SlideShare a Scribd company logo
Harris Academy South Norwood                             MEDIA Risk Assessment Record

                       Director, camera operator, music artist, actor x2                                       South Bank
Production /                                                                        Location of Shoot:
Person(s) involved:
                       Scene one – ‘the break up’.                                  Location Contact No:
Activity or process:   Couple breaking up over dinner
                                                                                    Date of Assessment:

Shoot Date(s):                                                                      Director’s / Student(s)
                                                                                    Signature:


                 A: HAZARDS                          B: DEGREE OF RISK                   C: PREVENTIVE MEASURES                   D: IF ACCIDENT OCCURS?
                                                     (Refer to Risk Matrix)

        Nature of hazard          Person(s) at    Severity Likelihood       Risk           Measures in place aimed at              Further necessary measures,
                                      risk                                 Rating        reducing risk to minimum level?          involving whom and by when?
                                  (See below)

    •   Pedestrians tripping     Cas             Major      Possible       C         •    All wires should be securely tapped      •   The First Aid Box will be
        over the cables          Cre                                                      to the floor to avoid anyone from the        carried by a crew member
                                 Pub                                                      tripping over them                       •   All crew members should
                                                                                     •    The tape should be a different               have phone , so an
                                                                                          colour from the pavement                     emergency call can be
                                                                                     •    Tell those who are skating in South          made easily
                                                                                          Bank that we will be filming in this     •   The accident should be
                                                                                          area                                         assessed first and if help is
                                                                                     •    A sign can be placed where the               needed then called
                                                                                          camera is to make people aware
                                                                                          filming is taking place
Persons at risk include: Cas – Cast                    Cre -    Crew                  Fam - Family                     Pub-    Public
                         Stu - Students                Tut –    Tutor(s)              Vis - Visitors
The “Risk Matrix” or Table of Overall Risk

The Risk Matrix is a useful tool in the assessment of the severity of overall risk. It is intended to allow the relationship between the likelihood of
incident/injury occurring and the possible severity of outcome. By comparing these two factors against each other, a Risk Rating can be arrived at,
employing a scale between ‘A’ (highest risk) and ‘E’ (lowest risk).

Risk Likely Rating, on a scale of ‘A’ to ‘E’ (‘A’ being the highest)

      Likely                                                   Risk Rating, on a scale of ‘A’ to ‘E’ (‘A’ being the highest)
    severity of
     outcome
                      Frequent                    Probable                      Possible                     Remote                     Unlikely

Fatal                 A                           B+                            C+                           D+                         E+
Major                 B+                          B                             C                            D                          E
Minor                 C+                          C                             D                            D                          E
Non- Reportable       D+                          D                             D                            E                          E


Explanation of severity of outcome (For definitions and full list of inclusions, refer to the Reporting of Injuries, Diseases and Dangerous Occurrence
Regulations (RIDDOR) 1995):

Fatal - any fatal injuries to employees, or any other person, sustained in an accident connected with your business

Major - any injury that includes:
· Fracture of the skull, spine, pelvis, any bone in the arms or legs (but not in the hand or foot).
· Amputations of the hand or foot, or of a finger, thumb or toe where the bone or joint is severed.
· Loss of sight in an eye, or a penetrating injury, chemical / hot burn to the eye.
· Electric shock resulting in loss of consciousness and / or medical treatment.
· Acute illness or loss of consciousness resulting from absorption, inhalation or ingestion of a substance.
· Any other injury requiring hospitalisation for more than 24 hours.

Minor - any other injury to an individual that results in absence from work, or an inability to carry out their normal work, for more than 3 days.
Non-Reportable - any injury or discomfort that does not cause more than 3 days’ disablement, or permanent damage.
Note: “Ill Health”, i.e. loss of hearing, respiratory illness, dermatitis etc. should be rated on their likely severity.
For each section of the Risk Assessment Record form above,
it is recommended that the assessor(s) refer to the notes below for an outline of the main requirements of the questions:

• Activity or Process - Basically you are required to state the physical nature of the activity.
This can either be a generic activity such as “booking out kit”, or a more specific activity such as
“filming in a moving car” or other more specialised activities; so if necessary try to describe it as best as possible.
For example: “erection and use of lights in living room for fight scene”.

• Nature of Hazard? - Concentrate upon things that could cause harm, not trivial things like flaky paintwork!
Consult the people who use the area as they may have a different perspective to you.
Do not rely solely upon others however, as they have become “blinkered” to certain hazards through daily exposure to them.

• Who may be at risk? - Identify types / groups and numbers of people, and perhaps individuals.
It could be “crew” in general, or more specific groups such as cast or guest interviewees who are not familiar with the location.

• Degree of risk - Compare the likely outcome (worst case scenario if you like) against
the likelihood of it occurring (unlikely through to frequent). Award a rating from A (high) down to E (very low).

Refer to the Risk Matrix above for risk rating.

• Preventive (Existing Control Measures) - Identify the measures already in place and ask yourself
if they are sufficient to eliminate or reduce the risk to the lowest possible degree?
It is not always possible to entirely eliminate a hazard, as they are often intrinsic to a piece of equipment (such as a tungsten light)
or an activity (such as driving).

• Preventive (Further Measures Required) - Is there a possibility of circumstances arising that could lead to additional unforeseen risk?
If so, how could these be pre-empted and addressed before they cause harm? If change is planned, what associated hazards
could arise? Could adverse weather conditions or a sudden influx of people result in additional hazards?

• If Accident Occurs – it is essential that plans are in place if any accident occurs, whether it be fatal, major, minor, or even some non-reportable outcomes.
This would normally take the form of having a record of emergency numbers of cast and crew, contacting the college and the media department,
and calling the emergency services as required.

This Risk Assessment Document has been approved by                                     Date
L. BRYANT                                                                              Dec 2011

More Related Content

Similar to Risk assessment south bank

Risk assessment regent street final
Risk assessment regent street finalRisk assessment regent street final
Risk assessment regent street final
DmeeThriller
 
Risk Assessment
Risk Assessment Risk Assessment
Risk Assessment
LarelleShay
 
Media risk assessment record
Media risk assessment recordMedia risk assessment record
Media risk assessment record
LarelleShay
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
LarelleShay
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
zac walpole
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
empentertainment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
empentertainment
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
josh mk
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
Josh Mand-King
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
josh mk
 
The 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projectsThe 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projects
Torsten Koerting
 
Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment Form
Brett Tinnion
 
Film Production Risk Assessment Form
Film Production Risk Assessment FormFilm Production Risk Assessment Form
Film Production Risk Assessment Form
Graveney School
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
Sam Benzie
 
Chandler faith
Chandler faithChandler faith
Chandler faith
NASAPMC
 
Crisis Development 2008 02 06
Crisis Development 2008 02 06Crisis Development 2008 02 06
Crisis Development 2008 02 06
Oboni Riskope Associates Inc.
 
Aha sample-scaffolding
Aha sample-scaffoldingAha sample-scaffolding
Aha sample-scaffolding
kashif Manzoor Watoo
 
Risk assessment townhall
Risk assessment townhallRisk assessment townhall
Risk assessment townhall
adamrobinsonmedia
 
coping with hazards
coping with hazardscoping with hazards
coping with hazards
James Foster
 
ASQ Clinic On Risk 09
ASQ Clinic On Risk  09ASQ Clinic On Risk  09
ASQ Clinic On Risk 09
JDhuwalia
 

Similar to Risk assessment south bank (20)

Risk assessment regent street final
Risk assessment regent street finalRisk assessment regent street final
Risk assessment regent street final
 
Risk Assessment
Risk Assessment Risk Assessment
Risk Assessment
 
Media risk assessment record
Media risk assessment recordMedia risk assessment record
Media risk assessment record
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
 
Film risk assessment
Film risk assessmentFilm risk assessment
Film risk assessment
 
The 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projectsThe 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projects
 
Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment Form
 
Film Production Risk Assessment Form
Film Production Risk Assessment FormFilm Production Risk Assessment Form
Film Production Risk Assessment Form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Chandler faith
Chandler faithChandler faith
Chandler faith
 
Crisis Development 2008 02 06
Crisis Development 2008 02 06Crisis Development 2008 02 06
Crisis Development 2008 02 06
 
Aha sample-scaffolding
Aha sample-scaffoldingAha sample-scaffolding
Aha sample-scaffolding
 
Risk assessment townhall
Risk assessment townhallRisk assessment townhall
Risk assessment townhall
 
coping with hazards
coping with hazardscoping with hazards
coping with hazards
 
ASQ Clinic On Risk 09
ASQ Clinic On Risk  09ASQ Clinic On Risk  09
ASQ Clinic On Risk 09
 

More from DmeeThriller

The survey monkey graphs
The survey monkey graphsThe survey monkey graphs
The survey monkey graphs
DmeeThriller
 
Font ideas
Font ideasFont ideas
Font ideas
DmeeThriller
 
Filming log 2 presentation
Filming log 2 presentationFilming log 2 presentation
Filming log 2 presentation
DmeeThriller
 
Font ideas
Font ideasFont ideas
Font ideas
DmeeThriller
 
Colour scheme ideas
Colour scheme ideasColour scheme ideas
Colour scheme ideasDmeeThriller
 
Genre album cover analysis
Genre album cover analysisGenre album cover analysis
Genre album cover analysis
DmeeThriller
 
Digipack research
Digipack researchDigipack research
Digipack research
DmeeThriller
 
Contingency plan
Contingency planContingency plan
Contingency plan
DmeeThriller
 
Floor plan
Floor planFloor plan
Floor plan
DmeeThriller
 
Floor plan
Floor planFloor plan
Floor plan
DmeeThriller
 
Location recce (all)
Location recce (all)Location recce (all)
Location recce (all)
DmeeThriller
 
We found love andrew goodwin 2
We found love   andrew goodwin 2We found love   andrew goodwin 2
We found love andrew goodwin 2
DmeeThriller
 
We found love andrew goodwin
We found love   andrew goodwinWe found love   andrew goodwin
We found love andrew goodwin
DmeeThriller
 
Star theory
Star theoryStar theory
Star theory
DmeeThriller
 
Michael gondry
Michael gondryMichael gondry
Michael gondry
DmeeThriller
 
Video analysis
Video analysisVideo analysis
Video analysis
DmeeThriller
 
Evaluation question 2
Evaluation question 2Evaluation question 2
Evaluation question 2
DmeeThriller
 
Question 1 evaluation
Question 1 evaluationQuestion 1 evaluation
Question 1 evaluation
DmeeThriller
 

More from DmeeThriller (18)

The survey monkey graphs
The survey monkey graphsThe survey monkey graphs
The survey monkey graphs
 
Font ideas
Font ideasFont ideas
Font ideas
 
Filming log 2 presentation
Filming log 2 presentationFilming log 2 presentation
Filming log 2 presentation
 
Font ideas
Font ideasFont ideas
Font ideas
 
Colour scheme ideas
Colour scheme ideasColour scheme ideas
Colour scheme ideas
 
Genre album cover analysis
Genre album cover analysisGenre album cover analysis
Genre album cover analysis
 
Digipack research
Digipack researchDigipack research
Digipack research
 
Contingency plan
Contingency planContingency plan
Contingency plan
 
Floor plan
Floor planFloor plan
Floor plan
 
Floor plan
Floor planFloor plan
Floor plan
 
Location recce (all)
Location recce (all)Location recce (all)
Location recce (all)
 
We found love andrew goodwin 2
We found love   andrew goodwin 2We found love   andrew goodwin 2
We found love andrew goodwin 2
 
We found love andrew goodwin
We found love   andrew goodwinWe found love   andrew goodwin
We found love andrew goodwin
 
Star theory
Star theoryStar theory
Star theory
 
Michael gondry
Michael gondryMichael gondry
Michael gondry
 
Video analysis
Video analysisVideo analysis
Video analysis
 
Evaluation question 2
Evaluation question 2Evaluation question 2
Evaluation question 2
 
Question 1 evaluation
Question 1 evaluationQuestion 1 evaluation
Question 1 evaluation
 

Risk assessment south bank

  • 1. Harris Academy South Norwood MEDIA Risk Assessment Record Director, camera operator, music artist, actor x2 South Bank Production / Location of Shoot: Person(s) involved: Scene one – ‘the break up’. Location Contact No: Activity or process: Couple breaking up over dinner Date of Assessment: Shoot Date(s): Director’s / Student(s) Signature: A: HAZARDS B: DEGREE OF RISK C: PREVENTIVE MEASURES D: IF ACCIDENT OCCURS? (Refer to Risk Matrix) Nature of hazard Person(s) at Severity Likelihood Risk Measures in place aimed at Further necessary measures, risk Rating reducing risk to minimum level? involving whom and by when? (See below) • Pedestrians tripping Cas Major Possible C • All wires should be securely tapped • The First Aid Box will be over the cables Cre to the floor to avoid anyone from the carried by a crew member Pub tripping over them • All crew members should • The tape should be a different have phone , so an colour from the pavement emergency call can be • Tell those who are skating in South made easily Bank that we will be filming in this • The accident should be area assessed first and if help is • A sign can be placed where the needed then called camera is to make people aware filming is taking place
  • 2. Persons at risk include: Cas – Cast Cre - Crew Fam - Family Pub- Public Stu - Students Tut – Tutor(s) Vis - Visitors The “Risk Matrix” or Table of Overall Risk The Risk Matrix is a useful tool in the assessment of the severity of overall risk. It is intended to allow the relationship between the likelihood of incident/injury occurring and the possible severity of outcome. By comparing these two factors against each other, a Risk Rating can be arrived at, employing a scale between ‘A’ (highest risk) and ‘E’ (lowest risk). Risk Likely Rating, on a scale of ‘A’ to ‘E’ (‘A’ being the highest) Likely Risk Rating, on a scale of ‘A’ to ‘E’ (‘A’ being the highest) severity of outcome Frequent Probable Possible Remote Unlikely Fatal A B+ C+ D+ E+ Major B+ B C D E Minor C+ C D D E Non- Reportable D+ D D E E Explanation of severity of outcome (For definitions and full list of inclusions, refer to the Reporting of Injuries, Diseases and Dangerous Occurrence Regulations (RIDDOR) 1995): Fatal - any fatal injuries to employees, or any other person, sustained in an accident connected with your business Major - any injury that includes: · Fracture of the skull, spine, pelvis, any bone in the arms or legs (but not in the hand or foot). · Amputations of the hand or foot, or of a finger, thumb or toe where the bone or joint is severed. · Loss of sight in an eye, or a penetrating injury, chemical / hot burn to the eye. · Electric shock resulting in loss of consciousness and / or medical treatment. · Acute illness or loss of consciousness resulting from absorption, inhalation or ingestion of a substance. · Any other injury requiring hospitalisation for more than 24 hours. Minor - any other injury to an individual that results in absence from work, or an inability to carry out their normal work, for more than 3 days.
  • 3. Non-Reportable - any injury or discomfort that does not cause more than 3 days’ disablement, or permanent damage. Note: “Ill Health”, i.e. loss of hearing, respiratory illness, dermatitis etc. should be rated on their likely severity. For each section of the Risk Assessment Record form above, it is recommended that the assessor(s) refer to the notes below for an outline of the main requirements of the questions: • Activity or Process - Basically you are required to state the physical nature of the activity. This can either be a generic activity such as “booking out kit”, or a more specific activity such as “filming in a moving car” or other more specialised activities; so if necessary try to describe it as best as possible. For example: “erection and use of lights in living room for fight scene”. • Nature of Hazard? - Concentrate upon things that could cause harm, not trivial things like flaky paintwork! Consult the people who use the area as they may have a different perspective to you. Do not rely solely upon others however, as they have become “blinkered” to certain hazards through daily exposure to them. • Who may be at risk? - Identify types / groups and numbers of people, and perhaps individuals. It could be “crew” in general, or more specific groups such as cast or guest interviewees who are not familiar with the location. • Degree of risk - Compare the likely outcome (worst case scenario if you like) against the likelihood of it occurring (unlikely through to frequent). Award a rating from A (high) down to E (very low). Refer to the Risk Matrix above for risk rating. • Preventive (Existing Control Measures) - Identify the measures already in place and ask yourself if they are sufficient to eliminate or reduce the risk to the lowest possible degree? It is not always possible to entirely eliminate a hazard, as they are often intrinsic to a piece of equipment (such as a tungsten light) or an activity (such as driving). • Preventive (Further Measures Required) - Is there a possibility of circumstances arising that could lead to additional unforeseen risk? If so, how could these be pre-empted and addressed before they cause harm? If change is planned, what associated hazards could arise? Could adverse weather conditions or a sudden influx of people result in additional hazards? • If Accident Occurs – it is essential that plans are in place if any accident occurs, whether it be fatal, major, minor, or even some non-reportable outcomes. This would normally take the form of having a record of emergency numbers of cast and crew, contacting the college and the media department, and calling the emergency services as required. This Risk Assessment Document has been approved by Date L. BRYANT Dec 2011