PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL
LOKASI : PERUM CANDRAMAS
TAHUN : 2008
Haraga Satuan Jumlah
( Rp ) ( Rp )
1 3 4 5 6 = 3x5
I PEKERJAAN PENDAHULUAN
1 Pekerjaan persiapan 1.00 Ls 500,000.00Rp 500,000.00Rp
SUB TOTAL I 500,000.00Rp
A PEKERJAAN LANTAI ATAS
II PEKERJAAN BETON BERTULANG
1 Kolom beton K 225 pemakaian besi 110 kg 1.08 m3
3,437,580.00Rp 3,697,117.29Rp
2 Ring balok 15/20 beton K 225 pemakaian besi 110 kg 2.07 m3
3,437,580.00Rp 7,115,790.60Rp
3 Plat deck t =10cm beton K 225 pemakaian besi 130 kg 0.72 m3
3,697,100.00Rp 2,676,700.40Rp
4 Balok 20/30 beton K 225 pemakaian besi 130 kg 0.66 m3
3,697,100.00Rp 2,435,649.48Rp
SUB TOTAL II 15,925,257.77Rp
III PEKERJAAN PASANGAN & PLESTERAN
1 Pas. Bata merah 1pc : 4ps 86.19 m2
71,510.00Rp 6,163,089.35Rp
2 Plesteran halus 1pc : 4ps tebal 1,5 cm 172.37 m2
24,260.00Rp 4,181,696.20Rp
3 Benangan 156.00 m1
7,130.00Rp 1,112,280.00Rp
SUB TOTAL III 11,457,065.55Rp
IV PEKERJAAN KERAMIK
1 Keramik lantai uk. 30x30cm 28.60 m2
110,950.00Rp 3,173,170.00Rp
2 Keramik lantai uk. 20x20cm (KM/WC) 1.84 m2
113,350.00Rp 208,564.00Rp
3 Keramik dinding uk. 20x25cm ( KM/WC) 7.35 m2
97,670.00Rp 717,874.50Rp
SUB TOTAL IV 4,099,608.50Rp
V PEKERJAAN ATAP
1 Balok tembok 8/12 kayu bengkirai 0.08 m3
8,130,900.00Rp 622,111.42Rp
2 Kuda-kuda 8/12 kayu bengkirai 0.35 m3
8,130,900.00Rp 2,855,702.17Rp
3 Gording 8/12 kayu bengkirai 0.31 m3
8,130,900.00Rp 2,546,988.16Rp
4 Usuk 5/7 + reng 2/3 kayu bengkirai 50.02 m2
91,120.00Rp 4,557,512.59Rp
5 Genteng karang pilang 50.02 m
2
109,540.00Rp 5,478,818.36Rp
6 List plank 3/30 kayu kamper 22.63 m
1
101,580.00Rp 2,298,755.40Rp
7 Talang seng BJLS 30 ( lebar 90 cm ) 5.65 m
1
107,280.00Rp 606,132.00Rp
8 Talang Pembuluh Pipa PVC 4" Type AW 9.00 m
1
40,640.00Rp 365,760.00Rp
9 Plafond eternit 100x100cm rangka kayu kamper 45.33 m
2
131,480.00Rp 5,960,172.47Rp
10 List plafond Gypsum 100.71 m1
12,000.00Rp 1,208,520.00Rp
SUB TOTAL V 26,500,472.59Rp
VI PEKERJAAN KAYU
1 Pas. Kusen pintu/jendela kayu kamper 6/15 cm 0.44 m
3
9,180,000.00Rp 4,023,594.00Rp
2 Pas. Daun pintu panil kayu kamper 2.94 m
2
476,250.00Rp 1,400,746.50Rp
3 Pas daun jendela kaca rangka kayu kamper 6.05 m2
284,940.00Rp 1,725,083.75Rp
SUB TOTAL VI 7,149,424.25Rp
VII PEKERJAAN INST. LISTRIK
1 Pas. Titik lampu 14.00 Ttk 380,500.00Rp 5,327,000.00Rp
2 Pas. Stop kontak 2.00 Ttk 169,900.00Rp 339,800.00Rp
3 Pas. Saklar tunggal 5.00 Ttk 130,000.00Rp 650,000.00Rp
4 Pas. Saklar ganda 1.00 Ttk 60,000.00Rp 60,000.00Rp
5 Pas. Lampu TL 1X40 watt 1.00 Ttk 60,000.00Rp 60,000.00Rp
6 Pas. Lampu downled 10.00 Ttk 70,000.00Rp 700,000.00Rp
7 Pas. Lampu PL 25 watt 3.00 Ttk 40,000.00Rp 120,000.00Rp
SUB TOTAL VII 7,256,800.00Rp
VIII PEKERJAAN FINISHING
1 Cat kayu 20.45 m2
37,400.00Rp 764,979.60Rp
2
RENCANA ANGGARAN BIAYA
No Uraian Kegiatan Volume Satuan
1 of 2
Haraga Satuan Jumlah
( Rp ) ( Rp )
1 3 4 5 6 = 3x52
No Uraian Kegiatan Volume Satuan
2 Cat dinding + plafond 217.70 m
2
16,800.00Rp 3,657,383.52Rp
SUB TOTAL VIII 4,422,363.12Rp
IX PEKERJAAN PENGGANTUNG PENGUNCI
1 Pas. Kunci tanam besar 2x putar 2.00 unit 255,700.00Rp 511,400.00Rp
2 Pas. Engsel pintu 6.00 stel 23,550.00Rp 141,300.00Rp
3 Pas. Engsel jendela 6.00 stel 15,450.00Rp 92,700.00Rp
4 Pemasangan Grendel biasa besar (Pintu) 2.00 unit 41,720.00Rp 83,440.00Rp
5 Pemasangan Grendel biasa kecil (jendela) 3.00 unit 20,860.00Rp 62,580.00Rp
SUB TOTAL IX 891,420.00Rp
X PEKERJAAN SANITASI DAN RIOLERING
1 Pembuatan bak mandi :
- Pas. Bata trasram ( 1pc : 3ps ) 0.07 m
3
74,590.00Rp 5,370.48Rp
- Pas. Keramik dinding bak air 20x25cm 1.39 m2
97,670.00Rp 135,370.62Rp
- Pas. Keramik dasar bak air 20x20cm 0.30 m2
113,350.00Rp 33,766.97Rp
2 Pemasangan Kloset jongkok 1.00 unit 467,800.00Rp 467,800.00Rp
3 Pemasangan instalasi air bersih dia.3/4" 10.00 m
1
12,990.00Rp 129,900.00Rp
4 Pemasangan instalasi air kotor dia. 4" 10.00 m
1
40,640.00Rp 406,400.00Rp
5 Pemasangan instalasi air kotoran dia. 4" 10.00 m
1
40,640.00Rp 406,400.00Rp
6 Kran air lokal 1.00 unit 33,350.00Rp 33,350.00Rp
7 Avour 1.00 unit 45,000.00Rp 45,000.00Rp
SUB TOTAL X 1,663,358.07Rp
B PEKERJAAN TERAS DEPAN
XI PEKERJAAN ATAP
1 Gording 8/12 kayu bengkirai 0.15 m3
8,130,900.00Rp 1,248,906.24Rp
2 Asbes gelombang besar 24.00 m2
109,540.00Rp 2,628,960.00Rp
3 Talang seng BJLS 30 ( lebar 90 cm ) 6.00 m1
107,280.00Rp 643,680.00Rp
4 Talang Pembuluh Pipa PVC 4" Type AW 2.70 m
1
40,640.00Rp 109,728.00Rp
5 Plafond eternit 100x100cm rangka kayu kamper 24.00 m
2
131,480.00Rp 3,155,520.00Rp
6 List plafond Gypsum 20.00 m1
12,000.00Rp 240,000.00Rp
SUB TOTAL XI 8,026,794.24Rp
XII PEKERJAAN KERAMIK
1 Keramik lantai uk. 30x30cm 24.00 m
2
110,950.00Rp 2,662,800.00Rp
SUB TOTAL XII 2,662,800.00Rp
XIII PEKERJAAN FINISHING
1 Cat dinding + plafond 65.30 m2
16,800.00Rp 1,097,040.00Rp
SUB TOTAL XIII 1,097,040.00Rp
B PEKERJAAN PAGAR
XIV PAGAR
1 Pagar minimalis 13.50 m
2
550,000.00Rp 7,425,000.00Rp
SUB TOTAL XIV 7,425,000.00Rp
XV PEKERJAAN LAIN-LAIN
1 Air kerja 1.00 ls 300,000.00Rp 300,000.00Rp
2 Pembersihan lokasi 1.00 ls 500,000.00Rp 500,000.00Rp
SUB TOTAL XV 800,000.00Rp
Jumlah total 99,877,404.08Rp
Dibulatkan 99,877,000.00Rp
Terbilang : Sembilan puluh sembilan juta delapan ratus tujuh puluh tujuh ribu rupiah rupiah
2 of 2

More Related Content

Similar to 2.pengajuanrabcandramas terasdepanatapasbes

Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
verytudjuka
 
Rehab kantor pariwsata
Rehab kantor pariwsataRehab kantor pariwsata
Rehab kantor pariwsataKashmir Brown
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahSekertariat_Akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahReguti
 
Rab final bata
Rab final bataRab final bata
Rab final bata
adityarahmannugraha
 
7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oeKashmir Brown
 
3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
Syahrul Najmi
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
Omar Faruque
 
Rab
RabRab
Rab
AL Vet
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
independiente
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimateimaduddin91
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
kurniawan yusril
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
ashleyyeap
 
Katalog bahan 1 bahan arsitektural dan sipil
Katalog bahan 1 bahan arsitektural dan sipilKatalog bahan 1 bahan arsitektural dan sipil
Katalog bahan 1 bahan arsitektural dan sipil
DIMENSIfurniture
 
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
BQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdfBQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdf
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
suryaman10
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Avin Kharel
 
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdfMaster Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
AJI DARMAWAN
 
Ahs semarang 2014 Rumah Tinggal
Ahs semarang 2014 Rumah TinggalAhs semarang 2014 Rumah Tinggal
Ahs semarang 2014 Rumah Tinggal
bayu wirawan
 
Valorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddsonValorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddson
Edd Leo G
 

Similar to 2.pengajuanrabcandramas terasdepanatapasbes (20)

Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
 
Rehab kantor pariwsata
Rehab kantor pariwsataRehab kantor pariwsata
Rehab kantor pariwsata
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Rab final bata
Rab final bataRab final bata
Rab final bata
 
7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe
 
3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Rab
RabRab
Rab
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimate
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Katalog bahan 1 bahan arsitektural dan sipil
Katalog bahan 1 bahan arsitektural dan sipilKatalog bahan 1 bahan arsitektural dan sipil
Katalog bahan 1 bahan arsitektural dan sipil
 
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
BQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdfBQ RSJ  TAHAP 1 TA 2022 Revisi  21 Februari 2022.pdf
BQ RSJ TAHAP 1 TA 2022 Revisi 21 Februari 2022.pdf
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdfMaster Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
 
Ahs semarang 2014 Rumah Tinggal
Ahs semarang 2014 Rumah TinggalAhs semarang 2014 Rumah Tinggal
Ahs semarang 2014 Rumah Tinggal
 
Valorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddsonValorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddson
 
Facade man hour
Facade man hourFacade man hour
Facade man hour
 

Recently uploaded

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 

Recently uploaded (20)

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 

2.pengajuanrabcandramas terasdepanatapasbes

  • 1. PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL LOKASI : PERUM CANDRAMAS TAHUN : 2008 Haraga Satuan Jumlah ( Rp ) ( Rp ) 1 3 4 5 6 = 3x5 I PEKERJAAN PENDAHULUAN 1 Pekerjaan persiapan 1.00 Ls 500,000.00Rp 500,000.00Rp SUB TOTAL I 500,000.00Rp A PEKERJAAN LANTAI ATAS II PEKERJAAN BETON BERTULANG 1 Kolom beton K 225 pemakaian besi 110 kg 1.08 m3 3,437,580.00Rp 3,697,117.29Rp 2 Ring balok 15/20 beton K 225 pemakaian besi 110 kg 2.07 m3 3,437,580.00Rp 7,115,790.60Rp 3 Plat deck t =10cm beton K 225 pemakaian besi 130 kg 0.72 m3 3,697,100.00Rp 2,676,700.40Rp 4 Balok 20/30 beton K 225 pemakaian besi 130 kg 0.66 m3 3,697,100.00Rp 2,435,649.48Rp SUB TOTAL II 15,925,257.77Rp III PEKERJAAN PASANGAN & PLESTERAN 1 Pas. Bata merah 1pc : 4ps 86.19 m2 71,510.00Rp 6,163,089.35Rp 2 Plesteran halus 1pc : 4ps tebal 1,5 cm 172.37 m2 24,260.00Rp 4,181,696.20Rp 3 Benangan 156.00 m1 7,130.00Rp 1,112,280.00Rp SUB TOTAL III 11,457,065.55Rp IV PEKERJAAN KERAMIK 1 Keramik lantai uk. 30x30cm 28.60 m2 110,950.00Rp 3,173,170.00Rp 2 Keramik lantai uk. 20x20cm (KM/WC) 1.84 m2 113,350.00Rp 208,564.00Rp 3 Keramik dinding uk. 20x25cm ( KM/WC) 7.35 m2 97,670.00Rp 717,874.50Rp SUB TOTAL IV 4,099,608.50Rp V PEKERJAAN ATAP 1 Balok tembok 8/12 kayu bengkirai 0.08 m3 8,130,900.00Rp 622,111.42Rp 2 Kuda-kuda 8/12 kayu bengkirai 0.35 m3 8,130,900.00Rp 2,855,702.17Rp 3 Gording 8/12 kayu bengkirai 0.31 m3 8,130,900.00Rp 2,546,988.16Rp 4 Usuk 5/7 + reng 2/3 kayu bengkirai 50.02 m2 91,120.00Rp 4,557,512.59Rp 5 Genteng karang pilang 50.02 m 2 109,540.00Rp 5,478,818.36Rp 6 List plank 3/30 kayu kamper 22.63 m 1 101,580.00Rp 2,298,755.40Rp 7 Talang seng BJLS 30 ( lebar 90 cm ) 5.65 m 1 107,280.00Rp 606,132.00Rp 8 Talang Pembuluh Pipa PVC 4" Type AW 9.00 m 1 40,640.00Rp 365,760.00Rp 9 Plafond eternit 100x100cm rangka kayu kamper 45.33 m 2 131,480.00Rp 5,960,172.47Rp 10 List plafond Gypsum 100.71 m1 12,000.00Rp 1,208,520.00Rp SUB TOTAL V 26,500,472.59Rp VI PEKERJAAN KAYU 1 Pas. Kusen pintu/jendela kayu kamper 6/15 cm 0.44 m 3 9,180,000.00Rp 4,023,594.00Rp 2 Pas. Daun pintu panil kayu kamper 2.94 m 2 476,250.00Rp 1,400,746.50Rp 3 Pas daun jendela kaca rangka kayu kamper 6.05 m2 284,940.00Rp 1,725,083.75Rp SUB TOTAL VI 7,149,424.25Rp VII PEKERJAAN INST. LISTRIK 1 Pas. Titik lampu 14.00 Ttk 380,500.00Rp 5,327,000.00Rp 2 Pas. Stop kontak 2.00 Ttk 169,900.00Rp 339,800.00Rp 3 Pas. Saklar tunggal 5.00 Ttk 130,000.00Rp 650,000.00Rp 4 Pas. Saklar ganda 1.00 Ttk 60,000.00Rp 60,000.00Rp 5 Pas. Lampu TL 1X40 watt 1.00 Ttk 60,000.00Rp 60,000.00Rp 6 Pas. Lampu downled 10.00 Ttk 70,000.00Rp 700,000.00Rp 7 Pas. Lampu PL 25 watt 3.00 Ttk 40,000.00Rp 120,000.00Rp SUB TOTAL VII 7,256,800.00Rp VIII PEKERJAAN FINISHING 1 Cat kayu 20.45 m2 37,400.00Rp 764,979.60Rp 2 RENCANA ANGGARAN BIAYA No Uraian Kegiatan Volume Satuan 1 of 2
  • 2. Haraga Satuan Jumlah ( Rp ) ( Rp ) 1 3 4 5 6 = 3x52 No Uraian Kegiatan Volume Satuan 2 Cat dinding + plafond 217.70 m 2 16,800.00Rp 3,657,383.52Rp SUB TOTAL VIII 4,422,363.12Rp IX PEKERJAAN PENGGANTUNG PENGUNCI 1 Pas. Kunci tanam besar 2x putar 2.00 unit 255,700.00Rp 511,400.00Rp 2 Pas. Engsel pintu 6.00 stel 23,550.00Rp 141,300.00Rp 3 Pas. Engsel jendela 6.00 stel 15,450.00Rp 92,700.00Rp 4 Pemasangan Grendel biasa besar (Pintu) 2.00 unit 41,720.00Rp 83,440.00Rp 5 Pemasangan Grendel biasa kecil (jendela) 3.00 unit 20,860.00Rp 62,580.00Rp SUB TOTAL IX 891,420.00Rp X PEKERJAAN SANITASI DAN RIOLERING 1 Pembuatan bak mandi : - Pas. Bata trasram ( 1pc : 3ps ) 0.07 m 3 74,590.00Rp 5,370.48Rp - Pas. Keramik dinding bak air 20x25cm 1.39 m2 97,670.00Rp 135,370.62Rp - Pas. Keramik dasar bak air 20x20cm 0.30 m2 113,350.00Rp 33,766.97Rp 2 Pemasangan Kloset jongkok 1.00 unit 467,800.00Rp 467,800.00Rp 3 Pemasangan instalasi air bersih dia.3/4" 10.00 m 1 12,990.00Rp 129,900.00Rp 4 Pemasangan instalasi air kotor dia. 4" 10.00 m 1 40,640.00Rp 406,400.00Rp 5 Pemasangan instalasi air kotoran dia. 4" 10.00 m 1 40,640.00Rp 406,400.00Rp 6 Kran air lokal 1.00 unit 33,350.00Rp 33,350.00Rp 7 Avour 1.00 unit 45,000.00Rp 45,000.00Rp SUB TOTAL X 1,663,358.07Rp B PEKERJAAN TERAS DEPAN XI PEKERJAAN ATAP 1 Gording 8/12 kayu bengkirai 0.15 m3 8,130,900.00Rp 1,248,906.24Rp 2 Asbes gelombang besar 24.00 m2 109,540.00Rp 2,628,960.00Rp 3 Talang seng BJLS 30 ( lebar 90 cm ) 6.00 m1 107,280.00Rp 643,680.00Rp 4 Talang Pembuluh Pipa PVC 4" Type AW 2.70 m 1 40,640.00Rp 109,728.00Rp 5 Plafond eternit 100x100cm rangka kayu kamper 24.00 m 2 131,480.00Rp 3,155,520.00Rp 6 List plafond Gypsum 20.00 m1 12,000.00Rp 240,000.00Rp SUB TOTAL XI 8,026,794.24Rp XII PEKERJAAN KERAMIK 1 Keramik lantai uk. 30x30cm 24.00 m 2 110,950.00Rp 2,662,800.00Rp SUB TOTAL XII 2,662,800.00Rp XIII PEKERJAAN FINISHING 1 Cat dinding + plafond 65.30 m2 16,800.00Rp 1,097,040.00Rp SUB TOTAL XIII 1,097,040.00Rp B PEKERJAAN PAGAR XIV PAGAR 1 Pagar minimalis 13.50 m 2 550,000.00Rp 7,425,000.00Rp SUB TOTAL XIV 7,425,000.00Rp XV PEKERJAAN LAIN-LAIN 1 Air kerja 1.00 ls 300,000.00Rp 300,000.00Rp 2 Pembersihan lokasi 1.00 ls 500,000.00Rp 500,000.00Rp SUB TOTAL XV 800,000.00Rp Jumlah total 99,877,404.08Rp Dibulatkan 99,877,000.00Rp Terbilang : Sembilan puluh sembilan juta delapan ratus tujuh puluh tujuh ribu rupiah rupiah 2 of 2