in maths • View & Update Statistical Data • Counselling & Health Promotion • Scholarships & Loans • Academic Intervention Form • Disability Support • Employer Speed-Networking • Online Payment for Graduations • The Honk (Student Guild) • Personal Counselling Coming & replacement Testamurs • Learning Centre web page update Coming • TLC in other languages Coming • CRM Retention Intervention • Student Services CO Engagement
  • 13.
    Some key things  Student relationship officers  Academic learning support  Peer assisted learning  USQ Retention strategy  Communities of Practice (CoPs)  Graduate skills and capabilities  ePortfolios  Closing the loop  Alumni
  • 14.
  • 15.
    Student Relationship Officer(SRO) Network STUDENT MANAGEMENT DIVISION  Recruitment & Admissions – prospective and new students  USQ International – prospective and new students  Student Support & Retention – current and continuing students FACULTIES  Student Support staff in each Faculty based at Toowoomba campus CAMPUSES  Discipline based SROs based at Springfield & Fraser Coast campuses
  • 16.
    Current Discipline Allocationfor SRO’s within Student Support •Student Relationship Officers •Sciences Student Support Coordinator Roxanne Parker Lorraine Juliana Shannon Svensen (Raeleen Cahill) Business & Law Deb Busiko Emma Goltz Clinton Bell Manager, Enrolments & Student Support Janelle Hartwig •Arts Dana Eggleston Shani McCormack Student Support Coordinator Education Deborah Sutton Maureen Crosisca (Clinton Bell) Jason Steinhardt Mary Reyes Engineering & Surveying Marg Kenny Damien Zekants
  • 17.
    RELATIONSHIP FRAMEWORK SUPPORT ADVICE EXPERTISE Individual or specific Individual academic support (individual advice, career or personal counselling etc students) Specific or targeted Course and program support (specific advice, retention etc students) Student support, Must have (all recruitment and students) retention etc Available and common Available and common to specific student Specific, individual to all students and / or cohorts and/or cohorts advice and support individuals
  • 18.
    Proactive support  Retention Management  Introduction Dana  Week 4  Week 6 Damien  Week 10  Week 15 Shani  Week18  Study Desk Inactivity  Pilot Projects - Assignment Non-Submission - Missed Exams
  • 19.
    Academic learning support Online and face-to-face sessions for communication skills and maths:  Individual or small group consultations  face to face  phone  email  online chat.  Workshops  Meet - Up  Course-based assistance
  • 21.
  • 22.
    The Learning Centre Alsodo: • lectures on common problem areas • embedded workshops in lectures in collaboration with academic staff • and we have an online learning centre
  • 23.
    Meet-Up  54 Meet-Upgroups meeting  Sessions are different from tutorials as they are:  led by students who have previously done the course  responsive to your needs as a student  interactive, informal and fun  they encourage discussion and develop understanding of course content  concerned with how to learn as well as what to learn  supervised by qualified academic staff
  • 24.
  • 25.
  • 26.
    ASK USQ –Right Now
  • 27.
  • 28.
    Peer assisted learning  We’re good at doing it for students  Meet-Up student leaders  Online student mentors  For staff  Learning Technologists in centralised units  Faculty technology mentors
  • 29.
    The role ofthe teacher  They are our interface  In most cases they want to  But are not confident  And not overly aware of what others are doing
  • 30.
    Example short course  A Key: Get the staff using the same tools as the students (if it’s good for the students it’s good for us) Image accessed 24 February 2012 from: http://www.fusionhq.com/package/templates/0/eatingdogfood.jpg
  • 31.
    ePortfolios Personal learning environment Outside Artefact 1 environments View 1 Artefact 2 For course assessments Group 1 Twitter Artefact 3 Flickr Skill 1 Group 2 View 2 For potential employers Artefact 5 YouTube Individual 1 Artefact 6 Facebook Skill 2 View 3 For parents or friends Individual 2 Artefact 8
  • 32.
    Staff portfolio  Professional portfolio  Evidence for promotion  Teaching tool  Interest group interaction  Linked with the LMS  11,000 Portfolios – 24,000 pages
  • 33.
  • 34.
    Communities of Practice Groupsof people who share a passion for something that they know how to do and who interact regularly to learn how to do it better. CoPs provide an opportunity to create a learning community around an area of interest or practice, to share and develop practice and build personal and professional knowledge and expertise. 21 + CoPs – e.g. CoP for Faculty technology mentors
  • 35.
    Management or Facilitation Whatwe have had What is emerging Traditional LMS LMS Activity4 Activity1 EdCom/OER etc. Activity1 Activity2 PLE Activity3 Activity2 Activity3 Activity4
  • 36.
    Staff regularly use: •Moodle LMS • Mahara ePortfolio • Equella repository • Camtasia Relay/Studio • Virtual Classroom • Voice tools • TurnItIn • Remote Access Labs • Video conferencing • Discovery layer • Cloud services (Skype, 2nd Life, etc.)
  • 37.
    Defined minimum standards 1. An introductory message, posted before the start of semester, which:  welcomes students to the course;  introduces the teaching team for the course;  describes how the StudyDesk space will be used throughout the semester; and  explains how students may obtain support by appropriately directing academic or technical. enquiries. 2. Checking of discussions and other student access areas on at least three [3] working days per week in order to:  monitor and moderate comments and discussion by students;  manage course operation by responding to student enquiries and learning activities. 3. Student requests for clarification or assistance should be responded to as soon as possible, but certainly within 48 hours during the working week.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
    Currently 8 1. Institution policy and governance for technology supported learning and teaching 2. Planning for, and quality improvement of the integration of technologies for learning and teaching 3. Information technology infrastructure to support learning and teaching 4. Pedagogical application of information and communication technology 5. Professional/staff development for the effective use of technologies for learning and teaching 6. Staff support for the use of technologies for learning and teaching 7. Student training for the effective use of technologies for learning 8. Student support for the use of technologies for learning
  • 43.
    Don’t forget!!! http://moodlemoot.org.au/

Editor's Notes

  • #16 The Student Relationship Officer Network within the Student Management Division has three main teams consisting of SRO’s. These teams are Domestic Recruitment & Admissions, USQ Internationaland Student Support & Retention.There are discipline based SRO’s at each of the campuses who assist with Faculty administration, similar to Student Support roles in Toowoomba Faculties. The Springfield and Fraser Coast SRO’s have a blended role which include SRO and Faculty administrative duties.So what is a Student Relationship Officer and what do they do? SRO’s are responsible for providing USQ’s brand of student support to help students achieve their goals, guide them through the challenges that study can bring and to celebrate our student’s success.
  • #17 Let’s have a closer look at the SRO’s within the Student Support and Retention team. There are 13 full time SRO positions who report to 2 Student Support Coordinators. The team is overseen by Manager Student Support and Retention. Each SRO is allocated a specific disciplinenamely Arts, Business & Law, Education, Engineering & Surveying and Sciences. This is the structure our team and if we take a closer look at the Business & Law Discipline, we can see that Deb Busiko and Emma Goltz are the nominated Business & Law SRO’s. In addition to this, our team is the first point of contact for the University and we can assist visitors and students from any faculty. This ensures all enquiries receive a consistent high quality service.
  • #18 Fundamentally within the Relationship Framework, the majority of questions the SRO team answer are general support enquiries. Examples of which include resetting passwords, advise on recommended enrolment patterns, study materials and exam timetables, to name a few. The advice column is when the SRO’s hand the enquiry over to the Faculty or relevant area to provide specific information, such as a complex enrolment question or querying the grounds of a failed exemption application. The hand-over point beyond this is where expert advice may be required. Examples of this would include referrals to counselling support that is offered by Student Services, specific course content enquiries to the relevant academic.As you can see there is another line on the bottom of the slide which represents the enquiry passingbetween teams, an issue or enquiry can be passed in either direction when required.
  • #19 We are continually trying to improve our proactive support. We send a variety of timely communications to specific student cohorts to support and guide them on through the different stages of their student learning journey. As part of our retention management plan we monitor and communicate with students who are new to USQ year on a regular basis. The types of information we communicate to students include orientation programs, enrolment health check, learning centre academic support, exam preparation, effective study techniques and end of semester results. Proactively communicating with our students can eliminate the stress and confusion that students can sometimes feel during their first semester. Student Support contacts students who are enrolled in courses and have not accessed their study desk within the first few weeks of the commencement of semester. This ensures students know how and where to access their course content and view vital information posted by their course leaders.We strive to work with other departments on pilot projects to further ensure the success of our students. Some of the most recent examples of this include working with the Faculty of Engineering and Surveying on projects such as contacting students who do not participate in submission of assignments and for those who do not to sit their final exams. Further information will be available at a later date once the review process has taken place.