The document provides a specification sheet for the RFS 4000 Series 802.11n Integrated Services Controller from Motorola. The RFS 4000 integrates wired, wireless and security networking features into a compact form factor, enabling organizations to create survivable branch networks using a single platform. It features dual-band 802.11n wireless connectivity, integrated security functions, support for additional applications such as locationing and RFID, and can provide concurrent wireless access and security monitoring. The RFS 4000 offers redundancy and resiliency features to ensure reliable network operation at branch locations.