Scalable Web Architectures Common Patterns & Approaches Cal Henderson
Hello
Flickr Large scale kitten-sharing Almost 5 years old 4.5 since public launch Open source stack An open attitude towards architecture
Flickr Large scale In a single second: Serve 40,000 photos Handle 100,000 cache operations Process 130,000 database queries
Scalable Web Architectures? What does scalable mean? What’s an architecture? An answer in 12 parts
1. Scaling
Scalability – myths and lies What is scalability?
Scalability – myths and lies What is scalability  not  ?
Scalability – myths and lies What is scalability  not  ? Raw Speed / Performance HA / BCP Technology X Protocol Y
Scalability – myths and lies So what  is  scalability?
Scalability – myths and lies So what  is  scalability? Traffic growth Dataset growth Maintainability
Today Two goals of application architecture: Scale HA
Today Three goals of application architecture: Scale HA Performance
Scalability Two kinds: Vertical (get bigger) Horizontal (get more)
Big Irons Sunfire E20k $450,000 - $2,500,000 36x 1.8GHz processors PowerEdge SC1435 Dualcore 1.8 GHz processor Around $1,500
Cost vs Cost
That’s OK Sometimes vertical scaling is right Buying a bigger box is quick (ish) Redesigning software is not Running out of MySQL performance? Spend months on data federation Or, Just buy a ton more RAM
The H & the V But we’ll mostly talk horizontal Else this is going to be boring
2. Architecture
Architectures then? The way the bits fit together What grows where The trade-offs between good/fast/cheap
LAMP We’re mostly talking about LAMP Linux Apache (or LightHTTPd) MySQL (or Postgres) PHP (or Perl, Python, Ruby) All open source All well supported All used in large operations (Same rules apply elsewhere)
Simple web apps A Web Application Or  “Web Site”  in Web 1.0 terminology Interwebnet App server Database
Simple web apps A Web Application Or  “Web Site”  in Web 1.0 terminology Interwobnet App server Database Cache Storage array AJAX!!!1
App servers App servers scale in two ways:
App servers App servers scale in two ways: Really well
App servers App servers scale in two ways: Really well Quite badly
App servers Sessions! (State) Local sessions == bad When they move == quite bad Centralized sessions == good No sessions at all == awesome!
Local sessions Stored on disk PHP sessions Stored in memory Shared memory block (APC) Bad! Can’t move users Can’t avoid hotspots Not fault tolerant
Mobile local sessions Custom built Store last session location in cookie If we hit a different server, pull our session information across If your load balancer has sticky sessions, you can still get hotspots Depends on volume – fewer heavier users hurt more
Remote centralized sessions Store in a central database Or an in-memory cache No porting around of session data No need for sticky sessions No hot spots Need to be able to scale the data store But we’ve pushed the issue down the stack
No sessions Stash it all in a cookie! Sign it for safety $data = $user_id . ‘-’ . $user_name; $time = time(); $sig = sha1($secret . $time . $data); $cookie = base64(“$sig-$time-$data”); Timestamp means it’s simple to expire it
Super slim sessions If you need more than the cookie (login status, user id, username), then pull their account row from the DB Or from the account cache None of the drawbacks of sessions Avoids the overhead of a query per page Great for high-volume pages which need little personalization Turns out you can stick quite a lot in a cookie too Pack with base64 and it’s easy to delimit fields
App servers The Rasmus way App server has ‘shared nothing’ Responsibility pushed down the stack Ooh, the stack
Trifle
Trifle Sponge / Database Jelly / Business Logic Custard / Page Logic Cream / Markup Fruit / Presentation
Trifle Sponge / Database Jelly / Business Logic Custard / Page Logic Cream / Markup Fruit / Presentation
App servers
App servers
App servers
Well, that was easy Scaling the web app server part is  easy The rest is the trickier part Database Serving static content Storing static content
The others Other services scale similarly to web apps That is, horizontally The canonical examples: Image conversion Audio transcoding Video transcoding Web crawling Compute!
Amazon Let’s talk about Amazon S3 - Storage EC2 – Compute! (XEN based) SQS – Queueing All horizontal Cheap when small Not cheap at scale
3. Load Balancing
Load balancing If we have multiple nodes in a class, we need to balance between them Hardware or software Layer 4 or 7
Hardware LB A hardware appliance Often a pair with heartbeats for HA Expensive! But offers high performance Easy to do > 1Gbps Many brands Alteon, Cisco, Netscalar, Foundry, etc L7 - web switches, content switches, etc
Software LB Just some software Still needs hardware to run on But can run on existing servers Harder to have HA Often people stick hardware LB’s in front But Wackamole helps here
Software LB Lots of options Pound Perlbal Apache with mod_proxy Wackamole with mod_backhand http://backhand.org/wackamole/ http ://backhand.org/mod_backhand/
Wackamole
Wackamole
The layers Layer 4 A ‘dumb’ balance Layer 7 A ‘smart’ balance OSI stack, routers, etc
4. Queuing
Parallelizable == easy! If we can transcode/crawl in parallel, it’s easy But think about queuing And asynchronous systems The web ain’t built for slow things But still, a simple problem
Synchronous systems
Asynchronous systems
Helps with peak periods
Synchronous systems
Asynchronous systems
Asynchronous systems
5. Relational Data
Databases Unless we’re doing a lot of file serving, the database is the toughest part to scale If we can, best to avoid the issue altogether and just buy bigger hardware Dual-Quad Opteron/Intel64 systems with 16+GB of RAM can get you a long way
More read power Web apps typically have a read/write ratio of somewhere between 80/20 and 90/10 If we can scale read capacity, we can solve a lot of situations MySQL replication!
Master-Slave Replication
Master-Slave Replication Reads and Writes Reads
Master-Slave Replication
Master-Slave Replication
Master-Slave Replication
Master-Slave Replication
Master-Slave Replication
Master-Slave Replication
Master-Slave Replication
Master-Slave Replication
6. Caching
Caching Caching avoids needing to scale! Or makes it cheaper Simple stuff mod_perl / shared memory Invalidation is hard MySQL query cache Bad performance (in most cases)
Caching Getting more complicated… Write-through cache Write-back cache Sideline cache
Write-through cache
Write-back cache
Sideline cache
Sideline cache Easy to implement Just add app logic Need to manually invalidate cache Well designed code makes it easy Memcached From Danga (LiveJournal) http://www.danga.com/memcached/
Memcache schemes Layer 4 Good: Cache can be local on a machine Bad: Invalidation gets more expensive with node count Bad: Cache space wasted by duplicate objects
Memcache schemes Layer 7 Good: No wasted space Good: linearly scaling invalidation Bad: Multiple, remote connections Can be avoided with a proxy layer Gets more complicated Last indentation level!
7. HA Data
But what about HA?
But what about HA?
SPOF! The key to HA is avoiding SPOFs Identify Eliminate Some stuff is hard to solve Fix it further up the tree Dual DCs solves Router/Switch SPOF
Master-Master
Master-Master Either hot/warm or hot/hot Writes can go to either But avoid collisions No auto-inc columns for hot/hot Bad for hot/warm too Unless you have MySQL 5 But you can’t rely on the ordering! Design schema/access to avoid collisions Hashing users to servers
Rings Master-master is just a small ring With 2 nodes Bigger rings are possible But not a mesh! Each slave may only have a single master Unless you build some kind of manual replication
Rings
Rings
Dual trees Master-master is good for HA But we can’t scale out the reads (or writes!) We often need to combine the read scaling with HA We can simply combine the two models
Dual trees
Cost models There’s a problem here We need to always have 200% capacity to avoid a SPOF 400% for dual sites! This costs too much Solution is straight forward Make sure clusters are bigger than 2
N+M N+M N = nodes needed to run the system M = nodes we can afford to lose Having M as big as N starts to suck If we could make each node smaller, we can increase N while M stays constant (We assume smaller nodes are cheaper)
1+1 = 200% hardware
3+1 = 133% hardware
Meshed masters Not possible with regular MySQL out-of-the-box today But there is hope! NBD (MySQL Cluster) allows a mesh Support for replication out to slaves in a coming version RSN!
8. Federation
Data federation At some point, you need more writes This is tough Each cluster of servers has limited write capacity Just add more clusters!
Simple things first Vertical partitioning Divide tables into sets that never get joined Split these sets onto different server clusters Voila! Logical limits When you run out of non-joining groups When a single table grows too large
Data federation Split up large tables, organized by some primary object Usually users Put all of a user’s data on one ‘cluster’ Or shard, or cell Have one central cluster for lookups
Data federation
Data federation Need more capacity? Just add shards! Don’t assign to shards based on user_id! For resource leveling as time goes on, we want to be able to move objects between shards Maybe – not everyone does this ‘ Lockable’ objects
The wordpress.com approach Hash users into one of  n  buckets Where  n  is a power of 2 Put all the buckets on one server When you run out of capacity, split the buckets across two servers Then you run out of capacity, split the buckets across four servers Etc
Data federation Heterogeneous hardware is fine Just give a larger/smaller proportion of objects depending on hardware Bigger/faster hardware for paying users A common approach Can also allocate faster app servers via magic cookies at the LB
Downsides Need to keep stuff in the right place App logic gets more complicated More clusters to manage Backups, etc More database connections needed per page Proxy can solve this, but complicated The dual table issue Avoid walking the shards!
Bottom line Data federation is how large applications are scaled
Bottom line It’s hard, but not impossible Good software design makes it easier Abstraction! Master-master pairs for shards give us HA Master-master trees work for central cluster (many reads, few writes)
9. Multi-site HA
Multiple Datacenters Having multiple datacenters is hard Not just with MySQL Hot/warm with MySQL slaved setup But manual (reconfig on failure) Hot/hot with master-master But dangerous (each site has a SPOF) Hot/hot with sync/async manual replication But tough (big engineering task)
Multiple Datacenters
GSLB Multiple sites need to be balanced Global Server Load Balancing Easiest are AkaDNS-like services Performance rotations Balance rotations
10. Serving Files
Serving lots of files Serving lots of files is not too tough Just buy lots of machines and load balance! We’re IO bound – need more spindles! But keeping many copies of data in sync is hard And sometimes we have other per-request overhead (like auth)
Reverse proxy
Reverse proxy Serving out of memory is fast! And our caching proxies can have disks too Fast or otherwise More spindles is better We can parallelize it!  50 cache servers gives us 50 times the serving rate of the origin server Assuming the working set is small enough to fit in memory in the cache cluster
Invalidation Dealing with invalidation is tricky We can prod the cache servers directly to clear stuff out Scales badly – need to clear asset from every server – doesn’t work well for 100 caches
Invalidation We can change the URLs of modified resources And let the old ones drop out cache naturally Or poke them out, for sensitive data Good approach! Avoids browser cache staleness Hello Akamai (and other CDNs) Read more:  http://www.thinkvitamin.com/features/webapps/serving-javascript-fast
CDN – Content Delivery Network Akamai, Savvis, Mirror Image Internet, etc Caches operated by other people Already in-place In lots of places GSLB/DNS balancing
Edge networks Origin
Edge networks Origin Cache Cache Cache Cache Cache Cache Cache Cache
CDN Models Simple model You push content to them, they serve it Reverse proxy model You publish content on an origin, they proxy and cache it
CDN Invalidation You don’t control the caches Just like those awful ISP ones Once something is cached by a CDN, assume it can never change Nothing can be deleted Nothing can be modified
Versioning When you start to cache things, you need to care about versioning Invalidation & Expiry Naming & Sync
Cache Invalidation If you control the caches, invalidation is possible But remember ISP and client caches Remove deleted content explicitly Avoid users finding old content Save cache space
Cache versioning Simple rule of thumb: If an item is modified, change its name (URL) This can be independent of the file system!
Virtual versioning Database indicates version 3 of file Web app writes version number into URL Request comes through cache and is cached with the versioned URL mod_rewrite converts versioned URL to path Version 3 example.com/foo_3.jpg Cached: foo_3.jpg foo_3.jpg -> foo.jpg
Reverse proxy Choices L7 load balancer & Squid http://www.squid-cache.org/ mod_proxy & mod_cache http://www.apache.org/ Perlbal and Memcache? http://www.danga.com/
More reverse proxy HA proxy Squid & CARP Varnish
High overhead serving What if you need to authenticate your asset serving? Private photos Private data Subscriber-only files Two main approaches Proxies w/ tokens Path translation
Perlbal Re-proxying Perlbal can do redirection magic Client sends request to Perlbal Perlbal plugin verifies user credentials token, cookies, whatever tokens avoid data-store access Perlbal goes to pick up the file from elsewhere Transparent to user
Perlbal Re-proxying
Perlbal Re-proxying Doesn’t keep database around while serving Doesn’t keep app server around while serving User doesn’t find out how to access asset directly
Permission URLs But why bother!? If we bake the auth into the URL then it saves the auth step We can do the auth on the web app servers when creating HTML Just need some magic to translate to paths We don’t want paths to be guessable
Permission URLs
Permission URLs (or mod_perl)
Permission URLs Downsides URL gives permission for life Unless you bake in tokens Tokens tend to be non-expirable We don’t want to track every token Too much overhead But can still expire But you choose at time of issue, not later Upsides It works Scales very nicely
11. Storing Files
Storing lots of files Storing files is easy! Get a big disk Get a bigger disk Uh oh! Horizontal scaling is the key Again
Connecting to storage NFS Stateful == Sucks Hard mounts vs Soft mounts, INTR SMB / CIFS / Samba Turn off MSRPC & WINS (NetBOIS NS) Stateful but degrades gracefully HTTP Stateless == Yay! Just use Apache
Multiple volumes Volumes are limited in total size Except (in theory) under ZFS & others Sometimes we need multiple volumes for performance reasons When using RAID with single/dual parity At some point, we need multiple volumes
Multiple volumes
Multiple hosts Further down the road, a single host will be too small Total throughput of machine becomes an issue Even physical space can start to matter So we need to be able to use multiple hosts
Multiple hosts
HA Storage HA is important for file assets too We can back stuff up But we tend to want hot redundancy RAID is good RAID 5 is cheap, RAID 10 is fast
HA Storage But whole machines can fail So we stick assets on multiple machines In this case, we can ignore RAID In failure case, we serve from alternative source But need to weigh up the rebuild time and effort against the risk Store more than 2 copies?
HA Storage
HA Storage But whole colos can fail So we stick assets in multiple colos Again, we can ignore RAID Or even multi-machine per colo But do we want to lose a whole colo because of  single disk failure? Redundancy is always a balance
Self repairing systems When something fails, repairing can be a pain RAID rebuilds by itself, but machine replication doesn’t The big appliances self heal NetApp, StorEdge, etc So does MogileFS (reaper)
Real Life Case Studies
GFS – Google File System Developed by … Google Proprietary Everything we know about it is based on talks they’ve given Designed to store huge files for fast access
GFS – Google File System Single ‘Master’ node holds metadata SPF – Shadow master allows warm swap Grid of ‘chunkservers’ 64bit filenames 64 MB file chunks
GFS – Google File System 1(a) 2(a) 1(b) Master
GFS – Google File System Client reads metadata from master then file parts from multiple chunkservers Designed for big files (>100MB) Master server allocates access leases Replication is automatic and self repairing Synchronously for atomicity
GFS – Google File System Reading is fast (parallelizable) But requires a lease Master server is required for all reads and writes
MogileFS – OMG Files Developed by Danga / SixApart Open source Designed for scalable web app storage
MogileFS – OMG Files Single metadata store (MySQL) MySQL Cluster avoids SPF Multiple ‘tracker’ nodes locate files Multiple ‘storage’ nodes store files
MogileFS – OMG Files Tracker Tracker MySQL
MogileFS – OMG Files Replication of file ‘classes’ happens transparently Storage nodes are not mirrored – replication is piecemeal Reading and writing go through trackers, but are performed directly upon storage nodes
Flickr File System Developed by Flickr Proprietary Designed for very large scalable web app storage
Flickr File System No metadata store Deal with it yourself Multiple ‘StorageMaster’ nodes Multiple storage nodes with virtual volumes
Flickr File System SM SM SM
Flickr File System Metadata stored by app Just a virtual volume number App chooses a path Virtual nodes are mirrored Locally and remotely Reading is done directly from nodes
Flickr File System StorageMaster nodes only used for write operations Reading and writing can scale separately
Amazon S3 A big disk in the sky Multiple ‘buckets’ Files have user-defined keys Data + metadata
Amazon S3 Servers Amazon
Amazon S3 Servers Amazon Users
The cost Fixed price, by the GB Store: $0.15 per GB per month Serve: $0.20 per GB
The cost S3
The cost S3 Regular Bandwidth
End costs ~$2k to store 1TB for a year ~$63 a month for 1Mb ~$65k a month for 1Gb
12. Field Work
Real world examples Flickr Because I know it LiveJournal Because everyone copies it
Flickr Architecture
Flickr Architecture
LiveJournal Architecture
LiveJournal Architecture
Buy my book!
Or buy Theo’s
The end!
Awesome! These slides are available online: iamcal.com/talks/

Scalable Web Architectures: Common Patterns and Approaches - Web 2.0 Expo NYC

  • 1.
    Scalable Web ArchitecturesCommon Patterns & Approaches Cal Henderson
  • 2.
  • 3.
    Flickr Large scalekitten-sharing Almost 5 years old 4.5 since public launch Open source stack An open attitude towards architecture
  • 4.
    Flickr Large scaleIn a single second: Serve 40,000 photos Handle 100,000 cache operations Process 130,000 database queries
  • 5.
    Scalable Web Architectures?What does scalable mean? What’s an architecture? An answer in 12 parts
  • 6.
  • 7.
    Scalability – mythsand lies What is scalability?
  • 8.
    Scalability – mythsand lies What is scalability not ?
  • 9.
    Scalability – mythsand lies What is scalability not ? Raw Speed / Performance HA / BCP Technology X Protocol Y
  • 10.
    Scalability – mythsand lies So what is scalability?
  • 11.
    Scalability – mythsand lies So what is scalability? Traffic growth Dataset growth Maintainability
  • 12.
    Today Two goalsof application architecture: Scale HA
  • 13.
    Today Three goalsof application architecture: Scale HA Performance
  • 14.
    Scalability Two kinds:Vertical (get bigger) Horizontal (get more)
  • 15.
    Big Irons SunfireE20k $450,000 - $2,500,000 36x 1.8GHz processors PowerEdge SC1435 Dualcore 1.8 GHz processor Around $1,500
  • 16.
  • 17.
    That’s OK Sometimesvertical scaling is right Buying a bigger box is quick (ish) Redesigning software is not Running out of MySQL performance? Spend months on data federation Or, Just buy a ton more RAM
  • 18.
    The H &the V But we’ll mostly talk horizontal Else this is going to be boring
  • 19.
  • 20.
    Architectures then? Theway the bits fit together What grows where The trade-offs between good/fast/cheap
  • 21.
    LAMP We’re mostlytalking about LAMP Linux Apache (or LightHTTPd) MySQL (or Postgres) PHP (or Perl, Python, Ruby) All open source All well supported All used in large operations (Same rules apply elsewhere)
  • 22.
    Simple web appsA Web Application Or “Web Site” in Web 1.0 terminology Interwebnet App server Database
  • 23.
    Simple web appsA Web Application Or “Web Site” in Web 1.0 terminology Interwobnet App server Database Cache Storage array AJAX!!!1
  • 24.
    App servers Appservers scale in two ways:
  • 25.
    App servers Appservers scale in two ways: Really well
  • 26.
    App servers Appservers scale in two ways: Really well Quite badly
  • 27.
    App servers Sessions!(State) Local sessions == bad When they move == quite bad Centralized sessions == good No sessions at all == awesome!
  • 28.
    Local sessions Storedon disk PHP sessions Stored in memory Shared memory block (APC) Bad! Can’t move users Can’t avoid hotspots Not fault tolerant
  • 29.
    Mobile local sessionsCustom built Store last session location in cookie If we hit a different server, pull our session information across If your load balancer has sticky sessions, you can still get hotspots Depends on volume – fewer heavier users hurt more
  • 30.
    Remote centralized sessionsStore in a central database Or an in-memory cache No porting around of session data No need for sticky sessions No hot spots Need to be able to scale the data store But we’ve pushed the issue down the stack
  • 31.
    No sessions Stashit all in a cookie! Sign it for safety $data = $user_id . ‘-’ . $user_name; $time = time(); $sig = sha1($secret . $time . $data); $cookie = base64(“$sig-$time-$data”); Timestamp means it’s simple to expire it
  • 32.
    Super slim sessionsIf you need more than the cookie (login status, user id, username), then pull their account row from the DB Or from the account cache None of the drawbacks of sessions Avoids the overhead of a query per page Great for high-volume pages which need little personalization Turns out you can stick quite a lot in a cookie too Pack with base64 and it’s easy to delimit fields
  • 33.
    App servers TheRasmus way App server has ‘shared nothing’ Responsibility pushed down the stack Ooh, the stack
  • 34.
  • 35.
    Trifle Sponge /Database Jelly / Business Logic Custard / Page Logic Cream / Markup Fruit / Presentation
  • 36.
    Trifle Sponge /Database Jelly / Business Logic Custard / Page Logic Cream / Markup Fruit / Presentation
  • 37.
  • 38.
  • 39.
  • 40.
    Well, that waseasy Scaling the web app server part is easy The rest is the trickier part Database Serving static content Storing static content
  • 41.
    The others Otherservices scale similarly to web apps That is, horizontally The canonical examples: Image conversion Audio transcoding Video transcoding Web crawling Compute!
  • 42.
    Amazon Let’s talkabout Amazon S3 - Storage EC2 – Compute! (XEN based) SQS – Queueing All horizontal Cheap when small Not cheap at scale
  • 43.
  • 44.
    Load balancing Ifwe have multiple nodes in a class, we need to balance between them Hardware or software Layer 4 or 7
  • 45.
    Hardware LB Ahardware appliance Often a pair with heartbeats for HA Expensive! But offers high performance Easy to do > 1Gbps Many brands Alteon, Cisco, Netscalar, Foundry, etc L7 - web switches, content switches, etc
  • 46.
    Software LB Justsome software Still needs hardware to run on But can run on existing servers Harder to have HA Often people stick hardware LB’s in front But Wackamole helps here
  • 47.
    Software LB Lotsof options Pound Perlbal Apache with mod_proxy Wackamole with mod_backhand http://backhand.org/wackamole/ http ://backhand.org/mod_backhand/
  • 48.
  • 49.
  • 50.
    The layers Layer4 A ‘dumb’ balance Layer 7 A ‘smart’ balance OSI stack, routers, etc
  • 51.
  • 52.
    Parallelizable == easy!If we can transcode/crawl in parallel, it’s easy But think about queuing And asynchronous systems The web ain’t built for slow things But still, a simple problem
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
    Databases Unless we’redoing a lot of file serving, the database is the toughest part to scale If we can, best to avoid the issue altogether and just buy bigger hardware Dual-Quad Opteron/Intel64 systems with 16+GB of RAM can get you a long way
  • 61.
    More read powerWeb apps typically have a read/write ratio of somewhere between 80/20 and 90/10 If we can scale read capacity, we can solve a lot of situations MySQL replication!
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 73.
    Caching Caching avoidsneeding to scale! Or makes it cheaper Simple stuff mod_perl / shared memory Invalidation is hard MySQL query cache Bad performance (in most cases)
  • 74.
    Caching Getting morecomplicated… Write-through cache Write-back cache Sideline cache
  • 75.
  • 76.
  • 77.
  • 78.
    Sideline cache Easyto implement Just add app logic Need to manually invalidate cache Well designed code makes it easy Memcached From Danga (LiveJournal) http://www.danga.com/memcached/
  • 79.
    Memcache schemes Layer4 Good: Cache can be local on a machine Bad: Invalidation gets more expensive with node count Bad: Cache space wasted by duplicate objects
  • 80.
    Memcache schemes Layer7 Good: No wasted space Good: linearly scaling invalidation Bad: Multiple, remote connections Can be avoided with a proxy layer Gets more complicated Last indentation level!
  • 81.
  • 82.
  • 83.
  • 84.
    SPOF! The keyto HA is avoiding SPOFs Identify Eliminate Some stuff is hard to solve Fix it further up the tree Dual DCs solves Router/Switch SPOF
  • 85.
  • 86.
    Master-Master Either hot/warmor hot/hot Writes can go to either But avoid collisions No auto-inc columns for hot/hot Bad for hot/warm too Unless you have MySQL 5 But you can’t rely on the ordering! Design schema/access to avoid collisions Hashing users to servers
  • 87.
    Rings Master-master isjust a small ring With 2 nodes Bigger rings are possible But not a mesh! Each slave may only have a single master Unless you build some kind of manual replication
  • 88.
  • 89.
  • 90.
    Dual trees Master-masteris good for HA But we can’t scale out the reads (or writes!) We often need to combine the read scaling with HA We can simply combine the two models
  • 91.
  • 92.
    Cost models There’sa problem here We need to always have 200% capacity to avoid a SPOF 400% for dual sites! This costs too much Solution is straight forward Make sure clusters are bigger than 2
  • 93.
    N+M N+M N= nodes needed to run the system M = nodes we can afford to lose Having M as big as N starts to suck If we could make each node smaller, we can increase N while M stays constant (We assume smaller nodes are cheaper)
  • 94.
    1+1 = 200%hardware
  • 95.
    3+1 = 133%hardware
  • 96.
    Meshed masters Notpossible with regular MySQL out-of-the-box today But there is hope! NBD (MySQL Cluster) allows a mesh Support for replication out to slaves in a coming version RSN!
  • 97.
  • 98.
    Data federation Atsome point, you need more writes This is tough Each cluster of servers has limited write capacity Just add more clusters!
  • 99.
    Simple things firstVertical partitioning Divide tables into sets that never get joined Split these sets onto different server clusters Voila! Logical limits When you run out of non-joining groups When a single table grows too large
  • 100.
    Data federation Splitup large tables, organized by some primary object Usually users Put all of a user’s data on one ‘cluster’ Or shard, or cell Have one central cluster for lookups
  • 101.
  • 102.
    Data federation Needmore capacity? Just add shards! Don’t assign to shards based on user_id! For resource leveling as time goes on, we want to be able to move objects between shards Maybe – not everyone does this ‘ Lockable’ objects
  • 103.
    The wordpress.com approachHash users into one of n buckets Where n is a power of 2 Put all the buckets on one server When you run out of capacity, split the buckets across two servers Then you run out of capacity, split the buckets across four servers Etc
  • 104.
    Data federation Heterogeneoushardware is fine Just give a larger/smaller proportion of objects depending on hardware Bigger/faster hardware for paying users A common approach Can also allocate faster app servers via magic cookies at the LB
  • 105.
    Downsides Need tokeep stuff in the right place App logic gets more complicated More clusters to manage Backups, etc More database connections needed per page Proxy can solve this, but complicated The dual table issue Avoid walking the shards!
  • 106.
    Bottom line Datafederation is how large applications are scaled
  • 107.
    Bottom line It’shard, but not impossible Good software design makes it easier Abstraction! Master-master pairs for shards give us HA Master-master trees work for central cluster (many reads, few writes)
  • 108.
  • 109.
    Multiple Datacenters Havingmultiple datacenters is hard Not just with MySQL Hot/warm with MySQL slaved setup But manual (reconfig on failure) Hot/hot with master-master But dangerous (each site has a SPOF) Hot/hot with sync/async manual replication But tough (big engineering task)
  • 110.
  • 111.
    GSLB Multiple sitesneed to be balanced Global Server Load Balancing Easiest are AkaDNS-like services Performance rotations Balance rotations
  • 112.
  • 113.
    Serving lots offiles Serving lots of files is not too tough Just buy lots of machines and load balance! We’re IO bound – need more spindles! But keeping many copies of data in sync is hard And sometimes we have other per-request overhead (like auth)
  • 114.
  • 115.
    Reverse proxy Servingout of memory is fast! And our caching proxies can have disks too Fast or otherwise More spindles is better We can parallelize it! 50 cache servers gives us 50 times the serving rate of the origin server Assuming the working set is small enough to fit in memory in the cache cluster
  • 116.
    Invalidation Dealing withinvalidation is tricky We can prod the cache servers directly to clear stuff out Scales badly – need to clear asset from every server – doesn’t work well for 100 caches
  • 117.
    Invalidation We canchange the URLs of modified resources And let the old ones drop out cache naturally Or poke them out, for sensitive data Good approach! Avoids browser cache staleness Hello Akamai (and other CDNs) Read more: http://www.thinkvitamin.com/features/webapps/serving-javascript-fast
  • 118.
    CDN – ContentDelivery Network Akamai, Savvis, Mirror Image Internet, etc Caches operated by other people Already in-place In lots of places GSLB/DNS balancing
  • 119.
  • 120.
    Edge networks OriginCache Cache Cache Cache Cache Cache Cache Cache
  • 121.
    CDN Models Simplemodel You push content to them, they serve it Reverse proxy model You publish content on an origin, they proxy and cache it
  • 122.
    CDN Invalidation Youdon’t control the caches Just like those awful ISP ones Once something is cached by a CDN, assume it can never change Nothing can be deleted Nothing can be modified
  • 123.
    Versioning When youstart to cache things, you need to care about versioning Invalidation & Expiry Naming & Sync
  • 124.
    Cache Invalidation Ifyou control the caches, invalidation is possible But remember ISP and client caches Remove deleted content explicitly Avoid users finding old content Save cache space
  • 125.
    Cache versioning Simplerule of thumb: If an item is modified, change its name (URL) This can be independent of the file system!
  • 126.
    Virtual versioning Databaseindicates version 3 of file Web app writes version number into URL Request comes through cache and is cached with the versioned URL mod_rewrite converts versioned URL to path Version 3 example.com/foo_3.jpg Cached: foo_3.jpg foo_3.jpg -> foo.jpg
  • 127.
    Reverse proxy ChoicesL7 load balancer & Squid http://www.squid-cache.org/ mod_proxy & mod_cache http://www.apache.org/ Perlbal and Memcache? http://www.danga.com/
  • 128.
    More reverse proxyHA proxy Squid & CARP Varnish
  • 129.
    High overhead servingWhat if you need to authenticate your asset serving? Private photos Private data Subscriber-only files Two main approaches Proxies w/ tokens Path translation
  • 130.
    Perlbal Re-proxying Perlbalcan do redirection magic Client sends request to Perlbal Perlbal plugin verifies user credentials token, cookies, whatever tokens avoid data-store access Perlbal goes to pick up the file from elsewhere Transparent to user
  • 131.
  • 132.
    Perlbal Re-proxying Doesn’tkeep database around while serving Doesn’t keep app server around while serving User doesn’t find out how to access asset directly
  • 133.
    Permission URLs Butwhy bother!? If we bake the auth into the URL then it saves the auth step We can do the auth on the web app servers when creating HTML Just need some magic to translate to paths We don’t want paths to be guessable
  • 134.
  • 135.
  • 136.
    Permission URLs DownsidesURL gives permission for life Unless you bake in tokens Tokens tend to be non-expirable We don’t want to track every token Too much overhead But can still expire But you choose at time of issue, not later Upsides It works Scales very nicely
  • 137.
  • 138.
    Storing lots offiles Storing files is easy! Get a big disk Get a bigger disk Uh oh! Horizontal scaling is the key Again
  • 139.
    Connecting to storageNFS Stateful == Sucks Hard mounts vs Soft mounts, INTR SMB / CIFS / Samba Turn off MSRPC & WINS (NetBOIS NS) Stateful but degrades gracefully HTTP Stateless == Yay! Just use Apache
  • 140.
    Multiple volumes Volumesare limited in total size Except (in theory) under ZFS & others Sometimes we need multiple volumes for performance reasons When using RAID with single/dual parity At some point, we need multiple volumes
  • 141.
  • 142.
    Multiple hosts Furtherdown the road, a single host will be too small Total throughput of machine becomes an issue Even physical space can start to matter So we need to be able to use multiple hosts
  • 143.
  • 144.
    HA Storage HAis important for file assets too We can back stuff up But we tend to want hot redundancy RAID is good RAID 5 is cheap, RAID 10 is fast
  • 145.
    HA Storage Butwhole machines can fail So we stick assets on multiple machines In this case, we can ignore RAID In failure case, we serve from alternative source But need to weigh up the rebuild time and effort against the risk Store more than 2 copies?
  • 146.
  • 147.
    HA Storage Butwhole colos can fail So we stick assets in multiple colos Again, we can ignore RAID Or even multi-machine per colo But do we want to lose a whole colo because of single disk failure? Redundancy is always a balance
  • 148.
    Self repairing systemsWhen something fails, repairing can be a pain RAID rebuilds by itself, but machine replication doesn’t The big appliances self heal NetApp, StorEdge, etc So does MogileFS (reaper)
  • 149.
  • 150.
    GFS – GoogleFile System Developed by … Google Proprietary Everything we know about it is based on talks they’ve given Designed to store huge files for fast access
  • 151.
    GFS – GoogleFile System Single ‘Master’ node holds metadata SPF – Shadow master allows warm swap Grid of ‘chunkservers’ 64bit filenames 64 MB file chunks
  • 152.
    GFS – GoogleFile System 1(a) 2(a) 1(b) Master
  • 153.
    GFS – GoogleFile System Client reads metadata from master then file parts from multiple chunkservers Designed for big files (>100MB) Master server allocates access leases Replication is automatic and self repairing Synchronously for atomicity
  • 154.
    GFS – GoogleFile System Reading is fast (parallelizable) But requires a lease Master server is required for all reads and writes
  • 155.
    MogileFS – OMGFiles Developed by Danga / SixApart Open source Designed for scalable web app storage
  • 156.
    MogileFS – OMGFiles Single metadata store (MySQL) MySQL Cluster avoids SPF Multiple ‘tracker’ nodes locate files Multiple ‘storage’ nodes store files
  • 157.
    MogileFS – OMGFiles Tracker Tracker MySQL
  • 158.
    MogileFS – OMGFiles Replication of file ‘classes’ happens transparently Storage nodes are not mirrored – replication is piecemeal Reading and writing go through trackers, but are performed directly upon storage nodes
  • 159.
    Flickr File SystemDeveloped by Flickr Proprietary Designed for very large scalable web app storage
  • 160.
    Flickr File SystemNo metadata store Deal with it yourself Multiple ‘StorageMaster’ nodes Multiple storage nodes with virtual volumes
  • 161.
  • 162.
    Flickr File SystemMetadata stored by app Just a virtual volume number App chooses a path Virtual nodes are mirrored Locally and remotely Reading is done directly from nodes
  • 163.
    Flickr File SystemStorageMaster nodes only used for write operations Reading and writing can scale separately
  • 164.
    Amazon S3 Abig disk in the sky Multiple ‘buckets’ Files have user-defined keys Data + metadata
  • 165.
  • 166.
    Amazon S3 ServersAmazon Users
  • 167.
    The cost Fixedprice, by the GB Store: $0.15 per GB per month Serve: $0.20 per GB
  • 168.
  • 169.
    The cost S3Regular Bandwidth
  • 170.
    End costs ~$2kto store 1TB for a year ~$63 a month for 1Mb ~$65k a month for 1Gb
  • 171.
  • 172.
    Real world examplesFlickr Because I know it LiveJournal Because everyone copies it
  • 173.
  • 174.
  • 175.
  • 176.
  • 177.
  • 178.
  • 179.
  • 180.
    Awesome! These slidesare available online: iamcal.com/talks/