OBJECTIVE
An accomplished result driven Project Engineer with 2 years and 6 months of experience focused on
Low Voltage Systems & ELV Systems in Electrical and communication technology industry. Proven
ability to interface with client and ensure product solutions to meet customer requirement. Exceptional
communicator with demonstrated success building relationships with upper management.
Key Accomplishments:
Active and Passive Networking.
 Experienced on Passive and Active Network Infrastructure.
 Experienced in deriving BOQ based on the drawings for LV,ELVS.
 Preparing of TechnicalSubmittals and addressing the comments from Consultants.
 Certified on various Passive and Active Components (Brand Rex, Molex, Corning, Cisco, Axis and
Korinex etc).
 Knowledge of Industry Standards for preparing and implementing designs in Passive Networking.
 Experienced in Installation of Structural cabling system (Copper, Fiber).
Good in Co-ordination with customer concerns and leading project team.
Professional Experience
Pan Arabia Information System LLC - Abu Dhabi, UAE. 2015 Junuary to Till Date
Position Site Engineer:
Project
Client : ADAC
Project : Midfield Terminal Project.
Responsibility : FO Cable installation as perADAC
Standards Supervising and arranging
For ADAC Witness testforhandoverofthe sub
stations.
Specialization - Structure – High rise Residential buildings and Independent villas.
Project : Welkin Park
Client/Contractor : Vermont Projects
Designation : Project Engineer
Duration : 2013 March to 2015 January
ABOUT WELKIN PARK:
Welkin Park is a modern, super luxury, well planned gated community located Begumpet, Hyderabad,
India. Welkin Park comprises 5 high rise apartment blocks, each 12 floors with two cellars. It has total
243 flats and various amenities
ROLES AND RESPONSIBILITIES:
 Execution of installation and wiring works of DB, Sockets, Panels, Switch Boards, Underground
Cable works, HT/LT lines, and Switch gears.
 Review and evaluation of Technical Submittals ( Material submittal)/ Drawings with respect to
project requirements & standard practices to submission authorities.
 To ensure that the project will be done according to
a) Approved drawings
b) Contract documents
c) Specifications and all applicable standards
 Estimates, prepares and assigns the resources such as manpower, materials, consumables,
equipment, tools, etc required for project
 Supports the Project Manager in accomplishing all the goals and targets for the all groups at site
 Prepare,review and modify contract documents and specifications
 Plans the execution of all electrical related works and coordinates the works to mechanical and
civil groups.
 Execution of point to point work as per the electrical drawings
 Reviewing the drawings and raising if any discrepancies found.
 Effective utilization and mobilization of manpower
 Ensuring timely deliver of assigned targets
 Resolving the daily problems of the Projects by discussing them with the Sub-Contractors and
arranging it with the contractor to solve them.
 Erection of Substations and Transformer as per the Drawings
 Execution as per the Transformer Cable drawings
 Ensuring Safety Standards during all electrical works
 Maintenance of All electrical equipments and machinery at site like DG with all the records
 Daily Reporting of Site Status to the concern project Engineer.
I secured overall exposure of Internal and external electrical works and practically proven regarding
execution of the all electrical works
TECHNICAL APTITUDE
B.Tech. (Electrical & Electronics):
College : Aware Madhavanji College of
engineering
Percentage Obtained : 62.3%
Year of Completion : 2013
ACADAMICPROJECTIN B-TECH:
Fuel Management System in A.P.GENCO.Thermal Power Plants : The fuel management system
forms an integral part of the management process in a power plant and hence is one of the most critical
areas. It deals with the management of commercial, operational and administrative functions pertaining
to estimating fuel requirements, selection of fuel suppliers, fuel quality check, transportation and fuel
handling, payment for fuel received, consumption and calculation of fuel efficiency.
SOFTWARE EXPOSURE
 MS Office
PERSONAL DETAILS
Full Name : D.ABDULNABI
Date of Birth : 15-8-1991.
Marital status : Single
Languages known : Hindi English and Telugu.
Nationality : Indian
Passport Number : L8634680
DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge and belief.
Place: Abu Dhabi
(D.ABDULNABI)

More Related Content

What's hot

Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshitRixit Patel
 
Resume_Raylene D'Souza
Resume_Raylene D'SouzaResume_Raylene D'Souza
Resume_Raylene D'SouzaRaylene Dsouza
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit CertificationVishnuprasad P
 
Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)khaja Ahammad
 
CURRICULUM VITAE-(Electrical Engg.)-1
CURRICULUM VITAE-(Electrical   Engg.)-1CURRICULUM VITAE-(Electrical   Engg.)-1
CURRICULUM VITAE-(Electrical Engg.)-1Nitin Rathore
 
Electromechanical engineer (2)
Electromechanical engineer (2)Electromechanical engineer (2)
Electromechanical engineer (2)Mohammad Zakir
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)sajid akram
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUMEVEERABHARATHI MUNI
 
M Grover - Curriculum Vitae
M Grover - Curriculum VitaeM Grover - Curriculum Vitae
M Grover - Curriculum VitaeMark Grover
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerTerence Anderson (BSEE & MBA)
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)amr gamal
 
Simon Britton CV linkedin
Simon Britton CV linkedinSimon Britton CV linkedin
Simon Britton CV linkedinSimon Britton
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalSAYANTAN GHOSH
 

What's hot (20)

Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
 
Resume_Raylene D'Souza
Resume_Raylene D'SouzaResume_Raylene D'Souza
Resume_Raylene D'Souza
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
 
Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)
 
CURRICULUM VITAE-(Electrical Engg.)-1
CURRICULUM VITAE-(Electrical   Engg.)-1CURRICULUM VITAE-(Electrical   Engg.)-1
CURRICULUM VITAE-(Electrical Engg.)-1
 
Electromechanical engineer (2)
Electromechanical engineer (2)Electromechanical engineer (2)
Electromechanical engineer (2)
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUME
 
Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)Jitendra_B_Chaudhari BE (MEP)
Jitendra_B_Chaudhari BE (MEP)
 
CV_Richard Mattox
CV_Richard MattoxCV_Richard Mattox
CV_Richard Mattox
 
Resume
ResumeResume
Resume
 
M Grover - Curriculum Vitae
M Grover - Curriculum VitaeM Grover - Curriculum Vitae
M Grover - Curriculum Vitae
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
 
RAJ PATIL
RAJ PATILRAJ PATIL
RAJ PATIL
 
Seth Resume 2016.01.15
Seth Resume 2016.01.15Seth Resume 2016.01.15
Seth Resume 2016.01.15
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
 
Simon Britton CV linkedin
Simon Britton CV linkedinSimon Britton CV linkedin
Simon Britton CV linkedin
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 

Viewers also liked

Apresentação Ecotrend 2015
Apresentação Ecotrend 2015    Apresentação Ecotrend 2015
Apresentação Ecotrend 2015 Ecotrend
 
ACPS_information
ACPS_informationACPS_information
ACPS_informationJack Rector
 
JSM Slides--Are State-Level Estimates for the AHS Feasible
JSM Slides--Are State-Level Estimates for the AHS FeasibleJSM Slides--Are State-Level Estimates for the AHS Feasible
JSM Slides--Are State-Level Estimates for the AHS FeasibleErnest Lawley
 
Palestra empreendedor rakuten expo 2015
Palestra empreendedor rakuten expo 2015Palestra empreendedor rakuten expo 2015
Palestra empreendedor rakuten expo 2015Paola Tucunduva
 
Tetley tea final
Tetley tea finalTetley tea final
Tetley tea finalTom Finch
 
NYK References
NYK ReferencesNYK References
NYK ReferencesPaul Chear
 
Webinar bol.com google adwords 8 oktober 2013
Webinar bol.com google adwords 8 oktober 2013Webinar bol.com google adwords 8 oktober 2013
Webinar bol.com google adwords 8 oktober 2013Eduvision Opleidingen
 
Are State-Level Estimates for the American Housing Survey Feasible Paper v1.0
Are State-Level Estimates for the American Housing Survey Feasible Paper v1.0Are State-Level Estimates for the American Housing Survey Feasible Paper v1.0
Are State-Level Estimates for the American Housing Survey Feasible Paper v1.0Ernest Lawley
 
Presentacion ticdf
Presentacion ticdfPresentacion ticdf
Presentacion ticdfsena
 

Viewers also liked (17)

Carlos Ewing CV2
Carlos Ewing CV2Carlos Ewing CV2
Carlos Ewing CV2
 
Apresentação Ecotrend 2015
Apresentação Ecotrend 2015    Apresentação Ecotrend 2015
Apresentação Ecotrend 2015
 
ACPS_information
ACPS_informationACPS_information
ACPS_information
 
Konrad
KonradKonrad
Konrad
 
Blog
BlogBlog
Blog
 
Zan1
Zan1Zan1
Zan1
 
JSM Slides--Are State-Level Estimates for the AHS Feasible
JSM Slides--Are State-Level Estimates for the AHS FeasibleJSM Slides--Are State-Level Estimates for the AHS Feasible
JSM Slides--Are State-Level Estimates for the AHS Feasible
 
Palestra empreendedor rakuten expo 2015
Palestra empreendedor rakuten expo 2015Palestra empreendedor rakuten expo 2015
Palestra empreendedor rakuten expo 2015
 
Tetley tea final
Tetley tea finalTetley tea final
Tetley tea final
 
Certificate
CertificateCertificate
Certificate
 
NYK References
NYK ReferencesNYK References
NYK References
 
Webinar bol.com google adwords 8 oktober 2013
Webinar bol.com google adwords 8 oktober 2013Webinar bol.com google adwords 8 oktober 2013
Webinar bol.com google adwords 8 oktober 2013
 
Are State-Level Estimates for the American Housing Survey Feasible Paper v1.0
Are State-Level Estimates for the American Housing Survey Feasible Paper v1.0Are State-Level Estimates for the American Housing Survey Feasible Paper v1.0
Are State-Level Estimates for the American Housing Survey Feasible Paper v1.0
 
Presentacion ticdf
Presentacion ticdfPresentacion ticdf
Presentacion ticdf
 
Schoolreisje in 1955 van OLS uit Hollum naar Gouda
Schoolreisje in 1955 van OLS uit Hollum naar GoudaSchoolreisje in 1955 van OLS uit Hollum naar Gouda
Schoolreisje in 1955 van OLS uit Hollum naar Gouda
 
Asignacion nº 1
Asignacion nº 1Asignacion nº 1
Asignacion nº 1
 
E0 ch05 prism_v12
E0 ch05 prism_v12E0 ch05 prism_v12
E0 ch05 prism_v12
 

Similar to nabi

Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15Santosh Singh
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)Umar Akbar
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
Girish BG - CV
Girish BG - CVGirish BG - CV
Girish BG - CVGirish BG
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza Aljabour
 

Similar to nabi (20)

HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
Resume
Resume Resume
Resume
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Maninder Kajal CV
Maninder Kajal CVManinder Kajal CV
Maninder Kajal CV
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
CV
CVCV
CV
 
Electrical Enginneer.
Electrical Enginneer.Electrical Enginneer.
Electrical Enginneer.
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
Md Ibrahim cv
Md Ibrahim cvMd Ibrahim cv
Md Ibrahim cv
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Girish BG - CV
Girish BG - CVGirish BG - CV
Girish BG - CV
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATOR
 

nabi

  • 1. D.ABUL NABI : abdulnabi201@gmail.com Cell No: 0555071293 Position: Project Engineer OBJECTIVE An accomplished result driven Project Engineer with 2 years and 6 months of experience focused on Low Voltage Systems & ELV Systems in Electrical and communication technology industry. Proven ability to interface with client and ensure product solutions to meet customer requirement. Exceptional communicator with demonstrated success building relationships with upper management. Key Accomplishments: Active and Passive Networking.  Experienced on Passive and Active Network Infrastructure.  Experienced in deriving BOQ based on the drawings for LV,ELVS.  Preparing of TechnicalSubmittals and addressing the comments from Consultants.  Certified on various Passive and Active Components (Brand Rex, Molex, Corning, Cisco, Axis and Korinex etc).  Knowledge of Industry Standards for preparing and implementing designs in Passive Networking.  Experienced in Installation of Structural cabling system (Copper, Fiber). Good in Co-ordination with customer concerns and leading project team. Professional Experience Pan Arabia Information System LLC - Abu Dhabi, UAE. 2015 Junuary to Till Date Position Site Engineer: Project Client : ADAC Project : Midfield Terminal Project. Responsibility : FO Cable installation as perADAC Standards Supervising and arranging For ADAC Witness testforhandoverofthe sub stations.
  • 2. Specialization - Structure – High rise Residential buildings and Independent villas. Project : Welkin Park Client/Contractor : Vermont Projects Designation : Project Engineer Duration : 2013 March to 2015 January ABOUT WELKIN PARK: Welkin Park is a modern, super luxury, well planned gated community located Begumpet, Hyderabad, India. Welkin Park comprises 5 high rise apartment blocks, each 12 floors with two cellars. It has total 243 flats and various amenities ROLES AND RESPONSIBILITIES:  Execution of installation and wiring works of DB, Sockets, Panels, Switch Boards, Underground Cable works, HT/LT lines, and Switch gears.  Review and evaluation of Technical Submittals ( Material submittal)/ Drawings with respect to project requirements & standard practices to submission authorities.  To ensure that the project will be done according to a) Approved drawings b) Contract documents c) Specifications and all applicable standards  Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc required for project  Supports the Project Manager in accomplishing all the goals and targets for the all groups at site  Prepare,review and modify contract documents and specifications  Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups.  Execution of point to point work as per the electrical drawings  Reviewing the drawings and raising if any discrepancies found.  Effective utilization and mobilization of manpower  Ensuring timely deliver of assigned targets
  • 3.  Resolving the daily problems of the Projects by discussing them with the Sub-Contractors and arranging it with the contractor to solve them.  Erection of Substations and Transformer as per the Drawings  Execution as per the Transformer Cable drawings  Ensuring Safety Standards during all electrical works  Maintenance of All electrical equipments and machinery at site like DG with all the records  Daily Reporting of Site Status to the concern project Engineer. I secured overall exposure of Internal and external electrical works and practically proven regarding execution of the all electrical works TECHNICAL APTITUDE B.Tech. (Electrical & Electronics): College : Aware Madhavanji College of engineering Percentage Obtained : 62.3% Year of Completion : 2013 ACADAMICPROJECTIN B-TECH: Fuel Management System in A.P.GENCO.Thermal Power Plants : The fuel management system forms an integral part of the management process in a power plant and hence is one of the most critical areas. It deals with the management of commercial, operational and administrative functions pertaining to estimating fuel requirements, selection of fuel suppliers, fuel quality check, transportation and fuel handling, payment for fuel received, consumption and calculation of fuel efficiency.
  • 4. SOFTWARE EXPOSURE  MS Office PERSONAL DETAILS Full Name : D.ABDULNABI Date of Birth : 15-8-1991. Marital status : Single Languages known : Hindi English and Telugu. Nationality : Indian Passport Number : L8634680 DECLARATION I hereby declare that the information furnished above is true to the best of my knowledge and belief. Place: Abu Dhabi (D.ABDULNABI)