Kegiatan : Pengadaan, Peningkatan Sarana Prasarana Rumah Sakit Umum Daerah Sambas Kontraktor : CV. TAUFIK AKBAR
Pekerjaan : Pengawasan Pembangunan Gedung CSSD RSUD SMBAS Kontrak No. ;
Lokasi : Rumah Sakit Umum Daerah Sambas Tanggal ;
Tahun Anggaran : 2019 Konsultan : CV. DW KREASI KONSULTAN
Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Tambah Kurang Ket
Nilai Sat Rp Rp Nilai Sat Rp Rp Rp Rp
A PEMBANGUNAN GEDUNG CCSD
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi 1.00 Lsm 1,750,000.00 1,750,000.00 1.00 Lsm 1,750,000.00 1,750,000.00 - - Tetap
2 Pemasangan Papan Nama Proyek 1.00 Lsm 450,000.00 450,000.00 1.00 Lsm 450,000.00 450,000.00 - - Tetap
3 Pengukuran & Pemasangan Bouwplank 1.00 Lsm 1,000,000.00 1,000,000.00 1.00 Lsm 1,000,000.00 1,000,000.00 - - Tetap
4 Mobilisasi Material Bangunan
- Papan Mall 27.00 Kpg 18,000.00 486,000.00 27.00 Kpg 18,000.00 486,000.00 - - Tetap
- Cerucuk 8 -10 cm - 4 m 34.00 Btg 12,000.00 408,000.00 34.00 Btg 12,000.00 408,000.00 - - Tetap
- Pembongkaran dan Perbaikan Pagar 1.00 Lsm 1,750,000.00 1,750,000.00 1.00 Lsm 1,750,000.00 1,750,000.00 - - Tetap
II PEKERJAAN PONDASI
1 Galian tanah Pondasi 65.26 M3 86,125.00 5,620,905.06 51.71 M3 86,125.00 4,453,300.94 - 1,167,604.12 Kurang
2 Urugan kembali tanah pondasi 48.59 M3 62,250.00 3,024,665.25 37.32 M3 62,250.00 2,323,377.35 - 701,287.90 Kurang
3 Cerucuk bentangor dia. 12 - 15 cm - 12 m 281.00 Btg 115,000.00 32,315,000.00 281.00 Btg 115,000.00 32,315,000.00 - - Tetap
4 Pemancangan cerucuk dia. 12 - 15 cm - 12 m 281.00 Btg 30,000.00 8,430,000.00 281.00 Btg 30,000.00 8,430,000.00 - - Tetap
5 Urugan pasir alas pondasi, t = 5 cm 3.92 M3 214,450.00 840,644.00 3.74 M3 214,450.00 801,223.80 - 39,420.20 Kurang
6 Lantai kerja beton mutu K 100, t = 5 cm 1.96 M3 1,161,653.86 2,276,841.56 1.38 M3 1,161,653.86 1,600,983.22 - 675,858.34 Kurang
7 Pondasi 1
- Beton K 225 9.00 M3 1,374,344.73 12,369,102.57 9.00 M3 1,374,344.73 12,369,102.57 - - Tetap
- Tulangan 1,210.39 kg 13,634.50 16,503,024.28 694.40 kg 13,634.50 9,467,796.80 - 7,035,227.48 Kurang
- Bekisting 24.00 M2 127,808.00 3,067,392.00 12.00 M2 127,808.00 1,533,696.00 - 1,533,696.00 Kurang
8 Pondasi 2
- Beton K 225 0.80 M3 1,374,344.73 1,099,475.78 0.80 M3 1,374,344.73 1,099,475.78 - - Tetap
- Tulangan 98.99 kg 13,634.50 1,349,679.16 119.00 kg 13,634.50 1,622,505.50 272,826.34 - Tambah
- Bekisting 4.00 M2 127,808.00 511,232.00 2.00 M2 127,808.00 255,616.00 - 255,616.00 Kurang
9 Kolom pondasi Uk 30/30
- Beton K 225 1.80 M3 1,374,344.73 2,467,635.96 0.54 M3 1,374,344.73 740,290.79 - 1,727,345.17 Kurang
- Tulangan 704.89 kg 13,634.50 9,610,882.70 563.92 kg 13,634.50 7,688,706.16 - 1,922,176.54 Kurang
- Bekisting 23.94 M2 127,808.00 3,059,723.52 7.18 M2 127,808.00 917,917.06 - 2,141,806.46 Kurang
10 Balok sloof Uk 20/40
- Beton K 225 7.60 M3 1,374,344.73 10,445,019.95 7.32 M3 1,374,344.73 10,060,203.42 - 384,816.52 Kurang
- Tulangan 844.39 kg 13,634.50 11,512,770.31 934.89 kg 13,634.50 12,746,787.25 1,234,016.94 - Tambah
- Bekisting 95.00 M2 127,808.00 12,141,760.00 95.00 M2 127,808.00 12,141,760.00 - - Tetap
11 Balok sloof Uk 15/30
- Beton K 225 0.83 M3 1,374,344.73 1,144,141.99 0.83 M3 1,374,344.73 1,144,141.99 - - Tetap
- Tulangan 150.03 kg 13,634.50 2,045,579.34 187.19 kg 13,634.50 2,552,269.32 506,689.98 - Tambah
- Bekisting 13.88 M2 127,808.00 1,773,336.00 13.88 M2 127,808.00 1,773,336.00 - - Tetap
2,013,533.26 17,584,854.73
REKAPITULASI HASIL PENGUKURAN ULANG
No Uraian
KONTRAK AWAL ADDENDUM I
Jumlah Harga
Volume Volume

More Related Content

Similar to Siap2 addendum cssd

3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
Syahrul Najmi
 
Gg melati
Gg melatiGg melati
Gg melati
kurniawan yusril
 
01 cronograma valorizado
01 cronograma valorizado01 cronograma valorizado
01 cronograma valorizado
JIMMY PANDURO
 
Daftarbahanbangunan
Daftarbahanbangunan Daftarbahanbangunan
Daftarbahanbangunan
Zainal Sitorus
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
Deny Sulistio
 
Gltc OM facility Bid Tabulation
Gltc OM facility Bid TabulationGltc OM facility Bid Tabulation
Gltc OM facility Bid Tabulation
Greater Lynchburg Transit Company
 
second review.pptx
second review.pptxsecond review.pptx
second review.pptx
KSelvakumarCIVIL
 
PP2 final account assignment calculations
PP2 final account assignment calculationsPP2 final account assignment calculations
PP2 final account assignment calculations
ashleyyeap
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excel
ashleyyeap
 
Training PPT
Training PPTTraining PPT
Training PPT
indrajeet kumar
 
232365141 1-qs-techinical-data
232365141 1-qs-techinical-data232365141 1-qs-techinical-data
232365141 1-qs-techinical-data
hlksd
 
Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
verytudjuka
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ssuser3797b9
 
Ready rackner for qs
Ready rackner for qsReady rackner for qs
Ready rackner for qs
Hiren Thakkar
 
Calendario valorizado sistema de recreacion amotape
Calendario valorizado  sistema de recreacion amotapeCalendario valorizado  sistema de recreacion amotape
Calendario valorizado sistema de recreacion amotape
Edikson Soto
 
Cost estimation
Cost estimationCost estimation
Cost estimation
Satyam Singh
 
Labul
LabulLabul
Daftar bahan bangunan
Daftar bahan bangunanDaftar bahan bangunan
Daftar bahan bangunan
Kustandi Subarna
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
ANANDA DS
 
Monthly progress package 4 (april 2016)
Monthly progress package 4 (april 2016)Monthly progress package 4 (april 2016)
Monthly progress package 4 (april 2016)
Herbin Sinaga
 

Similar to Siap2 addendum cssd (20)

3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
 
Gg melati
Gg melatiGg melati
Gg melati
 
01 cronograma valorizado
01 cronograma valorizado01 cronograma valorizado
01 cronograma valorizado
 
Daftarbahanbangunan
Daftarbahanbangunan Daftarbahanbangunan
Daftarbahanbangunan
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
 
Gltc OM facility Bid Tabulation
Gltc OM facility Bid TabulationGltc OM facility Bid Tabulation
Gltc OM facility Bid Tabulation
 
second review.pptx
second review.pptxsecond review.pptx
second review.pptx
 
PP2 final account assignment calculations
PP2 final account assignment calculationsPP2 final account assignment calculations
PP2 final account assignment calculations
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excel
 
Training PPT
Training PPTTraining PPT
Training PPT
 
232365141 1-qs-techinical-data
232365141 1-qs-techinical-data232365141 1-qs-techinical-data
232365141 1-qs-techinical-data
 
Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
Ready rackner for qs
Ready rackner for qsReady rackner for qs
Ready rackner for qs
 
Calendario valorizado sistema de recreacion amotape
Calendario valorizado  sistema de recreacion amotapeCalendario valorizado  sistema de recreacion amotape
Calendario valorizado sistema de recreacion amotape
 
Cost estimation
Cost estimationCost estimation
Cost estimation
 
Labul
LabulLabul
Labul
 
Daftar bahan bangunan
Daftar bahan bangunanDaftar bahan bangunan
Daftar bahan bangunan
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
 
Monthly progress package 4 (april 2016)
Monthly progress package 4 (april 2016)Monthly progress package 4 (april 2016)
Monthly progress package 4 (april 2016)
 

Recently uploaded

Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
CVCSOfficial
 

Recently uploaded (20)

Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
 

Siap2 addendum cssd

  • 1. Kegiatan : Pengadaan, Peningkatan Sarana Prasarana Rumah Sakit Umum Daerah Sambas Kontraktor : CV. TAUFIK AKBAR Pekerjaan : Pengawasan Pembangunan Gedung CSSD RSUD SMBAS Kontrak No. ; Lokasi : Rumah Sakit Umum Daerah Sambas Tanggal ; Tahun Anggaran : 2019 Konsultan : CV. DW KREASI KONSULTAN Harga Jumlah Harga Jumlah Satuan Harga Satuan Harga Tambah Kurang Ket Nilai Sat Rp Rp Nilai Sat Rp Rp Rp Rp A PEMBANGUNAN GEDUNG CCSD I PEKERJAAN PENDAHULUAN 1 Pembersihan Lokasi 1.00 Lsm 1,750,000.00 1,750,000.00 1.00 Lsm 1,750,000.00 1,750,000.00 - - Tetap 2 Pemasangan Papan Nama Proyek 1.00 Lsm 450,000.00 450,000.00 1.00 Lsm 450,000.00 450,000.00 - - Tetap 3 Pengukuran & Pemasangan Bouwplank 1.00 Lsm 1,000,000.00 1,000,000.00 1.00 Lsm 1,000,000.00 1,000,000.00 - - Tetap 4 Mobilisasi Material Bangunan - Papan Mall 27.00 Kpg 18,000.00 486,000.00 27.00 Kpg 18,000.00 486,000.00 - - Tetap - Cerucuk 8 -10 cm - 4 m 34.00 Btg 12,000.00 408,000.00 34.00 Btg 12,000.00 408,000.00 - - Tetap - Pembongkaran dan Perbaikan Pagar 1.00 Lsm 1,750,000.00 1,750,000.00 1.00 Lsm 1,750,000.00 1,750,000.00 - - Tetap II PEKERJAAN PONDASI 1 Galian tanah Pondasi 65.26 M3 86,125.00 5,620,905.06 51.71 M3 86,125.00 4,453,300.94 - 1,167,604.12 Kurang 2 Urugan kembali tanah pondasi 48.59 M3 62,250.00 3,024,665.25 37.32 M3 62,250.00 2,323,377.35 - 701,287.90 Kurang 3 Cerucuk bentangor dia. 12 - 15 cm - 12 m 281.00 Btg 115,000.00 32,315,000.00 281.00 Btg 115,000.00 32,315,000.00 - - Tetap 4 Pemancangan cerucuk dia. 12 - 15 cm - 12 m 281.00 Btg 30,000.00 8,430,000.00 281.00 Btg 30,000.00 8,430,000.00 - - Tetap 5 Urugan pasir alas pondasi, t = 5 cm 3.92 M3 214,450.00 840,644.00 3.74 M3 214,450.00 801,223.80 - 39,420.20 Kurang 6 Lantai kerja beton mutu K 100, t = 5 cm 1.96 M3 1,161,653.86 2,276,841.56 1.38 M3 1,161,653.86 1,600,983.22 - 675,858.34 Kurang 7 Pondasi 1 - Beton K 225 9.00 M3 1,374,344.73 12,369,102.57 9.00 M3 1,374,344.73 12,369,102.57 - - Tetap - Tulangan 1,210.39 kg 13,634.50 16,503,024.28 694.40 kg 13,634.50 9,467,796.80 - 7,035,227.48 Kurang - Bekisting 24.00 M2 127,808.00 3,067,392.00 12.00 M2 127,808.00 1,533,696.00 - 1,533,696.00 Kurang 8 Pondasi 2 - Beton K 225 0.80 M3 1,374,344.73 1,099,475.78 0.80 M3 1,374,344.73 1,099,475.78 - - Tetap - Tulangan 98.99 kg 13,634.50 1,349,679.16 119.00 kg 13,634.50 1,622,505.50 272,826.34 - Tambah - Bekisting 4.00 M2 127,808.00 511,232.00 2.00 M2 127,808.00 255,616.00 - 255,616.00 Kurang 9 Kolom pondasi Uk 30/30 - Beton K 225 1.80 M3 1,374,344.73 2,467,635.96 0.54 M3 1,374,344.73 740,290.79 - 1,727,345.17 Kurang - Tulangan 704.89 kg 13,634.50 9,610,882.70 563.92 kg 13,634.50 7,688,706.16 - 1,922,176.54 Kurang - Bekisting 23.94 M2 127,808.00 3,059,723.52 7.18 M2 127,808.00 917,917.06 - 2,141,806.46 Kurang 10 Balok sloof Uk 20/40 - Beton K 225 7.60 M3 1,374,344.73 10,445,019.95 7.32 M3 1,374,344.73 10,060,203.42 - 384,816.52 Kurang - Tulangan 844.39 kg 13,634.50 11,512,770.31 934.89 kg 13,634.50 12,746,787.25 1,234,016.94 - Tambah - Bekisting 95.00 M2 127,808.00 12,141,760.00 95.00 M2 127,808.00 12,141,760.00 - - Tetap 11 Balok sloof Uk 15/30 - Beton K 225 0.83 M3 1,374,344.73 1,144,141.99 0.83 M3 1,374,344.73 1,144,141.99 - - Tetap - Tulangan 150.03 kg 13,634.50 2,045,579.34 187.19 kg 13,634.50 2,552,269.32 506,689.98 - Tambah - Bekisting 13.88 M2 127,808.00 1,773,336.00 13.88 M2 127,808.00 1,773,336.00 - - Tetap 2,013,533.26 17,584,854.73 REKAPITULASI HASIL PENGUKURAN ULANG No Uraian KONTRAK AWAL ADDENDUM I Jumlah Harga Volume Volume