KARNATAKA UNIVERSITY, DHARWAD 
INSTITUTE OF BUSINESS MANAGEMENT AND RESEARCH, HUBLI. 
Summer Implant Project (SIP) 
A report on 
Customer Satisfaction Survey 
Towards DRIVE TRACK PLUS PROGRAM 
At 
Hindustan Petroleum Corporation Limited 
Regional Office Belgaum 
Submitted to 
KARNATAKA UNIVERSTIY, DHARWAD 
in partial fulfilment of the requirement for the award of degree in 
MASTER OF BUSINESS ADMINISTRATION 
carried during the academic year 2013-14 
Submitted by: 
HUSAIN FAIROZ B BAHAMANI 
Registration No: MBA131261007 
INTERNAL GUIDE: 
Prof. Dr. ARUN BABU ANGADI 
HOD and Associate Professor 
MBA Dept 
IBMR, Hubli 
EXTERNAL GUIDE: 
Mr. GAURAV MALIK 
Marketing Officer 
HPCL Regional Office Belgaum
Ref. No. KU/IBMR/2014/ 
Date: 16-08-2014 
CERTIFICATE 
This is to certify that HUSAIN FAIROZ B BAHAMANI, Reg. No. 
MBA131261007 student of 2nd semester of our Institution has completed 
Summer Internship Program (SIP) during the academic year 2013-2014 at 
“Hindustan Petroleum Corporation Limited” entitled “Customer 
Satisfaction Survey towards DRIVE TRACK PLUS Program” in partial 
fulfillment of Master of Business Administration degree as prescribed by 
Karnatak University, Dharwad. 
Dr. Rajendra C. Malowade 
Director, IBMR 
External Examiner:- 
1.______________________ 2.______________________
Ref No: IBMR/MBA/2014/ 
Date: 16-08-2014 
CERTIFICATE 
This is to certify that, HUSAIN FAIROZ B BAHAMANI, Reg. No. 
MBA1312161007 is a bonafide student of this Institute has completed Summer 
Internship Program (SIP) under my guidance during the academic year 2013- 
2014 at “HINDUSTAN PETROLEUM CORPORATION LIMITED”. He 
has prepared and submitted the project assigned to him, namely “Customer 
Satisfaction Survey Towards DRIVE TRACK PLUS Program” 
Arun Babu Angadi 
Assistant Professor and HOD MBA Dept 
IBMR, Hubli.
DECLARATION 
I Husain Fairoz B Bahamani student of MBA 2nd sem, Institute of Business 
Management and Research, Hubli, hereby declare that the project work entitled 
“Customer Satisfaction Survey” carried out at “Hindustan Petroleum 
Corporation Limited Regional Office Belgaum” is submitted to Karnataka 
University Dharwad through the Institute of Business Management and Research, 
Hubli, in partial fulfilment of the requirements for the award of the Master of Business 
Administration degree. This project report is a bona fide work prepared by me under 
the guidance of Prof. Dr. Arun babu Angadi HOD MBA Dept of Institute of 
Business Management and Research, Hubli. The findings and suggestions of this 
project report are based on the information collected by me during the period of my 
study. 
To the best of my knowledge and belief, the matter presented in this report has not 
been submitted previously in part or full to any university for the award of any 
degrees. 
Date: 16/08/2014 Husain Fairoz B Bahamani 
Place: HUBLI MBA131261007
ACKNOWLEDGEMENT 
I wish to express my heartfelt thanks to all those who were involved in completion of 
my project. 
First of all I wish to express my sincere thanks to our respectable Dean and Director 
Dr. Rajendra C. Malowade who has fully supported and encouraged me in this 
venture. 
It is my privilege to have accomplished this study under the guidance of my guide, 
Prof. Dr.Arun Babu Angadi HOD and Associate Professor MBA Dept for taking keen 
interest and full involvement, dynamic motivation and valuable guidance extended to 
me throughout the project. 
I wish to thank Hindustan Petroleum Corporation Limited Regional Office Belgaum 
and Mr. S S Patil (Chief Regional Manager Retail), and Mr. Gaurav Malik (Marketing 
Officer Belgaum RO) my external guide and all the employees of the organization for 
guiding and helping me in completing this project successfully. 
My sincere and affectionate regards to my parents for the immense support which 
encouraged me to conclude this project on time. 
I wouldn’t forget to thank all my faculty members of the Institute, friends and 
everybody for their kind co-operation and help in this matter. 
HUSAIN FAIROZ BAHAMANI 
MBA131261007
Contents 
SI. 
NO 
TOPICS PAGE NO 
1 
Executive Summary 
1 
2 
Company Profile: 
Brief about the company 
Brief about the organisation structure 
Company’s Vision, Mission and Objectives 
2 – 26 
27 – 33 
34 
3 
About the project 
a)Objective of the study 
b)Scope of the study 
c)Limitation of the study 
35 – 53 
54 
54 
4 
Research Methodology of the project 
a) Primary Data 
b) Secondary Data 
c) General Approach 
55 – 56 
56 
56 
5 
Conceptual Framework 
A Review of Earlier Research studies conducted 
57 
6 
Analysis, Findings and suggestions 
SWOT analysis 
59 – 68 
69 
7 Conclusion 70 – 71 
8 Reference 71 
9 Questionnaire 72 – 76
Executive Summary 
As a part of fulfilment of the MBA course at Institute Of Business Management & 
Research (IBMR) Business School, Hubli, SIP was undertaken with the Hindustan 
Petroleum Corporation Limited. 
This study is to analyse and know the customer satisfaction towards Drive Track Plus 
Program. In this survey of customer satisfaction the statistics are compared with competitors’. 
This survey helped me to experience practical functioning of this organization and to gain 
knowledge about the product & services and distribution channels of Hindustan Petroleum 
Corporation Limited. 
This project is specially designed to understand the subject matter of customer satisfaction 
about the product and services of the Organization. 
The purpose of training was to have a practical experience of working in an organization 
and to have exposure to the various management practices in the field of marketing. This 
training also has given me an on the job experience of marketing. 
This project is very useful for those who want to know about the company and marketing 
strategies of the company. 
For making satisfactory progress an organization need to make sure that their product is 
developing along with the market, if a product is developing well, then income should 
increase, if not then the marketing strategy should be revised. An organization should always 
know what is happening within their designated market, if it is changing, saturation, 
technological advances, slowing down or rapidly growing, being up to date on this is 
essential for companies to survive.
Introduction 
Hindustan Petroleum Corporation Limited 
HPCL is a Government of India Enterprise with a Navratna Status, and a Forbes 2000 
and Global Fortune 500 company. It had originally been incorporated as a company under 
the Indian Companies Act 1913. It is listed on the Bombay Stock exchange (BSE) and 
National Stock Exchange (NSE), India. 
HPCL has an annual sales/income from operations of Rs 2,32,188 Crores (US$ 38.75 
Billions) during FY 2013-14, having about 20% Marketing share in India among PSUs and a 
strong market infrastructure. HPCL's Crude Thruput and Market Sales (including exports) are 
15.51 Million Metric Tonnes (MMT) and 30.96 MMT respectively in the same period. It 
operates 2 major refineries producing a wide variety of petroleum fuels & specialties, one 
in Mumbai (West Coast) of 6.5 Million Metric Tonnes Per Annum (MMTPA) capacity and 
the other in Vishakhapatnam, (East Coast) with a capacity of 8.3 MMTPA. HPCL holds an 
equity stake of 16.95% in Mangalore Refinery & Petrochemicals Limited, a state-of-the-art 
refinery at Mangalore with a capacity of 15 MMTPA. In addition, HPCL has constructed a 9 
MMTPA refinery at Bathinda, in Punjab, with Mittal Energy Investments Pvt. Ltd. . as 
a Joint venture. 
HPCL also owns and operates the largest Lube Refinery in the India producing Lube 
Base Oils of international standards, with a capacity of 428 TMT. This Lube Refinery 
accounts for over 40% of the India's total Lube Base Oil production. Presently HPCL 
produces over 300+ grades of Lubes, Specialities and Greases. 
HPCL's vast marketing network consists of 13 Zonal offices in major cities and 101 
Regional Offices facilitated by a Supply & Distribution infrastructure comprising Terminals, 
Pipeline networks, Aviation Service Stations, LPG Bottling Plants, Inland Relay Depots & 
Retail Outlets, Lube and LPG Distributorships. HPCL, over the years, has moved from 
strength to strength on all fronts. The refining capacity steadily increased from 5.5 MMTPA 
in 1984/85 to 14.8 MMTPA presently.
HPCL has earned "Excellent" performance from FY1991-92 (basis signing of the first 
MOU with the Ministry of Petroleum & Natural Gas, GOI in FY 1991-92), till FY 2012-13, 
except for the single FY 2006-07, when it was adjudged as Very Good. HPCL has won the 
prestigious MOU Award for the year 2007-08 for Excellent Overall Performance, and for 
being one of the Top Ten Public Sector Enterprises who fall under the 'Excellent' category. 
HPCL has also earned the TOP PERFORMER status for two consecutive FY 2011-12 and 
2012-13, as the topper in the MOU ratings, in the Oil Industry. 
Consistent excellent performance has been made possible by highly motivated workforce 
of over 11,000 employees working all over India at its various refining and marketing 
locations. View Past Annual Reports to know more about HPCL. The RTI Information 
Manual provides various details about the operation of the Corporation. 
HPCL continually invests in innovative technologies to enhance the effectiveness of 
employees and bring qualitative changes in service. Business Process Re-Engineering 
exercise, creation of Strategic Business Units, ERP implementation, Organizational 
Transformation, Balanced Score Card, Competency Mapping, benchmarking of refineries and 
terminals for product specifications, ISO certification of Refineries and Supply Chain 
Management are some of the initiatives that broke new grounds. 
HPCL has successfully integrated Information Technology in its activities at different 
levels. The Enterprise Resource Planning (ERP) system is now operational on J.D.Edwards, 
an Oracle product, across the Corporation. 
Registered Office & Corporate Headquarters 
Hindustan Petroleum Corporation Limited. 
Petroleum House, 
17, Jamshedji Tata Road, 
Mumbai 400020. 
Maharashtra, India. 
Email: corphqo(at)hpcl[dot]co[dot]in 
Marketing Headquarters 
Hindustan Petroleum Corporation Limited. 
Hindustan Bhawan, 
8, Shoorji Vallabhdas Marg, 
Ballard Estate,Mumbai 400001.Maharashtra, India. 
Email: mktghqo(at)hpcl[dot]co[dot]in
CORPORATE LOGO 
Punch line of the Company 
FUTURE FULL OF ENERGY
OVERALL MARKET SHARE 
50.00% 
45.00% 
40.00% 
35.00% 
30.00% 
25.00% 
20.00% 
15.00% 
10.00% 
5.00% 
0.00% 
HPCL IOCL BPCL OTHERS 
 HPCL 25% 
 IOCL 50% 
 BPCL 23% 
 OTHERS 1.5%
MARKET SHARE IN PIPELINE 
50% 
45% 
40% 
35% 
30% 
25% 
20% 
15% 
10% 
5% 
0% 
BPCL HPCL ONGC IOCL 
 BPCL 7% 
 HPCL 16% 
 ONCG 30% 
 IOCL 47% 
Series1
CUSTOMER PREFERENCE 
45% 
40% 
35% 
30% 
25% 
20% 
15% 
10% 
5% 
0% 
HPCL BPCL IOCL OTHERS 
 HPCL 26% 
 BPCL 42% 
 IOCL 30% 
 OTHERS 2% 
Series1
SCORE OF COMPANIES ON SCALE 
SERVICE 
35% 
34% 
33% 
32% 
31% 
30% 
29% 
28% 
27% 
IOCL 30% 
BPCL 35% 
HPCL 35% 
IOCL BPCL HPCL 
Series1
ADVERTISEMENT 
45 
40 
35 
30 
25 
20 
15 
10 
5 
0 
HPCL IOCL BPCL 
HPCL 42% 
IOCL 30% 
BPCL 28% 
Series1
BRAND IMAGE 
35% 
34% 
33% 
32% 
31% 
30% 
29% 
28% 
27% 
HPCL 35% 
IOCL 35% 
BPCL 30% 
HPCL IOCL BPCL 
Series1
QUALITY 
45% 
40% 
35% 
30% 
25% 
20% 
15% 
10% 
5% 
0% 
IOCL 30% 
HPCL 45% 
BPCL 25% 
IOCL HPCL BPCL
Products and Services 
Refineries 
Welcome to Refineries Section 
Without refining, the rich resources of crude petroleum of nature would remain latent. Value-added 
products from crude petroleum like petrol, diesel, kerosene, liquefied petroleum gas, 
naphtha and many more products would not be available for growth and development of a 
nation. 
HPCL refineries upgrade the crude petroleum into many value-added products and over 
300 grades of lubricants, specialties and greases. The Lubricating Oils Refinery set up at 
Mumbai is largest lube refinery in India. It produces superior quality lube base oils. 
The offsite product handling facilities of refineries at Mumbai and Vishakhapatnam has been 
automated. Projects have been implemented and facilities upgraded to produce green fuels 
like unleaded petrol and low sulphur diesel. and Euro III & Euro IV works are in progress. 
The refineries have been benchmarked by an international agency for various performance 
parameters. Numerous awards have been bestowed on both the refineries in recognition of the 
efforts in the field of energy conservation, environment and safety. 
This section showcases about our Refineries: Its History, Performance, New Projects, 
Research & Development, Awards.
HP Aviation... Leading Jet fuel supplier in India 
Hindustan Petroleum (as Esso and Caltex prior to 1974) has been providing aviation 
refuelling (Aviation Turbine Fuel - ATF) services at various airports in India for more than 
half a century. To know more about HP Aviation, also fondly called "Hindustan" Aviation, 
browse the following links. 
Bulk Fuels and Specialities 
Welcome to Bulk Fuels & Specialities section (Direct Sales) 
The Bulk Fuel & Specialities Business unit caters to marketing of Bulk fuels & Petroleum 
products directly to Industrial consumers like power plants, chemicals, fertilisers, shipping 
companies and airlines. This unit is also involved in exports of Bulk fuels and finished 
Petroleum Products. 
International Trade
Welcome to International Trade section 
This section showcases about our International Marketing,Crude supplies and Our Offerings. 
Please navigate to various information using the links. 
The activities of IT&S relate to: 
 Crude oil imports 
 Petroleum Product Imports / Exports 
 Shipping 
 Production planning for Refineries 
 Supplies for domestic Markets 
 Product exchange with other Indian Oil Companies and Oil price risk management
Welcome to HP Gas, Your Friendly Gas 
HP Gas, the HPCL brand of LPG, is what keeps the fire burning in millions of Indian 
homes. 
Bottled at 44 LPG Bottling Plants throughout the country with a total capacity of over 3610 
thousand metric tonnes per annum (TMTPA), HP Gas reaches you after thorough checking at 
every stage right from bottling to distribution. That is what makes HP Gas synonymous with 
Safety. 
Lubes (HP Lubes) 
Lubes is an integral part of Hindustan Petroleum Corporation Limited, one of India's 
frontline oil majors, committed to providing energy and fueling growth in every significant 
area of development.
Retail Business 
At HPCL Retail Outlets (Petrol Pumps), we believe in maintenance. Maintaining not just 
the vehicle, but a steady relationship with our consumer. And to do so, provide better and 
efficient services. We take care of not only your fuelling needs, but also complete vehicle 
care. We stock related products like tyres, batteries and accessories, so you don't have to go 
shop-hopping. All our other value-added services ensure that your vehicle is well looked 
after.
Product Pipeline 
Pipeline is the most cost effective, energy efficient, safe and environment friendly mode of 
transportation of petroleum products. They ease the overburdened Rail & Road infrastructure 
and minimise the environmental impacts arising out of Rail & Road transportation. Pipelines 
play a significant role in meeting the demand of petroleum products in India. 
HPCL has laid pipelines for transportation of Petroleum Products to ensure product 
availability to its Consumers and the Public at large.
Alternate Energy 
Wind power 
Maharastra: HPCL's maiden renewable & alternate energy Wind Energy Generator was 
commissioned at Dhule in Maharashtra State in May 2007. This 3.75 MW pilot turnkey 
project, costing about Rs 19 Crores, comprised of just 3 Wind Turbine Generator (WTG) 
units, each with an installed capacity of 1.25 MW. This was executed by M/s Suzlon Energy 
Limited. 
Power generated from this venture is being sold to the Maharashtra State Electricity Board 
(MSEB). 
Rajasthan: HPCL comissioned another Wind 
power project in Jaisalmer in Rajasthan State on 1st January 2009. The 21.25 MW turnkey 
project, executed at Rs 110 Crore by M/s Suzlon Energy Limited, comprises of a 17 unit-farm, 
each WTG unit having an installed capacity of 1.25 MW. 
The 2nd Wind Power Project in Jaisalmer, Rajasthan was commissioned on 18th December 
2010. The 25.5 MW capacity turnkey project, executed at the cost of Rs. 154.57 Crore by 
M/s Suzlon Energy Limited, comprises of a 17 unit wind farm, each WTG unit having an 
installed capacity of 1.50 MW. 
The power generated is wheeled through the Rajasthan State Electricity grid and is partly 
consumed by HPCL’s centres at Ajmer, Jaipur, Kota, Pali and Jodhpur. Surplus power is 
being sold to Rajasthan State Electricity Board. (RSEB) 
HPCL remains committed to enhance use of renewable energy resources and exploration of 
alternate sources of energy.
Joint Venture 
Crude Refining and Marketing of finished Petroleum products is the core area of the 
Corporation. Opportunities are also being explored to access new revenue streams, and 
augment downstream businesses. Accordingly, HPCL has ventured in Upstream activities 
(Exploration and Production) and piped gas distribution in major cities. 
HPCL-Mittal Energy Ltd.(HMEL) 
JV with Mittal Energy Investments Pte. Ltd (MEI), Singapore, an L.N. Mittal group 
company, for implementation of Guru Gobind Refinery, a green field refinery project located 
at Bathinda, Punjab. 
Hindustan Colas (HINCOL) 
JV promoted with M/s COLAS SA, France. Incorporated on July 17, 1995 
Manufactures International quality value-added bituminous products such as bitumen 
emulsions & cutbacks and modified bitumen.
Brief about the Organisation Structure 
 Chairman and Managing Director 
 Functional Directors 
 Part-time ex-officio Directors 
 Part-time non-official Directors 
Chairman and Managing Director 
Ms. Nishi Vasudeva: Chairman and Managing Director 
Ms. Nishi Vasudeva took charge as Chairman & Managing Director of Hindustan 
Petroleum Corporation Ltd. effective March 01, 2014. Prior to this, she was Director - 
Marketing of the Corporation from July 4, 2011. She is the first woman to be appointed as 
Chairman & Managing Director of a Navratna PSU. She is also the Chairman of HPCL Joint 
Venture Companies - HPCL-Mittal Energy Ltd., South Asia LPG Co. Pvt. Ltd., and its 
wholly owned subsidiary, Prize Petroleum Co. Ltd. 
Functional Directors
Ms. Nishi Vasudeva: Director- Marketing (Additional Charge) 
Ms. Nishi Vasudeva, C&MD HPCL holds additional charge as Director-Marketing of 
HPCL till further notice. 
Mr. P K Joshi: Director- Human Resources 
Mr. Pushp Kumar Joshi took charge as Director - Human Resources effective August 01, 
2012. Prior to this he was holding key portfolios in Human Resources viz. Executive Director 
– HRD, and Head – HR of Marketing Division. 
A Bachelor of Law and an alumnus of XLRI, Jamshedpur, Mr. Pushp Kumar Joshi joined 
HPCL in 1986. Since then he has held various key positions in Human Resources and 
Industrial Relations functions at HQO, Marketing and Refineries Divisions of HPCL 
He has been responsible for the design and deployment of key HR policies and practices 
that are employee oriented and aim at building high performance culture. 
Mr. K V Roan: Director - Finance
Mr. K V Rao took charge as Director Finance effective 1st June 2013. Prior to his taking 
over as Director (Finance), Mr. K V Rao was Executive Director- Corporate Finance of 
HPCL for 5 years. 
A member of the Institute of Chartered Accountants of India (ICAI), Mr. Rao brings with 
him rich experience of over 3 decades in handling various challenging assignments in HPCL 
in the fields of Corporate Finance, Treasury Management, Internal Audit and Marketing & 
Refinery Finance. 
Mr. B. K Namdeo: Director – RefineriesMr. B. K Namdeo 
took charge as Director - Refineries effective July 01, 2013. Prior to this he was the 
Executive Director, International Trade and Supplies of HPCL. A Mechanical Engineer and a 
Master of Technology from IIT Bombay, he has over 32 years of experience in various refinery 
functions and has held key positions in Central Engineering (Refinery Projects), Operations, Projects 
and Maintenance of the Refineries.During his tenure as ED (IT&S), Mr. Namdeo was responsible for 
Procurement of Crude Oil, Product Evacuation, Ship Chartering, Refinery planning & scheduling and 
related commercial activities of both the refineries of HPCL. 
TopPart-time ex-officio Directors 
Dr. S C Khuntia: Director 
Dr. Subhash Chandra Khuntia, has been appointed as a Part Time Director on the HPCL 
Board effective August 3, 2012. 
Dr.S C Khuntia (IAS Karnataka cadre 1981) is a post -Graduate in Physics, Computer 
Science, Economics, Sociology and Doctorate in Economics. Before joining Petroleum
Ministry as Additional Secretary & Financial Advisor, he was Principal Secretary, PWD, 
Govt. of Karnataka. 
Mr. R K Singh: Director 
Mr. Rajesh Kumar Singh has been appointed as a Part Time Director on the HPCL Board 
effective June 26, 2013. 
Mr. R K Singh (IAS Kerala cadre 1989) joined the Ministry of Petroleum and Natural Gas 
effective 10th June 2013, as Joint Secretary (Refineries). He is B.A (Economics) from 
University of Delhi. 
Mr. Singh has previously served the Government of Kerala as Assistant Collector - 
Palakkad, Addl. Director - Tourism, Collector - Malappuram District, Jt.Commissioner - 
Finance, Secretary - Local self Government and Secretary - Ports including assignments such 
as Under Secretary - Ministry of Finance, Dy. Secretary - Ministry of Urban Development, 
and Joint Secretary - Information and Broadcasting, Government of India. He has also served 
as Commmissioner of the Delhi Development Authority (DDA). 
Top 
Part-time non-official Directors 
Mr. G K Pillai: Director 
Mr. G K Pillai joined the HPCL board as an Independent Director effective April 9, 2012. 
Mr. G K Pillai is a retired IAS officer. He joined Indian Administrative Service in the year 
1972 and belongs to Kerala Cadre. He has done his M.Sc. at IIT, Chennai. 
In addition to being a Director on Board of HPCL, he is also the Chairman of the Board of IVY Cap 
Ventures Pvt Ltd, a venture capital company sponsored by the IIT Alumni Association.
Prof. G. Raghuram: Director 
Prof. G. Raghuram joined the HPCL board as an Independent Director effective April 9, 
2012.Prof. Raghuram has done his graduation from the Indian Institute of Technology (IIT), 
Madras, MBA from IIM, Ahmedabad and PhD from Northwestern University, USA. 
Prof Raghuram is a Professor in the Indian Institute of Management (IIM), Ahmadabad. His 
specialization is in infrastructure and transportation systems, and supply chain & logistics 
management. His research, consultancy, case studies and publications focus includes 
railways, ports and shipping, air and road sector, service organizations and supply chain 
management. He has taught at North-western University and Tulane University, USA. He has 
been a visiting faculty at various universities in USA, Canada, Yugoslavia, Tanzania, UAE, 
Singapore and several institutions in India. 
Dr. Gitesh K Shah: Director 
Dr.Gitesh K Shah, a Scientist turned Management Expert, was appointed to the HPCL board 
effective February 26, 2013.Dr.Gitesh K Shah has done his M.Sc., Ph.D. & D.Sc in Organic 
Chemistry. Dr.Gitesh K Shah is a Chartered Scientist, Chartered Chemist and Fellow of the 
Royal Society of Chemistry(RSC), London. (C.Sci., C.Chem., F.R.S.C.). He is also member 
of the prestigious Dr.Vikram Sarabhai Award Committee. He is based at Ahmedabad. 
Dr.Gitesh K Shah, who is a noted Technocrat & Management Expert, has rich experience of 
20 years in the field of Petrochemical, Chem-informatics, Bio-informatics and Nano– 
Technology. He has to his credit 18 research papers in renowned international journals in the
field of Chemistry Dr.Gitesh K Shah has been an Part-time non-official Director of HPCL 
earlier - from December 7, 2009 to December 6, 2012. 
Mr. A.C Mahajan :Director 
Mr. Avinash Chander Mahajan joined the HPCL board as an Independent Director effective April 9, 
2012. 
Mr. A C Mahajan has done his M.Sc. (Chemistry Hons) in 1972, and thereafter joined Bank 
of India as an Officer in 1972. He is a career banker with over 38 years of varied experience 
in various Public Sector Banks in India and abroad. 
Mr.Rohit Khanna: Director 
Mr. Rohit Khanna joined the HPCL board as an Independent Director effective September 
27, 2013.He is a commerce graduate from Delhi University, besides being a Fellow Member 
of the Institute of Chartered Accounts of India (ICAI). 
Mr. Khanna is the Managing Partner of Khanna Gulati & Associates, Chartered 
Accountants, New Delhi. In addition, he is on the Board of various companies like Atlantic 
Softtech Pvt.Ltd, Bhikaji Power Pvt. Ltd. etc. He had earlier served on the Boards of Dena 
Bank and various other companies. 
Mr. Khanna brings with him front line organizational experience and broad functional 
knowledge. He has over 27 years of experience in diverse sectors of industry including 
corporate affairs, finance, law, banking, resource development, infrastructure and services. 
His specialization as an advisor on strategy, business structuring, finance fundamentals,
corporate governance, risk assessment, budgeting, appraisal and monitoring mechanisms has 
endowed him with experience and knowledge of key business processes.
Companies Vision, Mission and Objectives 
VISION: 
To be a World Class Energy Company known for caring and delighting the customers 
with high quality products and innovative services across domestic and international 
markets with aggressive growth and delivering superior financial performance. The Company 
will be a model of excellence in meeting social commitment, environment, health and safety 
norms and in employee welfare and relations. 
MISSION: 
HPCL, along with its joint ventures, will be a fully integrated company in the hydrocarbons 
sector of exploration and production, refining and marketing; focusing on enhancement of 
productivity, quality and profitability; caring for customers and employees; caring for 
environment protection and cultural heritage. It will also attain scale dimensions by 
diversifying into other energy related fields and by taking up transnational operations. 
OBJECTIVE: 
 To ensure that all management positions are manned by personnel having the requisite 
qualifications, exposure and competence 
 To integrate the aspirations for growth and development of Officers with the present 
and future requirements of the Corporation 
 To ensure equity, fairness and objectivity in matters relating to promotion 
 To recognise and reward meritorious performance
About the PROJECT 
 Objectives of the Study 
1. To study the HPCL loyalty program in Belgaum and nearby regions. 
2. To study the loyalty between the local customers and the company. 
3. To study the benefits provided by HPCL to the local customers. 
4. To study how HPCL tap local alliance partners for “DRIVE TRACK PLUS” Fleet Card 
program. 
5. To obtain customer opinions and suggestions at HPCL retail outlets and give 
Recommendations to HPCL to improve the implementation of “DRIVE TRACK PLUS” 
loyalty program. 
6. To study the comparative analysis between the loyalty card benefits of other marketing 
company. 
7. To become known to real market. 
8. To gain real experience of market that how corporate persons work. How we have to 
behave, how to present yourself, how to make deals with clients etc. 
9. To check our theoretical knowledge with comparison to the practical market demands. 
10. It gives us an opportunity to apply our thinking, idea, knowledge in real market 
11. To enhance our skill and gain experience to be a true professional. 
12. To enhance our interpersonal skills. 
13. To learn necessary managerial skills and positive attitude towards your work. 
14. To get a flavor of Teamwork, Organizational culture, Team dynamics, result orientation, 
organizational pressure, complexities in achieving desired result. 
15. To understand the day to day functioning of an department within the organization. 
16. And at last but not the least, to sharpen our career goals for a bright career.
LOYALTY PROGRAMS- AN INTRODUCTION 
Loyalty programs are structured marketing efforts that reward, and therefore encourage, loyal 
buying behaviour — behaviour which is potentially of benefit to the firm. 
Earning customer loyalty goes beyond gaining customer satisfaction. Loyal Customers 
evangelize the brand by sharing their satisfactory experience with their friends and 
colleagues. A great product or service is the starting point for customer loyalty. Great 
marketers architect loyalty programs from day one. 
Loyalty programs are initiated by businesses with two main goals. The primary goal for most 
loyalty programs is the acquisition of information relating to their customers' spending habits, 
while the secondary goal is to actively cultivate loyalty amongst customers to ensure they 
continue patronizing the business. While some companies do reverse these priorities, the 
above hierarchy holds true for most. 
Loyalty programs may offer benefits in a number of different ways. Many loyalty programs 
offer a sustained discount (such as 10%) for a period of time - perhaps a year, perhaps for the 
life of the business. Others offer a discount once certain criteria have been met — for 
example, a 20% discount on a single purchase once a customer has spent Rs 2000 at the 
business. Still others offer points which may then be redeemed for products which may or 
may not be directly related to the business. 
Loyalty cards are the most common form of loyalty programs found throughout the world 
today. Some of the first loyalty programs were instituted by airlines in the 1970s in the form 
of frequent flyer miles. In these loyalty programs, one accrues points by flying on the airline 
and then 'cashes in' the points in exchange for tickets, upgrades, or even third-party benefits. 
In the pastdecade, many nonairline businesses have combined their own loyalty programs 
with those of the airlines, offering frequent flyer miles in exchange for everything from 
telephone usage to purchasing gasoline. 
Loyalty programs have gained in popularity immensely in the past fifteen years, in no small 
part due to the development of a culture of entitlement, in which consumers feel that they
deserve special treatment. Businesses have capitalized on this when designing their loyalty 
programs, often offering benefits that cost little, but carry with them an assumed prestige, 
such as access to faster-moving lines or special parking spaces. 
Ultimately, the success of loyalty programs depends on how well the business uses the data it 
gathers to further refine its policies and loyalty programs. Many businesses find little profit in 
the use of loyalty programs, while others, such as eBay, attribute much of their financial 
success to a well-executed use of such programs. 
Loyalty Programs an Integral Part 
The immense competition will make loyalty programs an integral program of the day-to-day 
functioning of petro-retailing. Of course, right now many such loyalty programs are being run 
by the petro-retailers like Smart Fleet (BPCL), Xtra Power (IOCL), Drive Track Plus 
(HPCL), and Petro card (BPCL). However, these programs are mainly focused at the bulk 
consumers and the small consumers are left unnoticed more or less. But in future, there won‘t 
be such differentiation and loyalty programs will be there for every segment of consumers. 
Customer Relationship Management and Loyalty program 
Customer Relationship Management (CRM) can be widely defined as: 
Company activities related to developing and retaining customers. It is a blend of internal 
business processes: sales, marketing and customer support with technology and data 
capturing techniques. Customer Relationship Management is all about building long-term 
business relationships with customers. 
Most CRM initiatives begin with a strategic need to manage the process of handling customer 
related information more effectively. For beginners it could simply mean better lead 
management capabilities or sales pipeline visibility. However, as organizations mature in 
their CRM initiatives, they begin to look at CRM as tool to acquire strategic differentiators. 
Despite the immense benefits that the CRM solutions can deliver, they are not entirely 
without their share of problems.
Loyal customers are more profitable. Any company will like its mindshare status to improve 
from being a suspect to being an advocate. Company has to invest in terms of its product and 
service offerings to its customers. It has to innovate and meet the very needs of its clients/ 
customers so that they remain as advocates on the loyalty curve. 
An important facet of CRM is ―customer selectivity‖. As several research studies have 
shown not all customers are equally profitable (In fact in some cases 80% of the sales come 
through 20% of the customers). The company must therefore be selective and tailor its 
program and marketing efforts by segmenting and selecting appropriate customers for 
individual marketing programs. In some cases, it could even lead to ―outsourcing of some 
customers‖ so that a company better utilize its resources on those customers it can serve better 
and create mutual value. 
With growing competition in the petro-retailing sector, today‘s consumer is becoming more 
and more demanding. The emergence of new psychographic segments in petro retail market 
bears the testimony to this fact. A closer look at these segments tells us what exactly a 
consumer is looking for whenever he goes to a fuel station to purchase fuel. He looks for- 
 Quality & Quantity assurance 
 Quick filling and efficient forecourt service 
 Rewarding loyalty 
 Premium fuels 
 Cashless transactions 
 Non - fuel services. 
The immense competition will make loyalty programs an integral program of the day-to-day 
functioning of petro-retailing. Of course, right now many such loyalty programs are being run 
bythe petro-retailers like:
Smart Fleet (BPCL) 
Petro card (BPCL) 
Xtra reward (IOCL) Xtra Power (IOCL) 
Drive track Plus (HPCL)
However, these programs are mainly focused at the bulk consumers and the small consumers 
are left unnoticed more or less. But in future, there won‘t be such differentiation and loyalty 
programs will be there for every segment of consumers. 
DRIVE TRACK PLUS Fleet Card program 
The DRIVE TRACK PLUS Fleet Card program is a complete smart card-based fleet 
management solution for fleet operators and Corporate for cashless purchase of fuel & lubes 
from designated retail outlets of Hindustan Petroleum through flexible pre-paid and credit 
facilities. 
The fleet card program also offers an exciting rewards program and unique benefits like 
personal accident insurance cover and vehicle tracking facilities. In just under two years of its 
launch, Hindustan Petroleum’s Drive Track Plus Fleet Card has emerged as the largest fleet 
card in the country with the widest retail outlet coverage. 
Any business entity owning or operating a vehicle fleet can become a member of the 
Drive Track Plus fleet card program at a nominal annual charge. Each fleet owner is issued a 
Fleet Control Card and vehicle-specific Fleet Cards for every vehicle enrolled under the 
program. 
For enhanced security, the fleet card transactions are authorized through unique Personal 
Identification Number (PIN). Moreover, the card can help track each vehicle's movement 
across remote corners of the country leading to an improvement in vehicle utilization and 
route compliance. DRIVE TRACK PLUS is also backed by Hindustan Petroleum‘s vast 
infrastructure network and web based support services. 
DRIVE TRACK PLUS is one-of-a-kind fleet card program of Hindustan Petroleum, which 
gives you extra convenience, extra security and extra opportunity to earn Truckload of 
rewards. It is a tailor-made program for Fleet Owners, Operators & Corporate as well. Drive 
Track Plus Fleet Card program is a step of HPCL towards building loyalty among the 
existing customers. Loyalty program works only when the customer is emotionally attached 
to the brand.
Positioning of the loyalty program is very critical so that these benefits do not appear to be a 
just discount under the garb of loyalty this greatly affects the customer retailer relationship 
and greatly reducing the program to a pure commercial transaction where the customer 
constantly looks for deals. 
We need to enrol the right customers. We can recognize the highest value Customers to 
recognize and reward their value to our organization, we can Cultivate high potential 
customers who currently split their purchases between us and our competitors or reach out to 
those most at risk of churning. Knowing which customer groups are most important to us 
allows crafting recognition and rewarding strategy that piques their interest. 
Customers should be involved in the program by constant communication to make them 
understand what is in for them. Comprehensive surveys should be conducted to find out what 
should be the ideal way to reward the loyal customers and retain them for the life time. 
Activities like checking point balances online, responding to targeted offers, using kiosks, 
bidding on auction items, entering sweepstakes and so on. Such participation is a sure sign of 
increasing value to the customers. 
BENEFITS 
 Better credit proposition. 
 Higher value of reward points. 
 Attractive rewards program. 
 Personal accident insurance cover for the drivers and cleaners. 
 Lost card liability cover. 
 Online PIN unblocking. 
 Flexible cash loading options - Manual Reload & CCMS Reload (Remote loading of 
cards by depositing lump sum cash at one place) or CCMS reload payment through at 
select ICICI branch.
Literature Review 
 FICCI (2007): According to FICCI survey on fuel retailing industry in India, they 
concluded that the rising rate of growth of GDP, rising purchasing power of people 
with higher propensity to consume with preference for sophisticated brands would 
provide constant impetus to growth of petroleum industry. as people will have huge 
amount of money to buy their own vehicles. So as per as FICCI automobile sector 
will emerge as the front running sector in India. There is a very good chance for 
Indian fuel retailing sector to gain big hold in the market. the potential market will be 
rural one which is stillbeing untapped. Rural India which constitutes about 70% part 
of India will drive the major chunk of income of oil companies. So they need to 
concentrate on Indian rural market. 
 McKinney (2006): The Indian market for transportation fuels holds a lot of 
promise. The country’s aspiring middle class, recently estimated at 40 million 
households by consultancy McKinney, is becoming increasingly motorised. small 
towns are expanding at a rapid pace, sparking investment in roads and other 
infrastructure. The largest express highway project in India, for example, aims to link 
the cities of New Delhi, Mumbai, Kolkata and Chennai with a system of four- to six-lane 
highways. Automobile sales, which today number just over a million vehicles a 
year, could reach 20 million a year by 2030, predicts us-based consultancy keystone, 
making India the third-largest automobile market in the world after china and the 
USA. Moreover, the fact that many of India’s service stations are poorly designed and 
congested leaves a natural opening for newcomers who offer a better alternative. 
Typical old-fashioned Indian service stations feature long queues, cars jockeying for 
position, oily forecourts and hand-operated petrol pumps that may not accurately 
measure the volume of each sale.
Features 
I. Better Control on transporter’s 
 Fuel Consumption: Efficiently manage working 
capital by allocating funds to each card from central pool of funds (CCMS account). 
Access card balances information online. 
 Spends through user cards: Keep a check on the spends on each of the user cards with 
multiple spend limits that transporter can determine and change. 
II. More Convenience 
 Cash less transactions: With Drivetrack Plus card in driver’s pocket he need not carry 
any cash for fuel. 
 Central cash management system (CCMS): Allocating funds to the drivers can't get 
any easier. Just login to your Drive track Plus web account and allocate money to any 
of the user cards. Likewise,an of the user cards with excess money can transfer funds 
back to CCMS account. 
 Electronic Funds Transfer: CCMS account can be recharged by RTGS/NEFT or cash 
from a nearby HPCL outlet participating in the program. 
 MIS at the click of a button: Monitor of the transactions being carried out by the 
specific user cards anytime, anywhere. It’s just need to log on to the customer’s web 
account to view or download reports.
III. Enhanced Security 
PIN based security is employed with separate PIN for each of the user cards and Control Pin 
for Control card transactions. There is added level of security with control card. 
 No threat of theft: Because transporter’s employees need not carry cash for fuelling at 
all. 
IV. Insurance coverage 
Drive track Plus card brings accidental death insurance cover of Rs. 1 lakh each for the driver 
and cleaner of every active card. 
V. Fabulous Rewards 
Reward points on fuel purchase: Whenever the vehicle is fuelled using Drive track Plus card 
it earns Drivepoints which can be redeemed for free fuel / lubes at participating HPCL outlets 
or gifts. Extra reward points for purchase of lubes: You earn 500 Drivepoints per Rs. 100/- 
spent for purchase of lubes using Drive track Plus card
Cashless Transactions 
This smart card based program lets you purchase fuel and lubes from designated HPCL retail 
outlets with electronic purse in your card. You can also recharge you account using 
RTGS/NEFT, transfer funds from your central account to various user cards. 
Central Cash Management System 
CCMS is a cash management facility in Drivetrack Plus program that enables a member to 
 provide central pool of funds available for all user cards issued to the member 
 authorise employees/drivers to transfer funds from central account to user card for fuel 
purchases 
 Apportion funds to each user card from time to time 
 Recharge this central loyalty account 
 The CCMS account of the member can be recharged by 
 Cash Recharge by transaction on EDC terminal at participating HPCL retail outlets 
 RTGS/NEFT from any bank to member's CCMS account 
MIS Reports
 This program lets you control your fleet with useful MIS. These MIS reports are both 
vehicle (card) wise as well as consolidated reports of your entire fleet. You can access 
and download the MIS report by logging on to your account. 
 The MIS report gives you information on: CCMS Recharge, CCMS Reload, CCMS 
Balance, Total Spends/Reload, Vehicle wise Spends/Reload, Card wise balances, 
Drive Points Earned, Redeemed and Balance, Time/Location of purchase and 
Frequency of purchase 
Vehicle Tracking 
 The members can also track the location of their vehicles. All the driver has to do is to 
present the card at a participating outlet for a 'tracking transaction' post which the 
information will be available on your web account or on the customer care n 
VI. Customer Service 
24x7 customer care number for queries and assistance.
COMPARISON BETWEEN LOYALTY CARD BENEFITS WITH 
OTHER OMC 
To complete this comparison I have visited the retail outlet of IOCL and BPCL and spoken 
with their customers. This information is required to get a competitive edge over competitors. 
NAME OF THE 
COMPANIES 
BENEFITS 
HPCL 
BPCL 
IOCL 
Reward Points on 
DIESEL 
3% 
3% 
4% 
CASH LOADING 
MANUAL AND BY 
CENTARAL CASH 
MANAGEMENT SYSTEM 
(FREE) 
MANUAL AND BY 
CENTRAAL CASH 
MANAGEMENT 
SYSTEM (FREE) 
MANUAL AND BY 
CENTRAL CASH 
MANAGEMENT SYSTEM 
(FREE) 
ONLINE PIN 
UNLOCKING 
YES(FREE OF COST 
YES(FREE OF COST 
YES(FREE OF COST 
INSTANT FUEL 
REDEMPTION 
YES or GIFT 
YES 
YES 
INSURANCE FOR 
DRIVER AND 
CLEANER 
Free accidental death 
Insurance cover of Rs. 1 Lakh for 
drivers and Rs.1 Lakh for cleaners. 
NO ANY 
INSURANCE 
Driver : 50,000/- 
Co-Driver : 
25,000/-,Helper cum-cleaner 
: 
Rs.25,000/- 
LOST CARD 
LIABILITY 
A replacement card 
is issue to the card 
holder after due 
verification the pre 
paid amount 
balance of the lost 
card is transferred 
after verification 
A replacement card is 
issue to the card holder 
after due verification 
the pre paid amount 
balance 
of the lost card is 
transferred after 
verification. 
A replacement card is issue to the 
card holder after due verification 
the pre paid amount 
balance of the lost 
card istransferred 
with a fee of Rs 100per card.
NAME OF THE 
COMPANIES 
BENEFITS 
HPCL 
BPCL 
IOCL 
VEHICLE 
TRACKING 
Card-insert based 
offline tracking at 
no extra cost. At any 
HP Fleet card outlet, 
the driver has to 
place the card on 
the reader and enter 
his PIN Number. 
This is regardless of 
whether or not your 
Driver fuels the 
vehicle at the outlet. 
Card insert based 
online tracking at a 
nominal cost. 
Card-insert based 
offline tracking at no 
extra cost. Card 
insert based online 
tracking at a nominal 
cost. Vehicle tracking 
through sms (fee only 
for blue card holder 
Card-insert based 
offline tracking at 
no extra cost. Card insert based 
online tracking at a nominal cost 
of 
Rs.2/- 
SMART CARD 
PREPAID CREDIT 
YES 
YES 
YES 
MULTIPLE CREDIT 
PARTNER 
ICICI BANK 
Sundaram Finance Ltd 
Citicorp Finance 
IndusInd Bank 
(Currently, 
Sundaram Finance 
Ltd.) 
RELOADING 
FACILITY 
YES 
YES 
YES 
ENORLMENT FEE 
AND RENWAL FEE 
NA 
YES ,RS 250 PER 
CARD 
YES , RS 100 PRE 
CARD 
LOYALTY POINT 
VALUE 
Rs.1/- on consumption of rs.100/- 
NA 
PER POINT 1 
PAISA
NAME OF 
THE COMPANY 
BENEFIT 
HPCL 
BPCL 
IOCL 
REWARD ON FUEL AND 
LUBE 
YES 
YES 
YES 
MINIMUM POINT 
REQUIRED FOR 
REDEMPTION 
25,000-at any 
point of time valid 
up to 3 years. 
9, 00, 000 - once in year 
(for blue and silver) 
quarterly for gold and 
on demand 
for platinum card 
holder. 
80,000-1 year 
from the date of transaction. 
REDEMPTION 
OPTION THROUGH 
CRT MACHINE 
YES 
YES 
YES 
24 HRS HEELPLINE 
YES 
YES 
YES 
SMS BENEFIT 
NO SUCH BENEFIT 
Free sms alerts for all 
balance check and 
vehicle tracking (fee 
only for blue card 
holder). 
NO SUCH BENEFIT 
From this comparison it is clear that benefits provided by HPCL is better than its competitor 
in spite of this to get more customer the company can consider for benefits such as, 
 Free sms alert as provided by BPCL for balance check and vehicle tracking 
 Extra benefit scheme for customer with more transaction. 
 Multiple credit partner for customers 
 Redemption at any point of time with increased point validity from 1 year. 
 Fleet card vehicle for smaller vehicle
Revised tier based reward structure for Drive Track Plus Program 
customers for spends and EFT 
CATEGORY 
TIER 
QUARTERLY 
SLAB 
MONTHLY 
SLABS 
(FOR CLUB 
CUSTOMERS) 
DRIVE POINTS AS PER 
EXISTING REWARD 
STRUCTURE 
SPENDS EFT TOTAL 
SILVER 1 
TIER 3 
<4.5 LAKHS 
<1.5 L 
0 10 10 
SILVER 2 
TIER3 
4.5L TO 
37.5L 
1.5L TO12.5L 
10 20 30 
GOLD 
TIER2 
37.5L TO 
150L 
12.5L TO 50L 
30 50 80 
PLATINUM 
TIER1 
150L TO 
300L 
50L TO 100L 
30 60 90 
CLUB 
TIER1 
>300L 
>100L 
30 85 115
LIST OF SOME CUSTOMERS AND THEIR FEEDBACK 
Name of the 
Customer/Transpor 
t Agency 
Customer ID 
Mobile Number 
Total no of 
Vehicle and no 
of cards 
Feedback 
RAGKUMAR G 
2800000026 
9900036306 
650/216 
POSITIVE 
V V SHADRI 
2000058656 
9663332043 
436/250 
POSITIVE 
M K TRAVELS 
2000030697 
9845829290 
185/72 
POSITIVE 
GEETHA 
CHIDAMBRA 
2000030688 
9845177622 
144/96 
NEGETIVE 
MURLIDHARAN 
T N 
2000029066 
9740466034 
163/116 
NEGETIVE 
D N REKHA 
2000060775 
9845351153 
101/99 
POSITVE 
POPULAR 
ROADLINES 
20000042279 
0821-2493164 
139/74 
POSITIVE 
RAVI KIRAN C 
2000071056 
9986686255 
60/60 
POSITIVE
GOPAL C 
280000213 
9844247004 
60/42 
NAGETIVE 
CHETANKLOGI 
STICS LTD 
200003929 
9945019222 
53/48 
POSITIVE 
SAM TOURS 
200004738 
9880024646 
41/30 
POSITIVE 
SRINIVAS 
TRANSPORT 
2000041637 
9900777877 
35/31 
POSITIVE 
DEHLI FRIEGHT 
CARRIERS 
2000047457 
9845081002 
32/30 
NEGATIVE 
BHARAT 
ROADLINES 
2000030676 
9845032648 
54/50 
POSITIVE 
HANDA 
TRANSPORT 
2000030075 
9845250994 
75/70 
POSITIVE
Scope of the Study 
 Study of consumers needs and wants related to Drive Track Plus Program. 
 To know the customers buying behaviour towards Drive track Plus Program. 
 Product planning and development starts with the generation of product idea and 
ends with the product development and commercialisation. 
 Study of distribution channel is important in marketing. For maximum sales and profit 
goods are required to be distributed to the maximum consumers. 
 To maintain the interest on the customer to be loyal to the organization the DT plus 
Program plays an important role by which customer are benefited on the time of 
redemption of points with fuel or gift. 
Limitations of Study: 
1. I could have covered all the DTP customers across India but due to time & financial 
constraints, i could not do so. 
2. I could have known the customer buying behaviour if I was able to travel across the 
country. 
3. Customers from different areas could have enhanced my knowledge & information on 
what is it that they are loyal to the company, or which rewards attract them to be loyal to 
the DTP program of the company. 
4. Last but not the least I would gain some insight on what satisfies the consumer in 
different parts of the country.
RESEARCH METHODOLOGY OF THE PROJECT: 
DATA COLLECTION METHOD 
Types of Data and Data Collection: 
Data that I have received for making the project is a combination of both primary and 
secondary data. 
Primary Data 
The data collected through questionnaire based survey from the retailers and customers of 
Belgaum region. The name of the retail outlets of Hindustan Petroleum Corp[oration Limited 
from where these data are collected are 
 United Petroleum’s 
(College road Belgaum ) 
 TCI Petroleum’s 
( Kakti Belgaum ) 
 Vijaybharti Petroleum’s 
( Desur Belgaum ) 
 Renuka Highway Petroleum’s 
(Bhagewadi Belgaum) 
 Supreme Petroleum’s 
( Azam Nagar Belgaum) 
 Prabhat Auto Service Centre 
(Nava Nagar Hubli)
 Shanti Enterprise 
(Vidya Nagar Hubli) 
 J G Pawar Petroleum’s 
(Bharat Mill Road Hubli) 
Secondary Data 
Company‘s journal 
Company’s magazines 
Company‘s website 
Company‘s pamphlets 
Sampling plan 
 The sample size for retailer is 8 
 The sample size of customers is 75 on tier basis that is Tier1, Tier2, and Tier3 of 
Belgaum and nearby region. 
 The respondents are chosen through cluster sampling universe elements are chosen in 
rather than individually. Whereas convenience sampling is based on opportunism. 
General Approach 
First of all i thought of preparing a questionnaire with a set of questions which would satisfy 
my purpose of customer satisfaction survey of DTP program at HPCL. Then I intended to 
meet all the customers to have a diversified survey, my questionnaire would have points 
based on their satisfaction, higher the satisfaction higher the marks and vice versa. Based on 
this data i would evaluate, analyse & reach a conclusion and final purpose of my survey.
Conceptual Framework 
 A Review of Earlier Research studies conducted 
Scenario 1: 
Your driver has to make a long distance trip for delivering a consignment for an important 
customer. For the refuelling enrooted and for the return trip, he needs to carry a large sum of 
cash. Now highway journey is replete with various threats and there risk to your money. Is 
this worrying you? 
Scenario 2: 
You are based in Haryana. Your truck is bound for Chennai. Your driver or truck encounters 
some unforeseen exigency mid way and the money given to the driver for fuel is spent. Fuel 
tank is almost empty and vehicle has to still reach the destination and travel back. And worst 
of all you don’t have any contact there. Now what? 
Scenario 3: 
Business is thriving and your fleet is expanding. But monitoring the vehicle-wise fuel 
consumption and whereabouts of your vehicles all the time is a bit too time-taking. 
Accounting is slipping away from your hands. There is always some or the other discrepancy 
in the ledger. How to manage this ever-growing business, how to keep tab on drivers' 
transactions? 
Scenario 4: 
Fuel prices are increasing day by day. Some local petrol pumps extend facilities or rewards. 
But there are hardly any such offers to come by at the petrol pumps enroute. How good it 
would be if the rewards and facilities are available to customers uniformly all over the 
country.
Analysis 
TIER -1 
The definition of Tier-I is customer applied For DTP enrolment with a 
minimum of 100 vehicles. DT Plus Program Focuses majorly on such customers. 
Very few customers of Tier-I contribute to the maximum percentage of fuel 
consumption from HPCL retail network. Enrolling and maintaining such kind of 
customers is very important for the success of the program and maintaining the 
market share. Out of 75 sample size 25 Tier-I customers are interviewed through 
personal and telephonic interviews. The inferred results are presented in the below 
Tier-I table. Out of a maximum of 100 points for each feature, individually, the 
obtained points are presented. It is interred that the most preferred/useful feature was 
with the maximum points and the least preferred/useful feature was with the minimum 
points. 
Control and Convenience 80% 
Security 75% 
Insurance 50% 
Rewards 75% 
Customer Service 80%
80 
70 
60 
50 
40 
30 
20 
10 
0 
Control and 
Convenience 
Security Insurance Rewards Customer 
Service 
TIER-1 
TIER-1
TIER -2 
The definition of Tier-II is customer applied for DTP enrolment with a minimum of 25 
vehicles. DT Plus program focuses on such customers, because the entire market was majorly 
filled with this kind of customer segment only. Tier II customers can also contribute to the 
maximum percentage of fuel consumption from HPCL Retail network, sometimes, the 
absolute volumes stretch beyond 100 KL. Enrolling and maintaining such kind of customers 
is very important for the success of the program and maintaining the market share. Out of 75 
sample size 25 Tier II customers are interviewed through personal and telephonic interviews. 
The inferred results are presented in the below Tier II table. Out of a maximum of 100 points 
for each feature, individually, the obtained points are presented. It is interred that the most 
preferred/useful feature was with the maximum points and the least preferred/useful feature 
was with the minimum points. 
Control and Convenience 85% 
Security 80% 
Insurance 50% 
Rewards 85% 
Customer Service 75%
90 
80 
70 
60 
50 
40 
30 
20 
10 
0 
Control and 
Convenience 
Security Insurance Rewards Customer 
Service 
TIER 2 
TIER 2
TIER-3 
The definition of Tier-III is customer applied for DTP enrolment with a 1 to 25 vehicles. DT 
Plus program focuses on such customers, because the entire unorganised transporters market 
was majorly filled with this kind of customer segment only. Tier-III customers can also 
contribute to the maximum percentage of fuel consumption from HPCL retail network, but, 
enrolling and maintain such customers is very laborious and consumes the productive time 
that can be spent on above mentioned tiers. Out of 75 sample size 25. Tier III customers are 
interviewed through personal and telephonic interviews. The inferred results are presented in 
the below Tier III table. Out of a maximum of 100 points for each feature, individually, the 
obtained points are presented. It is interred that the most preferred/useful feature was with the 
maximum points and the least preferred/useful feature was with the minimum points. 
Control and Convenience 50% 
Security 50% 
Insurance 70% 
Rewards 90% 
Customer Service 90%
90 
80 
70 
60 
50 
40 
30 
20 
10 
0 
TIER 3 
TIER 3
TIER1,TIER2 and TIER3 
TIER 1 
TIER 2 
TIER 3 
TIER-1 
TIER-2 
TIER-3 
90 
80 
70 
60 
50 
40 
30 
20 
10 
0 
Control and 
Convenience 
80% 
85% 
50% 
Security 
75% 
80% 
50% 
Insurance 
50% 
50% 
90% 
Rewards 
75% 
85% 
70% 
Customer Service 
80% 
70% 
50%
OVERALL RESULT 
76 
74 
72 
70 
68 
66 
64 
62 
60 
58 
OVERALL RESULT 
Control and Convenience 71% 
Security 68% 
Insurance 64% 
Rewards 76% 
Customer Service 68% 
OVERALL RESULT
FINDINGS & Suggestions 
1. Most of the customers were very supporting and welcoming .They had Good will for 
HPCL. 
2. Customers who showed interest appreciated the offer provided and were eager to 
continue talks with HPCL. They were also wanted to know more about the program. 
3. Some of the prospective customers were not aware of India HPCL Drive Track Plus 
Program Fleet Card Loyalty Program. Hence they were not interested. Also due to the 
increase in the oil prices they were apprehensive a little bit. 
4. Some of the customers facing technical difficulties while using the card since they are not 
able to understand its operations clearly. 
5. Some customers have no clear idea about its benefit and they are happy to use their old 
traditional way of purchasing oil and lubricant. 
6. Some of the customer considers it as very complex and the benefit is not so high. 
7. Customers most of them are small transporter are not very keen for this program some 
of them have purchase the card but the card remains as idle as they have very less 
transaction and lack of information about the benefits. 
8. Drive Track Plus scheme is not available at all the retail outlet of Hindustan Petroleum in 
so at a time it creates problem. 
9. The card swiping machines are not properly maintained at some places leading to many 
customer complaints. Some of the machines are very old and they are need replacement 
with the new one. 
10. At some places pump attendants are also not interested in providing this service.
11. There are no pamphlets available at pumps, which could give a brief idea about the 
loyalty program. 
12. Pamphlet and booklets are in English; hence most of the people are not able to 
understand. 
13. There is no dedicated person for collecting the forms. So, there is a large backlog of 
forms. 
14. There is Lack of internet facility at some of the outlets and also problem with poor 
network service. 
15. Website of Drive Track Plus (www.hpcldtplus.com) is not regularly updated. 
16. There is no facility of sms for vehicle tracking and to know detail about existing balance 
where other major oil producing company (BPCL) provides this service to their 
customers. 
17. ICICI is the only partner for providing credit to the card owner. 
18. There are no any special benefits for customers having larger transaction.
SWOT Analysis 
STREGNTH: 
1.India's major oil and gas company 
2.Operates largest Lube refinery in India 
3.Large product portfolio 
4.Owns and operates the largest Lube Refinery in India producing Lube Base Oils of 
international standards 
5.Produces over 300+ grades of Lubes, Specialities and Greases 
WEAKNESS 
1.Legal issues 
2.Employee management 
3.Human right issues, rehabilitation issues 
4.Environmental hazards from wastes 
OPPORTUNITY 
1.Increasing fuel/oil prices 
2.Increasing natural gas market 
3.More oil well discoveries 
4.Expand export market 
THREATS 
1.Government regulations 
2.High Competition from other players
CONCLUSIONS 
Tier-I: 
 The customers are majorly focused on control/convenience that DT Plus offers in the 
form of MIS (Fleet & Spends) and customer servive. Cashless transaction with 
centralised fund management through DT Plus web-site increases their control on the 
day to day spends for fuel and customer service resolves issues faced by customers. 
 Rewards and Security are at next important feature that Tier-I customers prefer/use. 
As their consumption is very large their cash back on consumption is also 
proportionately large. 
 Insurance stands at the lowest. 
Tier-II: 
 Tier-II customers equally focuse on both control/ convenience and reward points that 
DT Plus offers. Control/convenience that DT Plus offers in the form of MIS (Fleet & 
Spends) and reward are the most preferred features by such customers. 
 Security is next important feature that Tier-II customers prefer/use. 
 Majorly, being, unorganised/non-institutional transporters they need assistance for 
hassle transactions in their respective routes so customer services is next preferred 
feature. 
 Insurance stands at the lowest, as these features are less availed by the customers. 
Tier-III: 
 This segment mostly cares about insurance feature and customer service. As most of 
the customers are small customers in terms of size, operations and financially, they 
want to be covered under insurance. 
 Cash back is next important feature for this segment of customer. 
 Tier-III customers are not much worried about control/convenience and security 
feature as they are not much involved in CCMS transactions; instead prefer cash 
loading/cash sale transactions.
Over All: 
Rewards and Control/Convenience are the most preferable features of DT Plus. Depending 
upon the respective size, operations need and financial position etc the mentioned segments 
are choosing among the features like Security, Customer Service and Insurance as depicted in 
below charts. 
RFERENCE 
Company‘s journal and magazines 
Company‘s website 
Company‘s pamphlets
Questionnaire for Retailers 
Personal details 
Name …………………………………………… 
Outlet …………………………………… 
Customer ID............................. 
Address ………………………………………… 
Date of visit ……………………………………. 
Instructions: 
Take your time to fill this questionnaire. Please read carefully, before answering 
question. 
1.How many people are trained in the outlet to use DTP terminal? 
Ans. 
2. Do you have login ID and password of DTP program. If no how do you check your 
monthly transactions? 
a)Yes 
b)No 
Ans. 
3.Do you know about point structure of DTP? 
a)Yes 
b)No 
Ans.
4. Where do you keep the DTP card? 
a)Customer 
b)Outlet 
Ans. 
5. Do you tell the customer/fleet owner/driver about the Drive rack Plus card loyalty program 
of HPCL? 
a) YES. 
b) NO. 
C) SOMETIMES. 
Ans. 
6. Do the staff/attendants know how to operate the machine of Drive Track Plus card? 
a) YES 
b) NO 
Ans. 
7. Do you maintain the list of credit customers, cash customers & DTP customers? 
Ans. 
8.Do you know about cash reload, cash sale and CCMS? 
Ans. 
9.What is the purpose of batch settlement? 
Ans. 
10.After batch settlement what do you understand by receivable and payable? 
Ans.
Appendices 
Customer Questionnaire 
Dear DT Plus Customer, 
I am approaching you for your kind cooperation in connection with our project titled “Study 
of features of DTP perceived by customers & factors contributing in enrolling 
customers”. This study aims in understanding and identifying the contributing factors for 
customer enrolment in to DT Plus program and enhance the product features for better 
services. So your response regarding the various features of DT Plus program and respective 
usage is valuable in this project. 
Gaurav Malik 
Marketing Officer, 
Belgaum Retail Region, HPCL 
Please provide the following information: 
Customer. ID: 
Tier: 
Phone No.: 
Region: 
1. What is your understanding/awareness about DTP Program? 
2. What are the features of DT Plus Program? 
3. What are the valuable features of DTplus program?
Control & Convenience 
Very Useful OK Not very useful 
MIS-Fleet 7 6 5 4 3 2 1 
MIS-Spends 7 6 5 4 3 2 1 
MIS-Vehicle Tracking 7 6 5 4 3 2 1 
Online monitor (website) 7 6 5 4 3 2 1 
Security 
Very Useful OK Not very useful 
Cashless transaction 7 6 5 4 3 2 1 
Pin-based transaction 7 6 5 4 3 2 1 
Insurance 
Very Useful OK Not very useful 
Accidental death insurance cover of 
Rs.1lakh each for the driver and cleaner 
for every active card 
7 6 5 4 3 2 1 
Rewards 
Very Useful OK Not very useful 
Reward Points against consumption 7 6 5 4 3 2 1 
Redemption (Fuels or Gifts) 7 6 5 4 3 2 1 
Customer Service 
Very Useful OK Not very useful 
24*7 Call Center 7 6 5 4 3 2 1 
Program team Assitance 7 6 5 4 3 2 1
Complaints/comments 
Suggestions/Feedback
Sip title and content.2

Sip title and content.2

  • 1.
    KARNATAKA UNIVERSITY, DHARWAD INSTITUTE OF BUSINESS MANAGEMENT AND RESEARCH, HUBLI. Summer Implant Project (SIP) A report on Customer Satisfaction Survey Towards DRIVE TRACK PLUS PROGRAM At Hindustan Petroleum Corporation Limited Regional Office Belgaum Submitted to KARNATAKA UNIVERSTIY, DHARWAD in partial fulfilment of the requirement for the award of degree in MASTER OF BUSINESS ADMINISTRATION carried during the academic year 2013-14 Submitted by: HUSAIN FAIROZ B BAHAMANI Registration No: MBA131261007 INTERNAL GUIDE: Prof. Dr. ARUN BABU ANGADI HOD and Associate Professor MBA Dept IBMR, Hubli EXTERNAL GUIDE: Mr. GAURAV MALIK Marketing Officer HPCL Regional Office Belgaum
  • 2.
    Ref. No. KU/IBMR/2014/ Date: 16-08-2014 CERTIFICATE This is to certify that HUSAIN FAIROZ B BAHAMANI, Reg. No. MBA131261007 student of 2nd semester of our Institution has completed Summer Internship Program (SIP) during the academic year 2013-2014 at “Hindustan Petroleum Corporation Limited” entitled “Customer Satisfaction Survey towards DRIVE TRACK PLUS Program” in partial fulfillment of Master of Business Administration degree as prescribed by Karnatak University, Dharwad. Dr. Rajendra C. Malowade Director, IBMR External Examiner:- 1.______________________ 2.______________________
  • 3.
    Ref No: IBMR/MBA/2014/ Date: 16-08-2014 CERTIFICATE This is to certify that, HUSAIN FAIROZ B BAHAMANI, Reg. No. MBA1312161007 is a bonafide student of this Institute has completed Summer Internship Program (SIP) under my guidance during the academic year 2013- 2014 at “HINDUSTAN PETROLEUM CORPORATION LIMITED”. He has prepared and submitted the project assigned to him, namely “Customer Satisfaction Survey Towards DRIVE TRACK PLUS Program” Arun Babu Angadi Assistant Professor and HOD MBA Dept IBMR, Hubli.
  • 4.
    DECLARATION I HusainFairoz B Bahamani student of MBA 2nd sem, Institute of Business Management and Research, Hubli, hereby declare that the project work entitled “Customer Satisfaction Survey” carried out at “Hindustan Petroleum Corporation Limited Regional Office Belgaum” is submitted to Karnataka University Dharwad through the Institute of Business Management and Research, Hubli, in partial fulfilment of the requirements for the award of the Master of Business Administration degree. This project report is a bona fide work prepared by me under the guidance of Prof. Dr. Arun babu Angadi HOD MBA Dept of Institute of Business Management and Research, Hubli. The findings and suggestions of this project report are based on the information collected by me during the period of my study. To the best of my knowledge and belief, the matter presented in this report has not been submitted previously in part or full to any university for the award of any degrees. Date: 16/08/2014 Husain Fairoz B Bahamani Place: HUBLI MBA131261007
  • 5.
    ACKNOWLEDGEMENT I wishto express my heartfelt thanks to all those who were involved in completion of my project. First of all I wish to express my sincere thanks to our respectable Dean and Director Dr. Rajendra C. Malowade who has fully supported and encouraged me in this venture. It is my privilege to have accomplished this study under the guidance of my guide, Prof. Dr.Arun Babu Angadi HOD and Associate Professor MBA Dept for taking keen interest and full involvement, dynamic motivation and valuable guidance extended to me throughout the project. I wish to thank Hindustan Petroleum Corporation Limited Regional Office Belgaum and Mr. S S Patil (Chief Regional Manager Retail), and Mr. Gaurav Malik (Marketing Officer Belgaum RO) my external guide and all the employees of the organization for guiding and helping me in completing this project successfully. My sincere and affectionate regards to my parents for the immense support which encouraged me to conclude this project on time. I wouldn’t forget to thank all my faculty members of the Institute, friends and everybody for their kind co-operation and help in this matter. HUSAIN FAIROZ BAHAMANI MBA131261007
  • 6.
    Contents SI. NO TOPICS PAGE NO 1 Executive Summary 1 2 Company Profile: Brief about the company Brief about the organisation structure Company’s Vision, Mission and Objectives 2 – 26 27 – 33 34 3 About the project a)Objective of the study b)Scope of the study c)Limitation of the study 35 – 53 54 54 4 Research Methodology of the project a) Primary Data b) Secondary Data c) General Approach 55 – 56 56 56 5 Conceptual Framework A Review of Earlier Research studies conducted 57 6 Analysis, Findings and suggestions SWOT analysis 59 – 68 69 7 Conclusion 70 – 71 8 Reference 71 9 Questionnaire 72 – 76
  • 7.
    Executive Summary Asa part of fulfilment of the MBA course at Institute Of Business Management & Research (IBMR) Business School, Hubli, SIP was undertaken with the Hindustan Petroleum Corporation Limited. This study is to analyse and know the customer satisfaction towards Drive Track Plus Program. In this survey of customer satisfaction the statistics are compared with competitors’. This survey helped me to experience practical functioning of this organization and to gain knowledge about the product & services and distribution channels of Hindustan Petroleum Corporation Limited. This project is specially designed to understand the subject matter of customer satisfaction about the product and services of the Organization. The purpose of training was to have a practical experience of working in an organization and to have exposure to the various management practices in the field of marketing. This training also has given me an on the job experience of marketing. This project is very useful for those who want to know about the company and marketing strategies of the company. For making satisfactory progress an organization need to make sure that their product is developing along with the market, if a product is developing well, then income should increase, if not then the marketing strategy should be revised. An organization should always know what is happening within their designated market, if it is changing, saturation, technological advances, slowing down or rapidly growing, being up to date on this is essential for companies to survive.
  • 8.
    Introduction Hindustan PetroleumCorporation Limited HPCL is a Government of India Enterprise with a Navratna Status, and a Forbes 2000 and Global Fortune 500 company. It had originally been incorporated as a company under the Indian Companies Act 1913. It is listed on the Bombay Stock exchange (BSE) and National Stock Exchange (NSE), India. HPCL has an annual sales/income from operations of Rs 2,32,188 Crores (US$ 38.75 Billions) during FY 2013-14, having about 20% Marketing share in India among PSUs and a strong market infrastructure. HPCL's Crude Thruput and Market Sales (including exports) are 15.51 Million Metric Tonnes (MMT) and 30.96 MMT respectively in the same period. It operates 2 major refineries producing a wide variety of petroleum fuels & specialties, one in Mumbai (West Coast) of 6.5 Million Metric Tonnes Per Annum (MMTPA) capacity and the other in Vishakhapatnam, (East Coast) with a capacity of 8.3 MMTPA. HPCL holds an equity stake of 16.95% in Mangalore Refinery & Petrochemicals Limited, a state-of-the-art refinery at Mangalore with a capacity of 15 MMTPA. In addition, HPCL has constructed a 9 MMTPA refinery at Bathinda, in Punjab, with Mittal Energy Investments Pvt. Ltd. . as a Joint venture. HPCL also owns and operates the largest Lube Refinery in the India producing Lube Base Oils of international standards, with a capacity of 428 TMT. This Lube Refinery accounts for over 40% of the India's total Lube Base Oil production. Presently HPCL produces over 300+ grades of Lubes, Specialities and Greases. HPCL's vast marketing network consists of 13 Zonal offices in major cities and 101 Regional Offices facilitated by a Supply & Distribution infrastructure comprising Terminals, Pipeline networks, Aviation Service Stations, LPG Bottling Plants, Inland Relay Depots & Retail Outlets, Lube and LPG Distributorships. HPCL, over the years, has moved from strength to strength on all fronts. The refining capacity steadily increased from 5.5 MMTPA in 1984/85 to 14.8 MMTPA presently.
  • 9.
    HPCL has earned"Excellent" performance from FY1991-92 (basis signing of the first MOU with the Ministry of Petroleum & Natural Gas, GOI in FY 1991-92), till FY 2012-13, except for the single FY 2006-07, when it was adjudged as Very Good. HPCL has won the prestigious MOU Award for the year 2007-08 for Excellent Overall Performance, and for being one of the Top Ten Public Sector Enterprises who fall under the 'Excellent' category. HPCL has also earned the TOP PERFORMER status for two consecutive FY 2011-12 and 2012-13, as the topper in the MOU ratings, in the Oil Industry. Consistent excellent performance has been made possible by highly motivated workforce of over 11,000 employees working all over India at its various refining and marketing locations. View Past Annual Reports to know more about HPCL. The RTI Information Manual provides various details about the operation of the Corporation. HPCL continually invests in innovative technologies to enhance the effectiveness of employees and bring qualitative changes in service. Business Process Re-Engineering exercise, creation of Strategic Business Units, ERP implementation, Organizational Transformation, Balanced Score Card, Competency Mapping, benchmarking of refineries and terminals for product specifications, ISO certification of Refineries and Supply Chain Management are some of the initiatives that broke new grounds. HPCL has successfully integrated Information Technology in its activities at different levels. The Enterprise Resource Planning (ERP) system is now operational on J.D.Edwards, an Oracle product, across the Corporation. Registered Office & Corporate Headquarters Hindustan Petroleum Corporation Limited. Petroleum House, 17, Jamshedji Tata Road, Mumbai 400020. Maharashtra, India. Email: corphqo(at)hpcl[dot]co[dot]in Marketing Headquarters Hindustan Petroleum Corporation Limited. Hindustan Bhawan, 8, Shoorji Vallabhdas Marg, Ballard Estate,Mumbai 400001.Maharashtra, India. Email: mktghqo(at)hpcl[dot]co[dot]in
  • 10.
    CORPORATE LOGO Punchline of the Company FUTURE FULL OF ENERGY
  • 11.
    OVERALL MARKET SHARE 50.00% 45.00% 40.00% 35.00% 30.00% 25.00% 20.00% 15.00% 10.00% 5.00% 0.00% HPCL IOCL BPCL OTHERS  HPCL 25%  IOCL 50%  BPCL 23%  OTHERS 1.5%
  • 12.
    MARKET SHARE INPIPELINE 50% 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% BPCL HPCL ONGC IOCL  BPCL 7%  HPCL 16%  ONCG 30%  IOCL 47% Series1
  • 13.
    CUSTOMER PREFERENCE 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% HPCL BPCL IOCL OTHERS  HPCL 26%  BPCL 42%  IOCL 30%  OTHERS 2% Series1
  • 14.
    SCORE OF COMPANIESON SCALE SERVICE 35% 34% 33% 32% 31% 30% 29% 28% 27% IOCL 30% BPCL 35% HPCL 35% IOCL BPCL HPCL Series1
  • 15.
    ADVERTISEMENT 45 40 35 30 25 20 15 10 5 0 HPCL IOCL BPCL HPCL 42% IOCL 30% BPCL 28% Series1
  • 16.
    BRAND IMAGE 35% 34% 33% 32% 31% 30% 29% 28% 27% HPCL 35% IOCL 35% BPCL 30% HPCL IOCL BPCL Series1
  • 17.
    QUALITY 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% IOCL 30% HPCL 45% BPCL 25% IOCL HPCL BPCL
  • 21.
    Products and Services Refineries Welcome to Refineries Section Without refining, the rich resources of crude petroleum of nature would remain latent. Value-added products from crude petroleum like petrol, diesel, kerosene, liquefied petroleum gas, naphtha and many more products would not be available for growth and development of a nation. HPCL refineries upgrade the crude petroleum into many value-added products and over 300 grades of lubricants, specialties and greases. The Lubricating Oils Refinery set up at Mumbai is largest lube refinery in India. It produces superior quality lube base oils. The offsite product handling facilities of refineries at Mumbai and Vishakhapatnam has been automated. Projects have been implemented and facilities upgraded to produce green fuels like unleaded petrol and low sulphur diesel. and Euro III & Euro IV works are in progress. The refineries have been benchmarked by an international agency for various performance parameters. Numerous awards have been bestowed on both the refineries in recognition of the efforts in the field of energy conservation, environment and safety. This section showcases about our Refineries: Its History, Performance, New Projects, Research & Development, Awards.
  • 22.
    HP Aviation... LeadingJet fuel supplier in India Hindustan Petroleum (as Esso and Caltex prior to 1974) has been providing aviation refuelling (Aviation Turbine Fuel - ATF) services at various airports in India for more than half a century. To know more about HP Aviation, also fondly called "Hindustan" Aviation, browse the following links. Bulk Fuels and Specialities Welcome to Bulk Fuels & Specialities section (Direct Sales) The Bulk Fuel & Specialities Business unit caters to marketing of Bulk fuels & Petroleum products directly to Industrial consumers like power plants, chemicals, fertilisers, shipping companies and airlines. This unit is also involved in exports of Bulk fuels and finished Petroleum Products. International Trade
  • 23.
    Welcome to InternationalTrade section This section showcases about our International Marketing,Crude supplies and Our Offerings. Please navigate to various information using the links. The activities of IT&S relate to:  Crude oil imports  Petroleum Product Imports / Exports  Shipping  Production planning for Refineries  Supplies for domestic Markets  Product exchange with other Indian Oil Companies and Oil price risk management
  • 24.
    Welcome to HPGas, Your Friendly Gas HP Gas, the HPCL brand of LPG, is what keeps the fire burning in millions of Indian homes. Bottled at 44 LPG Bottling Plants throughout the country with a total capacity of over 3610 thousand metric tonnes per annum (TMTPA), HP Gas reaches you after thorough checking at every stage right from bottling to distribution. That is what makes HP Gas synonymous with Safety. Lubes (HP Lubes) Lubes is an integral part of Hindustan Petroleum Corporation Limited, one of India's frontline oil majors, committed to providing energy and fueling growth in every significant area of development.
  • 25.
    Retail Business AtHPCL Retail Outlets (Petrol Pumps), we believe in maintenance. Maintaining not just the vehicle, but a steady relationship with our consumer. And to do so, provide better and efficient services. We take care of not only your fuelling needs, but also complete vehicle care. We stock related products like tyres, batteries and accessories, so you don't have to go shop-hopping. All our other value-added services ensure that your vehicle is well looked after.
  • 26.
    Product Pipeline Pipelineis the most cost effective, energy efficient, safe and environment friendly mode of transportation of petroleum products. They ease the overburdened Rail & Road infrastructure and minimise the environmental impacts arising out of Rail & Road transportation. Pipelines play a significant role in meeting the demand of petroleum products in India. HPCL has laid pipelines for transportation of Petroleum Products to ensure product availability to its Consumers and the Public at large.
  • 27.
    Alternate Energy Windpower Maharastra: HPCL's maiden renewable & alternate energy Wind Energy Generator was commissioned at Dhule in Maharashtra State in May 2007. This 3.75 MW pilot turnkey project, costing about Rs 19 Crores, comprised of just 3 Wind Turbine Generator (WTG) units, each with an installed capacity of 1.25 MW. This was executed by M/s Suzlon Energy Limited. Power generated from this venture is being sold to the Maharashtra State Electricity Board (MSEB). Rajasthan: HPCL comissioned another Wind power project in Jaisalmer in Rajasthan State on 1st January 2009. The 21.25 MW turnkey project, executed at Rs 110 Crore by M/s Suzlon Energy Limited, comprises of a 17 unit-farm, each WTG unit having an installed capacity of 1.25 MW. The 2nd Wind Power Project in Jaisalmer, Rajasthan was commissioned on 18th December 2010. The 25.5 MW capacity turnkey project, executed at the cost of Rs. 154.57 Crore by M/s Suzlon Energy Limited, comprises of a 17 unit wind farm, each WTG unit having an installed capacity of 1.50 MW. The power generated is wheeled through the Rajasthan State Electricity grid and is partly consumed by HPCL’s centres at Ajmer, Jaipur, Kota, Pali and Jodhpur. Surplus power is being sold to Rajasthan State Electricity Board. (RSEB) HPCL remains committed to enhance use of renewable energy resources and exploration of alternate sources of energy.
  • 28.
    Joint Venture CrudeRefining and Marketing of finished Petroleum products is the core area of the Corporation. Opportunities are also being explored to access new revenue streams, and augment downstream businesses. Accordingly, HPCL has ventured in Upstream activities (Exploration and Production) and piped gas distribution in major cities. HPCL-Mittal Energy Ltd.(HMEL) JV with Mittal Energy Investments Pte. Ltd (MEI), Singapore, an L.N. Mittal group company, for implementation of Guru Gobind Refinery, a green field refinery project located at Bathinda, Punjab. Hindustan Colas (HINCOL) JV promoted with M/s COLAS SA, France. Incorporated on July 17, 1995 Manufactures International quality value-added bituminous products such as bitumen emulsions & cutbacks and modified bitumen.
  • 31.
    Brief about theOrganisation Structure  Chairman and Managing Director  Functional Directors  Part-time ex-officio Directors  Part-time non-official Directors Chairman and Managing Director Ms. Nishi Vasudeva: Chairman and Managing Director Ms. Nishi Vasudeva took charge as Chairman & Managing Director of Hindustan Petroleum Corporation Ltd. effective March 01, 2014. Prior to this, she was Director - Marketing of the Corporation from July 4, 2011. She is the first woman to be appointed as Chairman & Managing Director of a Navratna PSU. She is also the Chairman of HPCL Joint Venture Companies - HPCL-Mittal Energy Ltd., South Asia LPG Co. Pvt. Ltd., and its wholly owned subsidiary, Prize Petroleum Co. Ltd. Functional Directors
  • 32.
    Ms. Nishi Vasudeva:Director- Marketing (Additional Charge) Ms. Nishi Vasudeva, C&MD HPCL holds additional charge as Director-Marketing of HPCL till further notice. Mr. P K Joshi: Director- Human Resources Mr. Pushp Kumar Joshi took charge as Director - Human Resources effective August 01, 2012. Prior to this he was holding key portfolios in Human Resources viz. Executive Director – HRD, and Head – HR of Marketing Division. A Bachelor of Law and an alumnus of XLRI, Jamshedpur, Mr. Pushp Kumar Joshi joined HPCL in 1986. Since then he has held various key positions in Human Resources and Industrial Relations functions at HQO, Marketing and Refineries Divisions of HPCL He has been responsible for the design and deployment of key HR policies and practices that are employee oriented and aim at building high performance culture. Mr. K V Roan: Director - Finance
  • 33.
    Mr. K VRao took charge as Director Finance effective 1st June 2013. Prior to his taking over as Director (Finance), Mr. K V Rao was Executive Director- Corporate Finance of HPCL for 5 years. A member of the Institute of Chartered Accountants of India (ICAI), Mr. Rao brings with him rich experience of over 3 decades in handling various challenging assignments in HPCL in the fields of Corporate Finance, Treasury Management, Internal Audit and Marketing & Refinery Finance. Mr. B. K Namdeo: Director – RefineriesMr. B. K Namdeo took charge as Director - Refineries effective July 01, 2013. Prior to this he was the Executive Director, International Trade and Supplies of HPCL. A Mechanical Engineer and a Master of Technology from IIT Bombay, he has over 32 years of experience in various refinery functions and has held key positions in Central Engineering (Refinery Projects), Operations, Projects and Maintenance of the Refineries.During his tenure as ED (IT&S), Mr. Namdeo was responsible for Procurement of Crude Oil, Product Evacuation, Ship Chartering, Refinery planning & scheduling and related commercial activities of both the refineries of HPCL. TopPart-time ex-officio Directors Dr. S C Khuntia: Director Dr. Subhash Chandra Khuntia, has been appointed as a Part Time Director on the HPCL Board effective August 3, 2012. Dr.S C Khuntia (IAS Karnataka cadre 1981) is a post -Graduate in Physics, Computer Science, Economics, Sociology and Doctorate in Economics. Before joining Petroleum
  • 34.
    Ministry as AdditionalSecretary & Financial Advisor, he was Principal Secretary, PWD, Govt. of Karnataka. Mr. R K Singh: Director Mr. Rajesh Kumar Singh has been appointed as a Part Time Director on the HPCL Board effective June 26, 2013. Mr. R K Singh (IAS Kerala cadre 1989) joined the Ministry of Petroleum and Natural Gas effective 10th June 2013, as Joint Secretary (Refineries). He is B.A (Economics) from University of Delhi. Mr. Singh has previously served the Government of Kerala as Assistant Collector - Palakkad, Addl. Director - Tourism, Collector - Malappuram District, Jt.Commissioner - Finance, Secretary - Local self Government and Secretary - Ports including assignments such as Under Secretary - Ministry of Finance, Dy. Secretary - Ministry of Urban Development, and Joint Secretary - Information and Broadcasting, Government of India. He has also served as Commmissioner of the Delhi Development Authority (DDA). Top Part-time non-official Directors Mr. G K Pillai: Director Mr. G K Pillai joined the HPCL board as an Independent Director effective April 9, 2012. Mr. G K Pillai is a retired IAS officer. He joined Indian Administrative Service in the year 1972 and belongs to Kerala Cadre. He has done his M.Sc. at IIT, Chennai. In addition to being a Director on Board of HPCL, he is also the Chairman of the Board of IVY Cap Ventures Pvt Ltd, a venture capital company sponsored by the IIT Alumni Association.
  • 35.
    Prof. G. Raghuram:Director Prof. G. Raghuram joined the HPCL board as an Independent Director effective April 9, 2012.Prof. Raghuram has done his graduation from the Indian Institute of Technology (IIT), Madras, MBA from IIM, Ahmedabad and PhD from Northwestern University, USA. Prof Raghuram is a Professor in the Indian Institute of Management (IIM), Ahmadabad. His specialization is in infrastructure and transportation systems, and supply chain & logistics management. His research, consultancy, case studies and publications focus includes railways, ports and shipping, air and road sector, service organizations and supply chain management. He has taught at North-western University and Tulane University, USA. He has been a visiting faculty at various universities in USA, Canada, Yugoslavia, Tanzania, UAE, Singapore and several institutions in India. Dr. Gitesh K Shah: Director Dr.Gitesh K Shah, a Scientist turned Management Expert, was appointed to the HPCL board effective February 26, 2013.Dr.Gitesh K Shah has done his M.Sc., Ph.D. & D.Sc in Organic Chemistry. Dr.Gitesh K Shah is a Chartered Scientist, Chartered Chemist and Fellow of the Royal Society of Chemistry(RSC), London. (C.Sci., C.Chem., F.R.S.C.). He is also member of the prestigious Dr.Vikram Sarabhai Award Committee. He is based at Ahmedabad. Dr.Gitesh K Shah, who is a noted Technocrat & Management Expert, has rich experience of 20 years in the field of Petrochemical, Chem-informatics, Bio-informatics and Nano– Technology. He has to his credit 18 research papers in renowned international journals in the
  • 36.
    field of ChemistryDr.Gitesh K Shah has been an Part-time non-official Director of HPCL earlier - from December 7, 2009 to December 6, 2012. Mr. A.C Mahajan :Director Mr. Avinash Chander Mahajan joined the HPCL board as an Independent Director effective April 9, 2012. Mr. A C Mahajan has done his M.Sc. (Chemistry Hons) in 1972, and thereafter joined Bank of India as an Officer in 1972. He is a career banker with over 38 years of varied experience in various Public Sector Banks in India and abroad. Mr.Rohit Khanna: Director Mr. Rohit Khanna joined the HPCL board as an Independent Director effective September 27, 2013.He is a commerce graduate from Delhi University, besides being a Fellow Member of the Institute of Chartered Accounts of India (ICAI). Mr. Khanna is the Managing Partner of Khanna Gulati & Associates, Chartered Accountants, New Delhi. In addition, he is on the Board of various companies like Atlantic Softtech Pvt.Ltd, Bhikaji Power Pvt. Ltd. etc. He had earlier served on the Boards of Dena Bank and various other companies. Mr. Khanna brings with him front line organizational experience and broad functional knowledge. He has over 27 years of experience in diverse sectors of industry including corporate affairs, finance, law, banking, resource development, infrastructure and services. His specialization as an advisor on strategy, business structuring, finance fundamentals,
  • 37.
    corporate governance, riskassessment, budgeting, appraisal and monitoring mechanisms has endowed him with experience and knowledge of key business processes.
  • 38.
    Companies Vision, Missionand Objectives VISION: To be a World Class Energy Company known for caring and delighting the customers with high quality products and innovative services across domestic and international markets with aggressive growth and delivering superior financial performance. The Company will be a model of excellence in meeting social commitment, environment, health and safety norms and in employee welfare and relations. MISSION: HPCL, along with its joint ventures, will be a fully integrated company in the hydrocarbons sector of exploration and production, refining and marketing; focusing on enhancement of productivity, quality and profitability; caring for customers and employees; caring for environment protection and cultural heritage. It will also attain scale dimensions by diversifying into other energy related fields and by taking up transnational operations. OBJECTIVE:  To ensure that all management positions are manned by personnel having the requisite qualifications, exposure and competence  To integrate the aspirations for growth and development of Officers with the present and future requirements of the Corporation  To ensure equity, fairness and objectivity in matters relating to promotion  To recognise and reward meritorious performance
  • 39.
    About the PROJECT  Objectives of the Study 1. To study the HPCL loyalty program in Belgaum and nearby regions. 2. To study the loyalty between the local customers and the company. 3. To study the benefits provided by HPCL to the local customers. 4. To study how HPCL tap local alliance partners for “DRIVE TRACK PLUS” Fleet Card program. 5. To obtain customer opinions and suggestions at HPCL retail outlets and give Recommendations to HPCL to improve the implementation of “DRIVE TRACK PLUS” loyalty program. 6. To study the comparative analysis between the loyalty card benefits of other marketing company. 7. To become known to real market. 8. To gain real experience of market that how corporate persons work. How we have to behave, how to present yourself, how to make deals with clients etc. 9. To check our theoretical knowledge with comparison to the practical market demands. 10. It gives us an opportunity to apply our thinking, idea, knowledge in real market 11. To enhance our skill and gain experience to be a true professional. 12. To enhance our interpersonal skills. 13. To learn necessary managerial skills and positive attitude towards your work. 14. To get a flavor of Teamwork, Organizational culture, Team dynamics, result orientation, organizational pressure, complexities in achieving desired result. 15. To understand the day to day functioning of an department within the organization. 16. And at last but not the least, to sharpen our career goals for a bright career.
  • 40.
    LOYALTY PROGRAMS- ANINTRODUCTION Loyalty programs are structured marketing efforts that reward, and therefore encourage, loyal buying behaviour — behaviour which is potentially of benefit to the firm. Earning customer loyalty goes beyond gaining customer satisfaction. Loyal Customers evangelize the brand by sharing their satisfactory experience with their friends and colleagues. A great product or service is the starting point for customer loyalty. Great marketers architect loyalty programs from day one. Loyalty programs are initiated by businesses with two main goals. The primary goal for most loyalty programs is the acquisition of information relating to their customers' spending habits, while the secondary goal is to actively cultivate loyalty amongst customers to ensure they continue patronizing the business. While some companies do reverse these priorities, the above hierarchy holds true for most. Loyalty programs may offer benefits in a number of different ways. Many loyalty programs offer a sustained discount (such as 10%) for a period of time - perhaps a year, perhaps for the life of the business. Others offer a discount once certain criteria have been met — for example, a 20% discount on a single purchase once a customer has spent Rs 2000 at the business. Still others offer points which may then be redeemed for products which may or may not be directly related to the business. Loyalty cards are the most common form of loyalty programs found throughout the world today. Some of the first loyalty programs were instituted by airlines in the 1970s in the form of frequent flyer miles. In these loyalty programs, one accrues points by flying on the airline and then 'cashes in' the points in exchange for tickets, upgrades, or even third-party benefits. In the pastdecade, many nonairline businesses have combined their own loyalty programs with those of the airlines, offering frequent flyer miles in exchange for everything from telephone usage to purchasing gasoline. Loyalty programs have gained in popularity immensely in the past fifteen years, in no small part due to the development of a culture of entitlement, in which consumers feel that they
  • 41.
    deserve special treatment.Businesses have capitalized on this when designing their loyalty programs, often offering benefits that cost little, but carry with them an assumed prestige, such as access to faster-moving lines or special parking spaces. Ultimately, the success of loyalty programs depends on how well the business uses the data it gathers to further refine its policies and loyalty programs. Many businesses find little profit in the use of loyalty programs, while others, such as eBay, attribute much of their financial success to a well-executed use of such programs. Loyalty Programs an Integral Part The immense competition will make loyalty programs an integral program of the day-to-day functioning of petro-retailing. Of course, right now many such loyalty programs are being run by the petro-retailers like Smart Fleet (BPCL), Xtra Power (IOCL), Drive Track Plus (HPCL), and Petro card (BPCL). However, these programs are mainly focused at the bulk consumers and the small consumers are left unnoticed more or less. But in future, there won‘t be such differentiation and loyalty programs will be there for every segment of consumers. Customer Relationship Management and Loyalty program Customer Relationship Management (CRM) can be widely defined as: Company activities related to developing and retaining customers. It is a blend of internal business processes: sales, marketing and customer support with technology and data capturing techniques. Customer Relationship Management is all about building long-term business relationships with customers. Most CRM initiatives begin with a strategic need to manage the process of handling customer related information more effectively. For beginners it could simply mean better lead management capabilities or sales pipeline visibility. However, as organizations mature in their CRM initiatives, they begin to look at CRM as tool to acquire strategic differentiators. Despite the immense benefits that the CRM solutions can deliver, they are not entirely without their share of problems.
  • 42.
    Loyal customers aremore profitable. Any company will like its mindshare status to improve from being a suspect to being an advocate. Company has to invest in terms of its product and service offerings to its customers. It has to innovate and meet the very needs of its clients/ customers so that they remain as advocates on the loyalty curve. An important facet of CRM is ―customer selectivity‖. As several research studies have shown not all customers are equally profitable (In fact in some cases 80% of the sales come through 20% of the customers). The company must therefore be selective and tailor its program and marketing efforts by segmenting and selecting appropriate customers for individual marketing programs. In some cases, it could even lead to ―outsourcing of some customers‖ so that a company better utilize its resources on those customers it can serve better and create mutual value. With growing competition in the petro-retailing sector, today‘s consumer is becoming more and more demanding. The emergence of new psychographic segments in petro retail market bears the testimony to this fact. A closer look at these segments tells us what exactly a consumer is looking for whenever he goes to a fuel station to purchase fuel. He looks for-  Quality & Quantity assurance  Quick filling and efficient forecourt service  Rewarding loyalty  Premium fuels  Cashless transactions  Non - fuel services. The immense competition will make loyalty programs an integral program of the day-to-day functioning of petro-retailing. Of course, right now many such loyalty programs are being run bythe petro-retailers like:
  • 43.
    Smart Fleet (BPCL) Petro card (BPCL) Xtra reward (IOCL) Xtra Power (IOCL) Drive track Plus (HPCL)
  • 44.
    However, these programsare mainly focused at the bulk consumers and the small consumers are left unnoticed more or less. But in future, there won‘t be such differentiation and loyalty programs will be there for every segment of consumers. DRIVE TRACK PLUS Fleet Card program The DRIVE TRACK PLUS Fleet Card program is a complete smart card-based fleet management solution for fleet operators and Corporate for cashless purchase of fuel & lubes from designated retail outlets of Hindustan Petroleum through flexible pre-paid and credit facilities. The fleet card program also offers an exciting rewards program and unique benefits like personal accident insurance cover and vehicle tracking facilities. In just under two years of its launch, Hindustan Petroleum’s Drive Track Plus Fleet Card has emerged as the largest fleet card in the country with the widest retail outlet coverage. Any business entity owning or operating a vehicle fleet can become a member of the Drive Track Plus fleet card program at a nominal annual charge. Each fleet owner is issued a Fleet Control Card and vehicle-specific Fleet Cards for every vehicle enrolled under the program. For enhanced security, the fleet card transactions are authorized through unique Personal Identification Number (PIN). Moreover, the card can help track each vehicle's movement across remote corners of the country leading to an improvement in vehicle utilization and route compliance. DRIVE TRACK PLUS is also backed by Hindustan Petroleum‘s vast infrastructure network and web based support services. DRIVE TRACK PLUS is one-of-a-kind fleet card program of Hindustan Petroleum, which gives you extra convenience, extra security and extra opportunity to earn Truckload of rewards. It is a tailor-made program for Fleet Owners, Operators & Corporate as well. Drive Track Plus Fleet Card program is a step of HPCL towards building loyalty among the existing customers. Loyalty program works only when the customer is emotionally attached to the brand.
  • 45.
    Positioning of theloyalty program is very critical so that these benefits do not appear to be a just discount under the garb of loyalty this greatly affects the customer retailer relationship and greatly reducing the program to a pure commercial transaction where the customer constantly looks for deals. We need to enrol the right customers. We can recognize the highest value Customers to recognize and reward their value to our organization, we can Cultivate high potential customers who currently split their purchases between us and our competitors or reach out to those most at risk of churning. Knowing which customer groups are most important to us allows crafting recognition and rewarding strategy that piques their interest. Customers should be involved in the program by constant communication to make them understand what is in for them. Comprehensive surveys should be conducted to find out what should be the ideal way to reward the loyal customers and retain them for the life time. Activities like checking point balances online, responding to targeted offers, using kiosks, bidding on auction items, entering sweepstakes and so on. Such participation is a sure sign of increasing value to the customers. BENEFITS  Better credit proposition.  Higher value of reward points.  Attractive rewards program.  Personal accident insurance cover for the drivers and cleaners.  Lost card liability cover.  Online PIN unblocking.  Flexible cash loading options - Manual Reload & CCMS Reload (Remote loading of cards by depositing lump sum cash at one place) or CCMS reload payment through at select ICICI branch.
  • 46.
    Literature Review FICCI (2007): According to FICCI survey on fuel retailing industry in India, they concluded that the rising rate of growth of GDP, rising purchasing power of people with higher propensity to consume with preference for sophisticated brands would provide constant impetus to growth of petroleum industry. as people will have huge amount of money to buy their own vehicles. So as per as FICCI automobile sector will emerge as the front running sector in India. There is a very good chance for Indian fuel retailing sector to gain big hold in the market. the potential market will be rural one which is stillbeing untapped. Rural India which constitutes about 70% part of India will drive the major chunk of income of oil companies. So they need to concentrate on Indian rural market.  McKinney (2006): The Indian market for transportation fuels holds a lot of promise. The country’s aspiring middle class, recently estimated at 40 million households by consultancy McKinney, is becoming increasingly motorised. small towns are expanding at a rapid pace, sparking investment in roads and other infrastructure. The largest express highway project in India, for example, aims to link the cities of New Delhi, Mumbai, Kolkata and Chennai with a system of four- to six-lane highways. Automobile sales, which today number just over a million vehicles a year, could reach 20 million a year by 2030, predicts us-based consultancy keystone, making India the third-largest automobile market in the world after china and the USA. Moreover, the fact that many of India’s service stations are poorly designed and congested leaves a natural opening for newcomers who offer a better alternative. Typical old-fashioned Indian service stations feature long queues, cars jockeying for position, oily forecourts and hand-operated petrol pumps that may not accurately measure the volume of each sale.
  • 47.
    Features I. BetterControl on transporter’s  Fuel Consumption: Efficiently manage working capital by allocating funds to each card from central pool of funds (CCMS account). Access card balances information online.  Spends through user cards: Keep a check on the spends on each of the user cards with multiple spend limits that transporter can determine and change. II. More Convenience  Cash less transactions: With Drivetrack Plus card in driver’s pocket he need not carry any cash for fuel.  Central cash management system (CCMS): Allocating funds to the drivers can't get any easier. Just login to your Drive track Plus web account and allocate money to any of the user cards. Likewise,an of the user cards with excess money can transfer funds back to CCMS account.  Electronic Funds Transfer: CCMS account can be recharged by RTGS/NEFT or cash from a nearby HPCL outlet participating in the program.  MIS at the click of a button: Monitor of the transactions being carried out by the specific user cards anytime, anywhere. It’s just need to log on to the customer’s web account to view or download reports.
  • 48.
    III. Enhanced Security PIN based security is employed with separate PIN for each of the user cards and Control Pin for Control card transactions. There is added level of security with control card.  No threat of theft: Because transporter’s employees need not carry cash for fuelling at all. IV. Insurance coverage Drive track Plus card brings accidental death insurance cover of Rs. 1 lakh each for the driver and cleaner of every active card. V. Fabulous Rewards Reward points on fuel purchase: Whenever the vehicle is fuelled using Drive track Plus card it earns Drivepoints which can be redeemed for free fuel / lubes at participating HPCL outlets or gifts. Extra reward points for purchase of lubes: You earn 500 Drivepoints per Rs. 100/- spent for purchase of lubes using Drive track Plus card
  • 49.
    Cashless Transactions Thissmart card based program lets you purchase fuel and lubes from designated HPCL retail outlets with electronic purse in your card. You can also recharge you account using RTGS/NEFT, transfer funds from your central account to various user cards. Central Cash Management System CCMS is a cash management facility in Drivetrack Plus program that enables a member to  provide central pool of funds available for all user cards issued to the member  authorise employees/drivers to transfer funds from central account to user card for fuel purchases  Apportion funds to each user card from time to time  Recharge this central loyalty account  The CCMS account of the member can be recharged by  Cash Recharge by transaction on EDC terminal at participating HPCL retail outlets  RTGS/NEFT from any bank to member's CCMS account MIS Reports
  • 50.
     This programlets you control your fleet with useful MIS. These MIS reports are both vehicle (card) wise as well as consolidated reports of your entire fleet. You can access and download the MIS report by logging on to your account.  The MIS report gives you information on: CCMS Recharge, CCMS Reload, CCMS Balance, Total Spends/Reload, Vehicle wise Spends/Reload, Card wise balances, Drive Points Earned, Redeemed and Balance, Time/Location of purchase and Frequency of purchase Vehicle Tracking  The members can also track the location of their vehicles. All the driver has to do is to present the card at a participating outlet for a 'tracking transaction' post which the information will be available on your web account or on the customer care n VI. Customer Service 24x7 customer care number for queries and assistance.
  • 51.
    COMPARISON BETWEEN LOYALTYCARD BENEFITS WITH OTHER OMC To complete this comparison I have visited the retail outlet of IOCL and BPCL and spoken with their customers. This information is required to get a competitive edge over competitors. NAME OF THE COMPANIES BENEFITS HPCL BPCL IOCL Reward Points on DIESEL 3% 3% 4% CASH LOADING MANUAL AND BY CENTARAL CASH MANAGEMENT SYSTEM (FREE) MANUAL AND BY CENTRAAL CASH MANAGEMENT SYSTEM (FREE) MANUAL AND BY CENTRAL CASH MANAGEMENT SYSTEM (FREE) ONLINE PIN UNLOCKING YES(FREE OF COST YES(FREE OF COST YES(FREE OF COST INSTANT FUEL REDEMPTION YES or GIFT YES YES INSURANCE FOR DRIVER AND CLEANER Free accidental death Insurance cover of Rs. 1 Lakh for drivers and Rs.1 Lakh for cleaners. NO ANY INSURANCE Driver : 50,000/- Co-Driver : 25,000/-,Helper cum-cleaner : Rs.25,000/- LOST CARD LIABILITY A replacement card is issue to the card holder after due verification the pre paid amount balance of the lost card is transferred after verification A replacement card is issue to the card holder after due verification the pre paid amount balance of the lost card is transferred after verification. A replacement card is issue to the card holder after due verification the pre paid amount balance of the lost card istransferred with a fee of Rs 100per card.
  • 52.
    NAME OF THE COMPANIES BENEFITS HPCL BPCL IOCL VEHICLE TRACKING Card-insert based offline tracking at no extra cost. At any HP Fleet card outlet, the driver has to place the card on the reader and enter his PIN Number. This is regardless of whether or not your Driver fuels the vehicle at the outlet. Card insert based online tracking at a nominal cost. Card-insert based offline tracking at no extra cost. Card insert based online tracking at a nominal cost. Vehicle tracking through sms (fee only for blue card holder Card-insert based offline tracking at no extra cost. Card insert based online tracking at a nominal cost of Rs.2/- SMART CARD PREPAID CREDIT YES YES YES MULTIPLE CREDIT PARTNER ICICI BANK Sundaram Finance Ltd Citicorp Finance IndusInd Bank (Currently, Sundaram Finance Ltd.) RELOADING FACILITY YES YES YES ENORLMENT FEE AND RENWAL FEE NA YES ,RS 250 PER CARD YES , RS 100 PRE CARD LOYALTY POINT VALUE Rs.1/- on consumption of rs.100/- NA PER POINT 1 PAISA
  • 53.
    NAME OF THECOMPANY BENEFIT HPCL BPCL IOCL REWARD ON FUEL AND LUBE YES YES YES MINIMUM POINT REQUIRED FOR REDEMPTION 25,000-at any point of time valid up to 3 years. 9, 00, 000 - once in year (for blue and silver) quarterly for gold and on demand for platinum card holder. 80,000-1 year from the date of transaction. REDEMPTION OPTION THROUGH CRT MACHINE YES YES YES 24 HRS HEELPLINE YES YES YES SMS BENEFIT NO SUCH BENEFIT Free sms alerts for all balance check and vehicle tracking (fee only for blue card holder). NO SUCH BENEFIT From this comparison it is clear that benefits provided by HPCL is better than its competitor in spite of this to get more customer the company can consider for benefits such as,  Free sms alert as provided by BPCL for balance check and vehicle tracking  Extra benefit scheme for customer with more transaction.  Multiple credit partner for customers  Redemption at any point of time with increased point validity from 1 year.  Fleet card vehicle for smaller vehicle
  • 54.
    Revised tier basedreward structure for Drive Track Plus Program customers for spends and EFT CATEGORY TIER QUARTERLY SLAB MONTHLY SLABS (FOR CLUB CUSTOMERS) DRIVE POINTS AS PER EXISTING REWARD STRUCTURE SPENDS EFT TOTAL SILVER 1 TIER 3 <4.5 LAKHS <1.5 L 0 10 10 SILVER 2 TIER3 4.5L TO 37.5L 1.5L TO12.5L 10 20 30 GOLD TIER2 37.5L TO 150L 12.5L TO 50L 30 50 80 PLATINUM TIER1 150L TO 300L 50L TO 100L 30 60 90 CLUB TIER1 >300L >100L 30 85 115
  • 55.
    LIST OF SOMECUSTOMERS AND THEIR FEEDBACK Name of the Customer/Transpor t Agency Customer ID Mobile Number Total no of Vehicle and no of cards Feedback RAGKUMAR G 2800000026 9900036306 650/216 POSITIVE V V SHADRI 2000058656 9663332043 436/250 POSITIVE M K TRAVELS 2000030697 9845829290 185/72 POSITIVE GEETHA CHIDAMBRA 2000030688 9845177622 144/96 NEGETIVE MURLIDHARAN T N 2000029066 9740466034 163/116 NEGETIVE D N REKHA 2000060775 9845351153 101/99 POSITVE POPULAR ROADLINES 20000042279 0821-2493164 139/74 POSITIVE RAVI KIRAN C 2000071056 9986686255 60/60 POSITIVE
  • 56.
    GOPAL C 280000213 9844247004 60/42 NAGETIVE CHETANKLOGI STICS LTD 200003929 9945019222 53/48 POSITIVE SAM TOURS 200004738 9880024646 41/30 POSITIVE SRINIVAS TRANSPORT 2000041637 9900777877 35/31 POSITIVE DEHLI FRIEGHT CARRIERS 2000047457 9845081002 32/30 NEGATIVE BHARAT ROADLINES 2000030676 9845032648 54/50 POSITIVE HANDA TRANSPORT 2000030075 9845250994 75/70 POSITIVE
  • 57.
    Scope of theStudy  Study of consumers needs and wants related to Drive Track Plus Program.  To know the customers buying behaviour towards Drive track Plus Program.  Product planning and development starts with the generation of product idea and ends with the product development and commercialisation.  Study of distribution channel is important in marketing. For maximum sales and profit goods are required to be distributed to the maximum consumers.  To maintain the interest on the customer to be loyal to the organization the DT plus Program plays an important role by which customer are benefited on the time of redemption of points with fuel or gift. Limitations of Study: 1. I could have covered all the DTP customers across India but due to time & financial constraints, i could not do so. 2. I could have known the customer buying behaviour if I was able to travel across the country. 3. Customers from different areas could have enhanced my knowledge & information on what is it that they are loyal to the company, or which rewards attract them to be loyal to the DTP program of the company. 4. Last but not the least I would gain some insight on what satisfies the consumer in different parts of the country.
  • 58.
    RESEARCH METHODOLOGY OFTHE PROJECT: DATA COLLECTION METHOD Types of Data and Data Collection: Data that I have received for making the project is a combination of both primary and secondary data. Primary Data The data collected through questionnaire based survey from the retailers and customers of Belgaum region. The name of the retail outlets of Hindustan Petroleum Corp[oration Limited from where these data are collected are  United Petroleum’s (College road Belgaum )  TCI Petroleum’s ( Kakti Belgaum )  Vijaybharti Petroleum’s ( Desur Belgaum )  Renuka Highway Petroleum’s (Bhagewadi Belgaum)  Supreme Petroleum’s ( Azam Nagar Belgaum)  Prabhat Auto Service Centre (Nava Nagar Hubli)
  • 59.
     Shanti Enterprise (Vidya Nagar Hubli)  J G Pawar Petroleum’s (Bharat Mill Road Hubli) Secondary Data Company‘s journal Company’s magazines Company‘s website Company‘s pamphlets Sampling plan  The sample size for retailer is 8  The sample size of customers is 75 on tier basis that is Tier1, Tier2, and Tier3 of Belgaum and nearby region.  The respondents are chosen through cluster sampling universe elements are chosen in rather than individually. Whereas convenience sampling is based on opportunism. General Approach First of all i thought of preparing a questionnaire with a set of questions which would satisfy my purpose of customer satisfaction survey of DTP program at HPCL. Then I intended to meet all the customers to have a diversified survey, my questionnaire would have points based on their satisfaction, higher the satisfaction higher the marks and vice versa. Based on this data i would evaluate, analyse & reach a conclusion and final purpose of my survey.
  • 60.
    Conceptual Framework A Review of Earlier Research studies conducted Scenario 1: Your driver has to make a long distance trip for delivering a consignment for an important customer. For the refuelling enrooted and for the return trip, he needs to carry a large sum of cash. Now highway journey is replete with various threats and there risk to your money. Is this worrying you? Scenario 2: You are based in Haryana. Your truck is bound for Chennai. Your driver or truck encounters some unforeseen exigency mid way and the money given to the driver for fuel is spent. Fuel tank is almost empty and vehicle has to still reach the destination and travel back. And worst of all you don’t have any contact there. Now what? Scenario 3: Business is thriving and your fleet is expanding. But monitoring the vehicle-wise fuel consumption and whereabouts of your vehicles all the time is a bit too time-taking. Accounting is slipping away from your hands. There is always some or the other discrepancy in the ledger. How to manage this ever-growing business, how to keep tab on drivers' transactions? Scenario 4: Fuel prices are increasing day by day. Some local petrol pumps extend facilities or rewards. But there are hardly any such offers to come by at the petrol pumps enroute. How good it would be if the rewards and facilities are available to customers uniformly all over the country.
  • 62.
    Analysis TIER -1 The definition of Tier-I is customer applied For DTP enrolment with a minimum of 100 vehicles. DT Plus Program Focuses majorly on such customers. Very few customers of Tier-I contribute to the maximum percentage of fuel consumption from HPCL retail network. Enrolling and maintaining such kind of customers is very important for the success of the program and maintaining the market share. Out of 75 sample size 25 Tier-I customers are interviewed through personal and telephonic interviews. The inferred results are presented in the below Tier-I table. Out of a maximum of 100 points for each feature, individually, the obtained points are presented. It is interred that the most preferred/useful feature was with the maximum points and the least preferred/useful feature was with the minimum points. Control and Convenience 80% Security 75% Insurance 50% Rewards 75% Customer Service 80%
  • 63.
    80 70 60 50 40 30 20 10 0 Control and Convenience Security Insurance Rewards Customer Service TIER-1 TIER-1
  • 64.
    TIER -2 Thedefinition of Tier-II is customer applied for DTP enrolment with a minimum of 25 vehicles. DT Plus program focuses on such customers, because the entire market was majorly filled with this kind of customer segment only. Tier II customers can also contribute to the maximum percentage of fuel consumption from HPCL Retail network, sometimes, the absolute volumes stretch beyond 100 KL. Enrolling and maintaining such kind of customers is very important for the success of the program and maintaining the market share. Out of 75 sample size 25 Tier II customers are interviewed through personal and telephonic interviews. The inferred results are presented in the below Tier II table. Out of a maximum of 100 points for each feature, individually, the obtained points are presented. It is interred that the most preferred/useful feature was with the maximum points and the least preferred/useful feature was with the minimum points. Control and Convenience 85% Security 80% Insurance 50% Rewards 85% Customer Service 75%
  • 65.
    90 80 70 60 50 40 30 20 10 0 Control and Convenience Security Insurance Rewards Customer Service TIER 2 TIER 2
  • 66.
    TIER-3 The definitionof Tier-III is customer applied for DTP enrolment with a 1 to 25 vehicles. DT Plus program focuses on such customers, because the entire unorganised transporters market was majorly filled with this kind of customer segment only. Tier-III customers can also contribute to the maximum percentage of fuel consumption from HPCL retail network, but, enrolling and maintain such customers is very laborious and consumes the productive time that can be spent on above mentioned tiers. Out of 75 sample size 25. Tier III customers are interviewed through personal and telephonic interviews. The inferred results are presented in the below Tier III table. Out of a maximum of 100 points for each feature, individually, the obtained points are presented. It is interred that the most preferred/useful feature was with the maximum points and the least preferred/useful feature was with the minimum points. Control and Convenience 50% Security 50% Insurance 70% Rewards 90% Customer Service 90%
  • 67.
    90 80 70 60 50 40 30 20 10 0 TIER 3 TIER 3
  • 68.
    TIER1,TIER2 and TIER3 TIER 1 TIER 2 TIER 3 TIER-1 TIER-2 TIER-3 90 80 70 60 50 40 30 20 10 0 Control and Convenience 80% 85% 50% Security 75% 80% 50% Insurance 50% 50% 90% Rewards 75% 85% 70% Customer Service 80% 70% 50%
  • 69.
    OVERALL RESULT 76 74 72 70 68 66 64 62 60 58 OVERALL RESULT Control and Convenience 71% Security 68% Insurance 64% Rewards 76% Customer Service 68% OVERALL RESULT
  • 70.
    FINDINGS & Suggestions 1. Most of the customers were very supporting and welcoming .They had Good will for HPCL. 2. Customers who showed interest appreciated the offer provided and were eager to continue talks with HPCL. They were also wanted to know more about the program. 3. Some of the prospective customers were not aware of India HPCL Drive Track Plus Program Fleet Card Loyalty Program. Hence they were not interested. Also due to the increase in the oil prices they were apprehensive a little bit. 4. Some of the customers facing technical difficulties while using the card since they are not able to understand its operations clearly. 5. Some customers have no clear idea about its benefit and they are happy to use their old traditional way of purchasing oil and lubricant. 6. Some of the customer considers it as very complex and the benefit is not so high. 7. Customers most of them are small transporter are not very keen for this program some of them have purchase the card but the card remains as idle as they have very less transaction and lack of information about the benefits. 8. Drive Track Plus scheme is not available at all the retail outlet of Hindustan Petroleum in so at a time it creates problem. 9. The card swiping machines are not properly maintained at some places leading to many customer complaints. Some of the machines are very old and they are need replacement with the new one. 10. At some places pump attendants are also not interested in providing this service.
  • 71.
    11. There areno pamphlets available at pumps, which could give a brief idea about the loyalty program. 12. Pamphlet and booklets are in English; hence most of the people are not able to understand. 13. There is no dedicated person for collecting the forms. So, there is a large backlog of forms. 14. There is Lack of internet facility at some of the outlets and also problem with poor network service. 15. Website of Drive Track Plus (www.hpcldtplus.com) is not regularly updated. 16. There is no facility of sms for vehicle tracking and to know detail about existing balance where other major oil producing company (BPCL) provides this service to their customers. 17. ICICI is the only partner for providing credit to the card owner. 18. There are no any special benefits for customers having larger transaction.
  • 72.
    SWOT Analysis STREGNTH: 1.India's major oil and gas company 2.Operates largest Lube refinery in India 3.Large product portfolio 4.Owns and operates the largest Lube Refinery in India producing Lube Base Oils of international standards 5.Produces over 300+ grades of Lubes, Specialities and Greases WEAKNESS 1.Legal issues 2.Employee management 3.Human right issues, rehabilitation issues 4.Environmental hazards from wastes OPPORTUNITY 1.Increasing fuel/oil prices 2.Increasing natural gas market 3.More oil well discoveries 4.Expand export market THREATS 1.Government regulations 2.High Competition from other players
  • 73.
    CONCLUSIONS Tier-I: The customers are majorly focused on control/convenience that DT Plus offers in the form of MIS (Fleet & Spends) and customer servive. Cashless transaction with centralised fund management through DT Plus web-site increases their control on the day to day spends for fuel and customer service resolves issues faced by customers.  Rewards and Security are at next important feature that Tier-I customers prefer/use. As their consumption is very large their cash back on consumption is also proportionately large.  Insurance stands at the lowest. Tier-II:  Tier-II customers equally focuse on both control/ convenience and reward points that DT Plus offers. Control/convenience that DT Plus offers in the form of MIS (Fleet & Spends) and reward are the most preferred features by such customers.  Security is next important feature that Tier-II customers prefer/use.  Majorly, being, unorganised/non-institutional transporters they need assistance for hassle transactions in their respective routes so customer services is next preferred feature.  Insurance stands at the lowest, as these features are less availed by the customers. Tier-III:  This segment mostly cares about insurance feature and customer service. As most of the customers are small customers in terms of size, operations and financially, they want to be covered under insurance.  Cash back is next important feature for this segment of customer.  Tier-III customers are not much worried about control/convenience and security feature as they are not much involved in CCMS transactions; instead prefer cash loading/cash sale transactions.
  • 74.
    Over All: Rewardsand Control/Convenience are the most preferable features of DT Plus. Depending upon the respective size, operations need and financial position etc the mentioned segments are choosing among the features like Security, Customer Service and Insurance as depicted in below charts. RFERENCE Company‘s journal and magazines Company‘s website Company‘s pamphlets
  • 75.
    Questionnaire for Retailers Personal details Name …………………………………………… Outlet …………………………………… Customer ID............................. Address ………………………………………… Date of visit ……………………………………. Instructions: Take your time to fill this questionnaire. Please read carefully, before answering question. 1.How many people are trained in the outlet to use DTP terminal? Ans. 2. Do you have login ID and password of DTP program. If no how do you check your monthly transactions? a)Yes b)No Ans. 3.Do you know about point structure of DTP? a)Yes b)No Ans.
  • 76.
    4. Where doyou keep the DTP card? a)Customer b)Outlet Ans. 5. Do you tell the customer/fleet owner/driver about the Drive rack Plus card loyalty program of HPCL? a) YES. b) NO. C) SOMETIMES. Ans. 6. Do the staff/attendants know how to operate the machine of Drive Track Plus card? a) YES b) NO Ans. 7. Do you maintain the list of credit customers, cash customers & DTP customers? Ans. 8.Do you know about cash reload, cash sale and CCMS? Ans. 9.What is the purpose of batch settlement? Ans. 10.After batch settlement what do you understand by receivable and payable? Ans.
  • 77.
    Appendices Customer Questionnaire Dear DT Plus Customer, I am approaching you for your kind cooperation in connection with our project titled “Study of features of DTP perceived by customers & factors contributing in enrolling customers”. This study aims in understanding and identifying the contributing factors for customer enrolment in to DT Plus program and enhance the product features for better services. So your response regarding the various features of DT Plus program and respective usage is valuable in this project. Gaurav Malik Marketing Officer, Belgaum Retail Region, HPCL Please provide the following information: Customer. ID: Tier: Phone No.: Region: 1. What is your understanding/awareness about DTP Program? 2. What are the features of DT Plus Program? 3. What are the valuable features of DTplus program?
  • 78.
    Control & Convenience Very Useful OK Not very useful MIS-Fleet 7 6 5 4 3 2 1 MIS-Spends 7 6 5 4 3 2 1 MIS-Vehicle Tracking 7 6 5 4 3 2 1 Online monitor (website) 7 6 5 4 3 2 1 Security Very Useful OK Not very useful Cashless transaction 7 6 5 4 3 2 1 Pin-based transaction 7 6 5 4 3 2 1 Insurance Very Useful OK Not very useful Accidental death insurance cover of Rs.1lakh each for the driver and cleaner for every active card 7 6 5 4 3 2 1 Rewards Very Useful OK Not very useful Reward Points against consumption 7 6 5 4 3 2 1 Redemption (Fuels or Gifts) 7 6 5 4 3 2 1 Customer Service Very Useful OK Not very useful 24*7 Call Center 7 6 5 4 3 2 1 Program team Assitance 7 6 5 4 3 2 1
  • 79.