This document summarizes ports under the management of Pelindo III, which is headquartered in Surabaya. It lists the ports in Central Kalimantan, South Kalimantan, Central Java, East Java, West Nusa Tenggara, East Nusa Tenggara, and Bali. It then outlines Pelindo III's strategies to improve ports, which include reconfiguring major ports to dedicated terminals, developing minor ports, and expanding ports in strategic locations. Key port expansion projects discussed are in Samarinda, Balikpapan, Sampit, and Lamong Bay.
1. 11-10-2011
PORTS UNDER MANAGEMENTOF PELINDO III (SURABAYA HQ)
PELINDO III
PORT DEVELOPMENT 1. CENTRAL KALIMANTAN : 2. SOUTH KALIMANTAN :
KUMAI, Pangkalan Bun, Sukamara, Bumiharjo; BANJARMASIN , Basirih, Pulang Pisau;
SAMPIT, KualaPembuang, Samuda, Pagatan- KOTABARU, Pagatan, Gunung Bt Besar, Batulicin,
Mendawai, Bagendang, Kuala Kapuas, Bahaur . Satui, Stagen, Mekar Putih.
5. WEST NUSA TENGGARA :
LEMBAR,
BIMA, Badas
3. CENTRAL JAWA :
TG. EMAS, 6. EAST NUSA TENGGARA :
TG.INTAN,
TEGAL TENAU/KUPANG,
Kalabahi, Waingapu,
MAUMERE, Ende,
Ippi
4. EAST JAWA :
TG. PERAK, 7. BALI :
GRESIK, Kalianget,
TG. WANGI, Banyuwangi, BENOA,
TG. TEMBAGA, Pasuruan, Panarukan CELUKAN BAWANG.
DJARWO SURJANTO โ President Director 1
PORT IMPROVEMENT STRATEGY BERLIAN TERMINAL DEVELOPMENT
MAJOR PORTS
Reconfiguration to
Dedicated Terminal
(cargo segmented)
Ex : Tg Perak, Tg Emas,
Banjarmasin
MINOR/ MARGINAL PORTS
Deploy small/medium equipment
strengthening infra structure
Ex : Lembar, Maumere
1
2. 11-10-2011
JAMRUD TERMINAL DEVELOPMENT TANJUNG PERAK RECONFIGURATION
WAREHOUSE
DEMOLITION
BENOA MARINA PORT
MAUMERE AND LEMBAR PORT
2
3. 11-10-2011
PORT EXPANSION AND
STRATEGIC LOCATION FOR NEW PORT
SAMARINDA RELOCATION
Along
Seaside/ Island Port
riverside
(in central city) Waterfront (Open Sea)
FOR EXAMPLE :
Low-density : Samarinda to Palaran , Balikpapan (Semayang to Kariangau) , Sampit to
Bagendang, Sorong, Jayapura, Ambon
High-density : Lamong Bay
SAMARINDA VICINITY
SAMPIT DEVELOPMENT
TO BAGENDANG
Sampit
Bagendang
3
4. 11-10-2011
WHARF PORT EXPANSION
BALIKPAPAN RELOCATION Phase I 500x50 m2,
Phase II 500x50 m2,
ultimate dev. (1.280 x 80m2) LAMONG BAY (ISLAND PORT)
DEPTH
Minimal -14 LWS to -16 LWS
CONTAINER YARD
Phase I 20 ha,
Phase II : 50 ha,
Ultimate Dev : 200 Ha
CONTAINER TERMINAL
KARIANGAU
THROUGHPUT
Phase I : 500 .000 Teuโs,
Phase II : 1 millionTeuโs,
KAMPUNG BARU Ultimate Dev 3 million Teuโs
DRY BULK, LIQUID BULK
INDUSTRIAL
PELABUHAN SEMAYANG BUFFER SPACE
BALIKPAPAN 300 ha at Ultimate Dev.
PILING WHARF (PACKAGE A) JULI 2011 OVERVIEW ERECTION SLAB & CASTING SEPTEMBER 2011
Gresik View
4
5. 11-10-2011
LAMONG BAY DEVELOPMENT
SURABAYA WEST ACCESS
CHANNEL (SWAC)
- DEPTH : -14 m LWS.
- WIDTH : 200 m
(two way traffic).
- Ship size : > 50.000 DWT
(Post Panamax).
Thank You
5