Relocation of Us headquarters:
Technology firm
Ji PeteNortheastern University
Executive Summary
The company is a global leader in threat detection and screening
technologies for military, transportation, homeland security, and
resilience applications.
The focus for this relocation:
Close the former headquarters.
Relocate numerous operations including customer service,
accounting and finance, and research and development
laboratories.
Create a program to retain and rehire key employees.
The technology company hired a project and finance manager to
manage the project
Already announced closures and moves to employees,
customers, and the public.
Cost and saving expectations were announced to the board of
the company.
Some other challenges they faced are state laws regarding
human resources notifications, HQ moving to one place while
other services move to another, relocation and removal of
hazardous materials, and major SAP changes in accounting and
operations.
Scope Management Processes
Plan
Plan Scope Management: Creating the Scope Management Plan
Collect
Collect Requirements: Defining and documenting the
stakeholder’s needs.
Define
Define Scope: Developing a detailed project scope statement.
Create
Create WBS: Subdividing project deliverables into smaller work
units.
Validate
Validate Scope: Formalizing the acceptance of the deliverables.
Control
Control Scope: The ongoing process of monitoring and
managing changes to the project scope.
Requirements Collection
Gathering Process
Document Analysis
Interviews
Brainstorming
Benchmarking
Gathering Team
Project Manager
Finance Manager
Senior Project Manager
Human Resource Manager
SME’s
MethodScheduleInterviewMonday-Friday: 5 Interviews a day
(if needed) Document Analysis5 Days Monday-Friday
(Maximum)Brainstorming
2 Days Max (Any day during the week that is free)3
DaysBenchmarking
Scope Statement
This project is designed to help the technology company with
its relocation efforts. They have hired a project and finance
manager, alongside the senior project manager for the company
to oversee the project. The main objectives is to close the
former headquarters, relocation management of numerous
operations including customer service, accounting and finance,
and research and development laboratories, and creating a
program to retain and rehire key employees. The closure and
moves have been announced to employees, customers, and the
public already. Also cost and saving expectations were
announced to the board.
Proper closure will include moving all necessities, closing
contracts, removing signage, and cleaning the workspaces.
Management of numerous relocation areas will oversee different
department transfers and the hiring for the new locations.
Lastly, the employee retention and rehiring program will be
designed to include numerous features like employee relief
benefits, healthcare and insurance, and competitive pay to keep
key employees.
Scope Statement Continued
Constraints
Budget and time, everything must be done on time for the move
and within the budget the company gives for the program.
Specific state laws regarding human resources notifications
HQ moving to one facility, while many services moving to
another
No down time in customer services
Relocation and removal of Hazardous Materials
A major SAP change was required to accommodate changes in
accounting and operations.
Assumptions
The project will only be addressing the efforts to close former
headquarter, produce an employee retention and rehiring
program, and hiring managers to manage new locations.
The project leaders will handle legal notifications and tasks.
The company already announced the closures and moves to
employees, customers, and public.
Cost and savings expectations had been announced to the
company board.
Relocation of numerous operations including customer services,
accounting and finance, and research and development
laboratories.
Special handling of research equipment and materials must be
present with moving the company’s belongings.
Senior Project Manager worked with a team of a client-provided
Project Manager and Project Finance Manager.
Scope Statement Continued
Exclusions
Will not hire or oversee personnel handling of hazardous
materials.
Moving of servers with IT provider/support.
Any equipment requires specialized or approved vendors to
move it. (Business Move Checklist)
Contacting post office, banks, IRS, vendors etc. for change of
address.
Risks
All key employees won’t relocate with new headquarter
locations.
Mishandling of equipment during move costing money.
Managers are ineffective causing schedule setbacks like the
rehiring process and getting departments prepared for business.
Setbacks occurring that will delay proper closure of former
headquarters
key features of the WBS
1.0 Initiating
Choosing Project Personnel
Business Case
Project Charter
Risk Statement
2.0 Planning
Scope Statement
Stakeholder Management Plan
Retention and Rehiring Program
Project Kickoff Meeting
3.0 Executing
Retention and Rehiring Program
Operations Relocation
Management
Monitor and Control
4.0 Closeout
Former Headquarters
Retention and Rehires Programs
Relocating Operations
Quality Assurance
Project Final Report/Audit
Project Scope Change Control process
9
Change Request
Project Manager Review of CR
Sent to Sponsor, Senior management, and Board of Company for
review, and stakeholders for implementation
Approve, Deny, or Need More information (With reasoning)
Sign Offs
Approve or Deny with explanation
Stakeholders involved are notified of decision
Documented and Implemented into the scope
recommended scope tradeoff
Some benefits within the Retention and Rehiring Program could
be exempt.
Recommend features:
Personal Growth and Development Program
Work Environment Improvements
Retail Case Study
Scope Management Plan
Rebecca J. Bernal
The following presentation will discuss the Retail Case Study
from PJM 6005 spring term. All speaker notes and information
has been taken from the case study document and my previous
term work regarding the project.
*See citations on the notes of the final slide.
1
Executive summary
The Retail Case Study Project will focus on the IT division of a
Fortune 100 global retailer looking to improve their current
project management training curriculum. According to the
study briefing, the client has said that the current curriculum is
not consistent with the company’s process and that participant
feedback indicates that the course is not helping the department
meet their goal of standardizing the project management process
throughout the organization.
PM College has been asked to create a custom project
management curriculum with a series of courses targeted at
multiple levels of knowledge as well as introducing new project
management instructors to teach the curriculum. Due to the
tight deadline, courses are to be released on a rolling schedule,
and improvements are to be made based on insights given as
courses are released.
According to the PMBOK Guide, the purpose of the scope
management plan is to discuss how the scope of the project will
be “defined, developed, monitored, controlled, and validated.”
The scope of this project will be contained to creating a custom
and comprehensive project management training program and
will be managed both in its ability to meet standards against the
existing PMBOK-compliant Curriculum, and a client-imposed
timeline and budget. The following presentation will go more
in depth on this plan.
2
This project focuses on the IT division of a large global retailer
looking to improve their current project management
curriculum. PM College has been hired in an effort to create a
custom project management curriculum that will be more in line
with the organization’s process and standard of operation. They
ask that the new curriculum target multiple levels of knowledge
as well as introduce new instructors to teach the program.
Due to the tight deadline, the new curriculum courses will be
released on a rolling schedule and improvements are to be made
based on insights given as courses are released
Collecting requirements
Requirements for this project will be collected in four distinct
ways:
-questionnaires and surveys
-interviews
-benchmarking
-observation
Questionnaires and surveys are a great way to get started on this
project since this is such a large organization. In order to get a
better feel for what the main problems in the current curriculum
are from the general employee pool; a survey can be sent out to
narrow down specifics.
Interviews with organization executives and team leaders to
find out what their main concerns are for the project
Benchmarking or comparing the organization’s current
curriculum against other IT project management curriculums in
similarly sized organizations in order to see what improvements
can be made
Observation as the courses are released in order to learn about
improvements that can be made as the project continues
3
Questionnaires &
Surveys
Interviews
Benchmarking
Observation
Scope statement
A scope statement should be comprised of a summary of the
project, business requirements, solution requirements, project
exclusions, key project features, assumptions and risks, and
project approvals.
A brief summary of this project was provided in the earlier
slides.
The other requirements will be discussed in depth in the
following slides.
All project changes should be approved by signature by all
project sponsors, managers, and relevant team leaders.
4
Project Summary
Business Requirements
Solution
Requirements
Exclusions
Key Project Features
Assumptions & Risks
Approvals
Scope Statement
Business Requirements
Courses must be accessible in multiple languages
Courses must adhere to PMBOK® Guide standards
Courses should target at least three levels of knowledge

More Related Content

Similar to Relocation of Us headquarters Technology firmJi Pete.docx

Strategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIStrategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO III
Jo Balucanag - Bitonio
 
3&4. project scope management at project.ppt
3&4. project scope management at project.ppt3&4. project scope management at project.ppt
3&4. project scope management at project.ppt
GoharSaeed6
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
Siwawong Wuttipongprasert
 
PROJECT MANAGEMENT.pptx
PROJECT MANAGEMENT.pptxPROJECT MANAGEMENT.pptx
PROJECT MANAGEMENT.pptx
Nimra zaman
 
Project Proposal Template Powerpoint Presentation Slides
Project Proposal Template Powerpoint Presentation SlidesProject Proposal Template Powerpoint Presentation Slides
Project Proposal Template Powerpoint Presentation Slides
SlideTeam
 
Project Proposal Template PowerPoint Presentation Slides
Project Proposal Template PowerPoint Presentation SlidesProject Proposal Template PowerPoint Presentation Slides
Project Proposal Template PowerPoint Presentation Slides
SlideTeam
 
VikramSingh- Updated
VikramSingh- UpdatedVikramSingh- Updated
VikramSingh- UpdatedVikram Singh
 
CV PHILLIS SKONTOS_ Jun_2016
CV PHILLIS SKONTOS_ Jun_2016CV PHILLIS SKONTOS_ Jun_2016
CV PHILLIS SKONTOS_ Jun_2016Phillis Skontos
 
Project and process engineering management industrial engineering management
Project and process engineering management industrial engineering managementProject and process engineering management industrial engineering management
Project and process engineering management industrial engineering management
Luis Cabrera
 
Pmo
PmoPmo
Pmo
ammody
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
AtulBhagwat6
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
Ahmed Rami Elsherif, PMP, ITBMC
 
Project Handling Proposal Template PowerPoint Presentation Slides
Project Handling Proposal Template PowerPoint Presentation SlidesProject Handling Proposal Template PowerPoint Presentation Slides
Project Handling Proposal Template PowerPoint Presentation Slides
SlideTeam
 
Regulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and ModelsRegulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and Models
Paul Kuiken
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
IRJET Journal
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project ManagementNoman Aftab
 
@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview
Daniel Brody
 

Similar to Relocation of Us headquarters Technology firmJi Pete.docx (20)

Tanushree Kadian_CV
Tanushree Kadian_CVTanushree Kadian_CV
Tanushree Kadian_CV
 
PACMTN Portfolio1
PACMTN Portfolio1PACMTN Portfolio1
PACMTN Portfolio1
 
Strategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIStrategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO III
 
PM
PMPM
PM
 
3&4. project scope management at project.ppt
3&4. project scope management at project.ppt3&4. project scope management at project.ppt
3&4. project scope management at project.ppt
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
PROJECT MANAGEMENT.pptx
PROJECT MANAGEMENT.pptxPROJECT MANAGEMENT.pptx
PROJECT MANAGEMENT.pptx
 
Project Proposal Template Powerpoint Presentation Slides
Project Proposal Template Powerpoint Presentation SlidesProject Proposal Template Powerpoint Presentation Slides
Project Proposal Template Powerpoint Presentation Slides
 
Project Proposal Template PowerPoint Presentation Slides
Project Proposal Template PowerPoint Presentation SlidesProject Proposal Template PowerPoint Presentation Slides
Project Proposal Template PowerPoint Presentation Slides
 
VikramSingh- Updated
VikramSingh- UpdatedVikramSingh- Updated
VikramSingh- Updated
 
CV PHILLIS SKONTOS_ Jun_2016
CV PHILLIS SKONTOS_ Jun_2016CV PHILLIS SKONTOS_ Jun_2016
CV PHILLIS SKONTOS_ Jun_2016
 
Project and process engineering management industrial engineering management
Project and process engineering management industrial engineering managementProject and process engineering management industrial engineering management
Project and process engineering management industrial engineering management
 
Pmo
PmoPmo
Pmo
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
 
Project Handling Proposal Template PowerPoint Presentation Slides
Project Handling Proposal Template PowerPoint Presentation SlidesProject Handling Proposal Template PowerPoint Presentation Slides
Project Handling Proposal Template PowerPoint Presentation Slides
 
Regulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and ModelsRegulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and Models
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project Management
 
@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview
 

More from debishakespeare

Ethical Case Study 2Gloria is a housekeeper in an independent li.docx
Ethical Case Study 2Gloria is a housekeeper in an independent li.docxEthical Case Study 2Gloria is a housekeeper in an independent li.docx
Ethical Case Study 2Gloria is a housekeeper in an independent li.docx
debishakespeare
 
Ethical consideration is important in nursing practice, especial.docx
Ethical consideration is important in nursing practice, especial.docxEthical consideration is important in nursing practice, especial.docx
Ethical consideration is important in nursing practice, especial.docx
debishakespeare
 
Ethical Competency Writing Assignment DescriptionPHI 108 Spr.docx
Ethical Competency Writing Assignment DescriptionPHI 108 Spr.docxEthical Competency Writing Assignment DescriptionPHI 108 Spr.docx
Ethical Competency Writing Assignment DescriptionPHI 108 Spr.docx
debishakespeare
 
Ethical Case StudyAn example of unethical treatment of participa.docx
Ethical Case StudyAn example of unethical treatment of participa.docxEthical Case StudyAn example of unethical treatment of participa.docx
Ethical Case StudyAn example of unethical treatment of participa.docx
debishakespeare
 
Ethical AwarenessDEFINITION a brief definition of the k.docx
Ethical AwarenessDEFINITION a brief definition of the k.docxEthical AwarenessDEFINITION a brief definition of the k.docx
Ethical AwarenessDEFINITION a brief definition of the k.docx
debishakespeare
 
ETHICAL CHALLENGES JOYCAROLYNE MUIGAINTC3025262020.docx
ETHICAL CHALLENGES JOYCAROLYNE MUIGAINTC3025262020.docxETHICAL CHALLENGES JOYCAROLYNE MUIGAINTC3025262020.docx
ETHICAL CHALLENGES JOYCAROLYNE MUIGAINTC3025262020.docx
debishakespeare
 
Ethical Conduct of Researchpower point from this document, 1.docx
Ethical Conduct of Researchpower point from this document, 1.docxEthical Conduct of Researchpower point from this document, 1.docx
Ethical Conduct of Researchpower point from this document, 1.docx
debishakespeare
 
Ethical Challenges and Agency IssuesI.IntroductionII.E.docx
Ethical Challenges and Agency IssuesI.IntroductionII.E.docxEthical Challenges and Agency IssuesI.IntroductionII.E.docx
Ethical Challenges and Agency IssuesI.IntroductionII.E.docx
debishakespeare
 
Ethical Approaches An Overview of .docx
Ethical Approaches An Overview of .docxEthical Approaches An Overview of .docx
Ethical Approaches An Overview of .docx
debishakespeare
 
Ethical and Professional Issues in Group PracticeThose who seek .docx
Ethical and Professional Issues in Group PracticeThose who seek .docxEthical and Professional Issues in Group PracticeThose who seek .docx
Ethical and Professional Issues in Group PracticeThose who seek .docx
debishakespeare
 
Ethical AnalysisSelect a work-related ethical scenario that .docx
Ethical AnalysisSelect a work-related ethical scenario that .docxEthical AnalysisSelect a work-related ethical scenario that .docx
Ethical AnalysisSelect a work-related ethical scenario that .docx
debishakespeare
 
Ethical (Moral) RelativismIn America, many are comfortable describ.docx
Ethical (Moral) RelativismIn America, many are comfortable describ.docxEthical (Moral) RelativismIn America, many are comfortable describ.docx
Ethical (Moral) RelativismIn America, many are comfortable describ.docx
debishakespeare
 
Ethical Analysis on Lehman Brothers financial crisis of 2008 , pleas.docx
Ethical Analysis on Lehman Brothers financial crisis of 2008 , pleas.docxEthical Analysis on Lehman Brothers financial crisis of 2008 , pleas.docx
Ethical Analysis on Lehman Brothers financial crisis of 2008 , pleas.docx
debishakespeare
 
Ethical Analysis on Merrill lynch financial crisis of 2008 , please .docx
Ethical Analysis on Merrill lynch financial crisis of 2008 , please .docxEthical Analysis on Merrill lynch financial crisis of 2008 , please .docx
Ethical Analysis on Merrill lynch financial crisis of 2008 , please .docx
debishakespeare
 
ETHC 101Discussion Board Reply Grading RubricCriteriaLevels .docx
ETHC 101Discussion Board Reply Grading RubricCriteriaLevels .docxETHC 101Discussion Board Reply Grading RubricCriteriaLevels .docx
ETHC 101Discussion Board Reply Grading RubricCriteriaLevels .docx
debishakespeare
 
Ethical and Human Rights Concerns in Global HealthChapter Fou.docx
Ethical and Human Rights Concerns in Global HealthChapter  Fou.docxEthical and Human Rights Concerns in Global HealthChapter  Fou.docx
Ethical and Human Rights Concerns in Global HealthChapter Fou.docx
debishakespeare
 
Ethical & Legal Aspects in Nursing WK 14Please answer the .docx
Ethical & Legal Aspects in Nursing WK 14Please answer the .docxEthical & Legal Aspects in Nursing WK 14Please answer the .docx
Ethical & Legal Aspects in Nursing WK 14Please answer the .docx
debishakespeare
 
EthernetSatellite dishInternational Plastics, Inc. - C.docx
EthernetSatellite dishInternational Plastics, Inc. -  C.docxEthernetSatellite dishInternational Plastics, Inc. -  C.docx
EthernetSatellite dishInternational Plastics, Inc. - C.docx
debishakespeare
 
Ethanolv.DrizinUnited States District Court, N.D. Iowa, Eastern .docx
Ethanolv.DrizinUnited States District Court, N.D. Iowa, Eastern .docxEthanolv.DrizinUnited States District Court, N.D. Iowa, Eastern .docx
Ethanolv.DrizinUnited States District Court, N.D. Iowa, Eastern .docx
debishakespeare
 
Ethan FromeEdith WhartonTHE EMC MASTERPIECE SERIES.docx
Ethan FromeEdith WhartonTHE EMC MASTERPIECE SERIES.docxEthan FromeEdith WhartonTHE EMC MASTERPIECE SERIES.docx
Ethan FromeEdith WhartonTHE EMC MASTERPIECE SERIES.docx
debishakespeare
 

More from debishakespeare (20)

Ethical Case Study 2Gloria is a housekeeper in an independent li.docx
Ethical Case Study 2Gloria is a housekeeper in an independent li.docxEthical Case Study 2Gloria is a housekeeper in an independent li.docx
Ethical Case Study 2Gloria is a housekeeper in an independent li.docx
 
Ethical consideration is important in nursing practice, especial.docx
Ethical consideration is important in nursing practice, especial.docxEthical consideration is important in nursing practice, especial.docx
Ethical consideration is important in nursing practice, especial.docx
 
Ethical Competency Writing Assignment DescriptionPHI 108 Spr.docx
Ethical Competency Writing Assignment DescriptionPHI 108 Spr.docxEthical Competency Writing Assignment DescriptionPHI 108 Spr.docx
Ethical Competency Writing Assignment DescriptionPHI 108 Spr.docx
 
Ethical Case StudyAn example of unethical treatment of participa.docx
Ethical Case StudyAn example of unethical treatment of participa.docxEthical Case StudyAn example of unethical treatment of participa.docx
Ethical Case StudyAn example of unethical treatment of participa.docx
 
Ethical AwarenessDEFINITION a brief definition of the k.docx
Ethical AwarenessDEFINITION a brief definition of the k.docxEthical AwarenessDEFINITION a brief definition of the k.docx
Ethical AwarenessDEFINITION a brief definition of the k.docx
 
ETHICAL CHALLENGES JOYCAROLYNE MUIGAINTC3025262020.docx
ETHICAL CHALLENGES JOYCAROLYNE MUIGAINTC3025262020.docxETHICAL CHALLENGES JOYCAROLYNE MUIGAINTC3025262020.docx
ETHICAL CHALLENGES JOYCAROLYNE MUIGAINTC3025262020.docx
 
Ethical Conduct of Researchpower point from this document, 1.docx
Ethical Conduct of Researchpower point from this document, 1.docxEthical Conduct of Researchpower point from this document, 1.docx
Ethical Conduct of Researchpower point from this document, 1.docx
 
Ethical Challenges and Agency IssuesI.IntroductionII.E.docx
Ethical Challenges and Agency IssuesI.IntroductionII.E.docxEthical Challenges and Agency IssuesI.IntroductionII.E.docx
Ethical Challenges and Agency IssuesI.IntroductionII.E.docx
 
Ethical Approaches An Overview of .docx
Ethical Approaches An Overview of .docxEthical Approaches An Overview of .docx
Ethical Approaches An Overview of .docx
 
Ethical and Professional Issues in Group PracticeThose who seek .docx
Ethical and Professional Issues in Group PracticeThose who seek .docxEthical and Professional Issues in Group PracticeThose who seek .docx
Ethical and Professional Issues in Group PracticeThose who seek .docx
 
Ethical AnalysisSelect a work-related ethical scenario that .docx
Ethical AnalysisSelect a work-related ethical scenario that .docxEthical AnalysisSelect a work-related ethical scenario that .docx
Ethical AnalysisSelect a work-related ethical scenario that .docx
 
Ethical (Moral) RelativismIn America, many are comfortable describ.docx
Ethical (Moral) RelativismIn America, many are comfortable describ.docxEthical (Moral) RelativismIn America, many are comfortable describ.docx
Ethical (Moral) RelativismIn America, many are comfortable describ.docx
 
Ethical Analysis on Lehman Brothers financial crisis of 2008 , pleas.docx
Ethical Analysis on Lehman Brothers financial crisis of 2008 , pleas.docxEthical Analysis on Lehman Brothers financial crisis of 2008 , pleas.docx
Ethical Analysis on Lehman Brothers financial crisis of 2008 , pleas.docx
 
Ethical Analysis on Merrill lynch financial crisis of 2008 , please .docx
Ethical Analysis on Merrill lynch financial crisis of 2008 , please .docxEthical Analysis on Merrill lynch financial crisis of 2008 , please .docx
Ethical Analysis on Merrill lynch financial crisis of 2008 , please .docx
 
ETHC 101Discussion Board Reply Grading RubricCriteriaLevels .docx
ETHC 101Discussion Board Reply Grading RubricCriteriaLevels .docxETHC 101Discussion Board Reply Grading RubricCriteriaLevels .docx
ETHC 101Discussion Board Reply Grading RubricCriteriaLevels .docx
 
Ethical and Human Rights Concerns in Global HealthChapter Fou.docx
Ethical and Human Rights Concerns in Global HealthChapter  Fou.docxEthical and Human Rights Concerns in Global HealthChapter  Fou.docx
Ethical and Human Rights Concerns in Global HealthChapter Fou.docx
 
Ethical & Legal Aspects in Nursing WK 14Please answer the .docx
Ethical & Legal Aspects in Nursing WK 14Please answer the .docxEthical & Legal Aspects in Nursing WK 14Please answer the .docx
Ethical & Legal Aspects in Nursing WK 14Please answer the .docx
 
EthernetSatellite dishInternational Plastics, Inc. - C.docx
EthernetSatellite dishInternational Plastics, Inc. -  C.docxEthernetSatellite dishInternational Plastics, Inc. -  C.docx
EthernetSatellite dishInternational Plastics, Inc. - C.docx
 
Ethanolv.DrizinUnited States District Court, N.D. Iowa, Eastern .docx
Ethanolv.DrizinUnited States District Court, N.D. Iowa, Eastern .docxEthanolv.DrizinUnited States District Court, N.D. Iowa, Eastern .docx
Ethanolv.DrizinUnited States District Court, N.D. Iowa, Eastern .docx
 
Ethan FromeEdith WhartonTHE EMC MASTERPIECE SERIES.docx
Ethan FromeEdith WhartonTHE EMC MASTERPIECE SERIES.docxEthan FromeEdith WhartonTHE EMC MASTERPIECE SERIES.docx
Ethan FromeEdith WhartonTHE EMC MASTERPIECE SERIES.docx
 

Recently uploaded

Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 

Recently uploaded (20)

Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 

Relocation of Us headquarters Technology firmJi Pete.docx

  • 1. Relocation of Us headquarters: Technology firm Ji PeteNortheastern University Executive Summary The company is a global leader in threat detection and screening technologies for military, transportation, homeland security, and resilience applications. The focus for this relocation: Close the former headquarters. Relocate numerous operations including customer service, accounting and finance, and research and development laboratories. Create a program to retain and rehire key employees. The technology company hired a project and finance manager to manage the project Already announced closures and moves to employees, customers, and the public. Cost and saving expectations were announced to the board of the company. Some other challenges they faced are state laws regarding human resources notifications, HQ moving to one place while other services move to another, relocation and removal of hazardous materials, and major SAP changes in accounting and operations.
  • 2. Scope Management Processes Plan Plan Scope Management: Creating the Scope Management Plan Collect Collect Requirements: Defining and documenting the stakeholder’s needs. Define Define Scope: Developing a detailed project scope statement. Create Create WBS: Subdividing project deliverables into smaller work units. Validate
  • 3. Validate Scope: Formalizing the acceptance of the deliverables. Control Control Scope: The ongoing process of monitoring and managing changes to the project scope. Requirements Collection Gathering Process Document Analysis Interviews Brainstorming Benchmarking Gathering Team Project Manager Finance Manager Senior Project Manager Human Resource Manager SME’s MethodScheduleInterviewMonday-Friday: 5 Interviews a day (if needed) Document Analysis5 Days Monday-Friday (Maximum)Brainstorming 2 Days Max (Any day during the week that is free)3 DaysBenchmarking
  • 4. Scope Statement This project is designed to help the technology company with its relocation efforts. They have hired a project and finance manager, alongside the senior project manager for the company to oversee the project. The main objectives is to close the former headquarters, relocation management of numerous operations including customer service, accounting and finance, and research and development laboratories, and creating a program to retain and rehire key employees. The closure and moves have been announced to employees, customers, and the public already. Also cost and saving expectations were announced to the board. Proper closure will include moving all necessities, closing contracts, removing signage, and cleaning the workspaces. Management of numerous relocation areas will oversee different department transfers and the hiring for the new locations. Lastly, the employee retention and rehiring program will be designed to include numerous features like employee relief benefits, healthcare and insurance, and competitive pay to keep key employees. Scope Statement Continued Constraints Budget and time, everything must be done on time for the move and within the budget the company gives for the program. Specific state laws regarding human resources notifications HQ moving to one facility, while many services moving to another No down time in customer services Relocation and removal of Hazardous Materials A major SAP change was required to accommodate changes in accounting and operations.
  • 5. Assumptions The project will only be addressing the efforts to close former headquarter, produce an employee retention and rehiring program, and hiring managers to manage new locations. The project leaders will handle legal notifications and tasks. The company already announced the closures and moves to employees, customers, and public. Cost and savings expectations had been announced to the company board. Relocation of numerous operations including customer services, accounting and finance, and research and development laboratories. Special handling of research equipment and materials must be present with moving the company’s belongings. Senior Project Manager worked with a team of a client-provided Project Manager and Project Finance Manager. Scope Statement Continued Exclusions Will not hire or oversee personnel handling of hazardous materials. Moving of servers with IT provider/support. Any equipment requires specialized or approved vendors to move it. (Business Move Checklist) Contacting post office, banks, IRS, vendors etc. for change of address. Risks All key employees won’t relocate with new headquarter locations.
  • 6. Mishandling of equipment during move costing money. Managers are ineffective causing schedule setbacks like the rehiring process and getting departments prepared for business. Setbacks occurring that will delay proper closure of former headquarters key features of the WBS 1.0 Initiating Choosing Project Personnel Business Case Project Charter Risk Statement 2.0 Planning Scope Statement Stakeholder Management Plan Retention and Rehiring Program Project Kickoff Meeting 3.0 Executing Retention and Rehiring Program Operations Relocation Management Monitor and Control 4.0 Closeout Former Headquarters Retention and Rehires Programs Relocating Operations Quality Assurance Project Final Report/Audit
  • 7. Project Scope Change Control process 9 Change Request Project Manager Review of CR Sent to Sponsor, Senior management, and Board of Company for review, and stakeholders for implementation Approve, Deny, or Need More information (With reasoning) Sign Offs Approve or Deny with explanation Stakeholders involved are notified of decision Documented and Implemented into the scope
  • 8. recommended scope tradeoff Some benefits within the Retention and Rehiring Program could be exempt. Recommend features: Personal Growth and Development Program Work Environment Improvements Retail Case Study Scope Management Plan Rebecca J. Bernal The following presentation will discuss the Retail Case Study from PJM 6005 spring term. All speaker notes and information has been taken from the case study document and my previous term work regarding the project. *See citations on the notes of the final slide. 1 Executive summary The Retail Case Study Project will focus on the IT division of a Fortune 100 global retailer looking to improve their current project management training curriculum. According to the study briefing, the client has said that the current curriculum is not consistent with the company’s process and that participant feedback indicates that the course is not helping the department meet their goal of standardizing the project management process
  • 9. throughout the organization. PM College has been asked to create a custom project management curriculum with a series of courses targeted at multiple levels of knowledge as well as introducing new project management instructors to teach the curriculum. Due to the tight deadline, courses are to be released on a rolling schedule, and improvements are to be made based on insights given as courses are released. According to the PMBOK Guide, the purpose of the scope management plan is to discuss how the scope of the project will be “defined, developed, monitored, controlled, and validated.” The scope of this project will be contained to creating a custom and comprehensive project management training program and will be managed both in its ability to meet standards against the existing PMBOK-compliant Curriculum, and a client-imposed timeline and budget. The following presentation will go more in depth on this plan. 2 This project focuses on the IT division of a large global retailer looking to improve their current project management curriculum. PM College has been hired in an effort to create a custom project management curriculum that will be more in line with the organization’s process and standard of operation. They ask that the new curriculum target multiple levels of knowledge as well as introduce new instructors to teach the program. Due to the tight deadline, the new curriculum courses will be released on a rolling schedule and improvements are to be made based on insights given as courses are released
  • 10. Collecting requirements Requirements for this project will be collected in four distinct ways: -questionnaires and surveys -interviews -benchmarking -observation Questionnaires and surveys are a great way to get started on this project since this is such a large organization. In order to get a better feel for what the main problems in the current curriculum are from the general employee pool; a survey can be sent out to narrow down specifics. Interviews with organization executives and team leaders to find out what their main concerns are for the project Benchmarking or comparing the organization’s current curriculum against other IT project management curriculums in similarly sized organizations in order to see what improvements can be made Observation as the courses are released in order to learn about improvements that can be made as the project continues 3 Questionnaires & Surveys Interviews
  • 11. Benchmarking Observation Scope statement A scope statement should be comprised of a summary of the project, business requirements, solution requirements, project exclusions, key project features, assumptions and risks, and project approvals. A brief summary of this project was provided in the earlier slides. The other requirements will be discussed in depth in the following slides. All project changes should be approved by signature by all project sponsors, managers, and relevant team leaders. 4 Project Summary Business Requirements
  • 12. Solution Requirements Exclusions Key Project Features Assumptions & Risks Approvals Scope Statement Business Requirements Courses must be accessible in multiple languages Courses must adhere to PMBOK® Guide standards
  • 13. Courses should target at least three levels of knowledge