The document discusses stakeholder management for a restaurant project called Bon Appetite. It identifies the project's primary stakeholders as the owners, staff/managers, and customers. Secondary stakeholders include local residents, competitors, and media. The document outlines each stakeholder's interests and how they should be communicated with. It also presents seven strategies for managing stakeholder relationships, such as acknowledging all stakeholder concerns and communicating openly with them. The goal is to gain support for the project and balance all stakeholder interests for successful project completion.
here is the description of the restaurant,
that how to design and how to use the space properly,how can we manage the space,and where the parking should be given,its approach,link with nature,its Types,its accessibility,location,importance...
here is the description of the restaurant,
that how to design and how to use the space properly,how can we manage the space,and where the parking should be given,its approach,link with nature,its Types,its accessibility,location,importance...
Significant risks come with opening a new restaurant and getting the design and construction of the venue right. Concept development and operations management may be among restaurant owners’ core competencies, but few have expertise managing the design and construction tasks that come with opening a new location. And keeping track of the countless related tasks remains equal parts art and science, when done correctly. In this hour-long webcast a panel of restaurant development professionals shared their experiences and expertise about successfully managing projects from concept to completion. These are the slides from the free webcast.
Hi! This is a slide show that make me feel to upload that, in our college the final year project assignment has been adopted from this slide. So you guys really feel that this slide is a great one to download and have a look exactly whats are in a Hospital management system has.
Quanta-HIS is web-based hospital information management software system from Birlamedisoft, demo of nurse module ,A software company provides hospital management software, healthcare software, blood bank management software, Laboratory management software, clinic management software, ophthalmology management software, HIS software solutions, diagnostics centre management Software, Web based HIMS system, LIMS management software, HIMS management software.
More and more customers, employees and investors expect companies to behave sustainably, i.e. showing respect for people and the environment. By responding to the need for sustainable products and services the company creates a foundation for sustainable profits.
Showing respect for the environment means reducing the negative environmental impact of a company’s products and services throughout the entire product life-cycle; in production, in use and at the end of its life.
Showing respect for people means ensuring that production is performed under safe and decent conditions and that products and services are safe to use. Companies should behave ethically and demonstrate respect for human rights. Customers, employees, business partners and owners then have confidence in the company and its management.
Plan sponsors of all sizes recognize the need to empower participants with financial education. Participants use it when offered. Your peers anticipate more clients will want it in the future. A tremendous opportunity exists for DC specialist advisors to bring financial wellness to clients.
Whether you’ve thought about financial wellness or not, this guide can help you talk to
plan sponsors and establish processes for success.
This video is for managers or professionals that are responsible for cultivating or "driving" change for their organization. Metaspire Cultural Change tools can be customized to support any transformational or change initiative.
Build Strength in your Business through Stakeholder Engagement.pdfEnterprise Wired
Effective stakeholder engagement involves identifying these diverse groups, understanding their interests, concerns, and expectations, and then devising strategies to foster open and transparent communication.
Show Me the Outcomes!
Evaluating and Proving Your Impact on the Community
Learn how to:
1. Understand how to build a successful outcomes plan for your nonprofit organization
2. Increase your funding by proving your program success to your funders
3. Make informed decisions about future programming and resource allocation
You will also receive an inside view of the Apricot Outcomes Palette™, a dynamic outcomes reporting tool
Presented by:
Kathryn Engelhardt-Cronk
Founder/CEO/President
Community TechKnowledge, Inc.
CPA Canada: A Starters Guide to Sustainability Reporting. This guide is a good starting point for new or early-stage sustainability reporters and is useful for small and medium-sized public companies, as well as large corporations.
Insurer's Customer Experience and Member Retention SummitWorldCongress
So you enrolled some of the 8 million health insurance consumers that were granted access to care under the Affordable Care Act and a number of other members during the inaugural AEP… Now what?
Topics include:
A focus on consumer experience as a differentiator in the market.
Shared sessions with providers surrounding member health, experience, and strategies to improve overall health outcomes through additive engagement programs for your members.
Strategies to retrain and revolutionize your call center operations to increase touch points with members, offer reform and policy advice, and include a sales aspect to persuade members to stay with your organization.
Advancements in technology that allow carriers to identify members at risk of cancelling their policies, and ways to personalize retention communications to prevent these cancelations.
Tips to navigate the rapidly changing post-reform landscape, and adapt to fluctuating legislation provisions and mandate extensions.
http://www.worldcongress.com/events/HW14084/
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
2. 1 | P a g e
Introduction:-
This research will introduce and discuss the goals and objectives of the Stakeholder
Management Strategy by using bon appetite resultant project as example. Effectively managing
stakeholders is a key component of successful project management and should never be ignored.
Proper stakeholder management can be used to gain support for a project and anticipate
resistance, conflict, or competing objectives among the project’s stakeholders.
Early identification and communication with stakeholders is imperative to ensure the
success of the bon appetite resultant Project by gaining support and input for the project.
Some stakeholders may have interests which may be positively or negatively affected by the
bon appetite resultant Project. By initiating early and frequent communication and
stakeholder management, we can more effectively manage and balance these interests while
accomplishing all project tasks.
The restaurant project mission statement
To ensure that each guest receives prompt, professional, friendly and courteous service.
To maintain a clean, comfortable and well maintained premises for our guests and staff. And to
provide a delicious and remarkable food and drinks. That the food and drink we made meets the
highest standards of quality, freshness and seasonality and combines both modern-creative and
traditional European styles of cookingand that by using only quality ingredients.
. To consistently provide our customers with impeccable service by demonstrating
warmth, graciousness, efficiency, knowledge, professionalism and integrity in our work. To have
every customer who comes through our doors leave impressed by bon appetite's and excited to
come back again. To create and maintain a restaurant that is comprehensive and exceptional in
its attention to every detail of operation. To provide all who work with us a friendly, cooperative
and rewarding environment which encourages long- term, satisfying, growth employment. To
keep our concept fresh, exciting and on the cutting edge of the hospitality and entertainment
industry. To use our restaurant to improve the quality of life in the Khartoum region.At a fair
price.
In one word
Customer complete satisfaction.
3. 2 | P a g e
Who are the Stakeholder’s?
• Stakeholders are the people or groups with an interest in the success or failure of an
organisation.
• Stakeholders can affect or be affected by the organization's actions, objectives and
policies.
• Not all stakeholders are equal. Some stakeholders are less important to a business than
others. The business would class them as either ;
Primary stakeholdersOr Secondary stakeholders
In order to differentiate between the different stakeholders we do
the following analysis
Power
Interest
Key Name Power
(1-5)
Interest
(1-5)
1 Sponsor / owner/
share holder
5 5
2 The staff
/managers
4 5
3 The customers 5 4
4 Supplier 3 4
5 Creditors / bank 5 2
6 Government/MOH 5 2
7 Local residents 1 4
8 Media 2 4
9 Competitors 2 5
1)2)3)
4) 5) 6)
1) 2) 3)
4)7)8)9)
7) 8) 9)
4. 3 | P a g e
Primary stakeholders
People or groups seen by the business to be vital to the organisation’s success or failure,a
firm cannot exist without their continuing participation
Examples of primary stakeholders such as
1. The owners /shareholders/sponsors
Definition Interest Communication system
as stakeholders
who have both
control and
responsibility for
cost and income
relatedto a project
creating an environment
leading to successful
projects in which
performance quality,
completion time and
final costs are within
prescribed limits and
tolerancesor eliminate
lengthy delays
What When How
information that
they want in on
project status,
issues and risks
Every
Month
Meeting /
Report
2. The staff /managers
Definition Interest Communication system
The employee
who have
direct activities
resulted in
success or
failure of the
project
To ensure the work is done
according the prepared plan and
policies and standard quality to
meet the mission statement that
were been set by the mangers
and the management board
What When How
To review
detailed plans
(tasks,
assignments,
and action
items).
Every
Day
Meeting/
Reports
3. The customers
Definition Interest Communication system
A customer known as
the recipient of a
good, service, product,
or idea, obtained from
a seller, vendor, or
supplier for a
monetary or other
valuable consideration
To test the new
food and service
to see if it meet
their expectations
in term of quality
and price and if it
really satisfy their
needs.
What When How
The
restaurant
food type,
price, cost
and
services
Every
three
days
booked through
phone, Facebook,
website and
personally visit
and through
regular
advertising and
commercials
5. 4 | P a g e
4. Supplier
Definition Interest Communication system
A supplier, also called a
vendor, is a person or
company that provides goods
and/or services to other
companies as one of the
contributors to the
development process on the
way to the ultimate customer
To ensure the
quality of the
food from the
supplier and
delivery
schedules and the
rational price
What When How
Quality
and
quantity
of food,
drinks
As
inventory
show
specific
level
Formal
requisition
through
E-mails,
phones
and any
documents
5. Creditors / bank
Definition Interest Communication system
It is a person
or institution
to whom
money is
owed
To ensure the
stability of the
restaurant and that
to ensure the
stability of the
collection of the
money in the exact
time and amount
What when How
Improve
Treasury cash
flow
management
efficiency and
assure ongoing
funding
Monthly, or as
identified in
Communication
Plan
Formal
report or
email
with a
trail
6. Local government/MOH
Definition Interest Communication system
The local government of
the statement /
And the Ministry Of
Health which set the
health criteria and
standard
The organization who will
decide the amount of taxes and
whether or not to allow future
planning permission on future
extension such as build a
warehouses and brought out
country labor. If the environment
within the health regulations
What when How
The project
missions and
the produced
deliverables
Before
starting
the
project
Formal
proposal
6. 5 | P a g e
Secondary stakeholders
People or groups who feel involved in the organisation’s success or failure, whether or
not the management agree.
Examples of secondary stakeholders
1. Local residents
Definition Interest Communication system
Is the people
or families or
old shop
keeper
Who may be affected
by traffic noise from
deliveries or may
crowd the street by
taking more space for
the parking area.
What when How
Inform people
of the project
and the
deliverables that
will impact
them
Twice a
week till
they
convinced
Stand-up
presentation
2. Competitors
Definition Interest Communication system
Are other restaurant with
the close and unique
service and food menu
The quality of food and
service and price and the
location
What when How
The project
missions
and the
produced
deliverables
Before and
after starting
the project
Regular
visit as
customer
3. Media
Definition Interest Communication system
Communicati
on channels
through
which
newspapers,
magazines,
TV, radio,
billboards,
direct mail,
telephone,
fax, and
internet
To reveal the
quality of the food
and service and
type of the
customers who
deal with the
restaurant besides
gaining extra
money from the
advertising and
promotion to the
restaurant
What When How
Inform about
progress and
organizational
change
impacts
Monthly, or as
identified in
Communication
Plan
Electronic
or paper
newsletters,
reports, or
video/podca
sts
7. 6 | P a g e
And then after that we classify and grouped the stakeholders we need to Monitor and manage
stakeholder relationships.
Stakeholder relationship management is essential byusing one of the following principals
Stakeholder Management Strategy
Strategy1
Managers should acknowledge and actively monitor the concerns of all legitimate
stakeholders, and should take their interests appropriately into account in decision-making and
operations.
Strategy 2
Managers should listen to and openly communicate with stakeholdersabout their
respective concerns and contributions, and about the risks that they assume because of their
involvement with the corporation.
Strategy3
Managers should adopt processes and modes of behavior that are sensitive to the
concerns and capabilities of each stakeholderconstituency.
Strategy 4
Managers should recognize the interdependence of efforts and rewards among
stakeholders, and should attempt to achieve a fair distribution of the benefits and burdens of
corporate activity among them, taking into account their respective risks and vulnerabilities.
Strategy 5
Managers should work cooperatively with other entities, both publicand private, to insure
that risks and harms arising from corporate activities are minimized and, where they cannot be
avoided, appropriately compensated.
8. 7 | P a g e
Strategy 6
Managers should avoid altogether activities that might jeopardize inalienable human
rights (e.g., the right to life) or give rise to risks which, if clearly understood, would be patently
unacceptable to relevant stakeholders.
Strategy 7
Managers should acknowledge the potential conflicts between (a) theirown role as
corporate stakeholders, and (b) their legal and moralresponsibilities for the interests of
stakeholders, and should address such conflicts through open communication, appropriate
reporting and incentive systems and, where necessary, third party review.