๏‚ž Researching Rural market:
๏‚ž Sanitizing rural market, Research design โ€“
  Reference frame, Research Approach,
๏‚ž Diffusion    of Innovation, Development
  studies, PRA Approach, The need for PRA
๏‚ž Sampling,   Operational aspects of data
  collection




  https://www.facebook.com/ialwaysthinkprettythings
The American Marketing Association defines
  market research as: โ€žThe systematic
  gathering, recording and analysing of data
  about problems related to marketing of
  goods and services.
a) Reactive Approach โ€“ These organisations
   do not conduct research, but follow what
   others do and see it as a way to keep up
   with competition.
b) Proactive Approach โ€“ These organizations
   anticipate developments in the market and
   introduce new ideas and methods to exploit
   opportunities or to minimise problems so as
   to get ahead of competition.

  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Low literacy levels โ€“ Literacy level in rural India are
  low, due to which villagers often find it difficult to
  understand the questions, or respond to Western
  ratings and ranking tools.
๏‚ž Poor media exposure, low product and brand
  awareness โ€“ Media penetration, whether electronic
  or non-electronic, is very low in rural areas.
  Therefore, awareness regarding products and brands
  is very low, making brand studies virtually
  impossible.
๏‚ž Local language communication โ€“ There are 15
  official languages, making communication extremely
  difficult for the researchers.
๏‚ž Scattered and Remote villages; inaccessible roads โ€“
  Tiny villages are remotely located, scattered and
  have almost inaccessible roads. Sampling such
  villages is a really painful task for researchers.

    https://www.facebook.com/ialwaysthinkprettythings
๏‚ž   Social taboos; difficulty in interacting with women
    respondents โ€“ Women in some parts of the country
    like Rajasthan and some parts of UP remain behind
    purdah. If the respondents include women, then this
    makes the job difficult for the researchers.
๏‚ž   Interview timing โ€“ Normally, younger men go to the
    fields in the morning and come back only in the
    evening. Women are busy in the morning and evening
    with cooking and other household chores.
    Researchers need to plan the day according to
    availability of the respondents.
๏‚ž   Rule out revalidation of data โ€“ The possibility of
    validating data over the telephone in rural areas is
    eliminated as telephone penetration per household is
    extremely low and physical validation is not feasible
    because villages are remote and scattered.

     https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Defining problems
๏‚ž Determining the research budget
๏‚ž Choosing    Research     design   (exploratory,
  descriptive    or   causal;    qualitative   or
  quantitative and based on primary data or
  secondary data)
๏‚ž Determining sampling method and size
๏‚ž Selecting appropriate data analysis tools
๏‚ž Preparing the research proposal
๏‚ž Organizing field work
๏‚ž Analysing and reporting findings


  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž   Research    problem      definition   involves      an
    understanding of the information needed             by
    managers and specifying the area of enquiry.

Various components of problem definition
๏‚ž Management objective : To increase the market
  share of televisions from the current rate of 20% to
  23%.
๏‚ž Management problem : Whether the new model that
  it is proposing to introduce will be a success?
๏‚ž Research problem : What are the perceptions of
  consumers requiring a new model?
๏‚ž Decision criteria : The company will introduce the
  model if 70% of the consumer responses are
  favourable.
๏‚ž Hypothesis : Consumers favouring the new model are
  equal to or more than 70%.
    https://www.facebook.com/ialwaysthinkprettythings
๏‚ž The   principle guiding the budgeting decision is
  โ€œConduct marketing research only when the
  expected value of perfect information is greater
  than the cost of obtaining it.โ€
๏‚ž As such, the budget decision involves two steps:
1. Specifying     the    approximate     value    of
    information.
2. Determining the maximum amount that can be
    spent.




   https://www.facebook.com/ialwaysthinkprettythings
๏‚ž A company is interested in marketing its products in
  the rural market for the first time. The marketing
  manger is interested in knowing whether rural
  markets are attractive. He prefers a small-scale
  survey, a sort of pilot study to assess the
  attractiveness of the rural market.
๏‚ž If the results are positive, he will order for a
  descriptive research, a large scale survey to assess
  the market potential and identify the strategic
  options.
๏‚ž In the final stage, he may undertake experimental
  research to test market his product in a few select
  villages to predict the success of the product. If the
  result is positive, he will implement his marketing
  plan for the entire rural market.

    https://www.facebook.com/ialwaysthinkprettythings
๏‚ž When    a manager is unaware of the
  phenomenon, he may initiate exploratory
  research to gain a basic understanding of it.
๏‚ž Next, he may go for descriptive research to
  have a thorough and analytical view of it.
๏‚ž He may opt for experimentation before
  making huge investments on it.




  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž In rural markets, the research is more
  exploratory in nature as many companies are
  looking for information to make entry decisions.
๏‚ž FMCG companies that have already spread their
  wings in rural areas such as HUL, Godrej,
  Colgate, LG, Philips and others are interested in
  assessing consumer preferences, consumer
  behavior and brand loyalty. Hence, they require
  descriptive and analytical studies.
๏‚ž Agri-input companies selling seeds, pesticides,
  fertilizers and farm equipment will be interested
  in going from the laboratory to the field and
  conducting real-life experimental studies to
  know how well their product works and how will
  it be received by the farmers.

    https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Quantitative research is numerically oriented. It
  requires respondents to give specific answers that
  are measurable. For eg. BSNL might ask its
  customers to rate its overall service as excellent,
  good, poor or very poor. Such scaling techniques
  cannot be used in rural areas as the respondents are
  less educated.
๏‚ž In qualitative research, there are no fixed set of
  questions but instead, a topic guide is used to
  explore various issues in-depth. The discussion
  between the interviewer and the respondent is
  largely determined by the respondentโ€Ÿs own
  thoughts and feelings. For eg. HUL personnel may
  stop a consumer who has purchased LUX and ask him
  or her why he or she has chosen the soap.
    https://www.facebook.com/ialwaysthinkprettythings
Qualitative Research can be done by:
๏‚ž Observation
๏‚ž Interviews
๏‚ž Group Discussion
๏‚ž Focus groups
๏‚ž Participatory Research methods




  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Industry,  commerce and trade associations โ€“
  FICCI, CII, ASSOCHAM
๏‚ž Marketing research agencies and associations
  โ€“ Rural Relations, MART, Anugrah Madison,
  Sampark, Rural marketing Association of
  India
๏‚ž Companies โ€“ Colgate, HUL, ITC, Rallis India
๏‚ž NGOโ€Ÿs โ€“ RASS (AP), Rural Innovations Network
  (Chennai), CARE (New Delhi)
๏‚ž Government Agencies โ€“ NCAER, RBI, Ministry
  for Rural Development, Mandal Revenue
  Offices, Panchayats.
  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Educational Institutions โ€“ Institutes like NIRD
  (AP), and NIRMA (Gujarat)
๏‚ž Media organs โ€“ The Economic Times, The
  Financial Express, Hindu Business Line,
  yojana, Kurukshetra, RMAI journals and other
  periodicals
๏‚ž Worldwide organizations โ€“ World Bank, IMF,
  IFAD, FAO and ILO




  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Census of India โ€“ Largest compilation of rural
  demographic data
๏‚ž NCAER (National Council for Applied Economic
  Research) โ€“ Largest sample surveyor in the country,
  compiles data on demographics, durables and non-
  durables.
๏‚ž NSSO (National Sample Survey Organization) โ€“
  Consumption and expenditure-related data on major
  products and services.
๏‚ž DRDA (District Rural Development Authority) โ€“
  Compilation of district-level data on government-
  aided projects.
๏‚ž ICDS (Integrated Child Development Scheme) โ€“
  Compilation of village-level information mainly on
  health by anganwadi workers.

    https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Sampling   is an easy process in urban areas due to
  marked similarity. This is a result of high mobility
  and exposure facilitated by infrastructure
  facilities, regularity of income receipts, savings
  patterns moulded by tax problems and time
  schedules and incomes.
๏‚ž Differential    and limited development of
  infrastructure, geo-physical differences, variation
  in literacy levels and differences in proximity to
  towns have contributed to the heterogeneity in
  the rural market place.


     https://www.facebook.com/ialwaysthinkprettythings
๏‚ž In  some places, toothpaste and soap are
  luxuries, whereas in some other places, it is
  necessity.
๏‚ž In Haryana and Punjab, hair dye has been
  used on buffaloes, and washing machines have
  been used for making lassi.
๏‚ž In some parts of Rajasthan, utensils are
  cleaned with ash and sand due to water
  scarcity. A washing powder would face
  competition from these alternatives that need
  very little water.
๏‚ž Hard water in most villages in Bikaner is the
  reason for the low acceptance of soap.

  https://www.facebook.com/ialwaysthinkprettythings
๏‚žA  variable such as income cannot be used to
  stratify rural samples. The reason is that
  incomes are uncertain and unaccounted.
๏‚ž In the urban context, the income category is
  the     primary   criterion   for   grouping
  consumers.
๏‚ž Often, rural market research utilizes land
  holding as an indicator of wealth and
  income.
๏‚ž The land holding has to be balanced with the
  productivity and realizations from the crop
  mix.

  https://www.facebook.com/ialwaysthinkprettythings
Village could be selected on the basis of :
๏‚ž Population
๏‚ž Proximity to highway or remote location
๏‚ž Occupation profile
๏‚ž Religion   : Hindu-dominated or muslim-
  dominated villages
๏‚ž Tribal population : tribal or non-tribal.




  https://www.facebook.com/ialwaysthinkprettythings
Factor                             Large                Small


Time available                     More                 Less


Accuracy                           High                 Low


Cost                               High                 Low


Population                         Heterogeneous        Homogeneous




    https://www.facebook.com/ialwaysthinkprettythings
๏‚ž The  time-tested sophisticated tools fail to
  evoke the required response in rural market.
๏‚ž Likewise, detailed questions need to be
  asked to simplify the inquiry and to pin down
  the response.
๏‚ž Rural consumers are comfortable with colors,
  pictures and stories.
๏‚ž Rural researchers make use of participatory
  research methods.




  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Secondary  data sources
๏‚ž Observation
๏‚ž Interviews
๏‚ž Diagrams
๏‚ž Stories and portraits




  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž PRA is a Data collection technique in rural market
  that gets the participants of the research process
  (respondents) to be actively involved in the
  research.
๏‚ž PRA is a set of approaches and methods to enable
  rural people to share, enhance and analyse their
  knowledge of life and conditions, to plan and to act.
  Therefore, it arouses the curiosity and interest of
  people and they voluntarily and eagerly get involved
  in the process and they enjoy sharing and analysing
  about themselves.
๏‚ž PRA involves local people and outsiders from
  different sectors and disciplines. Outsiders facilitate
  local people in analysing information, practicing
  critical self-awareness, taking responsibility and
  sharing knowledge of life and conditions to plan and
  to act.

    https://www.facebook.com/ialwaysthinkprettythings
Participatory Rural Appraisal                              Focus Group Discussion

Large and heterogeneous in nature,             Typically small and homogeneous in
ensuring participation from all walks of life. nature.

As expression is both verbal and non-verbal, A verbal channel โ€“ outspoken
even less assertive people can express their individuals dominate the discussion
views.
Moderatorโ€Ÿs role is low, hence information                 Moderatorโ€Ÿs intervention can be high
flow is more natural.                                      in evoking response and from all
                                                           sections.
Attitudes and behavioral change oriented.                  Action oriented.

On-the spot analysis by participants.                      Analysis done by moderators.
Cross checking and validation of data can                  FGD needs to be verified with more
be done on site by involving other members                 FGD till a consensus is reached.
or groups.
       https://www.facebook.com/ialwaysthinkprettythings
Key Principles :
๏‚ž Participation and Empowerment โ€“ Relies heavily on
  participation by the communities, as partners to the
  research team and sources of information.
๏‚ž Flexibility โ€“ Makes use of different techniques for
  collecting information.
๏‚ž Teamwork โ€“ It is best conducted by a local team with
  a few outsiders present.
๏‚ž Optimal ignorance โ€“ It avoids unnecessary details,
  and irrelevant data.
๏‚ž Systematic     โ€“ Alternative methods have been
  developed to ensure the validity and reliability of the
  findings.
๏‚ž Inclusiveness โ€“ Method allows researcher to involve
  different people.
    https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Time deadlines โ€“ Insufficient time is allowed for
  the team to relax and mingle with the local
  people, to listen to them and to learn about the
  more sensitive issues under consideration.
๏‚ž Credibility    โ€“ Individuals unfamiliar with
  participatory research methods may raise
  questions about the credibility of the PRA
  findings.
๏‚ž Hijacking โ€“ PRA agenda will be externally driven.
  This results in legitimacy problems.
๏‚ž Disappointment         โ€“     Unnecessary    local
  expectations may be raised. Local communities
  may view it as a wasteful exercise.

    https://www.facebook.com/ialwaysthinkprettythings
The type of analysis and the choice of analysis
  technique depend on the following factors :
๏‚ž Purpose of research
๏‚ž Type of data โ€“ quantitative or qualitative
๏‚ž Number of variables being examined โ€“ one or
  more
๏‚ž Type of measurement scale used โ€“ interval,
  nominal, ordinal
๏‚ž Number of samples to be compared โ€“ one or more
๏‚ž Nature of samples โ€“ dependent or independent
๏‚ž Size of the sample โ€“ small or large


   https://www.facebook.com/ialwaysthinkprettythings
The elements of a research proposal are :
๏‚ž Executive Summary / abstract
๏‚ž Background / introduction
๏‚ž Objectives and hypothesis
๏‚ž Methodology
๏‚ž Time schedule
๏‚ž Research staff and equipment
๏‚ž Cost estimates โ€“ recurring and non-recurring
๏‚ž Appendices




  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž    Preparation of data collection plan that specifies :
1.     Number of supervisors
2.     Number of field investigators
3.     Period of data collection and schedule
4.     Budget
๏‚ž      Organization of research effort
1.     Selecting investigators and supervisors
2.     Training the staff
3.     Allocating work
4.     Briefing the investigators
5.     Compensating the staff for the work turned out
๏‚ž      Controlling :
1.     Supervising the data collection with respect to time and
       cost
2.     Checking the data for validation
3.     Carrying out corrections, if any, or repeating the data
       collection wherever necessary

       https://www.facebook.com/ialwaysthinkprettythings
Aspect               Characteristics of respondents Dos
Appearance           Simple and culture bound                Dress simply

Greetings            Greetings and conversations      Make a courteous greeting with
                     are informal. They try to relate respect to age mentioning a
                     and show affection when          relationship.
                     interacting with others.
Language             Most of them are not literate           Speak in the local language. If
and culture          and unfamiliar with the English         possible, become familiar with the
                     language                                local dialect.
Rapport              Rural people like to be related. Engage the respondents in
                     They are open to known           interaction by inquiring on personal
                     people.                          and general issues in a casual way
                                                      showing concern and respect.
Investigatio         Rural people are sensitive.             Be slow in questioning and getting
n                    They are slow in understanding          responses. Be patient.
                     and exploring.
Overcoming           Villagers speak in groups. They         Encourage group interaction. After
limitations          look for social support and             gaining trust, obtain individual
                     approval.                               opinions.
         https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Donโ€™t pretend โ€“ Villagers look at a newcomer with
  some degree of apprehension. Avoid promising
  benefits that you cannot offer.
๏‚ž Avoid direct inquiry โ€“ Do not ask direct questions
  when conducting an interview in the presence of
  others.
๏‚ž Donโ€™t touch โ€“ Touching the arm or placing a hand on
  the shoulder of a villager without first establishing an
  intimate relationship is not desirable.
๏‚ž Avoid suspicious behaviors โ€“ Villagers are traditional
  in their outlook. In view of this, male researchers
  should not talk to women without a female assistant.
๏‚ž Donโ€™t become controversial โ€“ Avoid speaking about
  village politics or raising controversial issues that may
  lead to heated arguments and disputes.

    https://www.facebook.com/ialwaysthinkprettythings
๏‚ž   Mindset โ€“ It is important for the rural market researcher to
    be able to think from the rural perspective, to constantly
    evaluate responses and to mould his communication
    accordingly.
๏‚ž   Effective communication โ€“ For more effective
    communication and to elicit accurate responses in rural
    research, a working knowledge of and familiarity with local
    dialects is desirable.
๏‚ž   Discerning Ability โ€“ Researcher must know when to ask a
    specific question and when to put an end to the general
    discussion. He must also be able to discern between
    sensitive and non-sensitive issues and topics.
๏‚ž   Good Memory โ€“ Since the researcher is advised not to
    carry any writing material , he is expected to memorize all
    the relevant information.
๏‚ž   Patience โ€“ Researcher needs to have a lot of patience to
    get specific responses from villagers because they tend to
    get involved in their own repeat things.

      https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Title page
๏‚ž Table of contents
๏‚ž Executive summary
๏‚ž Introduction
๏‚ž Methodology
๏‚ž Findings
๏‚ž Limitations
๏‚ž Conclusions and recommendations
๏‚ž Appendices
๏‚ž Bibliography



    https://www.facebook.com/ialwaysthinkprettythings
Simple, easy to understand techniques to indicate varying
  preferences and feelings have been evolved by rural researchers.
๏‚ž Ladder โ€“ For rating purposes, a typical Likert scale on the
  ascendancy is achieved by the steps on the ladder. The
  respondent is asked to place a visual card corresponding to the
  product or preference on a rung according to his ranking or
                                              1
  rating.
                                                          2
                                                          3
                                                          4


๏‚ž   Images of faces โ€“ The images of faces with varying expressions
    (smiling to wailing) is another useful tool that is used to
    ascertain preferences and liking.
๏‚ž   Colour wheels โ€“ Colours are very strong indicators and forms of
    expressing feelings in the rural areas. The selection of colors is
    done on the basis of the association of rural people with colors.



      https://www.facebook.com/ialwaysthinkprettythings
Colour                               Rating               Association


Dark Green                           5                    Represents a good crop or
                                                          hariyali and hence represents
                                                          prosperity. It is considered to
                                                          be the best.
Light Green                          4                    Represents a Not very good
                                                          crop
Yellow                               3                    Represents Dry sand or a dry
                                                          field
Orange                               2                    Represents Setting sun and the
                                                          end of the day

Red                                  1                    Represents danger



      https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Dice โ€“ Dice are wooden or plastic piece with 6
  faces with varying number of holes or dots ranging
  from 1 to 6. A face value of 1 is the lowest and a
  face value of 6 is the highest.
๏‚ž Carrom coins โ€“ Fifteen coins are given to the
  respondents and they are asked to distribute them
  among the brands under study in order of their
  preferences โ€“ more coins for the most preferred
  brand.
๏‚ž Playing Cards โ€“ The face cards with K,Q,J,10 and 9
  represent a descending order in terms of values. As
  such, they are assigned ranks from 1 to 5 in that
  order.
๏‚ž 3-Point Rating Scale โ€“ Researchers interested in
  conventional scales may use three-point scales
  (agree, neutral, disagree), especially when the
  respondents are school educated.

    https://www.facebook.com/ialwaysthinkprettythings
Aspect                 Urban                                 Rural
Respondents            Literate, brand aware, individuals    Semiliterate or illiterate, brand unaware.
                       respond individually.                 Generally group responses are available.

Time                   Willing to respond. Have time         Hesitant, but devotes time.
                       pressures. Spare little time for
                       researchers.
Accessibility          Easy to access, though many           Tough to access; geographical distances
                       suffer from research fatigue.         are barriers. Donโ€Ÿt speak to outsiders.

Secondary data         Internal data, syndicate research,    Very few sources and less data.
sources                published media.

Primary data           Large number of middle men,           Fewer number of all categories.
sources                experts, sales force and
                       consumers.

Sampling               Respondents form relatively           Heterogeneous groups. Income and
                       homogeneous groups. Income can        landholding to be carefully applied.
                       be a criterion.

Data collection        Individual focused, use of            Participatory approaches. Require
                       sophisticated instrument.             simplified instruments.
         https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Retailshop / STD Booth
๏‚ž Tea stall
๏‚ž Playground
๏‚ž Chaupal
๏‚ž Haat




  https://www.facebook.com/ialwaysthinkprettythings
๏‚ž Questions should be simple and direct. Eg.
 Why do you think you donโ€Ÿt need to use a mobile
  phone? (not direct)
Would you consider using a mobile phone? (direct)
๏‚ž Questions should be self-explanatory.
๏‚ž Questions should not be ambiguous. Eg.
Do you like the mobile phone? (not clear)
Are you satisfied with the performance of the mobile
  phone? (clear)
๏‚ž Questions should have a logical flow, moving from
  general to specific and from macro to micro.
๏‚ž Questions should be in the local language. The
  accuracy of translations should be checked by
  persons from the same region to ensure that there is
  no shift in meaning or nuance.
    https://www.facebook.com/ialwaysthinkprettythings
Thank you..



https://www.facebook.com/ialwaysthinkprettythings

Rural Marketing Strategies, Market Research

  • 1.
  • 2.
    ๏‚ž Researching Ruralmarket: ๏‚ž Sanitizing rural market, Research design โ€“ Reference frame, Research Approach, ๏‚ž Diffusion of Innovation, Development studies, PRA Approach, The need for PRA ๏‚ž Sampling, Operational aspects of data collection https://www.facebook.com/ialwaysthinkprettythings
  • 3.
    The American MarketingAssociation defines market research as: โ€žThe systematic gathering, recording and analysing of data about problems related to marketing of goods and services. a) Reactive Approach โ€“ These organisations do not conduct research, but follow what others do and see it as a way to keep up with competition. b) Proactive Approach โ€“ These organizations anticipate developments in the market and introduce new ideas and methods to exploit opportunities or to minimise problems so as to get ahead of competition. https://www.facebook.com/ialwaysthinkprettythings
  • 4.
    ๏‚ž Low literacylevels โ€“ Literacy level in rural India are low, due to which villagers often find it difficult to understand the questions, or respond to Western ratings and ranking tools. ๏‚ž Poor media exposure, low product and brand awareness โ€“ Media penetration, whether electronic or non-electronic, is very low in rural areas. Therefore, awareness regarding products and brands is very low, making brand studies virtually impossible. ๏‚ž Local language communication โ€“ There are 15 official languages, making communication extremely difficult for the researchers. ๏‚ž Scattered and Remote villages; inaccessible roads โ€“ Tiny villages are remotely located, scattered and have almost inaccessible roads. Sampling such villages is a really painful task for researchers. https://www.facebook.com/ialwaysthinkprettythings
  • 5.
    ๏‚ž Social taboos; difficulty in interacting with women respondents โ€“ Women in some parts of the country like Rajasthan and some parts of UP remain behind purdah. If the respondents include women, then this makes the job difficult for the researchers. ๏‚ž Interview timing โ€“ Normally, younger men go to the fields in the morning and come back only in the evening. Women are busy in the morning and evening with cooking and other household chores. Researchers need to plan the day according to availability of the respondents. ๏‚ž Rule out revalidation of data โ€“ The possibility of validating data over the telephone in rural areas is eliminated as telephone penetration per household is extremely low and physical validation is not feasible because villages are remote and scattered. https://www.facebook.com/ialwaysthinkprettythings
  • 6.
    ๏‚ž Defining problems ๏‚žDetermining the research budget ๏‚ž Choosing Research design (exploratory, descriptive or causal; qualitative or quantitative and based on primary data or secondary data) ๏‚ž Determining sampling method and size ๏‚ž Selecting appropriate data analysis tools ๏‚ž Preparing the research proposal ๏‚ž Organizing field work ๏‚ž Analysing and reporting findings https://www.facebook.com/ialwaysthinkprettythings
  • 7.
    ๏‚ž Research problem definition involves an understanding of the information needed by managers and specifying the area of enquiry. Various components of problem definition ๏‚ž Management objective : To increase the market share of televisions from the current rate of 20% to 23%. ๏‚ž Management problem : Whether the new model that it is proposing to introduce will be a success? ๏‚ž Research problem : What are the perceptions of consumers requiring a new model? ๏‚ž Decision criteria : The company will introduce the model if 70% of the consumer responses are favourable. ๏‚ž Hypothesis : Consumers favouring the new model are equal to or more than 70%. https://www.facebook.com/ialwaysthinkprettythings
  • 8.
    ๏‚ž The principle guiding the budgeting decision is โ€œConduct marketing research only when the expected value of perfect information is greater than the cost of obtaining it.โ€ ๏‚ž As such, the budget decision involves two steps: 1. Specifying the approximate value of information. 2. Determining the maximum amount that can be spent. https://www.facebook.com/ialwaysthinkprettythings
  • 9.
    ๏‚ž A companyis interested in marketing its products in the rural market for the first time. The marketing manger is interested in knowing whether rural markets are attractive. He prefers a small-scale survey, a sort of pilot study to assess the attractiveness of the rural market. ๏‚ž If the results are positive, he will order for a descriptive research, a large scale survey to assess the market potential and identify the strategic options. ๏‚ž In the final stage, he may undertake experimental research to test market his product in a few select villages to predict the success of the product. If the result is positive, he will implement his marketing plan for the entire rural market. https://www.facebook.com/ialwaysthinkprettythings
  • 10.
    ๏‚ž When a manager is unaware of the phenomenon, he may initiate exploratory research to gain a basic understanding of it. ๏‚ž Next, he may go for descriptive research to have a thorough and analytical view of it. ๏‚ž He may opt for experimentation before making huge investments on it. https://www.facebook.com/ialwaysthinkprettythings
  • 11.
    ๏‚ž In ruralmarkets, the research is more exploratory in nature as many companies are looking for information to make entry decisions. ๏‚ž FMCG companies that have already spread their wings in rural areas such as HUL, Godrej, Colgate, LG, Philips and others are interested in assessing consumer preferences, consumer behavior and brand loyalty. Hence, they require descriptive and analytical studies. ๏‚ž Agri-input companies selling seeds, pesticides, fertilizers and farm equipment will be interested in going from the laboratory to the field and conducting real-life experimental studies to know how well their product works and how will it be received by the farmers. https://www.facebook.com/ialwaysthinkprettythings
  • 12.
    ๏‚ž Quantitative researchis numerically oriented. It requires respondents to give specific answers that are measurable. For eg. BSNL might ask its customers to rate its overall service as excellent, good, poor or very poor. Such scaling techniques cannot be used in rural areas as the respondents are less educated. ๏‚ž In qualitative research, there are no fixed set of questions but instead, a topic guide is used to explore various issues in-depth. The discussion between the interviewer and the respondent is largely determined by the respondentโ€Ÿs own thoughts and feelings. For eg. HUL personnel may stop a consumer who has purchased LUX and ask him or her why he or she has chosen the soap. https://www.facebook.com/ialwaysthinkprettythings
  • 13.
    Qualitative Research canbe done by: ๏‚ž Observation ๏‚ž Interviews ๏‚ž Group Discussion ๏‚ž Focus groups ๏‚ž Participatory Research methods https://www.facebook.com/ialwaysthinkprettythings
  • 14.
    ๏‚ž Industry, commerce and trade associations โ€“ FICCI, CII, ASSOCHAM ๏‚ž Marketing research agencies and associations โ€“ Rural Relations, MART, Anugrah Madison, Sampark, Rural marketing Association of India ๏‚ž Companies โ€“ Colgate, HUL, ITC, Rallis India ๏‚ž NGOโ€Ÿs โ€“ RASS (AP), Rural Innovations Network (Chennai), CARE (New Delhi) ๏‚ž Government Agencies โ€“ NCAER, RBI, Ministry for Rural Development, Mandal Revenue Offices, Panchayats. https://www.facebook.com/ialwaysthinkprettythings
  • 15.
    ๏‚ž Educational Institutionsโ€“ Institutes like NIRD (AP), and NIRMA (Gujarat) ๏‚ž Media organs โ€“ The Economic Times, The Financial Express, Hindu Business Line, yojana, Kurukshetra, RMAI journals and other periodicals ๏‚ž Worldwide organizations โ€“ World Bank, IMF, IFAD, FAO and ILO https://www.facebook.com/ialwaysthinkprettythings
  • 16.
    ๏‚ž Census ofIndia โ€“ Largest compilation of rural demographic data ๏‚ž NCAER (National Council for Applied Economic Research) โ€“ Largest sample surveyor in the country, compiles data on demographics, durables and non- durables. ๏‚ž NSSO (National Sample Survey Organization) โ€“ Consumption and expenditure-related data on major products and services. ๏‚ž DRDA (District Rural Development Authority) โ€“ Compilation of district-level data on government- aided projects. ๏‚ž ICDS (Integrated Child Development Scheme) โ€“ Compilation of village-level information mainly on health by anganwadi workers. https://www.facebook.com/ialwaysthinkprettythings
  • 17.
    ๏‚ž Sampling is an easy process in urban areas due to marked similarity. This is a result of high mobility and exposure facilitated by infrastructure facilities, regularity of income receipts, savings patterns moulded by tax problems and time schedules and incomes. ๏‚ž Differential and limited development of infrastructure, geo-physical differences, variation in literacy levels and differences in proximity to towns have contributed to the heterogeneity in the rural market place. https://www.facebook.com/ialwaysthinkprettythings
  • 18.
    ๏‚ž In some places, toothpaste and soap are luxuries, whereas in some other places, it is necessity. ๏‚ž In Haryana and Punjab, hair dye has been used on buffaloes, and washing machines have been used for making lassi. ๏‚ž In some parts of Rajasthan, utensils are cleaned with ash and sand due to water scarcity. A washing powder would face competition from these alternatives that need very little water. ๏‚ž Hard water in most villages in Bikaner is the reason for the low acceptance of soap. https://www.facebook.com/ialwaysthinkprettythings
  • 19.
    ๏‚žA variablesuch as income cannot be used to stratify rural samples. The reason is that incomes are uncertain and unaccounted. ๏‚ž In the urban context, the income category is the primary criterion for grouping consumers. ๏‚ž Often, rural market research utilizes land holding as an indicator of wealth and income. ๏‚ž The land holding has to be balanced with the productivity and realizations from the crop mix. https://www.facebook.com/ialwaysthinkprettythings
  • 20.
    Village could beselected on the basis of : ๏‚ž Population ๏‚ž Proximity to highway or remote location ๏‚ž Occupation profile ๏‚ž Religion : Hindu-dominated or muslim- dominated villages ๏‚ž Tribal population : tribal or non-tribal. https://www.facebook.com/ialwaysthinkprettythings
  • 21.
    Factor Large Small Time available More Less Accuracy High Low Cost High Low Population Heterogeneous Homogeneous https://www.facebook.com/ialwaysthinkprettythings
  • 22.
    ๏‚ž The time-tested sophisticated tools fail to evoke the required response in rural market. ๏‚ž Likewise, detailed questions need to be asked to simplify the inquiry and to pin down the response. ๏‚ž Rural consumers are comfortable with colors, pictures and stories. ๏‚ž Rural researchers make use of participatory research methods. https://www.facebook.com/ialwaysthinkprettythings
  • 23.
    ๏‚ž Secondary data sources ๏‚ž Observation ๏‚ž Interviews ๏‚ž Diagrams ๏‚ž Stories and portraits https://www.facebook.com/ialwaysthinkprettythings
  • 24.
    ๏‚ž PRA isa Data collection technique in rural market that gets the participants of the research process (respondents) to be actively involved in the research. ๏‚ž PRA is a set of approaches and methods to enable rural people to share, enhance and analyse their knowledge of life and conditions, to plan and to act. Therefore, it arouses the curiosity and interest of people and they voluntarily and eagerly get involved in the process and they enjoy sharing and analysing about themselves. ๏‚ž PRA involves local people and outsiders from different sectors and disciplines. Outsiders facilitate local people in analysing information, practicing critical self-awareness, taking responsibility and sharing knowledge of life and conditions to plan and to act. https://www.facebook.com/ialwaysthinkprettythings
  • 25.
    Participatory Rural Appraisal Focus Group Discussion Large and heterogeneous in nature, Typically small and homogeneous in ensuring participation from all walks of life. nature. As expression is both verbal and non-verbal, A verbal channel โ€“ outspoken even less assertive people can express their individuals dominate the discussion views. Moderatorโ€Ÿs role is low, hence information Moderatorโ€Ÿs intervention can be high flow is more natural. in evoking response and from all sections. Attitudes and behavioral change oriented. Action oriented. On-the spot analysis by participants. Analysis done by moderators. Cross checking and validation of data can FGD needs to be verified with more be done on site by involving other members FGD till a consensus is reached. or groups. https://www.facebook.com/ialwaysthinkprettythings
  • 26.
    Key Principles : ๏‚žParticipation and Empowerment โ€“ Relies heavily on participation by the communities, as partners to the research team and sources of information. ๏‚ž Flexibility โ€“ Makes use of different techniques for collecting information. ๏‚ž Teamwork โ€“ It is best conducted by a local team with a few outsiders present. ๏‚ž Optimal ignorance โ€“ It avoids unnecessary details, and irrelevant data. ๏‚ž Systematic โ€“ Alternative methods have been developed to ensure the validity and reliability of the findings. ๏‚ž Inclusiveness โ€“ Method allows researcher to involve different people. https://www.facebook.com/ialwaysthinkprettythings
  • 27.
    ๏‚ž Time deadlinesโ€“ Insufficient time is allowed for the team to relax and mingle with the local people, to listen to them and to learn about the more sensitive issues under consideration. ๏‚ž Credibility โ€“ Individuals unfamiliar with participatory research methods may raise questions about the credibility of the PRA findings. ๏‚ž Hijacking โ€“ PRA agenda will be externally driven. This results in legitimacy problems. ๏‚ž Disappointment โ€“ Unnecessary local expectations may be raised. Local communities may view it as a wasteful exercise. https://www.facebook.com/ialwaysthinkprettythings
  • 28.
    The type ofanalysis and the choice of analysis technique depend on the following factors : ๏‚ž Purpose of research ๏‚ž Type of data โ€“ quantitative or qualitative ๏‚ž Number of variables being examined โ€“ one or more ๏‚ž Type of measurement scale used โ€“ interval, nominal, ordinal ๏‚ž Number of samples to be compared โ€“ one or more ๏‚ž Nature of samples โ€“ dependent or independent ๏‚ž Size of the sample โ€“ small or large https://www.facebook.com/ialwaysthinkprettythings
  • 29.
    The elements ofa research proposal are : ๏‚ž Executive Summary / abstract ๏‚ž Background / introduction ๏‚ž Objectives and hypothesis ๏‚ž Methodology ๏‚ž Time schedule ๏‚ž Research staff and equipment ๏‚ž Cost estimates โ€“ recurring and non-recurring ๏‚ž Appendices https://www.facebook.com/ialwaysthinkprettythings
  • 30.
    ๏‚ž Preparation of data collection plan that specifies : 1. Number of supervisors 2. Number of field investigators 3. Period of data collection and schedule 4. Budget ๏‚ž Organization of research effort 1. Selecting investigators and supervisors 2. Training the staff 3. Allocating work 4. Briefing the investigators 5. Compensating the staff for the work turned out ๏‚ž Controlling : 1. Supervising the data collection with respect to time and cost 2. Checking the data for validation 3. Carrying out corrections, if any, or repeating the data collection wherever necessary https://www.facebook.com/ialwaysthinkprettythings
  • 31.
    Aspect Characteristics of respondents Dos Appearance Simple and culture bound Dress simply Greetings Greetings and conversations Make a courteous greeting with are informal. They try to relate respect to age mentioning a and show affection when relationship. interacting with others. Language Most of them are not literate Speak in the local language. If and culture and unfamiliar with the English possible, become familiar with the language local dialect. Rapport Rural people like to be related. Engage the respondents in They are open to known interaction by inquiring on personal people. and general issues in a casual way showing concern and respect. Investigatio Rural people are sensitive. Be slow in questioning and getting n They are slow in understanding responses. Be patient. and exploring. Overcoming Villagers speak in groups. They Encourage group interaction. After limitations look for social support and gaining trust, obtain individual approval. opinions. https://www.facebook.com/ialwaysthinkprettythings
  • 32.
    ๏‚ž Donโ€™t pretendโ€“ Villagers look at a newcomer with some degree of apprehension. Avoid promising benefits that you cannot offer. ๏‚ž Avoid direct inquiry โ€“ Do not ask direct questions when conducting an interview in the presence of others. ๏‚ž Donโ€™t touch โ€“ Touching the arm or placing a hand on the shoulder of a villager without first establishing an intimate relationship is not desirable. ๏‚ž Avoid suspicious behaviors โ€“ Villagers are traditional in their outlook. In view of this, male researchers should not talk to women without a female assistant. ๏‚ž Donโ€™t become controversial โ€“ Avoid speaking about village politics or raising controversial issues that may lead to heated arguments and disputes. https://www.facebook.com/ialwaysthinkprettythings
  • 33.
    ๏‚ž Mindset โ€“ It is important for the rural market researcher to be able to think from the rural perspective, to constantly evaluate responses and to mould his communication accordingly. ๏‚ž Effective communication โ€“ For more effective communication and to elicit accurate responses in rural research, a working knowledge of and familiarity with local dialects is desirable. ๏‚ž Discerning Ability โ€“ Researcher must know when to ask a specific question and when to put an end to the general discussion. He must also be able to discern between sensitive and non-sensitive issues and topics. ๏‚ž Good Memory โ€“ Since the researcher is advised not to carry any writing material , he is expected to memorize all the relevant information. ๏‚ž Patience โ€“ Researcher needs to have a lot of patience to get specific responses from villagers because they tend to get involved in their own repeat things. https://www.facebook.com/ialwaysthinkprettythings
  • 34.
    ๏‚ž Title page ๏‚žTable of contents ๏‚ž Executive summary ๏‚ž Introduction ๏‚ž Methodology ๏‚ž Findings ๏‚ž Limitations ๏‚ž Conclusions and recommendations ๏‚ž Appendices ๏‚ž Bibliography https://www.facebook.com/ialwaysthinkprettythings
  • 35.
    Simple, easy tounderstand techniques to indicate varying preferences and feelings have been evolved by rural researchers. ๏‚ž Ladder โ€“ For rating purposes, a typical Likert scale on the ascendancy is achieved by the steps on the ladder. The respondent is asked to place a visual card corresponding to the product or preference on a rung according to his ranking or 1 rating. 2 3 4 ๏‚ž Images of faces โ€“ The images of faces with varying expressions (smiling to wailing) is another useful tool that is used to ascertain preferences and liking. ๏‚ž Colour wheels โ€“ Colours are very strong indicators and forms of expressing feelings in the rural areas. The selection of colors is done on the basis of the association of rural people with colors. https://www.facebook.com/ialwaysthinkprettythings
  • 36.
    Colour Rating Association Dark Green 5 Represents a good crop or hariyali and hence represents prosperity. It is considered to be the best. Light Green 4 Represents a Not very good crop Yellow 3 Represents Dry sand or a dry field Orange 2 Represents Setting sun and the end of the day Red 1 Represents danger https://www.facebook.com/ialwaysthinkprettythings
  • 37.
    ๏‚ž Dice โ€“Dice are wooden or plastic piece with 6 faces with varying number of holes or dots ranging from 1 to 6. A face value of 1 is the lowest and a face value of 6 is the highest. ๏‚ž Carrom coins โ€“ Fifteen coins are given to the respondents and they are asked to distribute them among the brands under study in order of their preferences โ€“ more coins for the most preferred brand. ๏‚ž Playing Cards โ€“ The face cards with K,Q,J,10 and 9 represent a descending order in terms of values. As such, they are assigned ranks from 1 to 5 in that order. ๏‚ž 3-Point Rating Scale โ€“ Researchers interested in conventional scales may use three-point scales (agree, neutral, disagree), especially when the respondents are school educated. https://www.facebook.com/ialwaysthinkprettythings
  • 38.
    Aspect Urban Rural Respondents Literate, brand aware, individuals Semiliterate or illiterate, brand unaware. respond individually. Generally group responses are available. Time Willing to respond. Have time Hesitant, but devotes time. pressures. Spare little time for researchers. Accessibility Easy to access, though many Tough to access; geographical distances suffer from research fatigue. are barriers. Donโ€Ÿt speak to outsiders. Secondary data Internal data, syndicate research, Very few sources and less data. sources published media. Primary data Large number of middle men, Fewer number of all categories. sources experts, sales force and consumers. Sampling Respondents form relatively Heterogeneous groups. Income and homogeneous groups. Income can landholding to be carefully applied. be a criterion. Data collection Individual focused, use of Participatory approaches. Require sophisticated instrument. simplified instruments. https://www.facebook.com/ialwaysthinkprettythings
  • 39.
    ๏‚ž Retailshop /STD Booth ๏‚ž Tea stall ๏‚ž Playground ๏‚ž Chaupal ๏‚ž Haat https://www.facebook.com/ialwaysthinkprettythings
  • 40.
    ๏‚ž Questions shouldbe simple and direct. Eg. Why do you think you donโ€Ÿt need to use a mobile phone? (not direct) Would you consider using a mobile phone? (direct) ๏‚ž Questions should be self-explanatory. ๏‚ž Questions should not be ambiguous. Eg. Do you like the mobile phone? (not clear) Are you satisfied with the performance of the mobile phone? (clear) ๏‚ž Questions should have a logical flow, moving from general to specific and from macro to micro. ๏‚ž Questions should be in the local language. The accuracy of translations should be checked by persons from the same region to ensure that there is no shift in meaning or nuance. https://www.facebook.com/ialwaysthinkprettythings
  • 41.