Shigeo Shingo
The Master Of Lean
Manufacturing
HELLO!
I am Mohamed M. Helmy
Diploma of Hospital Management
AASTMT, Cairo Group
You can reach me at dr.mohamed-helmy@outlook.com
Presentation Outlines
We will discuss the following:
▫ Shigeo Shingo biography
▫ Just In Time (JIT)
▫ SMED
▫ Poka-Yoke
▫ Zero Quality Controle
Shigeo Shingo is a Japanese engineer, businessman and quality
guru, he is considered as the world’s leading expert on manufacturing practices.
Biography
Biography
Born in Saga, Japan
Graduated from Yamanashi Technical College with a degree in
Mechanical Engineering. Employed by Taipei Railway Factory
Manufacturing Section Chief at the Amano Manufacturing Plant,
Yokahama. He raises productivity by 100%.He works with other
divisions of manufacturing and continues to increase productivity.
Member of the Japan Management Association
Begins his research on Statistical Quality Control
1909
1930
1943
1945
1951
Biography
Consultant at Toyota Motor Corporation
Leads industrial engineering and factory improvement training at the
Toyota Motor Corporation
Leads a 3 year study on ship building at Mitsubishi Shipbuilding. He is
able to create a system that reduces production time by 50%
Founds the Institute of Management Improvement
Fully develops the SMED system to achieve zero quality defects
After that he dedicated his efforts to education and lecturing
1954
1955
1956
1959
1960
Biography
As a tribute to Dr. Shingo and his lifelong work, The Utah State University has
founded in 1988 the Shingo Prize for Operational Excellence which is awarded
annually for excellence in manufacturing
Biography
Best known for:
▫ Just In Time Manufacturing (JIT)
▫ Single Minute Exchange of Die (SMED)
▫ Poka – Yoke / Mistake Proofing / Zero Defect
“
“The best approach is to dig out
and eliminate problems where
they are assumed not to exist”
Just in time (JIT) is a production strategy that strives to improve
a business’ return on investment by reducing in-process
inventory and associated carrying costs.
Just In Time
Just In Time
Manufacturing
Also known as:
Motorola: Short Cycle Manufacturing (SCM)
IBM: Continuous Flow Manufacturing (CFM)
John Constanza: Demand Flow Manufacturing (DFM)
Just In Time
Manufacturing
Manufacturer Customer
The conventional manufacturing system
Just In Time
Manufacturing
The JIT manufacturing system
Manufacturer Customer
Just In Time
Manufacturing
To work flawlessly, the following are
needed:
▫ Continuous improvement (Simpler,
easier, QC, DRIFT)
▫ Eliminating waste (overproduction,
waiting time, transportation,
processing, inventory, product
defects)
▫ Workplace cleanliness and
organization
▫ Set-up time reduction
▫ Levelled / mixed production
▫ Powerful supply chain mechanism
▫ Kanban System
Advantages
▫ Short
production runs
▫ Fast ROI
▫ Reduce cost
▫ More cash
available in-
hand to utilize
Disadvantages
• Disruptions in
the supply
chain may stop
production
• Sudden
unexpected
orders will
delay delivery
of the product
• May face
variation in raw
materials costs
Just In Time
Manufacturing
Case study:
Toyota uses just-in-time inventory controls as part of its
business model. Toyota sends off orders for parts only
when it receives new orders from customers. The
company started this method in the 1970s, and it took
more than 15 years to perfect. Several elements of just-
in-time manufacturing need to occur for Toyota to
succeed. The company must have steady production,
high-quality workmanship, no machine breakdowns at
the plant, reliable suppliers and quick ways to assemble
machines that put together vehicles.
Just In Time
Manufacturing
Case study:
Toyota's just-in-time concept almost came to a crashing halt in February 1997. A
fire at a brake parts plant owned by Aisin decimated its capacity to produce a P-
valve for Toyota vehicles. The company was the sole supplier of the part, and the
fact that the plant was shut down for weeks could have devastated Toyota's
supply line. The auto manufacturer ran out of P-valve parts after just one day.
Production lines shut down for just two days until a supplier of Aisin was able to
start manufacturing the necessary valves. Other suppliers for Toyota also had to
shut down because the auto manufacturer didn't need other parts to complete
any cars on the assembly line. The fire cost Toyota nearly $15 billion in revenue
and 70,000 cars due to its two-day shutdown, but it could have been much worse.
Kanban System diagram
“
The most dangerous kind of
waste is the waste we do not
recognize
Poka – Yoke is any mechanism in a lean manufacturing process
that helps an equipment operator avoid (yokeru) mistakes
(poka). Its purpose is to eliminate product defects by preventing,
correcting, or drawing attention to human errors as they occur.
Poka - Yoke
Poka - Yoke
Poka-yoke is a Japanese term that means "mistake-proofing" or “inadvertent error
prevention”. The key word in the second translation, often omitted, is "inadvertent". There is
no Poka Yoke solution that protects against an operator’s sabotage, but sabotage is a rare
behavior among people.
The concept was formalized, and the term adopted, by Shigeo Shingo in the 1960s as part
of the Toyota Production System (TPS). Shingo distinguished between the concepts of
inevitable human mistakes and defects in the production. Defects occur when the
mistakes are allowed to reach the customer. The aim of poka-yoke is to design the
process so that mistakes can be detected and corrected immediately, eliminating defects
at the source.
It was originally described as Baka–Yoke which means "fool-proofing" (or "idiot-proofing")
the name was changed to the milder poka-yoke.
Poka - Yoke
Poka - Yoke
Benefits of Poka Yoke implementation
▫ Less time spent on training workers
▫ Elimination of many operations related to quality control
▫ Unburdening of operators from repetitive operations
▫ Promotion of the work improvement-oriented approach and actions
▫ A reduced number of rejects
▫ Immediate action when a problem occurs
“
It's only the last turn of a bolt
that tightens it - the rest is just
movement
SMED (Single-Minute Exchange of Dies) is a system for
dramatically reducing the time it takes to complete equipment
changeovers. The essence of the SMED system is to convert as
many changeover steps as possible to “external” (performed
while the equipment is running), and to simplify and streamline
the remaining steps.
SMED
SMED
SMED was developed by Shigeo Shingo who was extraordinarily successful in helping
companies dramatically reduce their changeover times. His pioneering work led to
documented reductions in changeover times averaging 94% (e.g. from 90 minutes to
less than 5 minutes) across a wide range of companies.
SMED
A successful SMED program will have the following benefits:
▫ Lower manufacturing cost (faster changeovers mean less equipment down time)
▫ Smaller lot sizes (faster changeovers enable more frequent product changes)
▫ Improved responsiveness to customer demand (smaller lot sizes enable more flexible
scheduling)
▫ Lower inventory levels (smaller lot sizes result in lower inventory levels)
▫ Smoother startups (standardized changeover processes improve consistency and
quality)
SMED application in pit crew
Shigeo Shingo
Dr. Shingo Shigeo was perhaps the greatest contributor to modern manufacturing
practices. While his name has little recognition in the western hemisphere, his teachings
and principles have formed the backbone of efficient engineering practices. In applying
his experience and expertise in the field of industrial engineering, Dr. Shigeo was able to
provide a better way of life for both the operators and the corporations. His policies have
gained reputation through results in manufacturing among the companies that have
implemented these teachings
“There are four purposes of improvement: easier, better, faster, and
cheaper. These four goals appear in the order of priority”
Shigeo Shingo
THANKS!
Any questions?
Feel free to contact me at
dr.mohamed-helmy@outlook.com
+2 0122 570 8970

More Related Content

What's hot

The Toyota Way (Toyota Production System) [Operations Management]
The Toyota Way (Toyota Production System) [Operations Management]The Toyota Way (Toyota Production System) [Operations Management]
The Toyota Way (Toyota Production System) [Operations Management]
Arjun Parekh
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
Gurpreet Singh
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
5S BALAMURUGAN
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
Akshay Jain
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
lakshya bhardwaj
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
Prashant thakur
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
Deepa Ram Suthar
 
What is TPS - Toyota Production System
What is TPS - Toyota Production SystemWhat is TPS - Toyota Production System
What is TPS - Toyota Production System
W3 Group Canada Inc.
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
Md.Muzahid Khan
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
mohammadaarifkhan
 
Just in time
Just in timeJust in time
Just in time
Avish Shah
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
Jitesh Gaurav
 
Jidoka lean manufacturing
Jidoka   lean manufacturingJidoka   lean manufacturing
Jidoka lean manufacturing
Harsh Joshi
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
Adrian Pask
 
Just in time (JIT).
Just in time (JIT).Just in time (JIT).
Just in time (JIT).
ravi bhivra
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
ASHUTOSH MISHRA
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
SIVA PRIYA
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
NareshChawla
 

What's hot (20)

The Toyota Way (Toyota Production System) [Operations Management]
The Toyota Way (Toyota Production System) [Operations Management]The Toyota Way (Toyota Production System) [Operations Management]
The Toyota Way (Toyota Production System) [Operations Management]
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
What is TPS - Toyota Production System
What is TPS - Toyota Production SystemWhat is TPS - Toyota Production System
What is TPS - Toyota Production System
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Just in time
Just in timeJust in time
Just in time
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Jidoka lean manufacturing
Jidoka   lean manufacturingJidoka   lean manufacturing
Jidoka lean manufacturing
 
Poka Yoka
Poka Yoka Poka Yoka
Poka Yoka
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Just in time (JIT).
Just in time (JIT).Just in time (JIT).
Just in time (JIT).
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 

Similar to Shigeo Shingo - The Master Of Lean

itititititjiriurhnd utiedheeurjdhdhedyeuded
itititititjiriurhnd utiedheeurjdhdhedyeudeditititititjiriurhnd utiedheeurjdhdhedyeuded
itititititjiriurhnd utiedheeurjdhdhedyeuded
sampadakhopade
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
Akshay Jain
 
3mu
3mu3mu
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
ssusera34210
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
Aysel Muradlı
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and BoeingMutunga David
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
Ashima Kandari
 
PRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTPRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENT
Aman Singh
 
Module-4 JIT.ppt
Module-4 JIT.pptModule-4 JIT.ppt
Module-4 JIT.ppt
MaulikVasani1
 
12. jit in toyota production system pgp
12. jit in toyota production system pgp12. jit in toyota production system pgp
12. jit in toyota production system pgp
PROF. PUTTU GURU PRASAD
 
Poka Yoke - Fundamentals by Praneet Surti
Poka Yoke - Fundamentals by Praneet SurtiPoka Yoke - Fundamentals by Praneet Surti
Poka Yoke - Fundamentals by Praneet Surti
Praneet Surti
 
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdfPoka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
fernandagomez120593
 
Toyota production system
Toyota production system   Toyota production system
Toyota production system
kmsonam
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
Arya Kulang
 
Lean production toyota production system
Lean production toyota production systemLean production toyota production system
Lean production toyota production system
Marcelo Augusto A. Cosgayon
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature viewAnqur Rauth
 
Wcm 5
Wcm 5Wcm 5
Ppt jit
Ppt jitPpt jit
Ppt jit
Vibha Nayak
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
vivatechijri
 

Similar to Shigeo Shingo - The Master Of Lean (20)

itititititjiriurhnd utiedheeurjdhdhedyeuded
itititititjiriurhnd utiedheeurjdhdhedyeudeditititititjiriurhnd utiedheeurjdhdhedyeuded
itititititjiriurhnd utiedheeurjdhdhedyeuded
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
3mu
3mu3mu
3mu
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and Boeing
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
PRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTPRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENT
 
Module-4 JIT.ppt
Module-4 JIT.pptModule-4 JIT.ppt
Module-4 JIT.ppt
 
12. jit in toyota production system pgp
12. jit in toyota production system pgp12. jit in toyota production system pgp
12. jit in toyota production system pgp
 
Poka Yoke - Fundamentals by Praneet Surti
Poka Yoke - Fundamentals by Praneet SurtiPoka Yoke - Fundamentals by Praneet Surti
Poka Yoke - Fundamentals by Praneet Surti
 
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdfPoka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
 
Toyota production system
Toyota production system   Toyota production system
Toyota production system
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Lean production toyota production system
Lean production toyota production systemLean production toyota production system
Lean production toyota production system
 
Jit report
Jit reportJit report
Jit report
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature view
 
Wcm 5
Wcm 5Wcm 5
Wcm 5
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
 

Recently uploaded

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 

Recently uploaded (20)

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 

Shigeo Shingo - The Master Of Lean

  • 1. Shigeo Shingo The Master Of Lean Manufacturing
  • 2. HELLO! I am Mohamed M. Helmy Diploma of Hospital Management AASTMT, Cairo Group You can reach me at dr.mohamed-helmy@outlook.com
  • 3. Presentation Outlines We will discuss the following: ▫ Shigeo Shingo biography ▫ Just In Time (JIT) ▫ SMED ▫ Poka-Yoke ▫ Zero Quality Controle
  • 4. Shigeo Shingo is a Japanese engineer, businessman and quality guru, he is considered as the world’s leading expert on manufacturing practices. Biography
  • 5. Biography Born in Saga, Japan Graduated from Yamanashi Technical College with a degree in Mechanical Engineering. Employed by Taipei Railway Factory Manufacturing Section Chief at the Amano Manufacturing Plant, Yokahama. He raises productivity by 100%.He works with other divisions of manufacturing and continues to increase productivity. Member of the Japan Management Association Begins his research on Statistical Quality Control 1909 1930 1943 1945 1951
  • 6. Biography Consultant at Toyota Motor Corporation Leads industrial engineering and factory improvement training at the Toyota Motor Corporation Leads a 3 year study on ship building at Mitsubishi Shipbuilding. He is able to create a system that reduces production time by 50% Founds the Institute of Management Improvement Fully develops the SMED system to achieve zero quality defects After that he dedicated his efforts to education and lecturing 1954 1955 1956 1959 1960
  • 7. Biography As a tribute to Dr. Shingo and his lifelong work, The Utah State University has founded in 1988 the Shingo Prize for Operational Excellence which is awarded annually for excellence in manufacturing
  • 8. Biography Best known for: ▫ Just In Time Manufacturing (JIT) ▫ Single Minute Exchange of Die (SMED) ▫ Poka – Yoke / Mistake Proofing / Zero Defect
  • 9. “ “The best approach is to dig out and eliminate problems where they are assumed not to exist”
  • 10. Just in time (JIT) is a production strategy that strives to improve a business’ return on investment by reducing in-process inventory and associated carrying costs. Just In Time
  • 11. Just In Time Manufacturing Also known as: Motorola: Short Cycle Manufacturing (SCM) IBM: Continuous Flow Manufacturing (CFM) John Constanza: Demand Flow Manufacturing (DFM)
  • 12. Just In Time Manufacturing Manufacturer Customer The conventional manufacturing system
  • 13. Just In Time Manufacturing The JIT manufacturing system Manufacturer Customer
  • 14. Just In Time Manufacturing To work flawlessly, the following are needed: ▫ Continuous improvement (Simpler, easier, QC, DRIFT) ▫ Eliminating waste (overproduction, waiting time, transportation, processing, inventory, product defects) ▫ Workplace cleanliness and organization ▫ Set-up time reduction ▫ Levelled / mixed production ▫ Powerful supply chain mechanism ▫ Kanban System Advantages ▫ Short production runs ▫ Fast ROI ▫ Reduce cost ▫ More cash available in- hand to utilize Disadvantages • Disruptions in the supply chain may stop production • Sudden unexpected orders will delay delivery of the product • May face variation in raw materials costs
  • 15. Just In Time Manufacturing Case study: Toyota uses just-in-time inventory controls as part of its business model. Toyota sends off orders for parts only when it receives new orders from customers. The company started this method in the 1970s, and it took more than 15 years to perfect. Several elements of just- in-time manufacturing need to occur for Toyota to succeed. The company must have steady production, high-quality workmanship, no machine breakdowns at the plant, reliable suppliers and quick ways to assemble machines that put together vehicles.
  • 16. Just In Time Manufacturing Case study: Toyota's just-in-time concept almost came to a crashing halt in February 1997. A fire at a brake parts plant owned by Aisin decimated its capacity to produce a P- valve for Toyota vehicles. The company was the sole supplier of the part, and the fact that the plant was shut down for weeks could have devastated Toyota's supply line. The auto manufacturer ran out of P-valve parts after just one day. Production lines shut down for just two days until a supplier of Aisin was able to start manufacturing the necessary valves. Other suppliers for Toyota also had to shut down because the auto manufacturer didn't need other parts to complete any cars on the assembly line. The fire cost Toyota nearly $15 billion in revenue and 70,000 cars due to its two-day shutdown, but it could have been much worse.
  • 18. “ The most dangerous kind of waste is the waste we do not recognize
  • 19. Poka – Yoke is any mechanism in a lean manufacturing process that helps an equipment operator avoid (yokeru) mistakes (poka). Its purpose is to eliminate product defects by preventing, correcting, or drawing attention to human errors as they occur. Poka - Yoke
  • 20. Poka - Yoke Poka-yoke is a Japanese term that means "mistake-proofing" or “inadvertent error prevention”. The key word in the second translation, often omitted, is "inadvertent". There is no Poka Yoke solution that protects against an operator’s sabotage, but sabotage is a rare behavior among people. The concept was formalized, and the term adopted, by Shigeo Shingo in the 1960s as part of the Toyota Production System (TPS). Shingo distinguished between the concepts of inevitable human mistakes and defects in the production. Defects occur when the mistakes are allowed to reach the customer. The aim of poka-yoke is to design the process so that mistakes can be detected and corrected immediately, eliminating defects at the source. It was originally described as Baka–Yoke which means "fool-proofing" (or "idiot-proofing") the name was changed to the milder poka-yoke.
  • 22. Poka - Yoke Benefits of Poka Yoke implementation ▫ Less time spent on training workers ▫ Elimination of many operations related to quality control ▫ Unburdening of operators from repetitive operations ▫ Promotion of the work improvement-oriented approach and actions ▫ A reduced number of rejects ▫ Immediate action when a problem occurs
  • 23. “ It's only the last turn of a bolt that tightens it - the rest is just movement
  • 24. SMED (Single-Minute Exchange of Dies) is a system for dramatically reducing the time it takes to complete equipment changeovers. The essence of the SMED system is to convert as many changeover steps as possible to “external” (performed while the equipment is running), and to simplify and streamline the remaining steps. SMED
  • 25. SMED SMED was developed by Shigeo Shingo who was extraordinarily successful in helping companies dramatically reduce their changeover times. His pioneering work led to documented reductions in changeover times averaging 94% (e.g. from 90 minutes to less than 5 minutes) across a wide range of companies.
  • 26. SMED A successful SMED program will have the following benefits: ▫ Lower manufacturing cost (faster changeovers mean less equipment down time) ▫ Smaller lot sizes (faster changeovers enable more frequent product changes) ▫ Improved responsiveness to customer demand (smaller lot sizes enable more flexible scheduling) ▫ Lower inventory levels (smaller lot sizes result in lower inventory levels) ▫ Smoother startups (standardized changeover processes improve consistency and quality)
  • 28. Shigeo Shingo Dr. Shingo Shigeo was perhaps the greatest contributor to modern manufacturing practices. While his name has little recognition in the western hemisphere, his teachings and principles have formed the backbone of efficient engineering practices. In applying his experience and expertise in the field of industrial engineering, Dr. Shigeo was able to provide a better way of life for both the operators and the corporations. His policies have gained reputation through results in manufacturing among the companies that have implemented these teachings
  • 29. “There are four purposes of improvement: easier, better, faster, and cheaper. These four goals appear in the order of priority” Shigeo Shingo
  • 30. THANKS! Any questions? Feel free to contact me at dr.mohamed-helmy@outlook.com +2 0122 570 8970