SlideShare a Scribd company logo
1 of 9
6 WSH tips on
SAFE DISTANCING AT
WORKPLACES
Making Workplaces Safer
Adopt safe work practices
• Safe distancing (also known as social or physical
distancing) serves to minimise physical contact between
persons.
• It is an important strategy to stop or slow down the spread
of an infectious disease (e.g. COVID-19, H1N1, SARS).
• Safe distancing needs to be swiftly implemented and
strictly adhered to during an epidemic or pandemic.
WHY SAFE DISTANCING ?
2/9
More Info:
MOM Advisory on Safe Distancing Measures at the Workplace
WSH Tip 1
Work from home (WFH) whenever possible
3/9
WSH Tip 2
Use the phone, or explore
teleconferencing to communicate
4/9
WSH Tip 3
If WFH is not possible, avoid crowds
by adopting staggered working hours
and meal times
5/9
WSH Tip 4
Defer or cancel all non-essential events
6/9
WSH Tip 5
Ensure workstations are at least one (1)
metre apart
7/9
WSH Tip 6
Maintain at least one (1) metre physical
spacing during briefings, meetings, and
meals
8/9
PRACTISE SAFE
DISTANCING TO REDUCE
RISK OF DISEASE
TRANSMISSION
Read more at: www.mom.gov.sg/covid-
19/advisory-on-safe-distancing-measures

More Related Content

More from BigbearBigbear

genesis-12-22-original-ppt.pptx
genesis-12-22-original-ppt.pptxgenesis-12-22-original-ppt.pptx
genesis-12-22-original-ppt.pptxBigbearBigbear
 
Vehicle_Fire_Investigation_part_1.ppt
Vehicle_Fire_Investigation_part_1.pptVehicle_Fire_Investigation_part_1.ppt
Vehicle_Fire_Investigation_part_1.pptBigbearBigbear
 
cupdf.com_cheme-process-control-lab-equipment-heat-exchanger.pptx
cupdf.com_cheme-process-control-lab-equipment-heat-exchanger.pptxcupdf.com_cheme-process-control-lab-equipment-heat-exchanger.pptx
cupdf.com_cheme-process-control-lab-equipment-heat-exchanger.pptxBigbearBigbear
 
2008_Georgia_Sugar_Refinery_Explosion_Pr.pptx
2008_Georgia_Sugar_Refinery_Explosion_Pr.pptx2008_Georgia_Sugar_Refinery_Explosion_Pr.pptx
2008_Georgia_Sugar_Refinery_Explosion_Pr.pptxBigbearBigbear
 
2008_Imperial Sugar_Refinery_Explosion_Pr.pptx
2008_Imperial Sugar_Refinery_Explosion_Pr.pptx2008_Imperial Sugar_Refinery_Explosion_Pr.pptx
2008_Imperial Sugar_Refinery_Explosion_Pr.pptxBigbearBigbear
 

More from BigbearBigbear (12)

genesis-12-22-original-ppt.pptx
genesis-12-22-original-ppt.pptxgenesis-12-22-original-ppt.pptx
genesis-12-22-original-ppt.pptx
 
Fire_Safety_4.ppt
Fire_Safety_4.pptFire_Safety_4.ppt
Fire_Safety_4.ppt
 
Fire.ppt
Fire.pptFire.ppt
Fire.ppt
 
firesafety10308.ppt
firesafety10308.pptfiresafety10308.ppt
firesafety10308.ppt
 
Fire_Safety_6.ppt
Fire_Safety_6.pptFire_Safety_6.ppt
Fire_Safety_6.ppt
 
Vehicle_Fire_Investigation_part_1.ppt
Vehicle_Fire_Investigation_part_1.pptVehicle_Fire_Investigation_part_1.ppt
Vehicle_Fire_Investigation_part_1.ppt
 
WinterFireSafety.pptx
WinterFireSafety.pptxWinterFireSafety.pptx
WinterFireSafety.pptx
 
Fire_Safety_PF.ppt
Fire_Safety_PF.pptFire_Safety_PF.ppt
Fire_Safety_PF.ppt
 
cupdf.com_cheme-process-control-lab-equipment-heat-exchanger.pptx
cupdf.com_cheme-process-control-lab-equipment-heat-exchanger.pptxcupdf.com_cheme-process-control-lab-equipment-heat-exchanger.pptx
cupdf.com_cheme-process-control-lab-equipment-heat-exchanger.pptx
 
2008_Georgia_Sugar_Refinery_Explosion_Pr.pptx
2008_Georgia_Sugar_Refinery_Explosion_Pr.pptx2008_Georgia_Sugar_Refinery_Explosion_Pr.pptx
2008_Georgia_Sugar_Refinery_Explosion_Pr.pptx
 
2008_Imperial Sugar_Refinery_Explosion_Pr.pptx
2008_Imperial Sugar_Refinery_Explosion_Pr.pptx2008_Imperial Sugar_Refinery_Explosion_Pr.pptx
2008_Imperial Sugar_Refinery_Explosion_Pr.pptx
 
FTA.pptx
FTA.pptxFTA.pptx
FTA.pptx
 

Recently uploaded

SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Stationsiddharthteach18
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfragupathi90
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxMustafa Ahmed
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationEmaan Sharma
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..MaherOthman7
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksIJECEIAES
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 

Recently uploaded (20)

SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 

Safe_Distancing_at_Workplaces.pptx

  • 1. 6 WSH tips on SAFE DISTANCING AT WORKPLACES Making Workplaces Safer Adopt safe work practices
  • 2. • Safe distancing (also known as social or physical distancing) serves to minimise physical contact between persons. • It is an important strategy to stop or slow down the spread of an infectious disease (e.g. COVID-19, H1N1, SARS). • Safe distancing needs to be swiftly implemented and strictly adhered to during an epidemic or pandemic. WHY SAFE DISTANCING ? 2/9 More Info: MOM Advisory on Safe Distancing Measures at the Workplace
  • 3. WSH Tip 1 Work from home (WFH) whenever possible 3/9
  • 4. WSH Tip 2 Use the phone, or explore teleconferencing to communicate 4/9
  • 5. WSH Tip 3 If WFH is not possible, avoid crowds by adopting staggered working hours and meal times 5/9
  • 6. WSH Tip 4 Defer or cancel all non-essential events 6/9
  • 7. WSH Tip 5 Ensure workstations are at least one (1) metre apart 7/9
  • 8. WSH Tip 6 Maintain at least one (1) metre physical spacing during briefings, meetings, and meals 8/9
  • 9. PRACTISE SAFE DISTANCING TO REDUCE RISK OF DISEASE TRANSMISSION Read more at: www.mom.gov.sg/covid- 19/advisory-on-safe-distancing-measures

Editor's Notes

  1. There are various safe distancing measures that can be implemented at workplaces – 6 of which will be covered in this set of slides. Such measures are to limit close contact between persons and prevent large gatherings of people in close proximity over a prolonged duration. When combined with good personal hygiene and social responsibility, these measures can help to suppress the spread of an infectious disease. Severe respiratory diseases such as COVID-19 and SARS can be detrimental to our everyday lives, and have resulted in thousands of deaths globally. Do your part at the workplace by practising safe distancing to minimise the risk of disease transmission during a virus outbreak. Note: An epidemic occurs when an infectious disease spreads across one city, region, or country. A pandemic occurs when an infectious disease spreads across a wide geographical area beyond national borders, possibly worldwide.
  2. Employers and principals must provide the necessary IT equipment and direct their workers to work from home whenever possible depending on the nature of the job. Working from home helps to significantly reduce the density of persons at the workplace. It also helps to reduce the density of persons on public transport (especially trains and buses). Employees are to strictly adhere to the work from home arrangement during an epidemic/pandemic.
  3. Avoid physical meetings as much as possible and make use of technological options for tele- or video- conferencing. This helps to reduce contact between persons at the office, thereby lowering the risk of disease transmission. If there is a critical need for a physical meeting to proceed, limit the number of attendees and keep the meeting as short as possible.
  4. For workers unable to work from home due to the nature of their work (such as frontline operations and fieldwork at construction sites, shipyards or plants), employers and principals can implement staggered working hours so that workers can avoid crowds during peak hours. The staggered hours should apply to : Reporting time for work and dismissal time from work (to avoid crowds during the commute to-and-from work) Start and end time for meals (to avoid crowds at public eating places and/or the office canteen) Start and end time for breaks (to avoid crowding in the office pantry or rest areas) Suggestion is to implement staggered working hours over at least three 1-hourly blocks, with not more than 50% of the employees reporting to work or having their meals within each 1-hour block. For example, if the normal working hours are from 9am to 6pm, employers could stagger employees’ reporting times at one-hour intervals between 7.30 am and 10.30 am (e.g. 7.30 am to 8.30 am, 8.30 am to 9.30 am and 9.30 am to 10.30am), with corresponding staggered timings for end of work.
  5. There may be workplace activities which involve close and/or prolonged contact amongst participants. Employers should defer (postpone) or cancel all such events or activities. These could include employee briefings, dialogues, training sessions as well as employee participation in conferences, seminars, forums and exhibitions. Advise employees to adhere to the designated work arrangement (e.g. working from home) during working hours.
  6. Employers must provide for wider physical spacing (at least 1m apart) for workstations (e.g. by manually separating or by clearly marking out the workstations that can be used to achieve the 1m spacing). Seating in boardrooms and meeting rooms should also be spaced at least 1m apart and clearly marked. This will help to significantly reduce the density of persons at the office and meeting rooms, thereby lowering the risk of disease transmission. The same safe distancing measures should also apply to common spaces such as office entrances/exits, lifts, pantries/canteens, where congregation or queuing of employees or visitors/clients might occur. Employees are to strictly adhere to these safe distancing measures.
  7. Adopt measures to ensure safe distancing of at least one metre between individuals during the following (non-exhaustive) scenarios: Briefings Meetings Meal times Any other work situations involving 2 or more persons Ensure employees adhere strictly to these physical spacing measures. This will help to significantly reduce the risk of disease transmission at the workplace.