Muhammad Waqar Ali is a telecom engineer currently working as a RAN Supervisor at Ericsson Pakistan. He has over 5 years of experience working on GSM and 3G/4G network implementation and transmission node upgrades for Ericsson and Huawei in Pakistan. His experience includes software and hardware upgrades, new network rollout configurations, and conducting transmission surveys. He is seeking a position where he can utilize his technical and intellectual skills efficiently.
1. MUHAMMAD WAQAR ALI
Email: waqarzaidi14@yahoo.com
Address:A/741, Muhammadi DeraMalir Karachi
Cell # +92-3332755805
OBJECTIVE:
An ambitious Telecom Engineer having knowledge of GSM, seeking of an organization where I can utilize my technical and intellectual
skills efficiently.
Currently working as a RAN Supervisor in Ericsson, Pakistan.
WORKING EXPERIENCE:
PROJECT:
Services Engineer (RAN) AT ERICSSON,Pakistan.
(2nd
June 2014 – Till date).
Ericsson TechnologiesPakistan Pvt. Ltd.
Software & Hardware Up gradation On Ericsson Transmission.
3G/4G implementation on transmission node.
Configuration and Implementation of New Rollout Links 1+0, 1+1, XPIC & SD Links.
Worked on Minilink craft 2.18, 2.20 & 13B.
E1 Routing BCS to Site (E1 Patching).
Connecting LTU via ADMs/SDH/PTN.
Configure Radio Links and made them alarm free for the PAT.
Work on Zong’s Software EOMS(Electronic operation maintenance system.)
PROJECTS: (1st March 2014 – 1 June 2014).
Formal Request for (3G Equipment).
TSSR and SSRF Report Completion.
Complete accomplished on SSRF, TSSR and LOS Reports and Surveys.
PROJECTS: (2nd September 2013 – 28 February 2014).
UFONE: RTN 600 AND 900(PDH/SDH/XPIC)SYSTEM (PHASE 9 - 10A)
UFONEGSM 900/1800 Expansion Project
CM PAK Rollout Project BTS3900
CM PAK 3G Expansion Survey
CM PAK MicrowaveInstallation
Huawei Technologies Pakistan Pvt. Ltd.
Installation of RTN Huawei. 0.3m, 0.6m & 1.2m.
Worked on commissioning and integration of Hybrid Microwave RTN 900 & 600 and 1+0, 1+1 and XPIC Configuration.
Conducting and Supervision of TSSR and LOS Surveys.
Worked on installation of BTS 3900 ( WCDMA )
Work on Huawei Transmission Project in Southern region for Ufone Project.
Commissioning of Huawei Transmission Equipment RTN 900 family RTN (950 & 950A) through I Manager U2000 Web LCT.
Preparation of LOS Matrix and TSS Documentation.
Rerouting microwave transmission links by analyzing L.O.S for existing and planned sites.
Dismantling of Old NEC MWEquipment.
3G TESurvey of CM PAK
2. Qualification:
Graduation:
“2012” B.S Telecom of Engineering and Engineering Technology from Sir Syed University.
Intermediate:
Intermediate from Govt. MuslimScience Intermediate College, Hyderabad in “PreEngineering”
Matriculation:
Matricfrom K.B Jackson Grammar High School, Hyderabad in “Science Group”.
Personal details:
Date of Birth: 21-June-1990
N.I.C NO: 35202-1681283-9
Nationality: Pakistani
Marital Status: Married
Religion: Islam
Computer skills:
M.S Office.
Basic Knowledge of Computer.
Commitment:
Believes in hardworking as it is thekey of success.
Reference:
Furnished upon request.