The document provides details of a photography shoot scheduled for January 29th at Nunnington Hall. Equipment including a DSLR camera, tripod, and memory cards have been booked. The shoot aims to capture 8 photographs documenting the hall and local workers. Models will be people taking photos rather than subjects. Props will only include on-site items. Contingency plans include shooting in York or photographing garden workers if needed. A risk assessment was completed identifying tripping, privacy, touching equipment, darkroom chemicals, and ergonomic hazards. Relevant health and safety acts are considered. Example shot plans and a model release form are included.
Fashionista Chic Couture Maze & Coloring Adventures is a coloring and activity book filled with many maze games and coloring activities designed to delight and engage young fashion enthusiasts. Each page offers a unique blend of fashion-themed mazes and stylish illustrations to color, inspiring creativity and problem-solving skills in children.
Hadj Ounis's most notable work is his sculpture titled "Metamorphosis." This piece showcases Ounis's mastery of form and texture, as he seamlessly combines metal and wood to create a dynamic and visually striking composition. The juxtaposition of the two materials creates a sense of tension and harmony, inviting viewers to contemplate the relationship between nature and industry.
This tutorial offers a step-by-step guide on how to effectively use Pinterest. It covers the basics such as account creation and navigation, as well as advanced techniques including creating eye-catching pins and optimizing your profile. The tutorial also explores collaboration and networking on the platform. With visual illustrations and clear instructions, this tutorial will equip you with the skills to navigate Pinterest confidently and achieve your goals.
Boudoir photography, a genre that captures intimate and sensual images of individuals, has experienced significant transformation over the years, particularly in New York City (NYC). Known for its diversity and vibrant arts scene, NYC has been a hub for the evolution of various art forms, including boudoir photography. This article delves into the historical background, cultural significance, technological advancements, and the contemporary landscape of boudoir photography in NYC.
This document announces the winners of the 2024 Youth Poster Contest organized by MATFORCE. It lists the grand prize and age category winners for grades K-6, 7-12, and individual age groups from 5 years old to 18 years old.
Fed by curiosity and beauty - Remembering Myrsine Zorba
Shooting schedule & risk assessment
1. Shooting Schedule
Date: Wednesday the 29th January 2014.
Location: Nunnington Hall, Ryedale
Equipment:
Booked? (Y/N)
DSLR Camera
Y
Tripod
Y
Memory Card
Y
Models: The images will be part of a collection of eight photographs that document
Nunnington Hall. From Workers in the gardens preserving the National park to the
workers in the shops selling local produce from farms nearby. The models used will
be other people taking photographs as it is more of a documentary type of
photography rather than a photojournalist approach.
Props: Props used will only be that of what is found at Nunnington Hall, such as the
tables and chairs found in the interior of the site.
Risk assessment completed? Yes
Contingency: To go into York city centre and take images of the old buildings and
walls. Also as Nunnington halls staff might not be working, a contingency is put in
place to take photographs of any workers in the garden industry. Should the weather
effect the outcome of the photographs then it has been thought about to take the
image indoors. One shoot should be enough to take the documentary images
however if needed a location will be prepared for a second shoot.
3. Hazard
Person(s) / Equipment at
Risk
Risk Control Taken
Tripping over at the site and
falling on floor.
Could harm myself and
maybe others around.
Camera falling and breaking
lens.
Having the strap over my
head supporting the camera
and making sure to look
around the surroundings.
Disturbing people’s privacy.
People in the photographs
taken may not want to be
pictured.
Making sure nobody is in the
way of the camera when
capturing an image. Also ask
people if they mind or not
being taken of.
Touching harmful equipment
(Gardening equipment)
The person who may get
hurt, the person responsible
may be at risk of being
punished and the equipment
may be damaged.
To not touch anything that
has been left by a worker,
also be aware of
surroundings at all times.
Darkroom exposure to
chemical agents.
It may lead to respiratory,
allergic, and nervous system
diseases.
Having breaks every 15
minutes when in dark areas.
Someone falling over Tripod
This may lead to the person
tripping over to be harmed
and the tripod to potentially
break.
To always keep the tripod
close by and not where
someone can walk near it.
Ergonomic risk of handling
heavy equipment.
Person at risk of strain or the To make sure regular breaks
camera and tripod may be in are taken to avoid neck pain
danger of falling on the floor. and back pain.
4. What Health and Safety legislation might you need to consider in this project?
Health and safety at work act 1974. I am to consider the general duties of the students when they the
care of the tutors. I will therefore look at students acting responsibly and being safe when around certain
sites or equipment. To also consider the tutors (People in charge of students behaviour) and the way
they should act. They should be trained to deal with certain aspects of the trip and to set an example on
how to behave in the premises of a National Park. They should also know whether the location of where
the students going is safe. Also instruct the students to take photographs without supervision.
Health and Safety (Display Screen Equipment) Regulations act 1992. This may be considered when
editing the images taken on the computer. Regular breaks to be taken to avoid eye problems.
Control of Hazardous and health (COSHH) regulations (2002). Registration, evaluation,
authorisation and restriction to chemicals (REACH) both of these are used for risk assessment
Provision and Use of Work Equipment Regulations 1998 (PUWER)
Planned places for photographs:
Image of person taking photograph. (No depth of field) (Quick shutter speed) (Model
release form)
5. Image of the full building (Wide shot) (Daylight White balance) (Rule of thirds)
Image of worker- Gardener (Portrait- if possible or candid to show him at work) (Model
release form)
Image of giant chess set (Close up, looking up- to make the pieces look bigger)
Image of inside (Tables & Chairs) (Rule of thirds)
Image of organic garden- (Long shot, leading lines)
Image of shop (workers) (Portrait, observational)
Image of canteen (Medium shot)
Image of Pic-nic spots (Depth of field used)
Close ups on buildings design (Texture) (Slow Shutter speed)
Image of exhibition (Use depth of field to capture many pieces in good detail)
Example of model Release form! Models are to sign this in order to take images.
This needs to be printed off and handed out to each model that participates in the
photographs. If the person is of a young age then the parent/guardian must consent to
images being taken.
6. Image of the full building (Wide shot) (Daylight White balance) (Rule of thirds)
Image of worker- Gardener (Portrait- if possible or candid to show him at work) (Model
release form)
Image of giant chess set (Close up, looking up- to make the pieces look bigger)
Image of inside (Tables & Chairs) (Rule of thirds)
Image of organic garden- (Long shot, leading lines)
Image of shop (workers) (Portrait, observational)
Image of canteen (Medium shot)
Image of Pic-nic spots (Depth of field used)
Close ups on buildings design (Texture) (Slow Shutter speed)
Image of exhibition (Use depth of field to capture many pieces in good detail)
Example of model Release form! Models are to sign this in order to take images.
This needs to be printed off and handed out to each model that participates in the
photographs. If the person is of a young age then the parent/guardian must consent to
images being taken.