A Project Report
On

“RETAIL BANKING”
For

By

Rajesh Kumar
Under the guidance of:
“Ms. Aditi Das”
Submitted to:

“NATIONAL INSTITUTE OF TECHNOLOGY”
“In partial fulfilment of the requirements for the award of the degree of
Master of Business Administration (MBA)”
Through
Department of Management Studies

National Institute of Technology Durgapur
Technology,
Mahatma Gandhi Avenue, Durgapur – 713209
West Bengal, India
1
DECLARATION

I hereby declare that the project report titled “RETAIL BANKING WITH
REFERENCE TO ALLAHABAD BANK” is my original work and has not
been published or submitted for any degree, diploma or other similar titles elsewhere.
This has been undertaken for the purpose of partial fulfilment of Master of Business
Administration (MBA) at National Institute of Technology, Durgapur (West Bengal).

Date: 13/ 07/2013

RAJESH KUMAR

Place: Durgapur, West Bengal

Roll No.: 12/MBA/23

2
PREFACE

This project report attempts to bring under one cover the entire hard work
and dedication put in by me in the completion of the project work on
Retail Banking with reference to Allahabad Bank.
I have expressed my experiences in my own simple way. I hope who goes
through it will find it interesting and worth reading. All constructive feedback
is cordially invited.

3
ACKNOWLEDGEMENT
It gives me great pleasure in presenting the project report that gives the details
of my project on “Retail Banking” carried out at Allahabad Bank, City Centre
Branch, Durgapur (West Bengal).
It is impossible to list all the people who have helped me during my project. I
take this opportunity to express my whole hearted thanks to Ms. Aditi Das
(Chief Manager) at Allahabad Bank who has treated me as a bank employee
& helped me in all my queries personally.
I would also like to express my deep sense of gratitude towards all managers,
staff, & to all those who directly or indirectly helped me in successfully
execution of my work.
Lastly but most essentially I would like to thank Mr. Sailaja Shankar
Bhattacharya (Senior Manager) without his help it wouldn’t be possible for
me to complete the project at the stipulated period of time.

Rajesh Kumar
Roll no.: 12/MBA/23
Session: 2012-14

4
CONTENTS
A. Executive Summary

7-11

B. Introduction to the concept

12-15

C. Industry profile

16

D. Company profile
- Product/Services Profile
- Workflow model (end to end)

17-19

E. Mckinsey’s Seven S Model
-Structure
-Skill
-Style
-Strategy
-System
-Staff
-Shared Values
-SWOT Analysis

29-31
32
33
33
34-35
35
35
36
37-38

F. Research Methodology
- Title of the Project
- Statement of the problem
- Objectives
- Operational definitions
- Data collection
- Statistical Tools used for research
- Sampling Technique – Sampling Unit, Sample Size and

39
40
40
40
41
41
41
42-44

20-26
27-28

5
Sampling method.
- Plan of Analysis
- Limitations to the study

45
46

G. Data Analysis and Interpretation

47-66

H. Summary of findings

67-68

I. Suggestions

69-71

J. Conclusions – Future Growth

72

K. Learning Experience

73

L. Annexure
- Financial Statements
- Questionnaires
- Bibliography

74
75-80
81-83
84

6
7
EXECUTIVE SUMMARY
TITLE OF PROJECT
“A Study on Retail Banking with special reference to ALLAHABAD
BANK”

STATEMENT OF THE PROBLEM
As there are immense opportunities of the retail banking in India. This
dissertation is on the issues and challenges in the retail banking because of the
competition of the various banks and the customer satisfaction of the services
which the banks are providing and at the same time to solve the complaints of
the customer and maintaining the sound relationship for the future and by this
way to estimate the future growth of the retail banking.

OBJECTIVES
To study the issues and challenges in retail banking.
To study the recent trends in retail banking.
To ensure high satisfaction level and reduce percentage of
complaints of customers in retail banking.
To estimate the future growth of Indian retail banking.
To understand Optimization of retail banking channels.
To suggest strategies for improvement in Customer Service.

8
DATA COLLECTION

Data was collected from two sources-primary and secondary sources.
1. Primary data collection- The primary data was collected by means
of survey. It was collected from different customers through
questionnaire.

2. Secondary data collection-This data was collected from
Internet, Company’s websites, Books & Magazines.
SAMPLE SIZE
Sample size was restricted to 50 respondents, since it was not possible to cover
the whole universe in the available time period.

SAMPLING METHOD

For this research Non- Probability Convenience Sampling has been used
because time limit for the completion of the work is limited and also managers
and employees were not available all the time.
Area of Study – Durgapur, West Bengal
Duration -

2 months (13th May ’13 – 13th July ’13)

9
SUMMARY OF FINDINGS
90% of customers are happy with the bank timings & they belief that
it is very good.

80% of respondents like the branch ambience & layout & find it
friendly. 80% of respondents said branch was clean and well
maintained.

Respondents were of view that Branch personnel had listened to them
patiently and have been able to respond to their queries and
clarifications.

74% of respondents responded that Branch personnel had been very
helpful and courteous.

72% of respondents opinion that branch personnel does ‘Need
Analysis’ & ‘Risk Assessment’ of customer savings before
recommending any investment option to them.

86% of respondents that branch personnel are aware of Product and
Services and responded to your queries.

10
SUGGESTIONS
As 10% customer response is not good for the clarification of the queries
response towards them so bank personnel should improve this issue
because customer is a source through which business can be increase and
satisfy customers is a source to create more customers, with reference to
table no. 4.
As it is only 10% respondent said that sometime there was a error in the
transaction happened so to avoid these kinds of errors should be avoided
because it is unnecessarily results in wastage of time for both staff
members and service rendered, with reference to table no. 9.
With reference to table no. 6, large number of branch personnel should do
‘Need Analysis’ & ‘Risk Assessment’ before recommending any
investment option to customer.
With reference to table no. 7, more branch personnel should be aware of
Product and Services and responded to customer’s queries.

With reference to table no. 10, Allahabad Bank should look into the
feedback provided by customer and takes necessary action wherever
required.

With reference to table no. 12, Allahabad Bank should focus on Mahila
Sanchay Saving Bank account as small 10% of customer likes this.

11
12
RETAIL BANKING AN INTRODUCTION
Retail banking has become a very important component in the business mix of
banks. Retail banking offers multiple comfort factors for banks to do business.
Large and divergent customer base across income segment offers huge scope
for banks to develop and offer multiple products and services. In addition to
traditional products and services offered by banks over the years, the retail
model has undergone rapid innovation in the past decade with regard to
products, processes, people and technology.
Technology has become the driver for retail banking explosion, and technology
products like ATM, Internet Banking, Mobile Banking, Card products like
Debit Cards and Credit Cards and remittance products like RTGS and NEFT are
making their presence felt in retail space. Banks are embracing different
strategies, redesigning their conventional business silos, reengineering their
channels, product and services to increase the share of customer wallet.
A bank functions can be divided into various divisions like:

Retail/Personal Banking: This division provides a range of financial services
to individual customers and small companies. It operates mainly through branch
networks.
Retail banking includes routine transactions like deposits and withdrawals of
money; money transfer; foreign currency exchange and traveller's cheque
encashment. They also deal with personal and small loans, credit and
mortgages; insurance policies; investment schemes; pension funds; and advice
to customers on various financial matters. Apart from offering home loans, car
loans, educational loans, consumer loans, etc. they also develop various deposit
schemes and help people fill their coffers.

13
Corporate Banking: They deal with medium to large-scale companies and
government agencies. It could start at the local branch manager level, though
more complex dealings are routed through corporate divisions of clearing banks
and their merchant banking subsidiaries. Corporate banking deals with credit
and advances, trade finance, foreign exchange management, asset management,
lease financing of heavy equipment, infrastructure, machinery, credit risk
assessment, etc. They also advise clients on matters such as corporate mergers
and acquisition, raising capital and business strategy regarding competitors and
outside factors.

Merchant Banking: Investment management is the primary activity of this
group. It could be on behalf of corporate clients, or institutional investors-like
pension funds, investment trusts, or those in the securities business. This groups
also handles public issue and marketing of shares, debentures and other such
papers. It may also include other stock market functions like dematerialization
services, investment advisory services, etc. Merchant banking executives
research into capital market, advice and manage funds of various corporate and
individual customers.

Treasury group: This group takes care of the total funds of a bank including
foreign exchange reserves. Responsibilities include bank portfolio management,
dealing in foreign currency, etc. There are Forex (foreign exchange) dealers in
this group who exclusively deal with the foreign market. They buy and sell
foreign exchange at the minimum exchange cost thereby earning maximum
profit from the transactions.

Rural Banking: This group deals with the banking and credit needs of people
in the rural sector. Not all banks have this group and some banks have separate
subsidiary companies for rural banking.
14
Product Management: This group conceptualizes various banking services and
then develops; implements and manages them. They have the responsibility for
a banking product (meaning services like personal loans, home loans, credit
cards, loans against shares, educational loans, etc.).
Apart from these main functional groups, there is an appraisal group to analyse
economic feasibility of industrial projects, the bank's exposure to financial risk
and long term returns. There are internal auditors who audit the bank's internal
books of accounts.
There are various groups of professionals like lawyers, engineers, agricultural
scientists, chartered accountant, company secretary, cost accountant and
economists who work in various departments in advisory capacities. They help
make decisions on issues that are legal, technical or economic in nature. For
example, the economist advises various functional groups on the implications of
the Union budget on the business of the banks, consumer buying pattern, etc.

15
POTENTIAL FOR RETAIL IN INDIA: IS SKY THE LIMIT
The Indian players are bullish on the Retail business and this is not totally
unfounded. There are two main reasons behind this. Firstly, it is now undeniable
that the face of the Indian consumer is changing. This is reflected in a change in
the urban household income pattern. The direct fallout of such a change will be
the consumption patterns and hence the banking habits of Indians, which will
now be skewed towards Retail products. At the same time, India compares
pretty poorly with the other economies of the world that are now becoming
comparable in terms of spending patterns with the opening up of our economy.
For instance, while the total outstanding Retail loans in Taiwan is around 41%
of GDP, the figure in India stands at less than 5%. The comparison with the
West is even more staggering. Another comparison that is natural when
comparing Retail sectors is the use of credit cards. Here also, the potential lies
in the fact that of all the consumer expenditure in India in 2001, less than 1%
was through plastic, the corresponding US figure standing at 18%.

16
17
Type

Public company

Traded as

BSE: 532480
NSE: ALBK

Industry

Banking, Financial services

Founded

1865

Headquarters

Kolkata, India

Number of

2,500 branches (2012)

locations
Key people
Services

Shubhalakshmi Panse(Chairman & MD)
T.R Chawla (Executive Director)
Finance and insurance
Consumer banking
Corporate banking

Revenue

16,822 crore(US$3.1 billion) (2012)

Operating income

3,770 crore(US$690 million) (2012)

Net income

1,867 crore(US$340 million) (2012)

Total equity

500 crore (US$92 million) (2012)

Website

allahabadbank.in

18
Allahabad Bank which began operations in 1865, has its head
head-quarters
in Kolkata is the oldest joint stock bank in India. The bank was founded
in Allahabad in 1865 and as of 31 March 2012 now has over 2500 branches
throughout India. The bank has a branch in Hong Kong and a representative
office in Shenzen.

19th century
On 24 April 1865, a group of Englishmen at Allahabad founded Allahabad
Bank. By the end of 19th century it had branches at Jhansi, Kanpur,
Lucknow, Bareilly, Nainital Calcutta, and Delhi.
Nainital,
20th century
In the early 20th century, with the start of Swadeshi movement, Allahabad Bank
witnessed a spurt in deposits. In 1920, P & O Banking Corporation acquired
Allahabad Bank with a bid price of 436 (US$8.00) per share. In 1923 the bank
moved its head office and the registered office to Calcutta for reasons of both
operational convenience and business opportunities. Then in 1927 Chartered
Bank of India, Australia and China acquired P&O Bank. However, Chartered
Bank continued to operate Allahabad Bank as a separate entity.
On 19 July 1969, the Government nationalised Allahabad Bank, together with
13 other banks.
In October 1989, Allahabad Bank acquired United Industrial Bank, a Calcutta
Calcuttabased bank that had been established in 1940. Two years later, Allahabad Bank
established
AllBank
Finance
Ltd,
a
wholly
owned Merchant
o
Banking subsidiary.
21st century
The government's ownership of Allahabad Bank shrank in October 2002 after
the bank engaged in an Initial Public Offering (IPO) of
10 crore (US$1.8 million) of shares, each with a face value 10. The IPO
reduced the Government's shareholding to 71.16%. Then in April 2005 the bank
shareholding
conducted a second public offering of 10 crore of shares, each with a face
value 10 and selling at a premium of 72. This offering reduced the
Government's ownership to 55.23%.
In June 2006 the bank opened its first office outside India when it opened a
representative office in Shenzen Mainland China. In February 2007, Allahabad
Shenzen,
Bank opened its first overseas branch, in Hong Kong. In March, the bank's
business crossed the 1 million crore mark.

19
PRODUCT AND SERVICES

1. Personal Banking
2. Social Banking
3. MSME Banking
4. Corporate Banking
5. International Banking
6. Other Services

20
PERSONAL BANKING
Personal banking of Allahabad Bank is further divided into three main categories:
i)
Deposit Products
ii)
Retail Credit Products; and
iii) Other Credit Products

Deposit Products:
It includes:a) Flexi-Fix Deposit
b) Mahila Sanchay Account
c) Monthly Plus
d) Current Plus Deposit Scheme
e) Rs 5 Banking
f) Vikash SB Account
g) Sishu Mangal Deposit Scheme
h) Premium SB Account
i) Premium Current Account
j) Tax Benefit Term Deposit Scheme

21
Retail Credit Products:
It includes:
a) Housing Loan
b) Saral Loan
c) Furnishing Loan
d) Gyan Dipika Scheme
e) Gold Loan Scheme
f) Personal Loan for Pensioners
g) Education Loan
h) Loan Against NSC(National Saving Certificate)/KVP(Kisan Vikas Patra)
i) Property Scheme
j) Reverse Mortgage Scheme
k) Loan Scheme for Doctors/Medical Practitioners
l) Commercial Vehicle Finance
m) Dream Car
n) Bank Rent Scheme
o) Trade Scheme
p) IPO/FPO Finance Scheme
q) Mobike Scheme
r) Overdraft Facility in SB Account
s) Housing Loan Scheme for NRI’s(Non-Resident Indians)/PIO’s(Persons of
Indian Origin)

Other Credit Products:
a) Akshay krishi – Kisan Credit Card Scheme
b) Allahabad Bank – EXPO Scheme
c) Allahabad Bank Tax Benefit Term Deposit Scheme

22
SOCIAL BANKING
Social Banking is also further segmented into three different categories:
i)
Priority Sector
ii)
Financial Inclusion
iii) Credit Facilities to Minority Communities

MSME BANKING
MSME stands for Micro, Small and Medium Enterprise. An “enterprises”
means an Industrial undertaking or a business concern or any other
establishment, by whatever name called, engaged in the manufacture or
production of goods pertaining to any industry specified in the First Schedule to
the Industries (Development and Regulation) Act 1951 or employing plant and
machinery in the process of value addition to the final product having a distinct
name or character or use or engaged in providing or rendering of any service or
services.
Some important MSME portals of Allahabad Bank are:
i)
MSME Policy of the Bank
ii)
Presence in MSME Cluster
iii) Specialized MSME Branches in Each State
iv) MSME Campaigns held and number of borrowers given loan in the
campaigns
v)
Training provided for the bank staff on MSME needs and number of
persons trained
vi) Online system of acknowledgement of loan application and loan tracking
system
vii) Format of loan application form with check list
viii) Interest on MSME/Services Charge
ix) OTS Scheme of the Bank
x)
Rehabilitation of sick MSME
xi) Number of people trained in RSETI’s and of them those provided credit
linkage
xii) Branch Level Customer meets held
xiii) Grievance Redressal Mechanism for MSME’s
xiv) Name of Nodal Officer of the bank for MSME complaints and queries:
Sri A.K. Mohapatra
Assistant General Manager
Priority Sector Credit Department
Head Office, 2 N.S. Road
Kolkata – 700001
23
CORPORATE BANKING
Corporate banking includes:
i)
Cash Management Services
ii)
Gold Card Scheme for Exporters
iii) Allahabad e – Trade
iv) 3 – IN – 1 Account (Triple Advantage)

INTERNATIONAL BANKING
Allahabad Bank is well spread out in India and one overseas Branch at Hong
Kong, besides a Representative office at Shenzhen, China. Bank has also
arrangements with correspondents at various important overseas locations,
which will ensure extending to all our NRI customers rich banking experience.
We understand your needs and value your patronage and would request you to
invest your surplus funds in the various products offered by our Bank.
Non – Resident:
A. In terms of Regulation 2(vi) of FEMA 5, a Person resident outside India, who is
a citizen of India or is a person of Indian Origin.
B. Indian Residents working abroad on assignment with Foreign Governments,
Government agencies or in UNO and its affiliates IMF, IBRD etc and
Government officials and other officials of PSU's deputed abroad or
assignments or posted abroad to their own offices including Diplomatic
Missions abroad.
C. A person of Indian Origin who is a citizen of any other country other than
Bangladesh or Pakistan if:
i.
ii.
iii.

He/She at any point of time, held an Indian Passport.
He/She or either of his/her parents or any of his/her grandparents was a citizen
of India by virtue of Constitution of India or Citizenship act 1955 (57 of 1955).
The persons are a spouse of an Indian Citizen or a person referred to in sub
clause b (i) or (ii) above.
24
Students going abroad for studies are treated as Non Resident Indians provided
their stay abroad is for more than 182 days in the preceding financial year and
broad
their intention to stay outside India for an uncertain period when they go abroad
for studies.

Deposit Account:
Non Resident Indians can open accounts under Repatriable and Non
NonRepatriable deposit schemes. In respect of Repatriable scheme the NRIs have
the choice of following schemes for depositing their savings with Our Bank.

25
OTHER SERVICES
THER
Other important services of Allahabad Bank are:
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)
xviii)
xix)

Insurance and Mutual Fund
Government Business
Depository Services
E – Products
Cards
ASBA(Application Supported by Block Amount) Facility
Account – Portability
Agriculture Debt Wavier
All Ayushman Bima Yojana
Samadhan Financial Literacy & Credit Counselling Centre
Deceased – Settlement
Depository Receipt
International Debit – Cum – ATM Card
Money Transfer Services
National Eligibility Fund Transfer(NEFT)
New Pension System(NPS)
Non – Life Business Insurance
Real Time Gross Settlement(RTGS)
Regional MSME Care Centres

NOTE:
VARIOUS RETAIL LENDING SCHEMES (Hyperlink):
Rate of Interest under Retail Credit Products.
Discretionary Authority under Various Retail Schemes.
Services Charges, Processing Fees and Prepayment Fees.

26
WORK FLOW MODEL
DEPOSITS
Customer Approaching the
Bank/Enquiry

Introduction

Documentation

Saving, Fixed, Current
and Recurring A/C

A/C holder facility
Deposits

Withdrawal

Cashier

Cashier

Cash supervision

Cash supervision

Account for the customer

27
ACCOUNT OPENING

Choose an Institution

Go to the Bank or Website

Pick the Product You Want

Provide Your Information

Agree to Terms

Print, Sign, and Mail (If Applicable)

Congratulate Yourself!

28
MCKINSEY’S SEVEN S MODEL AS APPLICABLE TO THAT
ORGANIZATION
The Seven-S is a framework for analyzing organizations and their effectiveness.
It looks at the seven key elements that make the organizations successful, or
not: strategy; structure; systems; style; skills; staff; and shared values.

Consultants at McKinsey & Company developed the 7S model in the late 1970s
to help managers address the difficulties of organizational change. The model
shows that organizational immune systems and the many interconnected
variables involved make change complex, and that an effective change effort
must address many of these issues simultaneously.

29
7-S Model – A Systemic Approach to Improving Organizations
The 7-S model is a tool for managerial analysis and action that provides a
structure with which to consider a company as a whole, so that the
organization's problems may be diagnosed and a strategy may be developed and
implemented.
The 7-S diagram illustrates the multiplicity interconnectedness of elements that
define an organization's ability to change. The theory helped to change
manager's thinking about how companies could be improved. It says that it is
not just a matter of devising a new strategy and following it through. Nor is it a
matter of setting up new systems and letting them generate improvements.

“ Shared values ―are commonly held beliefs, mindsets, and assumptions that
shape how an organization behaves – its corporate culture. Shared values are
what engender trust. They are an interconnecting centre of the 7S’s model.
Values are the identity by which a company is known throughout its business
areas, what the organization stands for and what it believes in, it central beliefs
and attitudes. These values must be explicitly stated as both corporate objectives
and individual values
― Strategy” is a plan of an organization formulates to reach identified goals,
and a set of decisions and actions aimed at gaining a sustainable advantage over
the competition. ―Systems” define the flow of activities involved in the daily
operation of business, including its core processes and its support systems. They
refer to the procedures, processes and routines that are used to manage the
organization and characterize how important work is to be done. ―Style” refers
to the cultural style of the organization, how key managers behave in achieving
the organization's goals, how managers collectively spend their time and
attention, and how they use symbolic behaviour. How management acts is more
important that what management says. ―Staff” refers to the number and types
of personnel within the organization and how companies develop employees
30
and shape basic values. ―Skills” refer to the dominant distinctive capabilities
and competencies of the personnel or of the organization as a whole.
Structure” is the organizational chart and associated information that shows
who reports to whom and how tasks are both divided up and integrated. In other
words, structures describe the hierarchy of authority and accountability in an
organization, the way the organization's units relate to each other: centralized,
functional

divisions

(top-down);

decentralized

(the

trend

in

larger

organizations); matrix, network, holding, etc. These relationships are frequently
diagrammed in organizational charts. Most organizations use some mix of
structures - pyramidal, matrix or networked ones - to accomplish their goals.

31
STRUCTURE
Board of Directors

Mrs. Subhalakshami Panse

Shri Tilak Raj Chawla

Shri Arun Tiwari

Dr. Shashank Saksena

Shri A. Udgata

Chairman & Managing Director Allahabad Bank

Executive Director

Executive Director

Government Nominee Director

RBI Nominee Director

Allahabad Bank

Allahabad Bank

Allahabad Bank

Allahabad Bank

Shri Rajesh Madanmohan
Chatruvedi

Chartered Accountant Director

Allahabad Bank

Shri Gour Das

Workmen Employee Director

Allahabad Bank

Dr. Sudip Chauduri

Shareholders’ Director

Allahabad Bank

32
SKILLS
Highly skilled candidates are recruited at various levels across the organization.
Skills can be classified broadly into highly skilled and semi skilled routine
work. Various training program are organized regularly to impart training needs
of the employees.
STYLE /CULTURE
The culture of the organisation, consisting of two components:
Organisational culture: the dominant values and beliefs, and norms,
which develop over time and become relatively enduring features of
organisation life.
Management Style: More matter of what managers do than what they
say how do a company‘s managers spend their time? What are they
focusing attention on?
Symbolism – the creation and maintenance (or sometimes deconstruction) of
meaning is a fundamental responsibility of managers.
Building a high performance culture is another key prerogative of the HR
function. Allahabad bank envisage a credible and transparent performance
management process that helps in aligning individual goals with corporate
objectives, both quantitative and qualitative, and encourages cross sell and team
spirit. Allahabad bank performance management process will be supported by a
robust rewards and recognition strategy for each business and a market based
compensation structure that is flexible, responsive and helps retention through
asset building and wealth creation for top performers.

33
STRATEGY
Being one of the leading banking institutions with rich culture of
professionalism the bank has various strategies to tackle with competitors in the
market. The bank has the strategy to make use of the growing potential of the
rural sector as well as the global academy, the business landscape will be
changing magically and so will the financial service need.
The bank has the strategy to enhance the reach of anytime and anywhere
banking. It has the ATM’s almost in all the cities and in good numbers. With
the growing of the net banking the bank have several new products and facilities
with state-of-the-art facilities, enabling you to conduct all your banking
activities using your personal computer, from the comfort of your home or
office. Thus providing you with secure, 24 hour access to all your accounts
from anywhere in the world.
Unique Advantages:
Single Access Key: Our revolutionary technology allows you to access
your account with your debit card PIN. Just log on to our website, select
Internet Banking services and key in your Customer ID and debit card
PIN. On successful validation you will be allowed to select an Internet
password. It's that easy.
Secure Technology: For the first time in India, our Two Factor
Authorization allows for "One Time Passwords" for Internet Banking
transaction authentication to be delivered via SMS to your Mobile Phone.
This password enhances your Internet Banking security and allows you
the freedom of banking without remembering multiple passwords.

34
Instant Payment Solutions: Our Real Time Gross Settlement (RTGS)
Payment and Electronic Funds Transfer (EFT) facilities allow you to
transfer funds to own or third party accounts instantly. You can also
request for multiple Demand Drafts at various locations and set up
standing instructions for your account to execute routine payments
SYSTEM
Formal and informal procedures that support the strategy and structure (systems
are more powerful than they are given credit).
The bank follows a systematic procedure at all the levels. The bank has very
good performance appraisal system, training and development system, resource
allocation system, distribution and recovery system. The instructions flow from
top management to lower levels of management.
The training needs are developed after TNI (Training Needs Identification) and
all the programs are put on the monthly/annual training calendar to be
implemented.
STAFF
The people/human resources management – processes used to develop
managers, socialization processes, ways of shaping basic values of management
cadre, ways of introducing young recruits to the company, ways of helping to
manage the careers of employees.
Allahabad Bank envisaged that for an individual to work with the organization
in perfect synergy, his/her goals had to be linked with the goals of the
organization. This process of aligning individual and organizational goals was
termed as the performance management process. The main objective of these
innovative performance management practices was to encourage the employees
to think innovatively.
35
SHARED VALUE
The bank aimed at building a culture to inculcate professional entrepreneurship
in them to make themselves and the shareholders prosperous. Allahabad Bank
has planned to steadily increase its presence in retail business. Earlier bank has
purposely maintained a low-key presence in the retail market, now is planning
to increase exposure in this segment. There is tremendous scope for Allahabad
Bank’s growth as it was trying to take care of the latent needs of the customers
with highly skilled and involved employees.

36
SWOT ANALYSIS

STRENGHTS:
•

It has an extensive distribution network comprising of 2716 branches.

•

The Bank has a strong retail depository base & has good number of
customer.

•

Bank boasts of strong brand equity.

•

The bank has a near competitive edge in area of operations.

•

The bank has a market leader in cash settlement service for the
major stock exchanges in its country.

•

Allahabad Bank is one of the largest public sector banks operating in
India.

•

It has a highly automated environment in terms of information
technology & communication system.

•

Infrastructure is best.

•

It has many innovative products like kids Instapay, NRI services.

WEAKNESS:
Some time account opening and delivery of cheque book take
comparatively more time.
Occasionally link failure.

37
OPPORTUNITY:
Branch expansion.
Door step services.
Infrastructure improvements & better systems for trading &
settlement in the government securities & foreign exchange markets.

THREATS:
o The bank has started facing competition from players like SBI, HDFC
Bank in the finance market itself.
o This reduces the profit margins in the future.

o

Some Private Banks have 7 days banking.

38
39
TITLE OF THE PROJECT
“A Study on Retail Banking with special reference to Allahabad Bank”

STATEMENT OF THE PROBLEM
As there are immense opportunities of the retail banking in India. This project is
on the issues and challenges in the retail banking because of the competition of
the various banks and the customer satisfaction of the services which the banks
are providing and at the same time to solve the complaints of the customer and
maintaining the sound relationship for the future and by this way to estimate the
future growth of the retail banking.
OBJECTIVES OF STUDY
To study the issues and challenges in retail banking.
To study the recent trends in retail banking.
To ensure high satisfaction level and reduce percentage of
complaints of customer in retail banking.
To estimate the future growth of Indian retail banking.
To understand Optimization of retail banking channels.
To suggest strategies for improvement in Customer Service.

40
OPERATIONAL DEFINITION
Retail banking refers to banking in which

banking institutions execute

transactions directly with consumers, rather than corporations or other banks.
Services offered include: savings and checking accounts, mortgages, personal
loans, debit cards, credit cards, and so forth. And to know about the customer’s
perceptions about the different products of the bank like current account,
savings account, FD, Smart Saver, Smart Access and others.
DATA COLLECTION
There are several approaches of data collection. The primary sources of data
collection are done through: Observation
Questionnaire
Questionnaire:
Questionnaire is the method of data collection, which is very much popular,
particularly in big cities. Different modes of questions are put up on the paper
and the particular universe, on which the research is conducted, are asked to fill
their responses.
The Secondary source includes data collection through:
Magazines, Journals, Books, Newspapers etc.
Company Website.

41
42
SAMPLING TECHNIQUE
(a) Sampling Unit: - Walk in customers and the company database of high
ended customer.
(b) Sample Size:Sample size for this project was restricted to 50 respondents. Since it was not
possible to cover the whole universe in the available time period, it was
necessary for me to take a sample size of 50 respondents.
(c) Sampling Method:There are three methods of sampling:1. Probability Sampling
2. Non-Probability Sampling
3. Quota
For this research work Non- Probability Convenience Sampling has been
chosen because time limit for the completion of the work is limited.
Area of Study - Durgapur, West Bengal
Duration -

2 months (13th May ’13 – 13th July ’13)

43
DATA COLLECTION METHOD
Data for the present study is collected from two sources:
1. Primary Data:
The data are collected directly from the universe by conducting
interviews, etc. these are the original sources from which the researcher
directly gathers data which are not previously referred. All the people
from different profession were personally visited and interviewed. They
were the main source of primary data. The method of collection of
primary data was personal direct interview through a structured
questionnaire.
The primary data was collected by means of survey. Questionnaires were
prepared and customers of Allahabad Bank were approached to fill up these
questionnaires. The filled up information was later analyzed to obtain the
required information.
2. Secondary Data:
The data are collected from the secondary sources such as magazines,
journals, etc. These sources consist of already variable data in the form of
statements, and reports, which may include sensory reports, financial
statements of the company, reports of governments departments, etc.
It was collected from internal sources. The secondary data was collected
on the basis of organizational file, official records, newspapers,
magazines, management books, preserved information in the company’s
database and the website of the company.
Both Primary and Secondary sources was used for data collection.
For primary source, Questionnaire was used. For secondary source
Internet, Books and Newspapers etc were used.

44
RESEARCH DESIGN
Research design is simply the framework or plan for a study, used as a guide in
collecting and analyzing data. There are three types of Research Design:1. Exploratory Research Design
2. Descriptive Research Design
3. Casual Research Design
For the study, Exploratory Research Design was undertaken to classify the
investors on their risk and return profile.

PLAN OF ANALYSIS
The data obtained from the structured questionnaire was interpreted and
recorded. The table and graph were constructed using data from the
questionnaire through simple techniques like average, percentage, etc. which
was then used for analyzing the acquired data.

45
LIMITATIONS
Designing own and new financial products is very costly and time
consuming for the bank.
Customers now-a-days prefer net banking to branch banking. The banks
that are slow in introducing technology-based products, are finding it
difficult to retain the customers who wish to opt for net banking.
Customers are attracted towards other financial products like mutual
funds etc.
Though banks are investing heavily in technology, they are not able to
exploit the same to the full extent.
A major disadvantage is monitoring and follows up of huge volume of
loan accounts inducing banks to spend heavily in human resource
department.
Long term loans like housing loan due to its long repayment term in the
absence of proper follow-up, can become NPAs.
The volume of amount borrowed by a single customer is very low as
compared to wholesale banking. This does not allow banks to exploit the
advantage of earning huge profits from single customer as in case of
wholesale banking.

46
47
Profile of Respondents

Respondents were the customers of Allahabad Bank of Durgapur
ere
Bank
city (West Bengal) of age group 21
21-65 years.
A. Opinion on Branch experience.
The Branch timings (10:0 am to 3:30 pm from Monday to Friday and
(10:00
10:00 am to 12:30 pm on Saturday are convenient?
Saturday)
Table: 1
Parameter
Very Good
Good
Satisfactory
Could be better

In numbers

In percentage

45
5
0
0

90
10
0
0

Interpretation
The purpose of this question is to know the whether the bank timings are
convenient for the custom 90% of respondents says that bank timings are
customer,
very good and 10% of respondent replied that timings are good. None of the
customers have any problem with resp to timings.
respect
Inference: As 90% responded very well, it seems high number are happy
,
with bank timings.

48
Is the branch ambience & layout is very friendly?
Table: 2
Parameter

In numbers

In percentage

Very Good

40

80

Good

7

14

Satisfactory

2

4

Could be better

1

2

Interpretation
80% were of the respondent says that branch ambience is very good, 14% were
of the respondent replied that branch ambience is good while 4% says that it is
satisfactory & just 1% replied that it could be better.
Inference: As 80% of respondents say branch ambience is very good, so
not too many respondents like the branch ambience.

49
Is the Branch was clean and well maintained?
Table: 3
Parameter
Very Good
Good

In numbers
40
7

In percentage
80
14

Satisfactory

2

4

Could be better

1

2

Interpretation
80% were of the respondent says that branch cleanness is very good, 14% were
of the replied that branch cleanness is good while 4% says that it is satisfactory
& just 1% replied that it could be better.
Inference: As 80% of respondents say branch cleanness is very good, so
not too many respondents like the branch cleanness.

50
B. Opinion of the customer regarding Branch personnel.
Is the branch personnel have listened to you patiently and have been able
to respond to your queries and clarifications?
Table: 4
Parameter

In
numbers

In percentage

Very Good
Good

38
7

76
14

Satisfactory
Could be better

3
2

6
4

Interpretation
76% of respondent says that branch personnel listened patiently& have been
able to respond to their queries, 14% of respondents replied that it is good.
While only 6% of respondent says that it is satisfactory and 4% replied that it
could be better.
Inference: As only 76% of respondent says that branch personnel listens
patiently and have been able to respond to queries and clarifications, so not too
many respondents are satisfied.
51
Is the branch personnel have been very helpful and courteous?
Table: 5
Parameter

In numbers

In percentage

Very Good

37

74

Good

8

16

Satisfactory

3

6

Could be better

2

4

Interpretation
74% of respondent says that branch personnel have been very helpful and
courteous, 16% of respondents replied that it is good. While only 6% of
respondent says that it is satisfactory and 4% replied that it could be better.
Inference: As only 74% of respondent says branch personnel have been very
helpful and courteous, so not too many respondents are satisfied.

52
Is the branch personnel have done a “Need Analysis” & “Risk
Assessment” before recommending any investment option?
Table: 6
Parameter
Very Good
Good
Satisfactory
Could be better

In numbers
36
10
3
1

In percentage
72
20
6
2

Interpretation
72% of the respondent says that risk assessment before recommending any
investment is very good, 20% of respondents replied that it is good, 6% of
respondent says that it satisfactory and only 2% replied it could be better.
Inference: As only 72% of respondent says that branch personnel does a
“Need Analysis” & “Risk Assessment” before recommending any investment
option, so not too many respondents have positive response.

53
Is the branch personnel were aware of Product and Services and
responded to your queries?
Table: 7
Parameter

In numbers

In percentage

Very Good

43

86

Good

3

6

Satisfactory

3

6

Could be better

1

2

Interpretation
86% respondent says that branch personnel responded to their queries and is
very good, 6% says to be good & 6% satisfactory. Only 2% said it could be
better.
Inference: As 86% of respondent says that branch personnel were aware of
Product and Services and responded to customer queries, so not too many
respondents are satisfied.

54
C. Customer’s opinion of transacting in Branches.
Is the waiting time at the Teller Counter was minimal?
Table: 8
Parameter

In numbers

In percentage

Very Good

40

80

Good

5

10

Satisfactory

1

2

Could be better

4

8

Interpretation
80% of respondent says that waiting time is minimum at teller counter and it is
very good, 10% of respondent replied that it is good, 8% it’s satisfactory and
2% said it could be better.
Inference: As 80% of respondent says that waiting time at teller counter was
minimal, not too many were satisfied with transaction.

55
Is the transactions done by us have been smooth & error free?
Table: 9
Parameter

In numbers

In percentage

Very Good

45

90

Good

5

10

Satisfactory

0

0

Could be better

0

0

Interpretation
90% of respective says that transactions are smooth and error free, 10% of
respondent replied that transactions are good. None of the customers have any
problem with respect to timings.
Inference: As 90% responded very well, it seems high number are happy with
the banking transactions.

56
Is Allahabad Bank looks into the feedback provided by you and takes
necessary action if required?
Table: 10
Parameter

In numbers

In percentage

Very Good

41

82

Good

5

10

Satisfactory

2

4

Could be better

2

4

Interpretation
82% of respondent responded that Allahabad Bank looks into the feedback &
is very good, 10% said its good, 4% said it’s satisfactory and 4% said it could
be better.
Inference: As 82% of respondent says Allahabad bank looks into the feedback
provided by customer and takes necessary action if required, not too many
were satisfied with transaction.

57
D. Customer’s opinion for bank services.

Are you happy with the TAT (Turn Around Time) post request?
Table: 11
Parameter

In numbers

In percentage

Very Good

40

80

Good

7

14

Satisfactory

2

4

Could be better

1

2

Interpretation
80% of respondent says that TAT post request is very good, 14% said its good
4% said it’s satisfactory and 2% said it could be better.
Inference: As 80% of respondent says the TAT (Turn Around Time) post
request is very good, not too many were satisfied with TAT post request.

58
E. Products and Services.

Which feature of the Allahabad Bank Savings account you like most?
Table: 12
Parameter

In numbers

In percentage

Rs 5 Banking
Current plus Deposit
Scheme
Mahila Sanchay

19

38

22
7

45
13

Vikash SB A/C

2

4

Interpretation
38% of the respondent says for Rs 5 Banking, 45% of respondent are in favour
of Current plus Deposit Scheme, 13% are in favour of Mahila Sanchay while
only 4% like Vikash Saving Bank Account.
Inference: Maximum number of people like Current plus Deposit Scheme
feature of Allahabad Bank Savings account.

59
How do you rate the “ALLAHABAD BANK COMMUNITY EVENTS”
held at Allahabad Bank?
Table: 13
Parameter

In numbers

In percentage

Very Good

37

74

Good

8

16

Satisfactory

3

6

Could be better

2

4

Interpretation
74% of the respondent says that ALLAHABAD BANK COMMUNITY
EVENTS are very good, 16% of respondents replied that events are good, 6%
said it is satisfactory and 4% said it could be better.
Inference: As 74% of respondent says ALLAHABAD BANK COMMUNITY
EVENTS is very good, not too many replied for community events.

60
Is the information in the Bank Statement clear, easy to understand and
adequate?
Table: 14
Parameter

In numbers

In percentage

Very Good

39

78

Good

6

12

Satisfactory

5

10

Could be better

0

0

Interpretation
78% of the respondent says that information in bank statement is clear, easy &
adequate and is very good, 12% of respondent replied that it is good, 10% said
it is satisfactory.
Inference: As 78% of respondent says that information in the Bank Statement
is clear, easy to understand and adequate or not, not too many were satisfied
with the bank statement.

61
Will you recommend Allahabad Bank to your friends and relatives?
Table: 15
Parameter

In numbers

In percentage

Most Definitely

45

90

Yes

4

8

May Be

1

2

No

0

0

Interpretation
90% of respondent says that they will most definitely recommend
ALLAHABAD BANK to their friends & relatives, 8% of respondent says yes.
Only 2% said may be.
Inference: As 90% of respondent says that they will definitely recommend
ALLAHABAD BANK to their families & friends, maximum number of
respondent replied positive.
62
OPPORTUNITIES AND CHALLENGES
Retail banking has immense opportunities in a growing economy like India. As
the growth story gets unfolded in India, retail banking is going to emerge a
major driver. How does the world view us? The BRIC report is viewing India as
an economic superpower. A.T. Kearney, a global management-consulting firm,
recently identified India as the ―second most attractive retail destination of 30
emergent markets.
The rise of Indian middle class is an important contributory factor in this regard.
The percentage of middle to high-income Indian households is expected to
continue rising. The younger population not only wields increasing purchasing
power, but as far as acquiring personal debt is concerned, they are perhaps more
comfortable than previous generations. Improving consumer purchasing power,
coupled with more liberal attitudes towards personal debt, is contributing to
India‘s retail banking segment.
The combination of above factors promises substantial growth in retail sector,
which at present is in the nascent stage. Due to bundling of services and
delivery channels, the areas of potential conflicts of interest tend to increase in
universal banks and financial conglomerates. Some of the key policy issues
relevant to the retail-banking sector are: financial inclusion, responsible lending,
and access to finance, long-term savings, financial capability, consumer
protection, regulation and financial crime prevention.

63
Challenges for the Industry and its Stakeholders:
First, retention of consumers is going to be a major challenge. According
to a research by Riechheld and Sasser in the Harvard Business review, 5
percent increase in customer retention can increase profitability by 35
percent in banking business, 50 percent in insurance and brokerage, and
125 percent in the consumer credit card market. Thus, banks need to
emphasis on retaining consumer and increasing the market share.
Second, rising indebtedness could turn out to be a cause for concern in the
future. India’s position, of course, is not comparable to that of developed
world where household debt as a proportion of disposable income is
much higher. Such a scenario creates high uncertainty. Expressing
concerns about the high growth witnessed in consumer credit segments
the reserve bank has, as a temporary measure, put in place risk
containment measures and increased the weight from 100 percent to 125
percent in the case of consumer credit including personal loans and credit
cards.
Third, information technology poses both opportunities and challenges.
Even with ATM machines and Internet Banking, many of the customers
still prefer the personal touch of their neighbourhood branch bank.
Technology has made it possible to deliver services throughout branch
network, providing instant updates to checking accounts and rapid
movement of money for stock transfers. However, this dependency on the
network has bought IT department‘s additional responsibilities and
challenges in managing, maintaining and optimizing the performance of
retail banking networks.
Fourth, KYC Issues and money laundering risks in retail banking is yet
another important issue. Retail lending is regarded as a low risk area for
money laundering because of the perception of the sums involved.
However, competition for clients may also lead to KYC procedures being
waived in the bid for new business. Banks must also consider seriously
the type of identification documents the will accept and other processes to
be completed. The Reserve Bank has issued details guidelines on
application of KYC norms in November 2004.

64
Trends in Retail Banking
Growing a retail banking business is becoming increasingly challenging. The
yield curve is flattening, reducing bank’s net interest margin. Competition is
intensifying, as new, non-traditional players enter the retail banking space. And
consumer preferences for financial products, payment methods and distribution
channels continue to evolve, providing revenue opportunities, but also
introducing new operational challenges.
The changing dynamics of the retail banking business have significant
implications for financial institutions. In order to successfully compete in this
environment, banks must provide a distinctive customer experience and offer
innovative product solutions in order to differentiate their value proposition in
the marketplace.

Key trends in retail Banking are:
1. Bifurcation of the retail banking business:
National- Consolidate- Credit Cards
Home Equity Loans Mortgages
Local- Fragmented- Deposits
Instalment Loans & Small Business Loans
2. Lack of differentiation in retail financial services:
Many financial institutions are struggling to differentiate their value
propositions in the retail banking market.
Free checking is now offered by all or most financial institutions.
Most institutions no longer charge for online banking or online bill
payment.
Extended branch hours are increasingly common in many markets, as
banks seek to increase customer convenience.
3. Proliferation and growth of electronic payments.
4. Increasing demand for ATM access.

65
Strategies for Ensuring high Customer Satisfaction
Set service expectations and standards of behaviour - this means that
managers must set clear service expectations and standards of
behaviour, beginning with defining "excellent service."
Identify and eliminate barriers and obstacles. Policies that do not
make sense; procedures that get in the way; and rules, norms that
make satisfying customers difficult all need to be eliminated to
successfully improve service.
Learn and develop skills. Clearly, personnel at all levels should learn
new skills related to service excellence and serve the customer.
Listen to your customers. Measurement of customer satisfaction can
be a powerful way to improve service if the feedback is not focused
on punishment.
Managers need to help staff hear, first hand, how they are doing. For
this feedback to be effective, however, it must be tied to specific
targets and goals and needs to be frontline driven.
Reinforce and support continuous improvement. The real challenge is
keeping the energy, learning, and improving alive.

66
SUMMARY OF FINDINGS
With reference to table no.1, 90% of customers are happy with the bank
timings & they said that it is very good.
With reference to table no. 2, 80% of respondents like the branch
ambience & layout & find it friendly with reference to table no.3, 80% of
respondents said branch was clean and well maintained.
With reference to table no.4, 76% respondents view that branch personnel
had listened to them patiently and have been able to respond to their
queries and clarifications.

74% of respondent responded that Branch personnel had been very
helpful and courteous with reference to table no.5.

With reference to table no. 6, 72% of respondent says that branch
personnel do “Need Analyses” & “Risk Assessment” of customer savings
before recommending any investment option to them.

With reference to table no.7, 86% of respondent that branch personnel are
aware of Product and Services and responded to your queries.
With reference to table no 8, 80% of respondents says that waiting time at
the Teller Counter is minimum and is very good.

With reference to table no.9, 90% of respondent says that transactions are
smooth and error free & is very good.

With reference to table no. 10, 82% of respondent responded that
Allahabad Bank looks into the feedback & is very good.
67
With reference to table no.11, 80% of respondent said that they are happy
with the TAT post request is very good.
With reference to table no.12, 45% of respondents are in favour of
Current plus Deposit Scheme feature of the Allahabad Bank Savings
account.

With reference to table no.13, 74% of the respondent said that
ALLAHABAD BANK COMMUNITY EVENTS are very good.

With reference to table no. 14, 78% of the respondent said that
information in bank statement is clear, easy & adequate and is very good.

With reference to table no 15, 90% of respondent said that they will most
definitely recommend ALLAHABAD BANK to their friends & relatives.
Overall the response of the bank customer is good.

68
SUGGESTIONS
Suggestions are always considered to be the most important part of any project
report because for every pros; there is cons associated with and to reduce the
effect of latter, following suggestions must be taken into consideration in regard
to retail banking.
The Branch personnel should listen to customer patiently and should
be able to respond to their queries and clarifications because some
customer are new to some of the bank services and until and unless
they will come to know about those services they will be not be
satisfied.

With reference to table no. 5 as not many respondents said that
Branch Personnel are helpful and courteous, so I will suggest that
Bank personnel should be helpful & courteous towards maximum
number of customers.
With reference to table no. 6, larger number of branch personnel
should do ‘Need Analysis’ & ‘Risk Assessment’ before
recommending any investment option to customer.
With reference to table no.7, more branch personnel should be aware
of Product and Services and responded to customer’s queries.

With reference to table 10, Allahabad bank should look into the
feedback provided by customer and takes necessary action wherever
required.

69
With reference to table no. 12, bank should focus on Mahila Sanchay
Saving Bank A/C as small 10% of customer likes this.

Some time the customer has to wait at the Teller Counter, the service
should be improved by appointing more staff, with reference to table
no.11.
Information in the Bank Statement should be more clear, easy to
understand and adequate.

Along with customer satisfaction employee’s participation must be
kept active by appraising their salary as well as their work.

Frequently customers must be kept delighted by providing them
regards and by maintaining customer relationship so that their interest
can be kept maintained.

The Allahabad bank should focus on business and service portfolio for
a reputation of being niche players in the industry.

The bank should concentrate on few reliable high net worth
companies and individuals rather than cater to the mass market.
As 10% customer response is not good for the clarification of the
queries response towards them so bank personnel should improve this
issue because customer is a source through which business can be
increase and satisfy customers is a source to create more customers,
with reference to table no.4.

70
As it is only 10% respondent said that sometime there was a error in
the transaction happened so to avoid these kinds of errors should be
avoided because it is unnecessarily results in wastage of time for both
staff members and service rendered, reference to table no. 9.

There should be increase in the number of events organize by bank
because it is a opportunity for the bank to introduce new products and
services and at the same time it is a open opportunity for the customer
to come forward and suggest its views which might prove to add the
values for the bank because 10% customer still not have a good
response, with reference to table no.13.

Communication with the customer should be improved and increased
so that bank can easily response towards them and in result the
customer would be satisfy and no question that they will recommend
the Allahabad Bank to their friends and relatives because only 2% of
customer are not responding in a positive manner.

71
CONCLUSIONS – FUTURE GROWTH
The project aims to study the retail banking operations of ALLAHABAD
BANK. The study was very fruitful, it yielded the desired results, helped me
understand the retail banking. The study also helps in what are the customer
opinions towards operations of bank & its various product and services.
Any serious discussion of the future of the retail banking industry eventually
raises a basic question: will future customers still need retail banks? The
answer, it turns out, depends on banks themselves. With technology and non
blank businesses providing new options for safeguarding and managing their
finances, customers will continue to depend on banks only as long as banks can
provide service and value that cannot be found anywhere else.
The need to become highly customer focused has forced the slow-moving
public sector banks to adopt a fast track approach. The unleashing of products
and services through the net has galvanized players at all levels of the banking
and financial institutions market grid to look a new at their existing portfolio
offering. Conservative banking practices allowed.
Indian banks to be insulated partially from the Asian currency crisis. Indian
banks are now quoting at higher valuation when compared to banks in other
Asian countries (viz. Hong Kong, Singapore, Philippines etc.) that have major
problems linked to huge Non Performing Assets (NPAs) and payment defaults.
Co-operative banks are nimble footed in approach and armed with efficient
branch networks focus primarily on the high revenue niche retail segments.
The Indian banking has finally worked up to the competitive
new Indian market and is addressing the relevant issues
multifarious challenges of globalization. Banks that employ
perceived to be futuristic and proactive players capable
multifarious requirements of the large customer’s base.

dynamics of
to take on
IT solutions
of meeting

the
the
are
the

ALLAHABAD BANK has a great opportunity to increase their market potential
in the present market situation.

72
LEARNING EXPERIENCE
The dissertation is to define the retail banking and regarding the general
services of bank.
The study was very fruitful, it yield the desire result, helped me to understand
the banking services better. The study also yields what are the factors that
banking is looking forward for the customer.
The Indian banking has come from a long way from being a sleepy business
institution to a highly proactive and dynamic entity. This transformation has
been largely brought about by the large dose of liberalization and economic
reforms that allowed banks to explore new business opportunities rather than
generating revenues from conventional streams (i.e. borrowing and lending).
The banking in India is highly fragmented with 30 banking units contributing to
almost 50% of deposits and 60% of advances.
Under the ambit of the nationalized banks come the specialized banking
institutions. The bank gives great importance towards customer satisfaction.
The senior staffs with their busy schedule try to advice the customer how to
invest in better way. The employees in the bank are well behaved and give a
great deal of satisfaction to see them how they approach their customers.
The bank plays an important role not only to fulfil their duties towards customer
but also to understand them better regarding what they want and how to
maximize the return on the investment.
The bank has set up separate department to impart training program for the
employees. The biggest achievement is the implementation of core banking
solution.

73
74
Audited Financial Results for the year ended 31st March 2013
ALLAHABAD BANK
AUDITED FINANCIAL RESULTS
for Year ended 31st March, 2013.
(Rs. In lakh)
Quarter Ended
PARTICULARS

Year Ended

Year
Ended (Consoli
dated)

31.12.2
31.03.2 012
013
(Revie
wed)

31.03.2
31.03.2
31.03.2012 (A 31.03.2 012
31.03.2 012
udited)
013
(Audit 013
(Audit
ed)
ed)

425236 444466

416824

174356 155232 174612 155276
9
8
0
7

Interest/disco
(a
unt on
312619 323371
)
advances/bills

307631

127450 116641 127450 116641
3
3
4
3

(b Income on
) investments

109792 116104

103974

447332 371638 449834 372009

Interest on
balances with
Reserve
(c
Bank of India
)
and other
interbank
funds

1808

2931

4843

15944

12289

15993

12289

(d
Others
)

1017

2060

376

5790

1988

5789

2056

2.

Other Income

52454

34068

35514

147691 129868 158773 131912

3

TOTAL
INCOME
(1+2)

477690 478534

452338

189126 168219 190489 168467
0
6
3
9

4

Interest
Expended

319634 311444

287987

125692 103606 125685 103599
8
3
3
7

5

Operating
Expenses (i)
+ (ii)

81328

74244

295810 269139 306770 272290

1.

Interest
Earned (a) +
(b) + (c) +(d)

81086

75
(i)

Employee
Cost

Other
operating
expenses
(All items
exceeding
10% of the
(ii total
) expenditure
excluding
interest
expenditure
may be
shown
separately)

54498

56349

49504

198594 183449 200069 183611

26830

24737

24740

97216

85690

106701 88679

6

Total
Expenditure
(4+5)
excluding
provisions
and
contingencies

400962 392530

362231

155273 130520 156362 130828
8
2
3
7

7

Operating
Profit before
Provisions
and
contingencies
(3-6)

76728

86004

90107

338522 376994 341270 376392

8

Provisions (
other than
tax) and
contingencies

62249

43243

45440

183254 160697 183253 160813

9

Exceptional
Items

0

0

0

0

9

--Of which
Provisions for
nonperforming
assets

14479

42761

44667

155268 216297 158017 215579

Profit (+)/
Loss (-) from
10 Ordinary
Activities
before tax (7-

0

0

0

76
8-9)
11 Tax Expenses 1864

11678

4645

36747

Net Profit(+) /
Loss (-) from
Ordinary
12
12615
Activities
after tax(1011)

31083

40022

118521 186678 121186 185960

Extraordinary
Items (net of
13
tax
expenses)

0

0

0

Net Profit (+)
/ Loss (-) for
14
12615
the
period (12-13)

31083

40022

118521 186678 121186 185960

Paid-up
equity share
capital
15
(Face Value
of share is
Rs10.00)

50003

50003

50003

50003

Reserves
excluding
16
revaluation
reserves

998326 914659

914659

999650 914658

102222
934240
1

55.24

55.24

55.24

55.24

55.24

55.24

55.24

Capital
Adequacy
(ii
Ratio (%)
11.03
)
(As per BaselII)

11.96

12.83

11.03

12.83

11.85

13.99

Earnings per
share (Rs.) a.
(ii
Basic and
i)
diluted EPS
before

6.22

8.40

23.70

39.18

24.24

39.03

17

0

29619

0

50003

36831

0

50003

29619

0

50003

Analytical
Ratios

Percentage of
shares held
(i) by
Government
of India

2.52

77
Extraordinary
Items (net of
tax
expense) for
the period, for
the
year to date
and for the
previous
year (not
annualised)
b. Basic and
diluted EPS
after
Extraordinary
Items for the
period, for the
2.52
year to date
and
for the
previous year
(not
annualised)

6.22

8.40

23.70

39.18

24.24

39.03

NPA Ratios
a) (i) Gross
NPA

513699 353160

205898

513699 205898 513699 205898

(ii) Net
NPA

412676 247750

109170

412676 109170 412676 109170

3.92

2.91

1.83

3.92

1.83

3.92

1.83

(ii) % Net
NPA

3.19

2.06

0.98

3.19

0.98

3.19

0.98

(c) Return on
Assets

0.26

0.67

0.88

0.64

1.02

0.64

1.02

(i
(b) (i) % of
v)
Gross NPA

Public Shareholding
223810 223810
771
771

223810771

223810 223810 223810 223810
771
771
771
771

--Percentage
of share
holding

18

-- Number of
shares

44.76

44.76

44.76

276215418

276215 276215 276215 276215
418
418
418
418

44.76

Promoters and
276215 276215
19 promoter
418
418
group

44.76

44.76

44.76

78
Shareholding
a)

Pledged/Encu
mbered
- Number of
Shares

NIL

NIL

NIL

NIL

NIL

NIL

-Percentage
of share (as a
% of the total
shareholding
of
promoter and
promoter
group)

NIL

NIL

NIL

NIL

NIL

NIL

NIL

-Percentage
of share (as a
%
of the total
share capital
of the
company)
b)

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

Nonencumbered
- No of
Shares

276215 276215
418
418

276215418

276215 276215 276215 276215
418
418
418
418

-Percentage
of share (as a
% of the total
shareholding
of
promoter and
promoter
group)

100

100

100

100

100

100

100

-Percentage
of share (as a
%
of the total
share capital
of the
company)

55.24

55.24

55.24

55.24

55.24

55.24

55.24

79
Statements of Assets and Liabilities are as under:
Rs. in lacs
Particulars

As on
31.03.2013
(Audited)

As on
31.03.2012
(Audited)

Capital and Liabilities:
50003

50003

1085249

1000659

17874160

15959308

1009759

909448

418148

374039

20437319

18293457

Cash and Balances with Reserve Bank of India

780822

871245

Balances with Bank and Money at Call and Short
Notice

526251

531276

5830586

5428324

12948965

11114510

Fixed Assets

125152

119773

Other Assets

225543

228329

20437319

18293457

Capital
Reserve and Surplus
Deposits
Borrowings
Other Liabilities
Total
Assets:

Investments
Advances

Total

80
QUESTIONNAIRE
Allahabad Bank – Help us to serve you even better
Dear Valued Customer,
Your candid feedback on our service standards is very important for us to help
you even better.
We would like to know a little more about you:Your Name: ____________________________________________________
Your Customer Id/A/c No. (Optional): _______________________________
Your Branch: ___________________________________________________
Your E-mail id: _________________________________________________
Your Contact details: _____________________________________________
How frequently do you visit the Branch (in a month)? ___________________
______________________________________________________________

81
We would like to know about your experience of banking with us. Please
tick as appropriate.
A. How was the Branch experience?
1) Is the branch timings (10:00 am to 3:30 pm from Monday to
Friday and 10:00 am to 12:30 pm on Saturday) are convenient?
a) Very Good

b) Good

c) Satisfactory

d) Could be
better

2) Is the branch atmosphere & layout is very friendly?
a) Very Good

b) Good

c) Satisfactory

3) Is the Branch was clean and well maintained?
a) Very Good
b) Good
c) Satisfactory

d) Could be
Better

d) Could be
Better

B. How did you find our Branch personnel?
4) Is the Branch personnel have listened to you patiently and have
been able to respond to your queries and clarifications?
a) Very Good

b) Good

c) Satisfactory

d) Could be
better

5) Is the Branch personnel have been very helpful and courteous?
a) Very Good
b) Good
c) Satisfactory d) Could be better
6) Is the branch personnel have done a ‘Need Analyses’ & ‘Risk
Assessment’ before recommending any investment option?
a) Very Good
b) Good
c) Satisfactory d) Could be better
7) Is the branch personnel were aware of Product and Services and
responded to your queries?
a) Very Good

b) Good

c) Satisfactory

d) Could be
better

C. How was your experience of transacting in our Branches?
8) Is the waiting time at the Teller Counter was minimal?
a) Very Good

b) Good

c) Satisfactory d) Could be better
be
82
9) Is the transactions done by us have been smooth & error free?
a) Very Good
10)

b) Good

c) Satisfactory

d) Could be
better

Is Allahabad bank looks into the feedback provided by you and takes
necessary action if required?

a) Very Good
11)

b) Good

c) Satisfactory

d) Could be
better

Are you Happy with the TAT (Turn Around Time) post request?
a) Very Good b) Good c) Satisfactory d) Could be better

12)

Which feature of the Allahabad Bank Savings account you like most?

a) Mahila Sanchay b)Vikash SB A/C c) Current plus Deposit Scheme
d) Rs 5 Banking
D. How do you like what we send to you?
13)

How do you rate the COMMUNITY EVENTS held at Allahabad
Bank?

a) Very Good b) Good c) Satisfactory d) Could be better
14)

Is the information in the Bank Statement clear, easy to
understand and adequate?

a) Very Good

b) Good

c) Satisfactory

d) Could be
better
15) Will you recommend Allahabad Bank to your friends and relatives?

a) Most Definitely

b) Yes

c) May be

d) No

Thank You

83
BIBLIOGRAPHY
BOOKS:

Retail Banking (By Indian Institute of Banking and Finance), Macmillan
Retail Management (By Bajaj Tulsi Shrivastva), OXFORD, University
Press

INTERNET:

www.allahabadbank.in
www.rbi.org.in
www.wikipedia.org
www.moneycontrol.com
www.wikipedia.org/Mckinsey_7S_Framework
www.mindtools.com/pages/article/newSTR_91.htm

84

Retail banking

  • 1.
    A Project Report On “RETAILBANKING” For By Rajesh Kumar Under the guidance of: “Ms. Aditi Das” Submitted to: “NATIONAL INSTITUTE OF TECHNOLOGY” “In partial fulfilment of the requirements for the award of the degree of Master of Business Administration (MBA)” Through Department of Management Studies National Institute of Technology Durgapur Technology, Mahatma Gandhi Avenue, Durgapur – 713209 West Bengal, India 1
  • 2.
    DECLARATION I hereby declarethat the project report titled “RETAIL BANKING WITH REFERENCE TO ALLAHABAD BANK” is my original work and has not been published or submitted for any degree, diploma or other similar titles elsewhere. This has been undertaken for the purpose of partial fulfilment of Master of Business Administration (MBA) at National Institute of Technology, Durgapur (West Bengal). Date: 13/ 07/2013 RAJESH KUMAR Place: Durgapur, West Bengal Roll No.: 12/MBA/23 2
  • 3.
    PREFACE This project reportattempts to bring under one cover the entire hard work and dedication put in by me in the completion of the project work on Retail Banking with reference to Allahabad Bank. I have expressed my experiences in my own simple way. I hope who goes through it will find it interesting and worth reading. All constructive feedback is cordially invited. 3
  • 4.
    ACKNOWLEDGEMENT It gives megreat pleasure in presenting the project report that gives the details of my project on “Retail Banking” carried out at Allahabad Bank, City Centre Branch, Durgapur (West Bengal). It is impossible to list all the people who have helped me during my project. I take this opportunity to express my whole hearted thanks to Ms. Aditi Das (Chief Manager) at Allahabad Bank who has treated me as a bank employee & helped me in all my queries personally. I would also like to express my deep sense of gratitude towards all managers, staff, & to all those who directly or indirectly helped me in successfully execution of my work. Lastly but most essentially I would like to thank Mr. Sailaja Shankar Bhattacharya (Senior Manager) without his help it wouldn’t be possible for me to complete the project at the stipulated period of time. Rajesh Kumar Roll no.: 12/MBA/23 Session: 2012-14 4
  • 5.
    CONTENTS A. Executive Summary 7-11 B.Introduction to the concept 12-15 C. Industry profile 16 D. Company profile - Product/Services Profile - Workflow model (end to end) 17-19 E. Mckinsey’s Seven S Model -Structure -Skill -Style -Strategy -System -Staff -Shared Values -SWOT Analysis 29-31 32 33 33 34-35 35 35 36 37-38 F. Research Methodology - Title of the Project - Statement of the problem - Objectives - Operational definitions - Data collection - Statistical Tools used for research - Sampling Technique – Sampling Unit, Sample Size and 39 40 40 40 41 41 41 42-44 20-26 27-28 5
  • 6.
    Sampling method. - Planof Analysis - Limitations to the study 45 46 G. Data Analysis and Interpretation 47-66 H. Summary of findings 67-68 I. Suggestions 69-71 J. Conclusions – Future Growth 72 K. Learning Experience 73 L. Annexure - Financial Statements - Questionnaires - Bibliography 74 75-80 81-83 84 6
  • 7.
  • 8.
    EXECUTIVE SUMMARY TITLE OFPROJECT “A Study on Retail Banking with special reference to ALLAHABAD BANK” STATEMENT OF THE PROBLEM As there are immense opportunities of the retail banking in India. This dissertation is on the issues and challenges in the retail banking because of the competition of the various banks and the customer satisfaction of the services which the banks are providing and at the same time to solve the complaints of the customer and maintaining the sound relationship for the future and by this way to estimate the future growth of the retail banking. OBJECTIVES To study the issues and challenges in retail banking. To study the recent trends in retail banking. To ensure high satisfaction level and reduce percentage of complaints of customers in retail banking. To estimate the future growth of Indian retail banking. To understand Optimization of retail banking channels. To suggest strategies for improvement in Customer Service. 8
  • 9.
    DATA COLLECTION Data wascollected from two sources-primary and secondary sources. 1. Primary data collection- The primary data was collected by means of survey. It was collected from different customers through questionnaire. 2. Secondary data collection-This data was collected from Internet, Company’s websites, Books & Magazines. SAMPLE SIZE Sample size was restricted to 50 respondents, since it was not possible to cover the whole universe in the available time period. SAMPLING METHOD For this research Non- Probability Convenience Sampling has been used because time limit for the completion of the work is limited and also managers and employees were not available all the time. Area of Study – Durgapur, West Bengal Duration - 2 months (13th May ’13 – 13th July ’13) 9
  • 10.
    SUMMARY OF FINDINGS 90%of customers are happy with the bank timings & they belief that it is very good. 80% of respondents like the branch ambience & layout & find it friendly. 80% of respondents said branch was clean and well maintained. Respondents were of view that Branch personnel had listened to them patiently and have been able to respond to their queries and clarifications. 74% of respondents responded that Branch personnel had been very helpful and courteous. 72% of respondents opinion that branch personnel does ‘Need Analysis’ & ‘Risk Assessment’ of customer savings before recommending any investment option to them. 86% of respondents that branch personnel are aware of Product and Services and responded to your queries. 10
  • 11.
    SUGGESTIONS As 10% customerresponse is not good for the clarification of the queries response towards them so bank personnel should improve this issue because customer is a source through which business can be increase and satisfy customers is a source to create more customers, with reference to table no. 4. As it is only 10% respondent said that sometime there was a error in the transaction happened so to avoid these kinds of errors should be avoided because it is unnecessarily results in wastage of time for both staff members and service rendered, with reference to table no. 9. With reference to table no. 6, large number of branch personnel should do ‘Need Analysis’ & ‘Risk Assessment’ before recommending any investment option to customer. With reference to table no. 7, more branch personnel should be aware of Product and Services and responded to customer’s queries. With reference to table no. 10, Allahabad Bank should look into the feedback provided by customer and takes necessary action wherever required. With reference to table no. 12, Allahabad Bank should focus on Mahila Sanchay Saving Bank account as small 10% of customer likes this. 11
  • 12.
  • 13.
    RETAIL BANKING ANINTRODUCTION Retail banking has become a very important component in the business mix of banks. Retail banking offers multiple comfort factors for banks to do business. Large and divergent customer base across income segment offers huge scope for banks to develop and offer multiple products and services. In addition to traditional products and services offered by banks over the years, the retail model has undergone rapid innovation in the past decade with regard to products, processes, people and technology. Technology has become the driver for retail banking explosion, and technology products like ATM, Internet Banking, Mobile Banking, Card products like Debit Cards and Credit Cards and remittance products like RTGS and NEFT are making their presence felt in retail space. Banks are embracing different strategies, redesigning their conventional business silos, reengineering their channels, product and services to increase the share of customer wallet. A bank functions can be divided into various divisions like: Retail/Personal Banking: This division provides a range of financial services to individual customers and small companies. It operates mainly through branch networks. Retail banking includes routine transactions like deposits and withdrawals of money; money transfer; foreign currency exchange and traveller's cheque encashment. They also deal with personal and small loans, credit and mortgages; insurance policies; investment schemes; pension funds; and advice to customers on various financial matters. Apart from offering home loans, car loans, educational loans, consumer loans, etc. they also develop various deposit schemes and help people fill their coffers. 13
  • 14.
    Corporate Banking: Theydeal with medium to large-scale companies and government agencies. It could start at the local branch manager level, though more complex dealings are routed through corporate divisions of clearing banks and their merchant banking subsidiaries. Corporate banking deals with credit and advances, trade finance, foreign exchange management, asset management, lease financing of heavy equipment, infrastructure, machinery, credit risk assessment, etc. They also advise clients on matters such as corporate mergers and acquisition, raising capital and business strategy regarding competitors and outside factors. Merchant Banking: Investment management is the primary activity of this group. It could be on behalf of corporate clients, or institutional investors-like pension funds, investment trusts, or those in the securities business. This groups also handles public issue and marketing of shares, debentures and other such papers. It may also include other stock market functions like dematerialization services, investment advisory services, etc. Merchant banking executives research into capital market, advice and manage funds of various corporate and individual customers. Treasury group: This group takes care of the total funds of a bank including foreign exchange reserves. Responsibilities include bank portfolio management, dealing in foreign currency, etc. There are Forex (foreign exchange) dealers in this group who exclusively deal with the foreign market. They buy and sell foreign exchange at the minimum exchange cost thereby earning maximum profit from the transactions. Rural Banking: This group deals with the banking and credit needs of people in the rural sector. Not all banks have this group and some banks have separate subsidiary companies for rural banking. 14
  • 15.
    Product Management: Thisgroup conceptualizes various banking services and then develops; implements and manages them. They have the responsibility for a banking product (meaning services like personal loans, home loans, credit cards, loans against shares, educational loans, etc.). Apart from these main functional groups, there is an appraisal group to analyse economic feasibility of industrial projects, the bank's exposure to financial risk and long term returns. There are internal auditors who audit the bank's internal books of accounts. There are various groups of professionals like lawyers, engineers, agricultural scientists, chartered accountant, company secretary, cost accountant and economists who work in various departments in advisory capacities. They help make decisions on issues that are legal, technical or economic in nature. For example, the economist advises various functional groups on the implications of the Union budget on the business of the banks, consumer buying pattern, etc. 15
  • 16.
    POTENTIAL FOR RETAILIN INDIA: IS SKY THE LIMIT The Indian players are bullish on the Retail business and this is not totally unfounded. There are two main reasons behind this. Firstly, it is now undeniable that the face of the Indian consumer is changing. This is reflected in a change in the urban household income pattern. The direct fallout of such a change will be the consumption patterns and hence the banking habits of Indians, which will now be skewed towards Retail products. At the same time, India compares pretty poorly with the other economies of the world that are now becoming comparable in terms of spending patterns with the opening up of our economy. For instance, while the total outstanding Retail loans in Taiwan is around 41% of GDP, the figure in India stands at less than 5%. The comparison with the West is even more staggering. Another comparison that is natural when comparing Retail sectors is the use of credit cards. Here also, the potential lies in the fact that of all the consumer expenditure in India in 2001, less than 1% was through plastic, the corresponding US figure standing at 18%. 16
  • 17.
  • 18.
    Type Public company Traded as BSE:532480 NSE: ALBK Industry Banking, Financial services Founded 1865 Headquarters Kolkata, India Number of 2,500 branches (2012) locations Key people Services Shubhalakshmi Panse(Chairman & MD) T.R Chawla (Executive Director) Finance and insurance Consumer banking Corporate banking Revenue 16,822 crore(US$3.1 billion) (2012) Operating income 3,770 crore(US$690 million) (2012) Net income 1,867 crore(US$340 million) (2012) Total equity 500 crore (US$92 million) (2012) Website allahabadbank.in 18
  • 19.
    Allahabad Bank whichbegan operations in 1865, has its head head-quarters in Kolkata is the oldest joint stock bank in India. The bank was founded in Allahabad in 1865 and as of 31 March 2012 now has over 2500 branches throughout India. The bank has a branch in Hong Kong and a representative office in Shenzen. 19th century On 24 April 1865, a group of Englishmen at Allahabad founded Allahabad Bank. By the end of 19th century it had branches at Jhansi, Kanpur, Lucknow, Bareilly, Nainital Calcutta, and Delhi. Nainital, 20th century In the early 20th century, with the start of Swadeshi movement, Allahabad Bank witnessed a spurt in deposits. In 1920, P & O Banking Corporation acquired Allahabad Bank with a bid price of 436 (US$8.00) per share. In 1923 the bank moved its head office and the registered office to Calcutta for reasons of both operational convenience and business opportunities. Then in 1927 Chartered Bank of India, Australia and China acquired P&O Bank. However, Chartered Bank continued to operate Allahabad Bank as a separate entity. On 19 July 1969, the Government nationalised Allahabad Bank, together with 13 other banks. In October 1989, Allahabad Bank acquired United Industrial Bank, a Calcutta Calcuttabased bank that had been established in 1940. Two years later, Allahabad Bank established AllBank Finance Ltd, a wholly owned Merchant o Banking subsidiary. 21st century The government's ownership of Allahabad Bank shrank in October 2002 after the bank engaged in an Initial Public Offering (IPO) of 10 crore (US$1.8 million) of shares, each with a face value 10. The IPO reduced the Government's shareholding to 71.16%. Then in April 2005 the bank shareholding conducted a second public offering of 10 crore of shares, each with a face value 10 and selling at a premium of 72. This offering reduced the Government's ownership to 55.23%. In June 2006 the bank opened its first office outside India when it opened a representative office in Shenzen Mainland China. In February 2007, Allahabad Shenzen, Bank opened its first overseas branch, in Hong Kong. In March, the bank's business crossed the 1 million crore mark. 19
  • 20.
    PRODUCT AND SERVICES 1.Personal Banking 2. Social Banking 3. MSME Banking 4. Corporate Banking 5. International Banking 6. Other Services 20
  • 21.
    PERSONAL BANKING Personal bankingof Allahabad Bank is further divided into three main categories: i) Deposit Products ii) Retail Credit Products; and iii) Other Credit Products Deposit Products: It includes:a) Flexi-Fix Deposit b) Mahila Sanchay Account c) Monthly Plus d) Current Plus Deposit Scheme e) Rs 5 Banking f) Vikash SB Account g) Sishu Mangal Deposit Scheme h) Premium SB Account i) Premium Current Account j) Tax Benefit Term Deposit Scheme 21
  • 22.
    Retail Credit Products: Itincludes: a) Housing Loan b) Saral Loan c) Furnishing Loan d) Gyan Dipika Scheme e) Gold Loan Scheme f) Personal Loan for Pensioners g) Education Loan h) Loan Against NSC(National Saving Certificate)/KVP(Kisan Vikas Patra) i) Property Scheme j) Reverse Mortgage Scheme k) Loan Scheme for Doctors/Medical Practitioners l) Commercial Vehicle Finance m) Dream Car n) Bank Rent Scheme o) Trade Scheme p) IPO/FPO Finance Scheme q) Mobike Scheme r) Overdraft Facility in SB Account s) Housing Loan Scheme for NRI’s(Non-Resident Indians)/PIO’s(Persons of Indian Origin) Other Credit Products: a) Akshay krishi – Kisan Credit Card Scheme b) Allahabad Bank – EXPO Scheme c) Allahabad Bank Tax Benefit Term Deposit Scheme 22
  • 23.
    SOCIAL BANKING Social Bankingis also further segmented into three different categories: i) Priority Sector ii) Financial Inclusion iii) Credit Facilities to Minority Communities MSME BANKING MSME stands for Micro, Small and Medium Enterprise. An “enterprises” means an Industrial undertaking or a business concern or any other establishment, by whatever name called, engaged in the manufacture or production of goods pertaining to any industry specified in the First Schedule to the Industries (Development and Regulation) Act 1951 or employing plant and machinery in the process of value addition to the final product having a distinct name or character or use or engaged in providing or rendering of any service or services. Some important MSME portals of Allahabad Bank are: i) MSME Policy of the Bank ii) Presence in MSME Cluster iii) Specialized MSME Branches in Each State iv) MSME Campaigns held and number of borrowers given loan in the campaigns v) Training provided for the bank staff on MSME needs and number of persons trained vi) Online system of acknowledgement of loan application and loan tracking system vii) Format of loan application form with check list viii) Interest on MSME/Services Charge ix) OTS Scheme of the Bank x) Rehabilitation of sick MSME xi) Number of people trained in RSETI’s and of them those provided credit linkage xii) Branch Level Customer meets held xiii) Grievance Redressal Mechanism for MSME’s xiv) Name of Nodal Officer of the bank for MSME complaints and queries: Sri A.K. Mohapatra Assistant General Manager Priority Sector Credit Department Head Office, 2 N.S. Road Kolkata – 700001 23
  • 24.
    CORPORATE BANKING Corporate bankingincludes: i) Cash Management Services ii) Gold Card Scheme for Exporters iii) Allahabad e – Trade iv) 3 – IN – 1 Account (Triple Advantage) INTERNATIONAL BANKING Allahabad Bank is well spread out in India and one overseas Branch at Hong Kong, besides a Representative office at Shenzhen, China. Bank has also arrangements with correspondents at various important overseas locations, which will ensure extending to all our NRI customers rich banking experience. We understand your needs and value your patronage and would request you to invest your surplus funds in the various products offered by our Bank. Non – Resident: A. In terms of Regulation 2(vi) of FEMA 5, a Person resident outside India, who is a citizen of India or is a person of Indian Origin. B. Indian Residents working abroad on assignment with Foreign Governments, Government agencies or in UNO and its affiliates IMF, IBRD etc and Government officials and other officials of PSU's deputed abroad or assignments or posted abroad to their own offices including Diplomatic Missions abroad. C. A person of Indian Origin who is a citizen of any other country other than Bangladesh or Pakistan if: i. ii. iii. He/She at any point of time, held an Indian Passport. He/She or either of his/her parents or any of his/her grandparents was a citizen of India by virtue of Constitution of India or Citizenship act 1955 (57 of 1955). The persons are a spouse of an Indian Citizen or a person referred to in sub clause b (i) or (ii) above. 24
  • 25.
    Students going abroadfor studies are treated as Non Resident Indians provided their stay abroad is for more than 182 days in the preceding financial year and broad their intention to stay outside India for an uncertain period when they go abroad for studies. Deposit Account: Non Resident Indians can open accounts under Repatriable and Non NonRepatriable deposit schemes. In respect of Repatriable scheme the NRIs have the choice of following schemes for depositing their savings with Our Bank. 25
  • 26.
    OTHER SERVICES THER Other importantservices of Allahabad Bank are: i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) Insurance and Mutual Fund Government Business Depository Services E – Products Cards ASBA(Application Supported by Block Amount) Facility Account – Portability Agriculture Debt Wavier All Ayushman Bima Yojana Samadhan Financial Literacy & Credit Counselling Centre Deceased – Settlement Depository Receipt International Debit – Cum – ATM Card Money Transfer Services National Eligibility Fund Transfer(NEFT) New Pension System(NPS) Non – Life Business Insurance Real Time Gross Settlement(RTGS) Regional MSME Care Centres NOTE: VARIOUS RETAIL LENDING SCHEMES (Hyperlink): Rate of Interest under Retail Credit Products. Discretionary Authority under Various Retail Schemes. Services Charges, Processing Fees and Prepayment Fees. 26
  • 27.
    WORK FLOW MODEL DEPOSITS CustomerApproaching the Bank/Enquiry Introduction Documentation Saving, Fixed, Current and Recurring A/C A/C holder facility Deposits Withdrawal Cashier Cashier Cash supervision Cash supervision Account for the customer 27
  • 28.
    ACCOUNT OPENING Choose anInstitution Go to the Bank or Website Pick the Product You Want Provide Your Information Agree to Terms Print, Sign, and Mail (If Applicable) Congratulate Yourself! 28
  • 29.
    MCKINSEY’S SEVEN SMODEL AS APPLICABLE TO THAT ORGANIZATION The Seven-S is a framework for analyzing organizations and their effectiveness. It looks at the seven key elements that make the organizations successful, or not: strategy; structure; systems; style; skills; staff; and shared values. Consultants at McKinsey & Company developed the 7S model in the late 1970s to help managers address the difficulties of organizational change. The model shows that organizational immune systems and the many interconnected variables involved make change complex, and that an effective change effort must address many of these issues simultaneously. 29
  • 30.
    7-S Model –A Systemic Approach to Improving Organizations The 7-S model is a tool for managerial analysis and action that provides a structure with which to consider a company as a whole, so that the organization's problems may be diagnosed and a strategy may be developed and implemented. The 7-S diagram illustrates the multiplicity interconnectedness of elements that define an organization's ability to change. The theory helped to change manager's thinking about how companies could be improved. It says that it is not just a matter of devising a new strategy and following it through. Nor is it a matter of setting up new systems and letting them generate improvements. “ Shared values ―are commonly held beliefs, mindsets, and assumptions that shape how an organization behaves – its corporate culture. Shared values are what engender trust. They are an interconnecting centre of the 7S’s model. Values are the identity by which a company is known throughout its business areas, what the organization stands for and what it believes in, it central beliefs and attitudes. These values must be explicitly stated as both corporate objectives and individual values ― Strategy” is a plan of an organization formulates to reach identified goals, and a set of decisions and actions aimed at gaining a sustainable advantage over the competition. ―Systems” define the flow of activities involved in the daily operation of business, including its core processes and its support systems. They refer to the procedures, processes and routines that are used to manage the organization and characterize how important work is to be done. ―Style” refers to the cultural style of the organization, how key managers behave in achieving the organization's goals, how managers collectively spend their time and attention, and how they use symbolic behaviour. How management acts is more important that what management says. ―Staff” refers to the number and types of personnel within the organization and how companies develop employees 30
  • 31.
    and shape basicvalues. ―Skills” refer to the dominant distinctive capabilities and competencies of the personnel or of the organization as a whole. Structure” is the organizational chart and associated information that shows who reports to whom and how tasks are both divided up and integrated. In other words, structures describe the hierarchy of authority and accountability in an organization, the way the organization's units relate to each other: centralized, functional divisions (top-down); decentralized (the trend in larger organizations); matrix, network, holding, etc. These relationships are frequently diagrammed in organizational charts. Most organizations use some mix of structures - pyramidal, matrix or networked ones - to accomplish their goals. 31
  • 32.
    STRUCTURE Board of Directors Mrs.Subhalakshami Panse Shri Tilak Raj Chawla Shri Arun Tiwari Dr. Shashank Saksena Shri A. Udgata Chairman & Managing Director Allahabad Bank Executive Director Executive Director Government Nominee Director RBI Nominee Director Allahabad Bank Allahabad Bank Allahabad Bank Allahabad Bank Shri Rajesh Madanmohan Chatruvedi Chartered Accountant Director Allahabad Bank Shri Gour Das Workmen Employee Director Allahabad Bank Dr. Sudip Chauduri Shareholders’ Director Allahabad Bank 32
  • 33.
    SKILLS Highly skilled candidatesare recruited at various levels across the organization. Skills can be classified broadly into highly skilled and semi skilled routine work. Various training program are organized regularly to impart training needs of the employees. STYLE /CULTURE The culture of the organisation, consisting of two components: Organisational culture: the dominant values and beliefs, and norms, which develop over time and become relatively enduring features of organisation life. Management Style: More matter of what managers do than what they say how do a company‘s managers spend their time? What are they focusing attention on? Symbolism – the creation and maintenance (or sometimes deconstruction) of meaning is a fundamental responsibility of managers. Building a high performance culture is another key prerogative of the HR function. Allahabad bank envisage a credible and transparent performance management process that helps in aligning individual goals with corporate objectives, both quantitative and qualitative, and encourages cross sell and team spirit. Allahabad bank performance management process will be supported by a robust rewards and recognition strategy for each business and a market based compensation structure that is flexible, responsive and helps retention through asset building and wealth creation for top performers. 33
  • 34.
    STRATEGY Being one ofthe leading banking institutions with rich culture of professionalism the bank has various strategies to tackle with competitors in the market. The bank has the strategy to make use of the growing potential of the rural sector as well as the global academy, the business landscape will be changing magically and so will the financial service need. The bank has the strategy to enhance the reach of anytime and anywhere banking. It has the ATM’s almost in all the cities and in good numbers. With the growing of the net banking the bank have several new products and facilities with state-of-the-art facilities, enabling you to conduct all your banking activities using your personal computer, from the comfort of your home or office. Thus providing you with secure, 24 hour access to all your accounts from anywhere in the world. Unique Advantages: Single Access Key: Our revolutionary technology allows you to access your account with your debit card PIN. Just log on to our website, select Internet Banking services and key in your Customer ID and debit card PIN. On successful validation you will be allowed to select an Internet password. It's that easy. Secure Technology: For the first time in India, our Two Factor Authorization allows for "One Time Passwords" for Internet Banking transaction authentication to be delivered via SMS to your Mobile Phone. This password enhances your Internet Banking security and allows you the freedom of banking without remembering multiple passwords. 34
  • 35.
    Instant Payment Solutions:Our Real Time Gross Settlement (RTGS) Payment and Electronic Funds Transfer (EFT) facilities allow you to transfer funds to own or third party accounts instantly. You can also request for multiple Demand Drafts at various locations and set up standing instructions for your account to execute routine payments SYSTEM Formal and informal procedures that support the strategy and structure (systems are more powerful than they are given credit). The bank follows a systematic procedure at all the levels. The bank has very good performance appraisal system, training and development system, resource allocation system, distribution and recovery system. The instructions flow from top management to lower levels of management. The training needs are developed after TNI (Training Needs Identification) and all the programs are put on the monthly/annual training calendar to be implemented. STAFF The people/human resources management – processes used to develop managers, socialization processes, ways of shaping basic values of management cadre, ways of introducing young recruits to the company, ways of helping to manage the careers of employees. Allahabad Bank envisaged that for an individual to work with the organization in perfect synergy, his/her goals had to be linked with the goals of the organization. This process of aligning individual and organizational goals was termed as the performance management process. The main objective of these innovative performance management practices was to encourage the employees to think innovatively. 35
  • 36.
    SHARED VALUE The bankaimed at building a culture to inculcate professional entrepreneurship in them to make themselves and the shareholders prosperous. Allahabad Bank has planned to steadily increase its presence in retail business. Earlier bank has purposely maintained a low-key presence in the retail market, now is planning to increase exposure in this segment. There is tremendous scope for Allahabad Bank’s growth as it was trying to take care of the latent needs of the customers with highly skilled and involved employees. 36
  • 37.
    SWOT ANALYSIS STRENGHTS: • It hasan extensive distribution network comprising of 2716 branches. • The Bank has a strong retail depository base & has good number of customer. • Bank boasts of strong brand equity. • The bank has a near competitive edge in area of operations. • The bank has a market leader in cash settlement service for the major stock exchanges in its country. • Allahabad Bank is one of the largest public sector banks operating in India. • It has a highly automated environment in terms of information technology & communication system. • Infrastructure is best. • It has many innovative products like kids Instapay, NRI services. WEAKNESS: Some time account opening and delivery of cheque book take comparatively more time. Occasionally link failure. 37
  • 38.
    OPPORTUNITY: Branch expansion. Door stepservices. Infrastructure improvements & better systems for trading & settlement in the government securities & foreign exchange markets. THREATS: o The bank has started facing competition from players like SBI, HDFC Bank in the finance market itself. o This reduces the profit margins in the future. o Some Private Banks have 7 days banking. 38
  • 39.
  • 40.
    TITLE OF THEPROJECT “A Study on Retail Banking with special reference to Allahabad Bank” STATEMENT OF THE PROBLEM As there are immense opportunities of the retail banking in India. This project is on the issues and challenges in the retail banking because of the competition of the various banks and the customer satisfaction of the services which the banks are providing and at the same time to solve the complaints of the customer and maintaining the sound relationship for the future and by this way to estimate the future growth of the retail banking. OBJECTIVES OF STUDY To study the issues and challenges in retail banking. To study the recent trends in retail banking. To ensure high satisfaction level and reduce percentage of complaints of customer in retail banking. To estimate the future growth of Indian retail banking. To understand Optimization of retail banking channels. To suggest strategies for improvement in Customer Service. 40
  • 41.
    OPERATIONAL DEFINITION Retail bankingrefers to banking in which banking institutions execute transactions directly with consumers, rather than corporations or other banks. Services offered include: savings and checking accounts, mortgages, personal loans, debit cards, credit cards, and so forth. And to know about the customer’s perceptions about the different products of the bank like current account, savings account, FD, Smart Saver, Smart Access and others. DATA COLLECTION There are several approaches of data collection. The primary sources of data collection are done through: Observation Questionnaire Questionnaire: Questionnaire is the method of data collection, which is very much popular, particularly in big cities. Different modes of questions are put up on the paper and the particular universe, on which the research is conducted, are asked to fill their responses. The Secondary source includes data collection through: Magazines, Journals, Books, Newspapers etc. Company Website. 41
  • 42.
  • 43.
    SAMPLING TECHNIQUE (a) SamplingUnit: - Walk in customers and the company database of high ended customer. (b) Sample Size:Sample size for this project was restricted to 50 respondents. Since it was not possible to cover the whole universe in the available time period, it was necessary for me to take a sample size of 50 respondents. (c) Sampling Method:There are three methods of sampling:1. Probability Sampling 2. Non-Probability Sampling 3. Quota For this research work Non- Probability Convenience Sampling has been chosen because time limit for the completion of the work is limited. Area of Study - Durgapur, West Bengal Duration - 2 months (13th May ’13 – 13th July ’13) 43
  • 44.
    DATA COLLECTION METHOD Datafor the present study is collected from two sources: 1. Primary Data: The data are collected directly from the universe by conducting interviews, etc. these are the original sources from which the researcher directly gathers data which are not previously referred. All the people from different profession were personally visited and interviewed. They were the main source of primary data. The method of collection of primary data was personal direct interview through a structured questionnaire. The primary data was collected by means of survey. Questionnaires were prepared and customers of Allahabad Bank were approached to fill up these questionnaires. The filled up information was later analyzed to obtain the required information. 2. Secondary Data: The data are collected from the secondary sources such as magazines, journals, etc. These sources consist of already variable data in the form of statements, and reports, which may include sensory reports, financial statements of the company, reports of governments departments, etc. It was collected from internal sources. The secondary data was collected on the basis of organizational file, official records, newspapers, magazines, management books, preserved information in the company’s database and the website of the company. Both Primary and Secondary sources was used for data collection. For primary source, Questionnaire was used. For secondary source Internet, Books and Newspapers etc were used. 44
  • 45.
    RESEARCH DESIGN Research designis simply the framework or plan for a study, used as a guide in collecting and analyzing data. There are three types of Research Design:1. Exploratory Research Design 2. Descriptive Research Design 3. Casual Research Design For the study, Exploratory Research Design was undertaken to classify the investors on their risk and return profile. PLAN OF ANALYSIS The data obtained from the structured questionnaire was interpreted and recorded. The table and graph were constructed using data from the questionnaire through simple techniques like average, percentage, etc. which was then used for analyzing the acquired data. 45
  • 46.
    LIMITATIONS Designing own andnew financial products is very costly and time consuming for the bank. Customers now-a-days prefer net banking to branch banking. The banks that are slow in introducing technology-based products, are finding it difficult to retain the customers who wish to opt for net banking. Customers are attracted towards other financial products like mutual funds etc. Though banks are investing heavily in technology, they are not able to exploit the same to the full extent. A major disadvantage is monitoring and follows up of huge volume of loan accounts inducing banks to spend heavily in human resource department. Long term loans like housing loan due to its long repayment term in the absence of proper follow-up, can become NPAs. The volume of amount borrowed by a single customer is very low as compared to wholesale banking. This does not allow banks to exploit the advantage of earning huge profits from single customer as in case of wholesale banking. 46
  • 47.
  • 48.
    Profile of Respondents Respondentswere the customers of Allahabad Bank of Durgapur ere Bank city (West Bengal) of age group 21 21-65 years. A. Opinion on Branch experience. The Branch timings (10:0 am to 3:30 pm from Monday to Friday and (10:00 10:00 am to 12:30 pm on Saturday are convenient? Saturday) Table: 1 Parameter Very Good Good Satisfactory Could be better In numbers In percentage 45 5 0 0 90 10 0 0 Interpretation The purpose of this question is to know the whether the bank timings are convenient for the custom 90% of respondents says that bank timings are customer, very good and 10% of respondent replied that timings are good. None of the customers have any problem with resp to timings. respect Inference: As 90% responded very well, it seems high number are happy , with bank timings. 48
  • 49.
    Is the branchambience & layout is very friendly? Table: 2 Parameter In numbers In percentage Very Good 40 80 Good 7 14 Satisfactory 2 4 Could be better 1 2 Interpretation 80% were of the respondent says that branch ambience is very good, 14% were of the respondent replied that branch ambience is good while 4% says that it is satisfactory & just 1% replied that it could be better. Inference: As 80% of respondents say branch ambience is very good, so not too many respondents like the branch ambience. 49
  • 50.
    Is the Branchwas clean and well maintained? Table: 3 Parameter Very Good Good In numbers 40 7 In percentage 80 14 Satisfactory 2 4 Could be better 1 2 Interpretation 80% were of the respondent says that branch cleanness is very good, 14% were of the replied that branch cleanness is good while 4% says that it is satisfactory & just 1% replied that it could be better. Inference: As 80% of respondents say branch cleanness is very good, so not too many respondents like the branch cleanness. 50
  • 51.
    B. Opinion ofthe customer regarding Branch personnel. Is the branch personnel have listened to you patiently and have been able to respond to your queries and clarifications? Table: 4 Parameter In numbers In percentage Very Good Good 38 7 76 14 Satisfactory Could be better 3 2 6 4 Interpretation 76% of respondent says that branch personnel listened patiently& have been able to respond to their queries, 14% of respondents replied that it is good. While only 6% of respondent says that it is satisfactory and 4% replied that it could be better. Inference: As only 76% of respondent says that branch personnel listens patiently and have been able to respond to queries and clarifications, so not too many respondents are satisfied. 51
  • 52.
    Is the branchpersonnel have been very helpful and courteous? Table: 5 Parameter In numbers In percentage Very Good 37 74 Good 8 16 Satisfactory 3 6 Could be better 2 4 Interpretation 74% of respondent says that branch personnel have been very helpful and courteous, 16% of respondents replied that it is good. While only 6% of respondent says that it is satisfactory and 4% replied that it could be better. Inference: As only 74% of respondent says branch personnel have been very helpful and courteous, so not too many respondents are satisfied. 52
  • 53.
    Is the branchpersonnel have done a “Need Analysis” & “Risk Assessment” before recommending any investment option? Table: 6 Parameter Very Good Good Satisfactory Could be better In numbers 36 10 3 1 In percentage 72 20 6 2 Interpretation 72% of the respondent says that risk assessment before recommending any investment is very good, 20% of respondents replied that it is good, 6% of respondent says that it satisfactory and only 2% replied it could be better. Inference: As only 72% of respondent says that branch personnel does a “Need Analysis” & “Risk Assessment” before recommending any investment option, so not too many respondents have positive response. 53
  • 54.
    Is the branchpersonnel were aware of Product and Services and responded to your queries? Table: 7 Parameter In numbers In percentage Very Good 43 86 Good 3 6 Satisfactory 3 6 Could be better 1 2 Interpretation 86% respondent says that branch personnel responded to their queries and is very good, 6% says to be good & 6% satisfactory. Only 2% said it could be better. Inference: As 86% of respondent says that branch personnel were aware of Product and Services and responded to customer queries, so not too many respondents are satisfied. 54
  • 55.
    C. Customer’s opinionof transacting in Branches. Is the waiting time at the Teller Counter was minimal? Table: 8 Parameter In numbers In percentage Very Good 40 80 Good 5 10 Satisfactory 1 2 Could be better 4 8 Interpretation 80% of respondent says that waiting time is minimum at teller counter and it is very good, 10% of respondent replied that it is good, 8% it’s satisfactory and 2% said it could be better. Inference: As 80% of respondent says that waiting time at teller counter was minimal, not too many were satisfied with transaction. 55
  • 56.
    Is the transactionsdone by us have been smooth & error free? Table: 9 Parameter In numbers In percentage Very Good 45 90 Good 5 10 Satisfactory 0 0 Could be better 0 0 Interpretation 90% of respective says that transactions are smooth and error free, 10% of respondent replied that transactions are good. None of the customers have any problem with respect to timings. Inference: As 90% responded very well, it seems high number are happy with the banking transactions. 56
  • 57.
    Is Allahabad Banklooks into the feedback provided by you and takes necessary action if required? Table: 10 Parameter In numbers In percentage Very Good 41 82 Good 5 10 Satisfactory 2 4 Could be better 2 4 Interpretation 82% of respondent responded that Allahabad Bank looks into the feedback & is very good, 10% said its good, 4% said it’s satisfactory and 4% said it could be better. Inference: As 82% of respondent says Allahabad bank looks into the feedback provided by customer and takes necessary action if required, not too many were satisfied with transaction. 57
  • 58.
    D. Customer’s opinionfor bank services. Are you happy with the TAT (Turn Around Time) post request? Table: 11 Parameter In numbers In percentage Very Good 40 80 Good 7 14 Satisfactory 2 4 Could be better 1 2 Interpretation 80% of respondent says that TAT post request is very good, 14% said its good 4% said it’s satisfactory and 2% said it could be better. Inference: As 80% of respondent says the TAT (Turn Around Time) post request is very good, not too many were satisfied with TAT post request. 58
  • 59.
    E. Products andServices. Which feature of the Allahabad Bank Savings account you like most? Table: 12 Parameter In numbers In percentage Rs 5 Banking Current plus Deposit Scheme Mahila Sanchay 19 38 22 7 45 13 Vikash SB A/C 2 4 Interpretation 38% of the respondent says for Rs 5 Banking, 45% of respondent are in favour of Current plus Deposit Scheme, 13% are in favour of Mahila Sanchay while only 4% like Vikash Saving Bank Account. Inference: Maximum number of people like Current plus Deposit Scheme feature of Allahabad Bank Savings account. 59
  • 60.
    How do yourate the “ALLAHABAD BANK COMMUNITY EVENTS” held at Allahabad Bank? Table: 13 Parameter In numbers In percentage Very Good 37 74 Good 8 16 Satisfactory 3 6 Could be better 2 4 Interpretation 74% of the respondent says that ALLAHABAD BANK COMMUNITY EVENTS are very good, 16% of respondents replied that events are good, 6% said it is satisfactory and 4% said it could be better. Inference: As 74% of respondent says ALLAHABAD BANK COMMUNITY EVENTS is very good, not too many replied for community events. 60
  • 61.
    Is the informationin the Bank Statement clear, easy to understand and adequate? Table: 14 Parameter In numbers In percentage Very Good 39 78 Good 6 12 Satisfactory 5 10 Could be better 0 0 Interpretation 78% of the respondent says that information in bank statement is clear, easy & adequate and is very good, 12% of respondent replied that it is good, 10% said it is satisfactory. Inference: As 78% of respondent says that information in the Bank Statement is clear, easy to understand and adequate or not, not too many were satisfied with the bank statement. 61
  • 62.
    Will you recommendAllahabad Bank to your friends and relatives? Table: 15 Parameter In numbers In percentage Most Definitely 45 90 Yes 4 8 May Be 1 2 No 0 0 Interpretation 90% of respondent says that they will most definitely recommend ALLAHABAD BANK to their friends & relatives, 8% of respondent says yes. Only 2% said may be. Inference: As 90% of respondent says that they will definitely recommend ALLAHABAD BANK to their families & friends, maximum number of respondent replied positive. 62
  • 63.
    OPPORTUNITIES AND CHALLENGES Retailbanking has immense opportunities in a growing economy like India. As the growth story gets unfolded in India, retail banking is going to emerge a major driver. How does the world view us? The BRIC report is viewing India as an economic superpower. A.T. Kearney, a global management-consulting firm, recently identified India as the ―second most attractive retail destination of 30 emergent markets. The rise of Indian middle class is an important contributory factor in this regard. The percentage of middle to high-income Indian households is expected to continue rising. The younger population not only wields increasing purchasing power, but as far as acquiring personal debt is concerned, they are perhaps more comfortable than previous generations. Improving consumer purchasing power, coupled with more liberal attitudes towards personal debt, is contributing to India‘s retail banking segment. The combination of above factors promises substantial growth in retail sector, which at present is in the nascent stage. Due to bundling of services and delivery channels, the areas of potential conflicts of interest tend to increase in universal banks and financial conglomerates. Some of the key policy issues relevant to the retail-banking sector are: financial inclusion, responsible lending, and access to finance, long-term savings, financial capability, consumer protection, regulation and financial crime prevention. 63
  • 64.
    Challenges for theIndustry and its Stakeholders: First, retention of consumers is going to be a major challenge. According to a research by Riechheld and Sasser in the Harvard Business review, 5 percent increase in customer retention can increase profitability by 35 percent in banking business, 50 percent in insurance and brokerage, and 125 percent in the consumer credit card market. Thus, banks need to emphasis on retaining consumer and increasing the market share. Second, rising indebtedness could turn out to be a cause for concern in the future. India’s position, of course, is not comparable to that of developed world where household debt as a proportion of disposable income is much higher. Such a scenario creates high uncertainty. Expressing concerns about the high growth witnessed in consumer credit segments the reserve bank has, as a temporary measure, put in place risk containment measures and increased the weight from 100 percent to 125 percent in the case of consumer credit including personal loans and credit cards. Third, information technology poses both opportunities and challenges. Even with ATM machines and Internet Banking, many of the customers still prefer the personal touch of their neighbourhood branch bank. Technology has made it possible to deliver services throughout branch network, providing instant updates to checking accounts and rapid movement of money for stock transfers. However, this dependency on the network has bought IT department‘s additional responsibilities and challenges in managing, maintaining and optimizing the performance of retail banking networks. Fourth, KYC Issues and money laundering risks in retail banking is yet another important issue. Retail lending is regarded as a low risk area for money laundering because of the perception of the sums involved. However, competition for clients may also lead to KYC procedures being waived in the bid for new business. Banks must also consider seriously the type of identification documents the will accept and other processes to be completed. The Reserve Bank has issued details guidelines on application of KYC norms in November 2004. 64
  • 65.
    Trends in RetailBanking Growing a retail banking business is becoming increasingly challenging. The yield curve is flattening, reducing bank’s net interest margin. Competition is intensifying, as new, non-traditional players enter the retail banking space. And consumer preferences for financial products, payment methods and distribution channels continue to evolve, providing revenue opportunities, but also introducing new operational challenges. The changing dynamics of the retail banking business have significant implications for financial institutions. In order to successfully compete in this environment, banks must provide a distinctive customer experience and offer innovative product solutions in order to differentiate their value proposition in the marketplace. Key trends in retail Banking are: 1. Bifurcation of the retail banking business: National- Consolidate- Credit Cards Home Equity Loans Mortgages Local- Fragmented- Deposits Instalment Loans & Small Business Loans 2. Lack of differentiation in retail financial services: Many financial institutions are struggling to differentiate their value propositions in the retail banking market. Free checking is now offered by all or most financial institutions. Most institutions no longer charge for online banking or online bill payment. Extended branch hours are increasingly common in many markets, as banks seek to increase customer convenience. 3. Proliferation and growth of electronic payments. 4. Increasing demand for ATM access. 65
  • 66.
    Strategies for Ensuringhigh Customer Satisfaction Set service expectations and standards of behaviour - this means that managers must set clear service expectations and standards of behaviour, beginning with defining "excellent service." Identify and eliminate barriers and obstacles. Policies that do not make sense; procedures that get in the way; and rules, norms that make satisfying customers difficult all need to be eliminated to successfully improve service. Learn and develop skills. Clearly, personnel at all levels should learn new skills related to service excellence and serve the customer. Listen to your customers. Measurement of customer satisfaction can be a powerful way to improve service if the feedback is not focused on punishment. Managers need to help staff hear, first hand, how they are doing. For this feedback to be effective, however, it must be tied to specific targets and goals and needs to be frontline driven. Reinforce and support continuous improvement. The real challenge is keeping the energy, learning, and improving alive. 66
  • 67.
    SUMMARY OF FINDINGS Withreference to table no.1, 90% of customers are happy with the bank timings & they said that it is very good. With reference to table no. 2, 80% of respondents like the branch ambience & layout & find it friendly with reference to table no.3, 80% of respondents said branch was clean and well maintained. With reference to table no.4, 76% respondents view that branch personnel had listened to them patiently and have been able to respond to their queries and clarifications. 74% of respondent responded that Branch personnel had been very helpful and courteous with reference to table no.5. With reference to table no. 6, 72% of respondent says that branch personnel do “Need Analyses” & “Risk Assessment” of customer savings before recommending any investment option to them. With reference to table no.7, 86% of respondent that branch personnel are aware of Product and Services and responded to your queries. With reference to table no 8, 80% of respondents says that waiting time at the Teller Counter is minimum and is very good. With reference to table no.9, 90% of respondent says that transactions are smooth and error free & is very good. With reference to table no. 10, 82% of respondent responded that Allahabad Bank looks into the feedback & is very good. 67
  • 68.
    With reference totable no.11, 80% of respondent said that they are happy with the TAT post request is very good. With reference to table no.12, 45% of respondents are in favour of Current plus Deposit Scheme feature of the Allahabad Bank Savings account. With reference to table no.13, 74% of the respondent said that ALLAHABAD BANK COMMUNITY EVENTS are very good. With reference to table no. 14, 78% of the respondent said that information in bank statement is clear, easy & adequate and is very good. With reference to table no 15, 90% of respondent said that they will most definitely recommend ALLAHABAD BANK to their friends & relatives. Overall the response of the bank customer is good. 68
  • 69.
    SUGGESTIONS Suggestions are alwaysconsidered to be the most important part of any project report because for every pros; there is cons associated with and to reduce the effect of latter, following suggestions must be taken into consideration in regard to retail banking. The Branch personnel should listen to customer patiently and should be able to respond to their queries and clarifications because some customer are new to some of the bank services and until and unless they will come to know about those services they will be not be satisfied. With reference to table no. 5 as not many respondents said that Branch Personnel are helpful and courteous, so I will suggest that Bank personnel should be helpful & courteous towards maximum number of customers. With reference to table no. 6, larger number of branch personnel should do ‘Need Analysis’ & ‘Risk Assessment’ before recommending any investment option to customer. With reference to table no.7, more branch personnel should be aware of Product and Services and responded to customer’s queries. With reference to table 10, Allahabad bank should look into the feedback provided by customer and takes necessary action wherever required. 69
  • 70.
    With reference totable no. 12, bank should focus on Mahila Sanchay Saving Bank A/C as small 10% of customer likes this. Some time the customer has to wait at the Teller Counter, the service should be improved by appointing more staff, with reference to table no.11. Information in the Bank Statement should be more clear, easy to understand and adequate. Along with customer satisfaction employee’s participation must be kept active by appraising their salary as well as their work. Frequently customers must be kept delighted by providing them regards and by maintaining customer relationship so that their interest can be kept maintained. The Allahabad bank should focus on business and service portfolio for a reputation of being niche players in the industry. The bank should concentrate on few reliable high net worth companies and individuals rather than cater to the mass market. As 10% customer response is not good for the clarification of the queries response towards them so bank personnel should improve this issue because customer is a source through which business can be increase and satisfy customers is a source to create more customers, with reference to table no.4. 70
  • 71.
    As it isonly 10% respondent said that sometime there was a error in the transaction happened so to avoid these kinds of errors should be avoided because it is unnecessarily results in wastage of time for both staff members and service rendered, reference to table no. 9. There should be increase in the number of events organize by bank because it is a opportunity for the bank to introduce new products and services and at the same time it is a open opportunity for the customer to come forward and suggest its views which might prove to add the values for the bank because 10% customer still not have a good response, with reference to table no.13. Communication with the customer should be improved and increased so that bank can easily response towards them and in result the customer would be satisfy and no question that they will recommend the Allahabad Bank to their friends and relatives because only 2% of customer are not responding in a positive manner. 71
  • 72.
    CONCLUSIONS – FUTUREGROWTH The project aims to study the retail banking operations of ALLAHABAD BANK. The study was very fruitful, it yielded the desired results, helped me understand the retail banking. The study also helps in what are the customer opinions towards operations of bank & its various product and services. Any serious discussion of the future of the retail banking industry eventually raises a basic question: will future customers still need retail banks? The answer, it turns out, depends on banks themselves. With technology and non blank businesses providing new options for safeguarding and managing their finances, customers will continue to depend on banks only as long as banks can provide service and value that cannot be found anywhere else. The need to become highly customer focused has forced the slow-moving public sector banks to adopt a fast track approach. The unleashing of products and services through the net has galvanized players at all levels of the banking and financial institutions market grid to look a new at their existing portfolio offering. Conservative banking practices allowed. Indian banks to be insulated partially from the Asian currency crisis. Indian banks are now quoting at higher valuation when compared to banks in other Asian countries (viz. Hong Kong, Singapore, Philippines etc.) that have major problems linked to huge Non Performing Assets (NPAs) and payment defaults. Co-operative banks are nimble footed in approach and armed with efficient branch networks focus primarily on the high revenue niche retail segments. The Indian banking has finally worked up to the competitive new Indian market and is addressing the relevant issues multifarious challenges of globalization. Banks that employ perceived to be futuristic and proactive players capable multifarious requirements of the large customer’s base. dynamics of to take on IT solutions of meeting the the are the ALLAHABAD BANK has a great opportunity to increase their market potential in the present market situation. 72
  • 73.
    LEARNING EXPERIENCE The dissertationis to define the retail banking and regarding the general services of bank. The study was very fruitful, it yield the desire result, helped me to understand the banking services better. The study also yields what are the factors that banking is looking forward for the customer. The Indian banking has come from a long way from being a sleepy business institution to a highly proactive and dynamic entity. This transformation has been largely brought about by the large dose of liberalization and economic reforms that allowed banks to explore new business opportunities rather than generating revenues from conventional streams (i.e. borrowing and lending). The banking in India is highly fragmented with 30 banking units contributing to almost 50% of deposits and 60% of advances. Under the ambit of the nationalized banks come the specialized banking institutions. The bank gives great importance towards customer satisfaction. The senior staffs with their busy schedule try to advice the customer how to invest in better way. The employees in the bank are well behaved and give a great deal of satisfaction to see them how they approach their customers. The bank plays an important role not only to fulfil their duties towards customer but also to understand them better regarding what they want and how to maximize the return on the investment. The bank has set up separate department to impart training program for the employees. The biggest achievement is the implementation of core banking solution. 73
  • 74.
  • 75.
    Audited Financial Resultsfor the year ended 31st March 2013 ALLAHABAD BANK AUDITED FINANCIAL RESULTS for Year ended 31st March, 2013. (Rs. In lakh) Quarter Ended PARTICULARS Year Ended Year Ended (Consoli dated) 31.12.2 31.03.2 012 013 (Revie wed) 31.03.2 31.03.2 31.03.2012 (A 31.03.2 012 31.03.2 012 udited) 013 (Audit 013 (Audit ed) ed) 425236 444466 416824 174356 155232 174612 155276 9 8 0 7 Interest/disco (a unt on 312619 323371 ) advances/bills 307631 127450 116641 127450 116641 3 3 4 3 (b Income on ) investments 109792 116104 103974 447332 371638 449834 372009 Interest on balances with Reserve (c Bank of India ) and other interbank funds 1808 2931 4843 15944 12289 15993 12289 (d Others ) 1017 2060 376 5790 1988 5789 2056 2. Other Income 52454 34068 35514 147691 129868 158773 131912 3 TOTAL INCOME (1+2) 477690 478534 452338 189126 168219 190489 168467 0 6 3 9 4 Interest Expended 319634 311444 287987 125692 103606 125685 103599 8 3 3 7 5 Operating Expenses (i) + (ii) 81328 74244 295810 269139 306770 272290 1. Interest Earned (a) + (b) + (c) +(d) 81086 75
  • 76.
    (i) Employee Cost Other operating expenses (All items exceeding 10% ofthe (ii total ) expenditure excluding interest expenditure may be shown separately) 54498 56349 49504 198594 183449 200069 183611 26830 24737 24740 97216 85690 106701 88679 6 Total Expenditure (4+5) excluding provisions and contingencies 400962 392530 362231 155273 130520 156362 130828 8 2 3 7 7 Operating Profit before Provisions and contingencies (3-6) 76728 86004 90107 338522 376994 341270 376392 8 Provisions ( other than tax) and contingencies 62249 43243 45440 183254 160697 183253 160813 9 Exceptional Items 0 0 0 0 9 --Of which Provisions for nonperforming assets 14479 42761 44667 155268 216297 158017 215579 Profit (+)/ Loss (-) from 10 Ordinary Activities before tax (7- 0 0 0 76
  • 77.
    8-9) 11 Tax Expenses1864 11678 4645 36747 Net Profit(+) / Loss (-) from Ordinary 12 12615 Activities after tax(1011) 31083 40022 118521 186678 121186 185960 Extraordinary Items (net of 13 tax expenses) 0 0 0 Net Profit (+) / Loss (-) for 14 12615 the period (12-13) 31083 40022 118521 186678 121186 185960 Paid-up equity share capital 15 (Face Value of share is Rs10.00) 50003 50003 50003 50003 Reserves excluding 16 revaluation reserves 998326 914659 914659 999650 914658 102222 934240 1 55.24 55.24 55.24 55.24 55.24 55.24 55.24 Capital Adequacy (ii Ratio (%) 11.03 ) (As per BaselII) 11.96 12.83 11.03 12.83 11.85 13.99 Earnings per share (Rs.) a. (ii Basic and i) diluted EPS before 6.22 8.40 23.70 39.18 24.24 39.03 17 0 29619 0 50003 36831 0 50003 29619 0 50003 Analytical Ratios Percentage of shares held (i) by Government of India 2.52 77
  • 78.
    Extraordinary Items (net of tax expense)for the period, for the year to date and for the previous year (not annualised) b. Basic and diluted EPS after Extraordinary Items for the period, for the 2.52 year to date and for the previous year (not annualised) 6.22 8.40 23.70 39.18 24.24 39.03 NPA Ratios a) (i) Gross NPA 513699 353160 205898 513699 205898 513699 205898 (ii) Net NPA 412676 247750 109170 412676 109170 412676 109170 3.92 2.91 1.83 3.92 1.83 3.92 1.83 (ii) % Net NPA 3.19 2.06 0.98 3.19 0.98 3.19 0.98 (c) Return on Assets 0.26 0.67 0.88 0.64 1.02 0.64 1.02 (i (b) (i) % of v) Gross NPA Public Shareholding 223810 223810 771 771 223810771 223810 223810 223810 223810 771 771 771 771 --Percentage of share holding 18 -- Number of shares 44.76 44.76 44.76 276215418 276215 276215 276215 276215 418 418 418 418 44.76 Promoters and 276215 276215 19 promoter 418 418 group 44.76 44.76 44.76 78
  • 79.
    Shareholding a) Pledged/Encu mbered - Number of Shares NIL NIL NIL NIL NIL NIL -Percentage ofshare (as a % of the total shareholding of promoter and promoter group) NIL NIL NIL NIL NIL NIL NIL -Percentage of share (as a % of the total share capital of the company) b) NIL NIL NIL NIL NIL NIL NIL NIL Nonencumbered - No of Shares 276215 276215 418 418 276215418 276215 276215 276215 276215 418 418 418 418 -Percentage of share (as a % of the total shareholding of promoter and promoter group) 100 100 100 100 100 100 100 -Percentage of share (as a % of the total share capital of the company) 55.24 55.24 55.24 55.24 55.24 55.24 55.24 79
  • 80.
    Statements of Assetsand Liabilities are as under: Rs. in lacs Particulars As on 31.03.2013 (Audited) As on 31.03.2012 (Audited) Capital and Liabilities: 50003 50003 1085249 1000659 17874160 15959308 1009759 909448 418148 374039 20437319 18293457 Cash and Balances with Reserve Bank of India 780822 871245 Balances with Bank and Money at Call and Short Notice 526251 531276 5830586 5428324 12948965 11114510 Fixed Assets 125152 119773 Other Assets 225543 228329 20437319 18293457 Capital Reserve and Surplus Deposits Borrowings Other Liabilities Total Assets: Investments Advances Total 80
  • 81.
    QUESTIONNAIRE Allahabad Bank –Help us to serve you even better Dear Valued Customer, Your candid feedback on our service standards is very important for us to help you even better. We would like to know a little more about you:Your Name: ____________________________________________________ Your Customer Id/A/c No. (Optional): _______________________________ Your Branch: ___________________________________________________ Your E-mail id: _________________________________________________ Your Contact details: _____________________________________________ How frequently do you visit the Branch (in a month)? ___________________ ______________________________________________________________ 81
  • 82.
    We would liketo know about your experience of banking with us. Please tick as appropriate. A. How was the Branch experience? 1) Is the branch timings (10:00 am to 3:30 pm from Monday to Friday and 10:00 am to 12:30 pm on Saturday) are convenient? a) Very Good b) Good c) Satisfactory d) Could be better 2) Is the branch atmosphere & layout is very friendly? a) Very Good b) Good c) Satisfactory 3) Is the Branch was clean and well maintained? a) Very Good b) Good c) Satisfactory d) Could be Better d) Could be Better B. How did you find our Branch personnel? 4) Is the Branch personnel have listened to you patiently and have been able to respond to your queries and clarifications? a) Very Good b) Good c) Satisfactory d) Could be better 5) Is the Branch personnel have been very helpful and courteous? a) Very Good b) Good c) Satisfactory d) Could be better 6) Is the branch personnel have done a ‘Need Analyses’ & ‘Risk Assessment’ before recommending any investment option? a) Very Good b) Good c) Satisfactory d) Could be better 7) Is the branch personnel were aware of Product and Services and responded to your queries? a) Very Good b) Good c) Satisfactory d) Could be better C. How was your experience of transacting in our Branches? 8) Is the waiting time at the Teller Counter was minimal? a) Very Good b) Good c) Satisfactory d) Could be better be 82
  • 83.
    9) Is thetransactions done by us have been smooth & error free? a) Very Good 10) b) Good c) Satisfactory d) Could be better Is Allahabad bank looks into the feedback provided by you and takes necessary action if required? a) Very Good 11) b) Good c) Satisfactory d) Could be better Are you Happy with the TAT (Turn Around Time) post request? a) Very Good b) Good c) Satisfactory d) Could be better 12) Which feature of the Allahabad Bank Savings account you like most? a) Mahila Sanchay b)Vikash SB A/C c) Current plus Deposit Scheme d) Rs 5 Banking D. How do you like what we send to you? 13) How do you rate the COMMUNITY EVENTS held at Allahabad Bank? a) Very Good b) Good c) Satisfactory d) Could be better 14) Is the information in the Bank Statement clear, easy to understand and adequate? a) Very Good b) Good c) Satisfactory d) Could be better 15) Will you recommend Allahabad Bank to your friends and relatives? a) Most Definitely b) Yes c) May be d) No Thank You 83
  • 84.
    BIBLIOGRAPHY BOOKS: Retail Banking (ByIndian Institute of Banking and Finance), Macmillan Retail Management (By Bajaj Tulsi Shrivastva), OXFORD, University Press INTERNET: www.allahabadbank.in www.rbi.org.in www.wikipedia.org www.moneycontrol.com www.wikipedia.org/Mckinsey_7S_Framework www.mindtools.com/pages/article/newSTR_91.htm 84