SlideShare a Scribd company logo
1 of 10
Flyover Quality
Management: Using
Smartsheet template
Contents
• Introduction
• What is a Quality Management
Plan?
• Why Use Smartsheet Template?
• How to Implement Quality
Management Plan Using
Smartsheet Template
• Challenges and Solutions
• Conclusion
Introduction
• Welcome to this presentation on
performing quality management
plans for flyovers using the
Smartsheet template, where we’ll
explore into its significance in
flyover construction and how it
ensures successful outcomes.
What is a Quality Management Plan?
A quality management plan is a
document that outlines the processes,
procedures, and standards necessary to
ensure that a project or product meets
the required level of quality. In the
construction of a flyover, a quality
management plan is essential to ensure
that the structure is safe, durable, and
meets all regulatory requirements.
The plan typically includes information
on quality objectives, quality control
measures, quality assurance processes,
and quality improvement initiatives. It is
important to note that the plan should
be developed in collaboration with all
stakeholders involved in the project to
ensure that it is comprehensive and
effective.
Why Use Smartsheet Template?
• Smartsheet template is a powerful tool that can help streamline
the process of developing and implementing a quality
management plan. It provides a user-friendly interface that allows
users to easily create, edit, and share documents, spreadsheets,
and other project-related materials.
• Using Smartsheet template can help ensure that all stakeholders
are on the same page regarding quality objectives, control
measures, and assurance processes. It also enables real-time
collaboration, which can improve communication and reduce
errors or misunderstandings.
Benefits of chosen template
for our project
Comprehensive
Work Progress
Description
Clear Identification
of Contractors and
Subcontractors
Equipment and
Trade Details
Emphasis on
Quality and Safety
Flexibility for
Additional
Information
How to Implement Quality Management
Plan Using Smartsheet Template
• Implementing a quality management plan using
Smartsheet template is a straightforward process. First,
you need to identify the key stakeholders involved in the
project and ensure that they have access to the
template. Next, you should work with them to develop
the plan, taking into account their input and feedback.
• Once the plan is complete, you can use Smartsheet to
track progress, assign tasks, and monitor performance.
You can also use the tool to generate reports and
dashboards, which can provide valuable insights into the
success of the plan and areas for improvement.
Challenges and Solutions
• While implementing a quality management plan using
Smartsheet template can be beneficial, there may be some
challenges along the way. For example, some stakeholders
may be resistant to change or have difficulty adapting to the
new tool. There may also be technical issues or difficulties
with data integration.
• To overcome these challenges, it is important to provide
adequate training and support to stakeholders, communicate
the benefits of using Smartsheet template, and address any
technical issues promptly. It may also be helpful to establish a
project management office or other oversight body to ensure
that the plan is being implemented effectively.
Conclusion
• In conclusion, performing quality management
plan of flyover using Smartsheet template is an
essential process in ensuring the success of the
construction project. By using an effective
quality management plan, stakeholders can
work together to ensure that the flyover meets
all regulatory requirements and is safe and
durable.
• Smartsheet template provides a powerful tool
for developing and implementing the plan,
streamlining the process and improving
communication and collaboration. While there
may be challenges along the way, with the
right approach and support, these challenges
can be overcome, and the project can be
completed successfully.
Reference
1. Cianci, A. M., Gambatese, J. A., & Simek, M. E. (2008). Implementing quality management
in construction: An evaluation of challenges and benefits. Journal of Construction Engineering
and Management, 134(3), 171-180. https://doi.org/10.1061/(ASCE)0733-
9364(2008)134:3(171)
2. Malsam, W. (2022, April14). The quality Management Plan in Project Management. Project
Manager. https://www.projectmanager.com/blog/quality-management-plan

More Related Content

Similar to Section2_GroupIMMORTALS_Quality management plan_presentation.pptx

Neetha S Nichani
Neetha S NichaniNeetha S Nichani
Neetha S NichaniNeetha S
 
Managing the Consulting Engagement
Managing the Consulting EngagementManaging the Consulting Engagement
Managing the Consulting EngagementSaumya Ganguly
 
Dinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part threeHossam Maghrabi
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdfJamieDornan2
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementN Raghuraman
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Managementneha2788
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfEidTahir
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectProject Management Solutions
 
SilvianJeyabalanServicesResume
SilvianJeyabalanServicesResumeSilvianJeyabalanServicesResume
SilvianJeyabalanServicesResumeSilvian Jeyabalan
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management ServicesEugene Nizeyimana
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]OyetadeTobi
 
Introduction to project management.ppt for
Introduction to project management.ppt  forIntroduction to project management.ppt  for
Introduction to project management.ppt forItcHcm1
 

Similar to Section2_GroupIMMORTALS_Quality management plan_presentation.pptx (20)

Neetha S Nichani
Neetha S NichaniNeetha S Nichani
Neetha S Nichani
 
Managing the Consulting Engagement
Managing the Consulting EngagementManaging the Consulting Engagement
Managing the Consulting Engagement
 
Dinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager ResumeDinesh Kumar: Experienced Medical Device Project Manager Resume
Dinesh Kumar: Experienced Medical Device Project Manager Resume
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part three
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
 
Project Cost.pptx
Project Cost.pptxProject Cost.pptx
Project Cost.pptx
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery project
 
SilvianJeyabalanServicesResume
SilvianJeyabalanServicesResumeSilvianJeyabalanServicesResume
SilvianJeyabalanServicesResume
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management Services
 
Ananth_Resume
Ananth_ResumeAnanth_Resume
Ananth_Resume
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
Introduction to project management.ppt for
Introduction to project management.ppt  forIntroduction to project management.ppt  for
Introduction to project management.ppt for
 

More from HardikPatel611017

Quality Mgt Plan Template Presentation.pptx
Quality Mgt Plan Template Presentation.pptxQuality Mgt Plan Template Presentation.pptx
Quality Mgt Plan Template Presentation.pptxHardikPatel611017
 
GroupIMMORTALS_Quality management plan_presentation---final.pptx
GroupIMMORTALS_Quality management plan_presentation---final.pptxGroupIMMORTALS_Quality management plan_presentation---final.pptx
GroupIMMORTALS_Quality management plan_presentation---final.pptxHardikPatel611017
 
Quality Mgt Plan Template Presentation[1]SOL.pptx
Quality Mgt Plan Template Presentation[1]SOL.pptxQuality Mgt Plan Template Presentation[1]SOL.pptx
Quality Mgt Plan Template Presentation[1]SOL.pptxHardikPatel611017
 
quality_management_plan_4108 ppt final.pptx
quality_management_plan_4108 ppt final.pptxquality_management_plan_4108 ppt final.pptx
quality_management_plan_4108 ppt final.pptxHardikPatel611017
 
Quality management plan.pptx
Quality management plan.pptxQuality management plan.pptx
Quality management plan.pptxHardikPatel611017
 
quality_management_plan_4108_ppt_final.pptx
quality_management_plan_4108_ppt_final.pptxquality_management_plan_4108_ppt_final.pptx
quality_management_plan_4108_ppt_final.pptxHardikPatel611017
 

More from HardikPatel611017 (13)

Quality Mgt Plan Template Presentation.pptx
Quality Mgt Plan Template Presentation.pptxQuality Mgt Plan Template Presentation.pptx
Quality Mgt Plan Template Presentation.pptx
 
GroupIMMORTALS_Quality management plan_presentation---final.pptx
GroupIMMORTALS_Quality management plan_presentation---final.pptxGroupIMMORTALS_Quality management plan_presentation---final.pptx
GroupIMMORTALS_Quality management plan_presentation---final.pptx
 
ripandeep kaur .pptx
ripandeep kaur .pptxripandeep kaur .pptx
ripandeep kaur .pptx
 
Presentation new (2).pptx
Presentation new (2).pptxPresentation new (2).pptx
Presentation new (2).pptx
 
Quality Mgt Plan Template Presentation[1]SOL.pptx
Quality Mgt Plan Template Presentation[1]SOL.pptxQuality Mgt Plan Template Presentation[1]SOL.pptx
Quality Mgt Plan Template Presentation[1]SOL.pptx
 
Presentation new (1).pptx
Presentation new (1).pptxPresentation new (1).pptx
Presentation new (1).pptx
 
quality_management_plan_4108 ppt final.pptx
quality_management_plan_4108 ppt final.pptxquality_management_plan_4108 ppt final.pptx
quality_management_plan_4108 ppt final.pptx
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Presentation 1 .pptx
Presentation 1 .pptxPresentation 1 .pptx
Presentation 1 .pptx
 
PROJECT DREAM HOUSE.pptx
PROJECT DREAM HOUSE.pptxPROJECT DREAM HOUSE.pptx
PROJECT DREAM HOUSE.pptx
 
Quality management plan.pptx
Quality management plan.pptxQuality management plan.pptx
Quality management plan.pptx
 
Presentation new.pptx
Presentation new.pptxPresentation new.pptx
Presentation new.pptx
 
quality_management_plan_4108_ppt_final.pptx
quality_management_plan_4108_ppt_final.pptxquality_management_plan_4108_ppt_final.pptx
quality_management_plan_4108_ppt_final.pptx
 

Recently uploaded

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 

Recently uploaded (20)

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

Section2_GroupIMMORTALS_Quality management plan_presentation.pptx

  • 2. Contents • Introduction • What is a Quality Management Plan? • Why Use Smartsheet Template? • How to Implement Quality Management Plan Using Smartsheet Template • Challenges and Solutions • Conclusion
  • 3. Introduction • Welcome to this presentation on performing quality management plans for flyovers using the Smartsheet template, where we’ll explore into its significance in flyover construction and how it ensures successful outcomes.
  • 4. What is a Quality Management Plan? A quality management plan is a document that outlines the processes, procedures, and standards necessary to ensure that a project or product meets the required level of quality. In the construction of a flyover, a quality management plan is essential to ensure that the structure is safe, durable, and meets all regulatory requirements. The plan typically includes information on quality objectives, quality control measures, quality assurance processes, and quality improvement initiatives. It is important to note that the plan should be developed in collaboration with all stakeholders involved in the project to ensure that it is comprehensive and effective.
  • 5. Why Use Smartsheet Template? • Smartsheet template is a powerful tool that can help streamline the process of developing and implementing a quality management plan. It provides a user-friendly interface that allows users to easily create, edit, and share documents, spreadsheets, and other project-related materials. • Using Smartsheet template can help ensure that all stakeholders are on the same page regarding quality objectives, control measures, and assurance processes. It also enables real-time collaboration, which can improve communication and reduce errors or misunderstandings.
  • 6. Benefits of chosen template for our project Comprehensive Work Progress Description Clear Identification of Contractors and Subcontractors Equipment and Trade Details Emphasis on Quality and Safety Flexibility for Additional Information
  • 7. How to Implement Quality Management Plan Using Smartsheet Template • Implementing a quality management plan using Smartsheet template is a straightforward process. First, you need to identify the key stakeholders involved in the project and ensure that they have access to the template. Next, you should work with them to develop the plan, taking into account their input and feedback. • Once the plan is complete, you can use Smartsheet to track progress, assign tasks, and monitor performance. You can also use the tool to generate reports and dashboards, which can provide valuable insights into the success of the plan and areas for improvement.
  • 8. Challenges and Solutions • While implementing a quality management plan using Smartsheet template can be beneficial, there may be some challenges along the way. For example, some stakeholders may be resistant to change or have difficulty adapting to the new tool. There may also be technical issues or difficulties with data integration. • To overcome these challenges, it is important to provide adequate training and support to stakeholders, communicate the benefits of using Smartsheet template, and address any technical issues promptly. It may also be helpful to establish a project management office or other oversight body to ensure that the plan is being implemented effectively.
  • 9. Conclusion • In conclusion, performing quality management plan of flyover using Smartsheet template is an essential process in ensuring the success of the construction project. By using an effective quality management plan, stakeholders can work together to ensure that the flyover meets all regulatory requirements and is safe and durable. • Smartsheet template provides a powerful tool for developing and implementing the plan, streamlining the process and improving communication and collaboration. While there may be challenges along the way, with the right approach and support, these challenges can be overcome, and the project can be completed successfully.
  • 10. Reference 1. Cianci, A. M., Gambatese, J. A., & Simek, M. E. (2008). Implementing quality management in construction: An evaluation of challenges and benefits. Journal of Construction Engineering and Management, 134(3), 171-180. https://doi.org/10.1061/(ASCE)0733- 9364(2008)134:3(171) 2. Malsam, W. (2022, April14). The quality Management Plan in Project Management. Project Manager. https://www.projectmanager.com/blog/quality-management-plan