CURRICULUM VITAE
SEEKING A
SR.PROJECT
MANAGEMENT POST
Address for
communication:-
7th
Floor, Guna Building,
Teynampet, Chennai
Tamilnadu-600017, India
Phone: +91 9176200101
Residential Address:
FlatNo-05,2nd
Floor,
Lathakunj Apartment,
Saradhambal Street,
T.Nagar, Chennai, Tamil
Nadu-600017, India.
Permanent Address:
At/ Po. Bhagirathipur, PS-
Kamakhya Nagar, Dist.
Dhenkanal, Orissa-759018,
India
Emails Ids:-
uc_mohapatra@yahoo.com
uc.mohapatra.65@gmail.com
Personal Details:
Date of Birth:05.11.1965
Gender: Male
Nationality: Indian
Status: Married
Contact No:9176200101
Educational Qualification:-
• 1981 Matric(10th
) in 1st
Div. From Bhagirathipur
High School,Board Of
Secondary Education,
Odisha, India.
• 1984-Bachelors Degree
in Science- Physics,
Dhenkanal College,
Utkal University, Odisha,
(Physics Hons
completed 1st
year-1984)
U. C. MOHAPATRA
Asst. Vice President (Project Management):- Having expertise in both
Project Management, Project Co-ordination, All types of Site
Construction Management for High Rise structures in Real Estate
Industries, Thermal power Projects, Nuclear Power Projects, Oil
Refineries & Petrochemicals, Steel Manufacturing Industries as well
as Oil & Gas industries.
Career at a Glance:-
A result oriented & competent civil engineering professional from NIT/Kurukshetra
University, 1989 batch having 25+ years 6months experience, mainly in the field of
Project Co-ordination, Project Management, construction management, with an
outstanding track record in executing more than 20 infrastructure projects for Real
Estate Industries, Thermal power plants, Nuclear Power Projects, Oil Refineries &
Petrochemicals, Steel Industries as well as Oil & Gas industries. Seeking a
challenging senior management assignment as VP/ Head- Civil in an organization of
repute abroad to establish the potentials and to use the expertise gained so far.
Competency of Profile:-
• Wide experience in project management, Construction Management, Civil
Engineering, & execution of projects with a flair for adopting modern construction
methodologies.
• Adept in planning & scheduling projects for construction of residential building,
swimming pool, & railway bridge
• Proven track record in planning, scheduling, & implementing projects for
constructing cooling tower for IDCT, NDCT (170 mtr.)} with jump form shuttering
as well as constructing chimney 220/ 275mtr & silos with slip form shuttering
• Monitoring the civil, electrical, mechanical, quality dept. & safety dept of the
project from start to finish as per client’s schedule and specifications.
• Adroit in supervising planning & budgeting of various types of Site/ Project
Engineering jobs & resolving bottlenecks.
• Demonstrated skills in undertaking feasibility studies with proven expertise in
material & resource evaluation, allocation & control as well as implementing
efficient and cost effective work practices.
• Hands on experience in Lean Project Management, ensuring that the quality of
the cost engineering, planning/ scheduling and contract administration in
accordance with the established company procedures and expectations.
• Mobilisation of materials & manpower for the project
• Verifiable capability in development of plans & procedures to review the progress
reports & initiating remedial actions wherever required.
• Close monitoring of everyday work & meeting with customer for approval of
execution drawings
• Procurement of local materials well in advance
• Target oriented progress, timely billing & payment collection, budgeting, cost
control, SHE, timely completion, trial run & commissioning of the project
• Prowess in executing auxiliary works for the project i.e. construction power room
CURRICULUM VITAE
• 1983 I.Sc. in 1st
Div.
From Dhenkanal
College, Utkal University,
Odisha, India.
• 1989,B.Sc. (Civil
Engg.), 1st
. div(Hons)
From National Institute
of Technology,
(Formerly REC),
Kurukshetra University,
Haryana, India.
Languages known:-
English, Hindi, Bengali &
Odia
Training History:-
• Undergone training
module on ISO 9000
awareness & auditor's
certification
• Undergone onsite
training conducted by
Paharpur Cooling
Towers.
• Attended in house
training programmes
conducted on
fundamentals of project
management.
Specialties:-
• Project Management &
Project Co-ordination
• Kick Off Meeting with
customer & consultant
• Resources Planning &
Mobilization
• Manpower Planning &
Mobilization
• Co-ordination with
customer & consultant
for inputs required.
• Monthly billing and
monitoring fund inflow &
outflow
installation, batching plant installation, aviation lights, fabrication & erection of
underground & over ground H.W. pipeline starting from 300mm dia up to
3200mm dia
• Depth of knowledge in identifying critical activities, carrying out risk analysis,
preparing contingency plans, and taking necessary measures to ensure timely
completion of project.
• Expertise in trouble shooting & ensuring completion of project within the time &
cost parameters.
• Prowess in interfacing & negotiating with clients to meet project requirements.
• Initiating, planning, and implementing process improvement strategies.
• Driving the quality of work, safety, schedule, & productivity of work force
personnel & sub-contractors
• Finesse in interfacing with client representatives in a professional manner
• Motivating the team, leading by example and delivering results as per set
project objectives.
• Ability to work efficiently in demanding work environments, meeting
deadlines, and achieving targets.
Professional Milestones:-
BGR ENERGY SYSTEMS LIMITED,
Asst. Vice President (Project Management)- (March’15 to Till Date),
Reporting to the CEO/JMD- Project Co-ordination, Project Monitoring, Project
Management, Resource planning & Mobilization, Progress monitoring co-ordinating
with all site teams i.e SHE Team, Civil construction team, Quality Control Team,
Electrical Team, Mechanical Fabrication & Erection Team, Repair & Maintenance
Group . It’s START TO FINIST PROJECT including commissioning and hand-over in
2X300MW, TRN ENERGY/Raigargh/Chhattisgarh & 2X660MW OPGCL/Odisha,
BOP, EPC contract, both in India.)
Paharpur Cooling Towers Ltd., Kolkata
General Manager (Construction)- (November ‘1991 to Feb’2015),
(Reporting to the Executive Advisor( Construction) & leading a team of more 100
odd members consisting of SHE Team, Civil construction team, Quality Control
Team, Electrical Team, Mechanical Fabrication & Erection Team, Repair &
Maintenance Group,)
Job Profile:
As General Manager(Construction)- managing overall coordination of the
civil construction project & overseeing project control functions to meet project
stakeholder expectations as per defined Key Performance Indicators-
• Managing all company project site management operations by directing and
coordinating activities consistent with established goals, objectives, & policies.
• Identifying, defining, providing, & measuring KPIs for different project tasks
based on goals.
• Assisting Project Manager in developing method statement for project execution.
• Specifying project objectives and plans including delineation of scope,
budgeting, scheduling, setting performance requirements, and selecting the
project participants.
• Monitoring and reviewing all aspects of project control functions on EPC projects
to ensure quality of the cost engineering, planning/ scheduling and contract
CURRICULUM VITAE
• Budget preparation and
monitoring to keep the
cost under control
• Progress review with
customers
• Progress review meeting
with block heads and
fixing of weekly targets
• On time deliveries of the
target
• Use of Jump-form
technology
• Use of Slip form
technology
• Risk Analysis in Site
Execution
• Quality Controls
• Implementation of SHE
for safe working of
milestones.
• Monthly Progress
Presentation & review
with Directors & Stake
Holders
Engineering Tools:-
• Hardware :Pentium Pc’s
• Operating System:
Window 2000, Win XP,
Internet
• Special Softwares :
MS Word, MS Excel, MS
Project.
Highlights:-
• Experience in Real
States, Thermal Power
plant, Nuclear Power
Plant, Steel plant, Oil &
Refineries, Sugar
administration are in accordance with the established company procedures and
expectations.
• Handling project resources- machinery & manpower on site to maximize
resource efficiency & restrict costs of labor, materials, and equipment.
• Reviewing status reports of the performance of project team members &
assessing results achieved
• Identifying resources to optimize costs & ensuring timely and adequate
completion of all phases of the project.
• Planning procurements,
• Coordinating with customers, consultant, & sub-contractors
• Handling project budgeting as well as controlling costs of the project
• Customer billing & collection,
• Undertaking trial run & commissioning of the project as well as conducting
performance test.
• Preparing L2 & L3 schedules & planning timely execution of project
• Preparing deployment schedule for materials & manpower
• Selecting sub-contractors & their deployment at site
• Coordinating with customer & consultant for executing drawing
• Interfacing on internal audit activities, identifying & assessing environmental
impacts & occupational health hazards
• Implementing SHE as per ISO 14001:2004 & OHSAS 18001:2007 norms &
ensuring certification
• Following up on quality management systems & monitoring quality control
aspects
• Organising project progress meetings to cover all relevant issues as well as
tracking progress reports.
• Managing project planning & project schedules, as well as assessing the project
risks.
• Implementing various operations through proper coordination and control of
planning, design, estimating, contracting, and construction in the entire process.
• Supervising project controls teams in the preparation and presentation of cost
and schedule forecasts & all special project performance / status reviews as
required.
• Recruiting project managers and staff.
• Providing direct input to proposals, client presentations and contract negotiations
• Assessing feedback reports reflecting the lessons learnt on project completion.
Contributions:
• Made significant contribution in the completion of 15000cum RCC in two months
for the chimney foundation.
• Spearheaded the project completion as per project specifications, and ensured
customers satisfaction.
• Effectively achieved the project objectives within the planned time, resources, &
quality parameters.
• Introduced best practices in the construction work and successfully met the
stringent quality standards.
• Made noteworthy contributions in optimization of project costs using available
resources
J.K. Constructions, Angul, Orissa
Site Engineer (July’ 1990- Nov’ 1991) (Reported
to the Project Manager & led a team of 20 members)
Job Profile:
As Site Engineer, handled resources & ensured project completion as per the Key
CURRICULUM VITAE
Industries etc.
• Experience in slip form
and jump-form technology
using all types Tower
Cranes having boom
length of 70MT and tip
load capacity up-to 5MT,
MTC, ACE Cranes,
Hydras, JCB, Batching
Plants
• Experience in the
construction of high
raised RCC framed
structures, Silos,
Chimneys, NDCT, IDCT,
Pump House & indepth
knowledge & Experience
in Industrial buildings
References:-
1.Mr.T.K.Ghattak, Ex.
CEO(P) Paharpur Cooling
Towers Ltd., Paharpur
House, 8/1/B,Diamond
Harbour Road. Kol-27,India.
Email:tkgsm@yahoo.co.uk
Contact No.+919830324366
2.Mr.R.N.Rai, Ex. CEO(P)
Paharpur Cooling Towers
Ltd., Paharpur House,
8/1/B,Diamond Harbour
Road. Kol-27,India.
Contact No.+919830324366
3)Mr.D.Nehru,Ex-
VP(Constn), Paharpur
Cooling Towers Ltd.,
Paharpur House,
8/1/B,Diamond Harbour
Performance Matrices-
• Created & executed project work plans, conducted revisions as appropriate to
meet the changing requirements.
• Coordinated between all on-site parties to cut down cost & expedite progress
without sacrificing quality
• Managed various sub-contractor teams and expedited the day to day progress of
work.
• Coordinated quality procedures & effectively applied the standards set by client.
• Ensured maintenance of complete & proper project documents.
• Reviewed status reports of the performance of project team members &
assessed results achieved.
Contributions:
• Introduced initiatives to ensure proper project progress with increased
productivity.
Jay Enn Associates Pvt. Ltd, Kapurthala, Punjab
Project Engineer (June ‘1989- July’ 1990)
(Reported to the Project Manager & led a team of 12 members)
Job Profile:
As Project Engineer, supervised, monitored, and reported on project progress
throughout the project cycle as per the specific Key Result Areas-
• Prepared bill of quantities for shuttering, concreting, & reinforcement
• Coordinated with customer for weekly/ monthly programme
• Supervised lay out, checked the work in line with the drawing & pour card
• Prepared bar bending schedule
• Executed programme with the sub-contractors as well as verified sub-contractor
billing
• Reconciled cement, steel & aggregates
Contributions:
• Successfully completed a 2 storey residential building of with 40 apartment of
two bed room flats before completion date.
• Projects executed successfully within the set budgets and in time.
• Maintained a successful track record of satisfactory work and punctual delivery.
Projects Handled in Brief:-
Paharpur Cooling Towers Ltd., Kolkata (November 1991 to date)
Role: General Manager (Construction), handled following projects that involved
construction of highrise framed structures including switch rooms, chimneys, silos,
cooling towers along with pavements, roads & drains, EPC contracts. The highest
single contract value handled as a Team Leader is more than 400 Cr. Worked with all
leading organisation in India i.e. Unit # 6/9/10/CPP/NALCO/Angul, NPC/Kaiga,
ACC/Wadi, MSEB/MPGCL, SAIL/RSP/ Rourkela, TATA
Steel/Jamshedpur,WBPDCL/Kolaghat, INDAL/Belur,IOCL/Barauni, Swadeshi Sugar
Mills/Narkatiaganj, Halikhed Sugar Factory/Bidar, National Thermal Power
Corporation/Kaniha & TTPS/Odisha, TPCL/Jojobera, DVC/BHEL in all four locations
i.e. Mejia/Andal/Koderma/Raghunathpur, IEL/TPL/PH#06/Tata Steel/JSR,
TSL/NICCO/LD#01/JSR, SAIL/RSP/BF#05/ Rourkela, BPSCL/Bina/MP,
CURRICULUM VITAE
Road. Kol-700027,India.
Email:d.nehru@ymail.com
Contact No.+919007014466
4)Mr.R.C.Tripathy,
DGM(Mech. Project),
Captive Power Plant,
NATIONAL ALUMINIUM
COMPANY LTD.
Dist:Angul,Odisha,India
Email Id:
rctripathy@nalcoindia.co.in
Contact No.+919437026220
OTHER DETAILS:-
• Location:-Anywhere in
Abroad or India .
• Notice Period:-One month
• Current salary PA:-
44.50 lacs(INR)
• Expected Salary:-
Negotiable.
• Lead Time To Join:- 30
days
-Max.
One Month from the date of
receipt of App. Letter
• Passport No.& Validity:-
H1529244 Valid Till
24.11.2018
PPGCL/Allahabad.
Jay Enn Associates Pvt. Ltd, Kapurthala, Punjab (July 1989- June 1990)
Role: As Project Engineer, supervised construction of residential colony &
swimming pool for Rail Coach Factory, Kapurthala, Punjab
J.K. Constructions, Angul, Orissa (July 1990- October 1991)
Role: As Site Engineer, supervised construction of a railway bridge near
Bhimcoach, Sambalpur, Odisha.
Details declared above are true to the best of my knowledge.
Your’s truely,
U.C.MOHAPATRA
CURRICULUM VITAE
Road. Kol-700027,India.
Email:d.nehru@ymail.com
Contact No.+919007014466
4)Mr.R.C.Tripathy,
DGM(Mech. Project),
Captive Power Plant,
NATIONAL ALUMINIUM
COMPANY LTD.
Dist:Angul,Odisha,India
Email Id:
rctripathy@nalcoindia.co.in
Contact No.+919437026220
OTHER DETAILS:-
• Location:-Anywhere in
Abroad or India .
• Notice Period:-One month
• Current salary PA:-
44.50 lacs(INR)
• Expected Salary:-
Negotiable.
• Lead Time To Join:- 30
days
-Max.
One Month from the date of
receipt of App. Letter
• Passport No.& Validity:-
H1529244 Valid Till
24.11.2018
PPGCL/Allahabad.
Jay Enn Associates Pvt. Ltd, Kapurthala, Punjab (July 1989- June 1990)
Role: As Project Engineer, supervised construction of residential colony &
swimming pool for Rail Coach Factory, Kapurthala, Punjab
J.K. Constructions, Angul, Orissa (July 1990- October 1991)
Role: As Site Engineer, supervised construction of a railway bridge near
Bhimcoach, Sambalpur, Odisha.
Details declared above are true to the best of my knowledge.
Your’s truely,
U.C.MOHAPATRA

UCM-CV

  • 1.
    CURRICULUM VITAE SEEKING A SR.PROJECT MANAGEMENTPOST Address for communication:- 7th Floor, Guna Building, Teynampet, Chennai Tamilnadu-600017, India Phone: +91 9176200101 Residential Address: FlatNo-05,2nd Floor, Lathakunj Apartment, Saradhambal Street, T.Nagar, Chennai, Tamil Nadu-600017, India. Permanent Address: At/ Po. Bhagirathipur, PS- Kamakhya Nagar, Dist. Dhenkanal, Orissa-759018, India Emails Ids:- uc_mohapatra@yahoo.com uc.mohapatra.65@gmail.com Personal Details: Date of Birth:05.11.1965 Gender: Male Nationality: Indian Status: Married Contact No:9176200101 Educational Qualification:- • 1981 Matric(10th ) in 1st Div. From Bhagirathipur High School,Board Of Secondary Education, Odisha, India. • 1984-Bachelors Degree in Science- Physics, Dhenkanal College, Utkal University, Odisha, (Physics Hons completed 1st year-1984) U. C. MOHAPATRA Asst. Vice President (Project Management):- Having expertise in both Project Management, Project Co-ordination, All types of Site Construction Management for High Rise structures in Real Estate Industries, Thermal power Projects, Nuclear Power Projects, Oil Refineries & Petrochemicals, Steel Manufacturing Industries as well as Oil & Gas industries. Career at a Glance:- A result oriented & competent civil engineering professional from NIT/Kurukshetra University, 1989 batch having 25+ years 6months experience, mainly in the field of Project Co-ordination, Project Management, construction management, with an outstanding track record in executing more than 20 infrastructure projects for Real Estate Industries, Thermal power plants, Nuclear Power Projects, Oil Refineries & Petrochemicals, Steel Industries as well as Oil & Gas industries. Seeking a challenging senior management assignment as VP/ Head- Civil in an organization of repute abroad to establish the potentials and to use the expertise gained so far. Competency of Profile:- • Wide experience in project management, Construction Management, Civil Engineering, & execution of projects with a flair for adopting modern construction methodologies. • Adept in planning & scheduling projects for construction of residential building, swimming pool, & railway bridge • Proven track record in planning, scheduling, & implementing projects for constructing cooling tower for IDCT, NDCT (170 mtr.)} with jump form shuttering as well as constructing chimney 220/ 275mtr & silos with slip form shuttering • Monitoring the civil, electrical, mechanical, quality dept. & safety dept of the project from start to finish as per client’s schedule and specifications. • Adroit in supervising planning & budgeting of various types of Site/ Project Engineering jobs & resolving bottlenecks. • Demonstrated skills in undertaking feasibility studies with proven expertise in material & resource evaluation, allocation & control as well as implementing efficient and cost effective work practices. • Hands on experience in Lean Project Management, ensuring that the quality of the cost engineering, planning/ scheduling and contract administration in accordance with the established company procedures and expectations. • Mobilisation of materials & manpower for the project • Verifiable capability in development of plans & procedures to review the progress reports & initiating remedial actions wherever required. • Close monitoring of everyday work & meeting with customer for approval of execution drawings • Procurement of local materials well in advance • Target oriented progress, timely billing & payment collection, budgeting, cost control, SHE, timely completion, trial run & commissioning of the project • Prowess in executing auxiliary works for the project i.e. construction power room
  • 2.
    CURRICULUM VITAE • 1983I.Sc. in 1st Div. From Dhenkanal College, Utkal University, Odisha, India. • 1989,B.Sc. (Civil Engg.), 1st . div(Hons) From National Institute of Technology, (Formerly REC), Kurukshetra University, Haryana, India. Languages known:- English, Hindi, Bengali & Odia Training History:- • Undergone training module on ISO 9000 awareness & auditor's certification • Undergone onsite training conducted by Paharpur Cooling Towers. • Attended in house training programmes conducted on fundamentals of project management. Specialties:- • Project Management & Project Co-ordination • Kick Off Meeting with customer & consultant • Resources Planning & Mobilization • Manpower Planning & Mobilization • Co-ordination with customer & consultant for inputs required. • Monthly billing and monitoring fund inflow & outflow installation, batching plant installation, aviation lights, fabrication & erection of underground & over ground H.W. pipeline starting from 300mm dia up to 3200mm dia • Depth of knowledge in identifying critical activities, carrying out risk analysis, preparing contingency plans, and taking necessary measures to ensure timely completion of project. • Expertise in trouble shooting & ensuring completion of project within the time & cost parameters. • Prowess in interfacing & negotiating with clients to meet project requirements. • Initiating, planning, and implementing process improvement strategies. • Driving the quality of work, safety, schedule, & productivity of work force personnel & sub-contractors • Finesse in interfacing with client representatives in a professional manner • Motivating the team, leading by example and delivering results as per set project objectives. • Ability to work efficiently in demanding work environments, meeting deadlines, and achieving targets. Professional Milestones:- BGR ENERGY SYSTEMS LIMITED, Asst. Vice President (Project Management)- (March’15 to Till Date), Reporting to the CEO/JMD- Project Co-ordination, Project Monitoring, Project Management, Resource planning & Mobilization, Progress monitoring co-ordinating with all site teams i.e SHE Team, Civil construction team, Quality Control Team, Electrical Team, Mechanical Fabrication & Erection Team, Repair & Maintenance Group . It’s START TO FINIST PROJECT including commissioning and hand-over in 2X300MW, TRN ENERGY/Raigargh/Chhattisgarh & 2X660MW OPGCL/Odisha, BOP, EPC contract, both in India.) Paharpur Cooling Towers Ltd., Kolkata General Manager (Construction)- (November ‘1991 to Feb’2015), (Reporting to the Executive Advisor( Construction) & leading a team of more 100 odd members consisting of SHE Team, Civil construction team, Quality Control Team, Electrical Team, Mechanical Fabrication & Erection Team, Repair & Maintenance Group,) Job Profile: As General Manager(Construction)- managing overall coordination of the civil construction project & overseeing project control functions to meet project stakeholder expectations as per defined Key Performance Indicators- • Managing all company project site management operations by directing and coordinating activities consistent with established goals, objectives, & policies. • Identifying, defining, providing, & measuring KPIs for different project tasks based on goals. • Assisting Project Manager in developing method statement for project execution. • Specifying project objectives and plans including delineation of scope, budgeting, scheduling, setting performance requirements, and selecting the project participants. • Monitoring and reviewing all aspects of project control functions on EPC projects to ensure quality of the cost engineering, planning/ scheduling and contract
  • 3.
    CURRICULUM VITAE • Budgetpreparation and monitoring to keep the cost under control • Progress review with customers • Progress review meeting with block heads and fixing of weekly targets • On time deliveries of the target • Use of Jump-form technology • Use of Slip form technology • Risk Analysis in Site Execution • Quality Controls • Implementation of SHE for safe working of milestones. • Monthly Progress Presentation & review with Directors & Stake Holders Engineering Tools:- • Hardware :Pentium Pc’s • Operating System: Window 2000, Win XP, Internet • Special Softwares : MS Word, MS Excel, MS Project. Highlights:- • Experience in Real States, Thermal Power plant, Nuclear Power Plant, Steel plant, Oil & Refineries, Sugar administration are in accordance with the established company procedures and expectations. • Handling project resources- machinery & manpower on site to maximize resource efficiency & restrict costs of labor, materials, and equipment. • Reviewing status reports of the performance of project team members & assessing results achieved • Identifying resources to optimize costs & ensuring timely and adequate completion of all phases of the project. • Planning procurements, • Coordinating with customers, consultant, & sub-contractors • Handling project budgeting as well as controlling costs of the project • Customer billing & collection, • Undertaking trial run & commissioning of the project as well as conducting performance test. • Preparing L2 & L3 schedules & planning timely execution of project • Preparing deployment schedule for materials & manpower • Selecting sub-contractors & their deployment at site • Coordinating with customer & consultant for executing drawing • Interfacing on internal audit activities, identifying & assessing environmental impacts & occupational health hazards • Implementing SHE as per ISO 14001:2004 & OHSAS 18001:2007 norms & ensuring certification • Following up on quality management systems & monitoring quality control aspects • Organising project progress meetings to cover all relevant issues as well as tracking progress reports. • Managing project planning & project schedules, as well as assessing the project risks. • Implementing various operations through proper coordination and control of planning, design, estimating, contracting, and construction in the entire process. • Supervising project controls teams in the preparation and presentation of cost and schedule forecasts & all special project performance / status reviews as required. • Recruiting project managers and staff. • Providing direct input to proposals, client presentations and contract negotiations • Assessing feedback reports reflecting the lessons learnt on project completion. Contributions: • Made significant contribution in the completion of 15000cum RCC in two months for the chimney foundation. • Spearheaded the project completion as per project specifications, and ensured customers satisfaction. • Effectively achieved the project objectives within the planned time, resources, & quality parameters. • Introduced best practices in the construction work and successfully met the stringent quality standards. • Made noteworthy contributions in optimization of project costs using available resources J.K. Constructions, Angul, Orissa Site Engineer (July’ 1990- Nov’ 1991) (Reported to the Project Manager & led a team of 20 members) Job Profile: As Site Engineer, handled resources & ensured project completion as per the Key
  • 4.
    CURRICULUM VITAE Industries etc. •Experience in slip form and jump-form technology using all types Tower Cranes having boom length of 70MT and tip load capacity up-to 5MT, MTC, ACE Cranes, Hydras, JCB, Batching Plants • Experience in the construction of high raised RCC framed structures, Silos, Chimneys, NDCT, IDCT, Pump House & indepth knowledge & Experience in Industrial buildings References:- 1.Mr.T.K.Ghattak, Ex. CEO(P) Paharpur Cooling Towers Ltd., Paharpur House, 8/1/B,Diamond Harbour Road. Kol-27,India. Email:tkgsm@yahoo.co.uk Contact No.+919830324366 2.Mr.R.N.Rai, Ex. CEO(P) Paharpur Cooling Towers Ltd., Paharpur House, 8/1/B,Diamond Harbour Road. Kol-27,India. Contact No.+919830324366 3)Mr.D.Nehru,Ex- VP(Constn), Paharpur Cooling Towers Ltd., Paharpur House, 8/1/B,Diamond Harbour Performance Matrices- • Created & executed project work plans, conducted revisions as appropriate to meet the changing requirements. • Coordinated between all on-site parties to cut down cost & expedite progress without sacrificing quality • Managed various sub-contractor teams and expedited the day to day progress of work. • Coordinated quality procedures & effectively applied the standards set by client. • Ensured maintenance of complete & proper project documents. • Reviewed status reports of the performance of project team members & assessed results achieved. Contributions: • Introduced initiatives to ensure proper project progress with increased productivity. Jay Enn Associates Pvt. Ltd, Kapurthala, Punjab Project Engineer (June ‘1989- July’ 1990) (Reported to the Project Manager & led a team of 12 members) Job Profile: As Project Engineer, supervised, monitored, and reported on project progress throughout the project cycle as per the specific Key Result Areas- • Prepared bill of quantities for shuttering, concreting, & reinforcement • Coordinated with customer for weekly/ monthly programme • Supervised lay out, checked the work in line with the drawing & pour card • Prepared bar bending schedule • Executed programme with the sub-contractors as well as verified sub-contractor billing • Reconciled cement, steel & aggregates Contributions: • Successfully completed a 2 storey residential building of with 40 apartment of two bed room flats before completion date. • Projects executed successfully within the set budgets and in time. • Maintained a successful track record of satisfactory work and punctual delivery. Projects Handled in Brief:- Paharpur Cooling Towers Ltd., Kolkata (November 1991 to date) Role: General Manager (Construction), handled following projects that involved construction of highrise framed structures including switch rooms, chimneys, silos, cooling towers along with pavements, roads & drains, EPC contracts. The highest single contract value handled as a Team Leader is more than 400 Cr. Worked with all leading organisation in India i.e. Unit # 6/9/10/CPP/NALCO/Angul, NPC/Kaiga, ACC/Wadi, MSEB/MPGCL, SAIL/RSP/ Rourkela, TATA Steel/Jamshedpur,WBPDCL/Kolaghat, INDAL/Belur,IOCL/Barauni, Swadeshi Sugar Mills/Narkatiaganj, Halikhed Sugar Factory/Bidar, National Thermal Power Corporation/Kaniha & TTPS/Odisha, TPCL/Jojobera, DVC/BHEL in all four locations i.e. Mejia/Andal/Koderma/Raghunathpur, IEL/TPL/PH#06/Tata Steel/JSR, TSL/NICCO/LD#01/JSR, SAIL/RSP/BF#05/ Rourkela, BPSCL/Bina/MP,
  • 5.
    CURRICULUM VITAE Road. Kol-700027,India. Email:d.nehru@ymail.com ContactNo.+919007014466 4)Mr.R.C.Tripathy, DGM(Mech. Project), Captive Power Plant, NATIONAL ALUMINIUM COMPANY LTD. Dist:Angul,Odisha,India Email Id: rctripathy@nalcoindia.co.in Contact No.+919437026220 OTHER DETAILS:- • Location:-Anywhere in Abroad or India . • Notice Period:-One month • Current salary PA:- 44.50 lacs(INR) • Expected Salary:- Negotiable. • Lead Time To Join:- 30 days -Max. One Month from the date of receipt of App. Letter • Passport No.& Validity:- H1529244 Valid Till 24.11.2018 PPGCL/Allahabad. Jay Enn Associates Pvt. Ltd, Kapurthala, Punjab (July 1989- June 1990) Role: As Project Engineer, supervised construction of residential colony & swimming pool for Rail Coach Factory, Kapurthala, Punjab J.K. Constructions, Angul, Orissa (July 1990- October 1991) Role: As Site Engineer, supervised construction of a railway bridge near Bhimcoach, Sambalpur, Odisha. Details declared above are true to the best of my knowledge. Your’s truely, U.C.MOHAPATRA
  • 6.
    CURRICULUM VITAE Road. Kol-700027,India. Email:d.nehru@ymail.com ContactNo.+919007014466 4)Mr.R.C.Tripathy, DGM(Mech. Project), Captive Power Plant, NATIONAL ALUMINIUM COMPANY LTD. Dist:Angul,Odisha,India Email Id: rctripathy@nalcoindia.co.in Contact No.+919437026220 OTHER DETAILS:- • Location:-Anywhere in Abroad or India . • Notice Period:-One month • Current salary PA:- 44.50 lacs(INR) • Expected Salary:- Negotiable. • Lead Time To Join:- 30 days -Max. One Month from the date of receipt of App. Letter • Passport No.& Validity:- H1529244 Valid Till 24.11.2018 PPGCL/Allahabad. Jay Enn Associates Pvt. Ltd, Kapurthala, Punjab (July 1989- June 1990) Role: As Project Engineer, supervised construction of residential colony & swimming pool for Rail Coach Factory, Kapurthala, Punjab J.K. Constructions, Angul, Orissa (July 1990- October 1991) Role: As Site Engineer, supervised construction of a railway bridge near Bhimcoach, Sambalpur, Odisha. Details declared above are true to the best of my knowledge. Your’s truely, U.C.MOHAPATRA