Explore the multifaceted world of Muntadher Saleh, an Iraqi polymath renowned for his expertise in visual art, writing, design, and pharmacy. This SlideShare delves into his innovative contributions across various disciplines, showcasing his unique ability to blend traditional themes with modern aesthetics. Learn about his impactful artworks, thought-provoking literary pieces, and his vision as a Neo-Pop artist dedicated to raising awareness about Iraq's cultural heritage. Discover why Muntadher Saleh is celebrated as "The Last Polymath" and how his multidisciplinary talents continue to inspire and influence.
2137ad - Characters that live in Merindol and are at the center of main storiesluforfor
Kurgan is a russian expatriate that is secretly in love with Sonia Contado. Henry is a british soldier that took refuge in Merindol Colony in 2137ad. He is the lover of Sonia Contado.
Hadj Ounis's most notable work is his sculpture titled "Metamorphosis." This piece showcases Ounis's mastery of form and texture, as he seamlessly combines metal and wood to create a dynamic and visually striking composition. The juxtaposition of the two materials creates a sense of tension and harmony, inviting viewers to contemplate the relationship between nature and industry.
2137ad Merindol Colony Interiors where refugee try to build a seemengly norm...luforfor
This are the interiors of the Merindol Colony in 2137ad after the Climate Change Collapse and the Apocalipse Wars. Merindol is a small Colony in the Italian Alps where there are around 4000 humans. The Colony values mainly around meritocracy and selection by effort.
2137ad Merindol Colony Interiors where refugee try to build a seemengly norm...
Task 5!
1. Shooting Schedule
Date: Wednesday the 29th January 2014.
Location: Nunnington Hall, Ryedale
Equipment:
Booked? (Y/N)
DSLR Camera
Y
Tripod
Y
Memory Card
Y
Models: The images will be part of a collection of eight photographs that document
Nunnington Hall. From Workers in the gardens preserving the National park to the
workers in the shops selling local produce from farms nearby. The models used will
be other people taking photographs as it is more of a documentary type of
photography rather than a photojournalist approach.
Props: Props used will only be that of what is found at Nunnington Hall, such as the
tables and chairs found in the interior of the site.
Risk assessment completed? Yes
Contingency: To go into York city centre and take images of the old buildings and
walls. Also as Nunnington halls staff might not be working, a contingency is put in
place to take photographs of any workers in the garden industry. Should the weather
effect the outcome of the photographs then it has been thought about to take the
image indoors. One shoot should be enough to take the documentary images
however if needed a location will be prepared for a second shoot.
Risk Assessment
Name: Alan Smith
Project: Discovery Photography
Location: Nunnington Hall
2. What Health and Safety legislation might you need to consider in this project?
Hazard
Person(s) the general duties
Risk Control Taken
Health and safety at work act 1974. To consider / Equipment at of the students when in the care of
Risk
the tutors. That of acting responsibly and being safe when around certain sites or equipment. To also
consider the tutors (People in charge of students behaviour) and the way they should act. They should
be trained to deal with certain aspects of the trip and to set an example on how to behave in the
premises of a Nationalsite and should also know whether the location of where the students going is
Tripping over at the Park. They Could harm myself and
Having the strap over my
safe. Also instruct the students to take photographs without supervision. supporting the camera
falling on floor.
maybe others around.
head
Camera falling and breaking
and making sure to look
Health and Safety (Display Screen Equipment) Regulations act 1992. This may be considered when
lens.
around the surroundings.
editing the images taken on the computer. Regular breaks to be taken to avoid eye problems.
Control of Hazardous and health (COSHH) regulations (2002). Registration, evaluation,
authorisation and restriction to chemicals (REACH) both of these are used for risk assessment
Disturbing people’s privacy.
People in the photographs
taken may not want to be
pictured.
Making sure nobody is in the
way of the camera when
capturing an image. Also ask
people if they mind or not
being taken of.
Touching harmful equipment
(Gardening equipment)
The person who may get
hurt, the person responsible
may be at risk of being
punished and the equipment
may be damaged.
To not touch anything that
has been left by a worker,
also be aware of
surroundings at all times.
Darkroom exposure to
chemical agents.
It may lead to respiratory,
Having breaks every 15
allergic, and nervous system minutes when in dark areas.
diseases.
Provision and Use of Work Equipment Regulations 1998 (PUWER)
Someone falling over Tripod
This may lead to the person
tripping over to be harmed
and the tripod to potentially
break.
To always keep the tripod
close by and not where
someone can walk near it.
Ergonomic risk of handling
heavy equipment.
Person at risk of strain or the To make sure regular breaks
camera and tripod may be in are taken to avoid neck pain
danger of falling on the floor. and back pain.
4. Image of person taking photograph. (No depth of field) (Quick shutter speed) (Model
release form)
Image of the full building (Wide shot) (Daylight White balance) (Rule of thirds)
Image of worker- Gardener (Portrait- if possible or candid to show him at work) (Model
release form)
Image of giant chess set (Close up, looking up- to make the pieces look bigger)
Image of inside (Tables & Chairs) (Rule of thirds)
Image of organic garden- (Long shot, leading lines)
Image of shop (workers) (Portrait, observational)
Image of canteen (Medium shot)
Image of Pic-nic spots (Depth of field used)
Close ups on buildings design (Texture) (Slow Shutter speed)
Image of exhibition (Use depth of field to capture many pieces in good detail)
Example of model Release form! Models to sign this in order to take images.
This needs to be printed off and handed out to each model that participates in the
photographs. If the person is of a young age then the parent/guardian must consent to
images being taken.