Ahmed Rashed has over 9 years of experience in electrical substation projects management, maintenance, and consulting, including roles at Saudi Engineering Group International and the Egyptian Electricity Transmission Company, and seeks new opportunities. He holds a bachelor's degree in electrical power and machines and various technical certifications. His experience includes substation design, maintenance, commissioning, project management, and electrical consulting.
1. (1/2) Resume of
Ahmed Rashed
6319 Coachwood Dr.Houston, TX 77035
qewa2000@yahoo.com – 001-832-949-4565
Willing to relocate: Anywhere
SUMMARY
Over 9 years' experience of Extra High Voltage and all voltage levels for Electrical
Substation in fields of projects management and maintenance
WORK EXPERIENCE
Freelance Electrical Engineer
September 2016 – January 2017
Electrical Consultant at Saudi Engineering Group International (SEGI)
September 2014 - August 2016 (2 years)
Substation Maintenance Electrical Engineer at Egyptian Electricity Transmission
Company (EETC)
November 2007 - September 2014 (6 years 11 months)
EDUCATION
• Bachelor’s Degree, Electrical power & machines, 2002 – 2007 from The Higher Institute
of Engineering at El-shorouk Academy
• Graduation project: Design and Analysis of Electrical Distribution System for Filling Station
• Excellent Graduation project grade
• Good Cumulative grade
• General Education degree (High school ) from El Salam secondary school
CERTIFICATIONS/LICENSES
• International computer driving license (ICDL)
• Texas apprentice electrician
• Maintenance and protection of power transformers
• Fresh graduate engineers training course
• Fundamentals of project planning and management
• PMP preparation course
PROJECTS
• KAIA JNE S/S 380/110/13.8 KV
October 2014 to February 2015
New Indoor 380/110//13.8 KV Gas Insulated Substation, named as King Abd Aziz International
airport- Jeddah North East 380/110/13.8 KV BSP
• Madinah Industrial City (MIC) 380/110/33/13.8 KV S/S
February 2015 to August 2016
New Indoor 380/110/33/13.8kV Gas Insulated Substation, named as Madinah
Industrial City 380/110/33/13.8 KV BSP (MIC BSP).
(2/2) Resume of Ahmed Rashed
JOBS DETAILS:
Freelance Electrical Engineer
2. September 2016 – January 2017
• Reading and interpreting blueprints, technical drawings, schematics, and computer-
generated reports.
• Planning and implementing research methodologies and procedures to apply
principles of electrical theory to engineering projects.
• Preparing specifications for purchase of materials and equipment.
• Liaising with, supervising, and training project team members as necessary.
• Investigating, testing and stress testing vendors and competitors’ products.
• Overseeing the project production efforts to assure projects finish on time and within
budget.
• Preparing and studying technical drawings, specifications of electrical systems, and
topographical maps to ensure that installation and operations conform to standards
and customer requirements.
• Developing budgets, estimating labor, material, and construction costs.
• Compiling data and writing reports regarding existing and potential engineering
studies and projects.
• Collecting data relating to commercial and residential development, population, and
power system interconnection to determine operating efficiency of electrical systems.
• Writing performance requirements for Electrical projects.
Electrical Consultant at Saudi Engineering Group International (SEGI)
September 2014 - August 2016 (2 years)
• Follow up and supervise Electrical installation for EHV Substation projects of Saudi Electric
Company (SEC) in Western Region from the initial stage of the project (Letter of Award)
up to the defect liability / close out of the project in compliance with contract scope,
specification & International standards, within budgeted cost & quality standards
• Wide field Experience, Inspection FAT, Commissioning SAT of switchgear,
Capacitor banks ,shunt reactors and all equipment for EHV substations
• Supervise practices relating to safety of workers and equipment on the project site.
• Monitoring and controlling of contract activities and reporting the job status
periodically to the stakeholders as required
• Ensures that the contract procedures are followed during the implementation of the
project.
• Coordinate with concerned parties to plan for effective utilization of outages. In
addition, attending regular meetings and visit projects sites to check and monitor the
progress of the work.
• Insure that the contactor /subcontractor following technical specification ref. as per
the contract.
• Proactively manages project requests for information and action items
• Work collaboratively with the Project Controls team to ensure project schedules and
costs are managed and tracking to plan
• Field checking installation and location of electrical equipment, electrical duct,
conduit, cable, panels and other components of the electrical system being installed.
• Monitoring all electrical installations to assure circuitry phasing, equipment, and
grounding adhere to construction documents requirements.
Substation Maintenance Electrical Engineer at Egyptian Electricity Transmission
Company (EETC)
November 2007 - September 2014 (6 years 11 months)
• Installation/maintenance of all substation equipment (CB, CT, VT, ES, Power Tr.,
Reactors, Capacitors,…etc.) for all levels of voltage .
• Implements a wide variety of engineering solutions to increase system availability,
increase net operating rate, reduce down time, and achieve standard and acceptable
customer satisfaction.
3. SKILLS & EXPERTISE:
Transformer, Switchgear, Substation
Power Systems, Power Distribution
High Voltage, Project Management
Maintenance and Protection of Power Transformers,
Personal Skills , Industrial Safety