This risk assessment summarizes the filming of an interview between two people at Northumbria University School of Design. It identifies potential hazards such as cold environment, manual handling, trip hazards, physical fatigue, stress/anxiety, and nuisance noise/vibration. Control measures are outlined to minimize risks, such as dressing appropriately for cold weather, being cautious when lifting equipment, clearing space to avoid trips, scheduling short filming times to prevent fatigue, reducing stress through preparation, and pausing filming or changing locations if noise becomes an issue. With these controls, the risks are deemed unlikely to possible but negligible to slight.