SlideShare a Scribd company logo
1 of 11
Download to read offline
Brooke
Anderson
LSS
Black Belt
Introduction to DMAIC
This project follows the DMAIC model for identifying, proposing, and implementing solutions to organizational
opportunities. DMAIC is an acronym for Define, Measure, Analyze, Improve, and Control. This Lean Six Sigma
methodology is most commonly used in lean initiatives because it is specific, quantifiable, and a repeatable model that
proves effective in solving problems regardless of complexity. A brief description of the intent of each phase may be
informative.
Define
•Clearly defines the project's purpose and scope.
•Collect background information on the process and your customer's needs and requirements.
Measure
•Gather information on the current situation to provide a clearer focus for your improvement effort.
Analyze
•Identify the root causes of defects.
•Confirm them with data.
Improve
•Develop, try out, and implement solutions that address the root causes.
•Use data to evaluate results for the solutions and the plans used to carry them out.
Control
•Maintain the gains that you have achieved by standardizing your work methods or processes.
•Anticipate future improvements and make plans to preserve the lessons learned from this
improvement effort.
Define Phase
 Purpose:
Pacific Mountain Workforce Development Council (PacMtn) currently has no standardized process in place to
manage its Internal Policy Development Program. As PacMtn has grown significantly since its inception, there
is now an opportunity to develop and implement a consistent process with clearly defined roles to effectively
and efficiently manage the large number of intricate policies being internally developed and disseminated.
 Importance:
1. Updating and disseminating policies in a timely manner is critical to ensuring PacMtn avoids being subject
to disallowed costs should state and federal regulators find its contractors out of compliance because they are
not informed of new or updated policies.
2. Realize significant time and resource savings.
 Objectives:
1. Develop and implement a standardized and lean internal policy development process starting from the policy
writing stage through the dissemination stage.
 Reduce rework and redundancy
 Minimize stagnant time between policy development stages
 Eliminate confusion on policy status
 Ensure policies are disseminated and updated on the website immediately and accurately
2. Clearly define each individual’s role within the process.
 Who is responsible for writing, approving, communicating, training, updating website, and being
content experts?
3. Devise and implement a plan for ongoing monitoring and improvement of the process.
 Success Criteria:
1. 30% reduction in touch time*.
*The actual time spent developing a product or service with the ultimate goal being the addition of value to the end consumer.
2. 30% reduction in workflow stops.
3. Ongoing and consistent internal website monitoring finds no policy inaccuracies.
Project Team
Person Department Position
Cheryl Fambles
Bridget Vidonne
Sponsor/Mgmt.
Sponsor/Fiscal
CEO
Director of Finance and Admin Services
Jaime Britton Fiscal Senior Accounting Specialist
Craig Clark Program Program and Performance Coordinator
Corinne Daffern Program Associate Director of Workforce Services
Sarah Wilkins Program Youth Initiatives Coordinator
Sean Murphy Program Associate Director of SS&I
Neva Barton Support Program Assistant II
Measure & Analyze Phases
The current process for PacMtn’s internal development program has not been developed until now. Previously, PacMtn
has had simple and single policies that infrequently needed updating and managing the process was not a priority. In
recent years PacMtn has undergone tremendous organizational growth and they are now faced with the need to update
multiple and complex policies frequently and consistently which is why they have a prioritized this initiative by working
with a Lean Six Sigma consultant and supplying resources to implement a lean process for managing their internal
policy development program.
 Current State Process:
 Policy writing starts 4-6 weeks prior to the board meeting where policies are approved. Shortening
this overall timeframe will have no impact on the process time and monetary savings since the process
steps are done intermittently in conjunction with other job duties.
 Reducing touch time and the number of workflow stops within the process is the focus of the lean
initiative since this will have the greatest time and monetary savings for the organization.
 No standardized/formal process in place.
 Measurable Opportunities for Improvement:
1. Touch Time.
 Eliminate non value added (NVA) process redundancies.
2. Number of workflow stops.
3. Policy accuracy during internal website auditing.
Improve Phase
Touch Time:
Title
Current State Average Minutes
(TT)
Future State Average Minutes
(TT)
Program & Performance Coordinator 1175 680
Program Assistant II 960 140
Director of Finance & Admin Services 550 525
Avg Hourly- Admin & Fiscal Team 120 120
Total 2804 1465
Touch Time Reduction: 47.7%
Labor Cost:
Title
Hourly
Wage
Current State Labor
Cost Future State Labor Cost
Program & Performance Coordinator 0.523 614 355
Program Assistant II 0.307 294 43
Director of Finance & Admin Services 0.651 358 342
Avg Hourly- Admin & Fiscal Team 0.493 59 59
Total 1325 799
Labor Cost Reduction: 39.7%
Workflow Stops:
Title Current State # of Handoffs
Future State # of
Handoffs
Program & Performance Coordinator 12 3
Program Assistant II 9 3
Director of Finance & Admin Services 3 1
Admin & Fiscal Team 1 1
CEO 1 1
IT 1 1
Board of Directors 1 1
Total 28 11
Workflow Stop Reduction: 60.7%
Control Phase
 The recommendations to realize project success is as follows:
1. Consistent website monitoring to ensure posted policies are accurate and up to date.
 Website monitoring once per month.
 Record and update any inaccurate or out of date policies.
2. Ensure each Fiscal & Program Cubicle has a copy of the Internal Policy Development Process Manual.
3. Measure and Record each step in the process to ensure time reduction is realized.
 Each time policy is developed or updated.
4. After process completion, schedule Project Team meeting to review results and alter the process if needed.
 Update Internal Policy Development Process Manual.
RACI Matrix: Policy Development Process
Project
Team
CEO
Directorof
Finance&Admin
Services
Boardof
Directors
Program&
Performance
Coordinator
Program
AssistantII
Associate
DirectorofSS&I
Directorof
Workforce
Services
YouthInitiatives
Coordinator
Senior
Accounting
Specialist
- Identify Policies Needing to be Developed or Updated A R R C C C
- Develop and Update Policies A R/A R/A
- Policy Content R/A R/A C C C
- Policy Editing C C A/R I I I I
- Policy Approval I A/R I I I I I I
- Policy Finals A R R/A I I I I
- Policy Finals Posted to Website A/I R/A R I I I I I
- Policy updates disseminated A/I R/A I R R R R R R
- Website Monitoring for Policy Accuracy. I A R/A C C C
Project LeadershipProject Leadership
Role
Project Deliverable
(or Activity)
Future Improvement Opportunities
 HR Recruitment and Filling Positions:
 “As the organization has expanded we grew from little or no process/paperwork for hire to a place
where we are now with a fairly well developed system that could use some focus and attention.”
 Determining which policies need or should be internally developed.
RACI Matrix: Lean Initiatives
Project
Team
External
Resources
Executive
Sponsor
ProjectSponsor
Program&
Performance
Coordinator
Program
AssistantII
Associate
DirectorofSS&I
Directorof
Workforce
Services
YouthInitiatives
Coordinator
Senior
Accounting
Specialist
Consultant
Initiate Phase Activities
- Submit Project Request R/A R C C C C C
- Develop Business Case I R/A R C C C C C
- Project Request Approval A R I I I I I I
Plan Phase Activities
- Create Project Charter R R/A C C C C C C R/A
- Create Schedule I R/A C C C C C C R/A
- Create Additional Plans as required I R/A R I I I I I R/A
Execute Phase Activities
- Execute Deliverables R/A R R R R R R C
- Create Status Report I A R C C C C C R/A
Control Phase Activities
- Website Auditing for Policy Accuracy A/I A R C C C C
- Monitor Policy Process R/A R C C C C C I
- Update Policy Process As Needed R/A R C C C C C C
Close Phase Activities
- Create Lessons Learned A C R C C C C C
- Create Project Closure Report C R/A C C C C C C R/A
Project
Leadership
Project
Leadership
Role
Project Deliverable
(or Activity)
Appendix
Project Charter, Process Guide: Internal Policy Development Process
Process Guide: Internal Policy Development Program
A. Policy Writers
1. Develop and update policies.
2. Save policy to share drive.
3. Notify Assistant to schedule Policy Committee Meeting.
4. Inform Assistant what policy documents needed for meeting.
B. Assistant
5. Schedule Policy Committee Meeting.
6. Send email invites to attendees.
7. Print out documents needed for meeting.
C. Policy Committee Meeting
8. Review policies and identify any content revision that is needed.
9. Policy Writers to document revisions needed.
D. Policy Writers
10. Make policy revisions
11. Save policies to share drive.
12. Notify Assistant that policies are ready to be grammatically edited.
E. Assistant
13. Email Policy Committee that policies have been saved to share drive for final content review.
F. Policy Committee
14. Review policies for accuracy and notify Assistant or Policy Writers of any revisions that need to be
made within 48 hours.
G. Assistant
15. Notify CEO of policy updates.
H. CEO
16. Add policy updates to board agenda for approval.
I. Board of Directors Meeting
17. Approve policies.
J. Assistant
18. Create policy finals.
19. Email IT to post on website.
K. IT
20. Post policies on website
21. Notify Policy Committee that policies have been posted.
L. Policy Writers
22. Review website to verify policies have been added.
M. Policy Committee
23. Notify staff and contractors (your email distribution list) of policy updates.
N. Policy Writers
24. Review policies posted on website once per month to ensure accuracy and identify if updates are
needed.

More Related Content

What's hot

PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementMohamed Loey
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management FrameworkAarti Dahiya PMP
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guiderobsonnasc
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessRuffin Veal and Associates, Inc.
 
13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder EngagementDavidMcLachlan1
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Managementpankajsh10
 
Project Management Presentation material
Project Management Presentation material Project Management Presentation material
Project Management Presentation material Abdel Rahman okasha
 
Project integration management
Project integration management Project integration management
Project integration management KU Leuven
 
13.4 Monitor Stakeholder Engagement
13.4 Monitor Stakeholder Engagement13.4 Monitor Stakeholder Engagement
13.4 Monitor Stakeholder EngagementDavidMcLachlan1
 
PMP PMBok 5th Project management processes
PMP PMBok 5th Project management processesPMP PMBok 5th Project management processes
PMP PMBok 5th Project management processesAbdullah Ahmed, PMP, RMP
 
Project Execution and PM Elements
Project Execution and PM ElementsProject Execution and PM Elements
Project Execution and PM Elementsharoldtaylor1113
 
Project implimentation
Project implimentationProject implimentation
Project implimentationMazhar Poohlah
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 

What's hot (20)

The Effective Program Management Office (PgMO) (c) 2010
The Effective Program Management Office (PgMO) (c) 2010The Effective Program Management Office (PgMO) (c) 2010
The Effective Program Management Office (PgMO) (c) 2010
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration Management
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
 
Portfolio mostafa saad_jan_2020
Portfolio mostafa saad_jan_2020Portfolio mostafa saad_jan_2020
Portfolio mostafa saad_jan_2020
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement13.3 Manage Stakeholder Engagement
13.3 Manage Stakeholder Engagement
 
7.4 Control Costs
7.4 Control Costs7.4 Control Costs
7.4 Control Costs
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
Project Management Presentation material
Project Management Presentation material Project Management Presentation material
Project Management Presentation material
 
Project integration management
Project integration management Project integration management
Project integration management
 
10 project communications
10 project communications10 project communications
10 project communications
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
 
13.4 Monitor Stakeholder Engagement
13.4 Monitor Stakeholder Engagement13.4 Monitor Stakeholder Engagement
13.4 Monitor Stakeholder Engagement
 
PMP PMBok 5th Project management processes
PMP PMBok 5th Project management processesPMP PMBok 5th Project management processes
PMP PMBok 5th Project management processes
 
Project Execution and PM Elements
Project Execution and PM ElementsProject Execution and PM Elements
Project Execution and PM Elements
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
9.5 Manage Team
9.5 Manage Team9.5 Manage Team
9.5 Manage Team
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 

Viewers also liked

FW11 Collection Linesheets
FW11 Collection LinesheetsFW11 Collection Linesheets
FW11 Collection LinesheetsLara Miller
 
Lara Miller SP12 LineSheets FINAL EMAIL
Lara Miller SP12 LineSheets FINAL EMAILLara Miller SP12 LineSheets FINAL EMAIL
Lara Miller SP12 LineSheets FINAL EMAILLara Miller
 
La integración de las tic en la escuela sueli e ana
La integración de las tic en la escuela sueli e anaLa integración de las tic en la escuela sueli e ana
La integración de las tic en la escuela sueli e anaNilson Irenio
 
FW12LineSheetpdf
FW12LineSheetpdfFW12LineSheetpdf
FW12LineSheetpdfLara Miller
 
Tecnologia Educativa
Tecnologia EducativaTecnologia Educativa
Tecnologia EducativaNilson Irenio
 
LARA MILLER MIXED MEDIA TEXTILE DESIGN
LARA MILLER MIXED MEDIA TEXTILE DESIGNLARA MILLER MIXED MEDIA TEXTILE DESIGN
LARA MILLER MIXED MEDIA TEXTILE DESIGNLara Miller
 
Proyecto Integrador de saberes
Proyecto Integrador de saberesProyecto Integrador de saberes
Proyecto Integrador de saberesGabriel Hurtado
 

Viewers also liked (12)

FW11 Collection Linesheets
FW11 Collection LinesheetsFW11 Collection Linesheets
FW11 Collection Linesheets
 
TP draft 6
TP draft 6TP draft 6
TP draft 6
 
Tarsis Ruiz PPP
Tarsis Ruiz PPPTarsis Ruiz PPP
Tarsis Ruiz PPP
 
Manic_Nomad_Website
Manic_Nomad_WebsiteManic_Nomad_Website
Manic_Nomad_Website
 
Lara Miller SP12 LineSheets FINAL EMAIL
Lara Miller SP12 LineSheets FINAL EMAILLara Miller SP12 LineSheets FINAL EMAIL
Lara Miller SP12 LineSheets FINAL EMAIL
 
my C.V2
my C.V2my C.V2
my C.V2
 
Trent Ballentine JRules
Trent Ballentine JRulesTrent Ballentine JRules
Trent Ballentine JRules
 
La integración de las tic en la escuela sueli e ana
La integración de las tic en la escuela sueli e anaLa integración de las tic en la escuela sueli e ana
La integración de las tic en la escuela sueli e ana
 
FW12LineSheetpdf
FW12LineSheetpdfFW12LineSheetpdf
FW12LineSheetpdf
 
Tecnologia Educativa
Tecnologia EducativaTecnologia Educativa
Tecnologia Educativa
 
LARA MILLER MIXED MEDIA TEXTILE DESIGN
LARA MILLER MIXED MEDIA TEXTILE DESIGNLARA MILLER MIXED MEDIA TEXTILE DESIGN
LARA MILLER MIXED MEDIA TEXTILE DESIGN
 
Proyecto Integrador de saberes
Proyecto Integrador de saberesProyecto Integrador de saberes
Proyecto Integrador de saberes
 

Similar to PACMTN Portfolio1

Strategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIStrategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIJo Balucanag - Bitonio
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability frameworkRobert Greca, PMP, SA
 
Relocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxRelocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxcarlt4
 
Relocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxRelocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxdebishakespeare
 
CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1Sherrill Moore
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 
LSS Intro
LSS IntroLSS Intro
LSS Introevansjr
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 
Process Improvement Teams.pptx
Process Improvement Teams.pptxProcess Improvement Teams.pptx
Process Improvement Teams.pptxbill671640
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsAhmed Alageed
 
Project roll-out Implementation - decisions & options
Project roll-out Implementation - decisions & optionsProject roll-out Implementation - decisions & options
Project roll-out Implementation - decisions & optionsChief Innovation
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011tigcap
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011tigcap
 
Projects Management
Projects ManagementProjects Management
Projects ManagementNirmal Shah
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure ReportCheryl Burcham
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesErin Jones
 

Similar to PACMTN Portfolio1 (20)

ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
 
Strategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIStrategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO III
 
KEVIN_Resume LSS
KEVIN_Resume LSSKEVIN_Resume LSS
KEVIN_Resume LSS
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability framework
 
Relocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxRelocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docx
 
Relocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxRelocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docx
 
CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1CV-SAM JAN 2016 - application 1
CV-SAM JAN 2016 - application 1
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
LSS Intro
LSS IntroLSS Intro
LSS Intro
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
Process Improvement Teams.pptx
Process Improvement Teams.pptxProcess Improvement Teams.pptx
Process Improvement Teams.pptx
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes Groups
 
Project roll-out Implementation - decisions & options
Project roll-out Implementation - decisions & optionsProject roll-out Implementation - decisions & options
Project roll-out Implementation - decisions & options
 
1B project MS V2
1B project MS V21B project MS V2
1B project MS V2
 
Session 22 4th edition PMP
Session 22 4th edition PMPSession 22 4th edition PMP
Session 22 4th edition PMP
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011
 
Projects Management
Projects ManagementProjects Management
Projects Management
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 

PACMTN Portfolio1

  • 2. Introduction to DMAIC This project follows the DMAIC model for identifying, proposing, and implementing solutions to organizational opportunities. DMAIC is an acronym for Define, Measure, Analyze, Improve, and Control. This Lean Six Sigma methodology is most commonly used in lean initiatives because it is specific, quantifiable, and a repeatable model that proves effective in solving problems regardless of complexity. A brief description of the intent of each phase may be informative. Define •Clearly defines the project's purpose and scope. •Collect background information on the process and your customer's needs and requirements. Measure •Gather information on the current situation to provide a clearer focus for your improvement effort. Analyze •Identify the root causes of defects. •Confirm them with data. Improve •Develop, try out, and implement solutions that address the root causes. •Use data to evaluate results for the solutions and the plans used to carry them out. Control •Maintain the gains that you have achieved by standardizing your work methods or processes. •Anticipate future improvements and make plans to preserve the lessons learned from this improvement effort.
  • 3. Define Phase  Purpose: Pacific Mountain Workforce Development Council (PacMtn) currently has no standardized process in place to manage its Internal Policy Development Program. As PacMtn has grown significantly since its inception, there is now an opportunity to develop and implement a consistent process with clearly defined roles to effectively and efficiently manage the large number of intricate policies being internally developed and disseminated.  Importance: 1. Updating and disseminating policies in a timely manner is critical to ensuring PacMtn avoids being subject to disallowed costs should state and federal regulators find its contractors out of compliance because they are not informed of new or updated policies. 2. Realize significant time and resource savings.  Objectives: 1. Develop and implement a standardized and lean internal policy development process starting from the policy writing stage through the dissemination stage.  Reduce rework and redundancy  Minimize stagnant time between policy development stages  Eliminate confusion on policy status  Ensure policies are disseminated and updated on the website immediately and accurately 2. Clearly define each individual’s role within the process.  Who is responsible for writing, approving, communicating, training, updating website, and being content experts? 3. Devise and implement a plan for ongoing monitoring and improvement of the process.  Success Criteria: 1. 30% reduction in touch time*. *The actual time spent developing a product or service with the ultimate goal being the addition of value to the end consumer. 2. 30% reduction in workflow stops. 3. Ongoing and consistent internal website monitoring finds no policy inaccuracies. Project Team Person Department Position Cheryl Fambles Bridget Vidonne Sponsor/Mgmt. Sponsor/Fiscal CEO Director of Finance and Admin Services Jaime Britton Fiscal Senior Accounting Specialist Craig Clark Program Program and Performance Coordinator Corinne Daffern Program Associate Director of Workforce Services Sarah Wilkins Program Youth Initiatives Coordinator Sean Murphy Program Associate Director of SS&I Neva Barton Support Program Assistant II
  • 4. Measure & Analyze Phases The current process for PacMtn’s internal development program has not been developed until now. Previously, PacMtn has had simple and single policies that infrequently needed updating and managing the process was not a priority. In recent years PacMtn has undergone tremendous organizational growth and they are now faced with the need to update multiple and complex policies frequently and consistently which is why they have a prioritized this initiative by working with a Lean Six Sigma consultant and supplying resources to implement a lean process for managing their internal policy development program.  Current State Process:  Policy writing starts 4-6 weeks prior to the board meeting where policies are approved. Shortening this overall timeframe will have no impact on the process time and monetary savings since the process steps are done intermittently in conjunction with other job duties.  Reducing touch time and the number of workflow stops within the process is the focus of the lean initiative since this will have the greatest time and monetary savings for the organization.  No standardized/formal process in place.  Measurable Opportunities for Improvement: 1. Touch Time.  Eliminate non value added (NVA) process redundancies. 2. Number of workflow stops. 3. Policy accuracy during internal website auditing.
  • 5. Improve Phase Touch Time: Title Current State Average Minutes (TT) Future State Average Minutes (TT) Program & Performance Coordinator 1175 680 Program Assistant II 960 140 Director of Finance & Admin Services 550 525 Avg Hourly- Admin & Fiscal Team 120 120 Total 2804 1465 Touch Time Reduction: 47.7% Labor Cost: Title Hourly Wage Current State Labor Cost Future State Labor Cost Program & Performance Coordinator 0.523 614 355 Program Assistant II 0.307 294 43 Director of Finance & Admin Services 0.651 358 342 Avg Hourly- Admin & Fiscal Team 0.493 59 59 Total 1325 799 Labor Cost Reduction: 39.7%
  • 6. Workflow Stops: Title Current State # of Handoffs Future State # of Handoffs Program & Performance Coordinator 12 3 Program Assistant II 9 3 Director of Finance & Admin Services 3 1 Admin & Fiscal Team 1 1 CEO 1 1 IT 1 1 Board of Directors 1 1 Total 28 11 Workflow Stop Reduction: 60.7%
  • 7. Control Phase  The recommendations to realize project success is as follows: 1. Consistent website monitoring to ensure posted policies are accurate and up to date.  Website monitoring once per month.  Record and update any inaccurate or out of date policies. 2. Ensure each Fiscal & Program Cubicle has a copy of the Internal Policy Development Process Manual. 3. Measure and Record each step in the process to ensure time reduction is realized.  Each time policy is developed or updated. 4. After process completion, schedule Project Team meeting to review results and alter the process if needed.  Update Internal Policy Development Process Manual. RACI Matrix: Policy Development Process Project Team CEO Directorof Finance&Admin Services Boardof Directors Program& Performance Coordinator Program AssistantII Associate DirectorofSS&I Directorof Workforce Services YouthInitiatives Coordinator Senior Accounting Specialist - Identify Policies Needing to be Developed or Updated A R R C C C - Develop and Update Policies A R/A R/A - Policy Content R/A R/A C C C - Policy Editing C C A/R I I I I - Policy Approval I A/R I I I I I I - Policy Finals A R R/A I I I I - Policy Finals Posted to Website A/I R/A R I I I I I - Policy updates disseminated A/I R/A I R R R R R R - Website Monitoring for Policy Accuracy. I A R/A C C C Project LeadershipProject Leadership Role Project Deliverable (or Activity)
  • 8. Future Improvement Opportunities  HR Recruitment and Filling Positions:  “As the organization has expanded we grew from little or no process/paperwork for hire to a place where we are now with a fairly well developed system that could use some focus and attention.”  Determining which policies need or should be internally developed. RACI Matrix: Lean Initiatives Project Team External Resources Executive Sponsor ProjectSponsor Program& Performance Coordinator Program AssistantII Associate DirectorofSS&I Directorof Workforce Services YouthInitiatives Coordinator Senior Accounting Specialist Consultant Initiate Phase Activities - Submit Project Request R/A R C C C C C - Develop Business Case I R/A R C C C C C - Project Request Approval A R I I I I I I Plan Phase Activities - Create Project Charter R R/A C C C C C C R/A - Create Schedule I R/A C C C C C C R/A - Create Additional Plans as required I R/A R I I I I I R/A Execute Phase Activities - Execute Deliverables R/A R R R R R R C - Create Status Report I A R C C C C C R/A Control Phase Activities - Website Auditing for Policy Accuracy A/I A R C C C C - Monitor Policy Process R/A R C C C C C I - Update Policy Process As Needed R/A R C C C C C C Close Phase Activities - Create Lessons Learned A C R C C C C C - Create Project Closure Report C R/A C C C C C C R/A Project Leadership Project Leadership Role Project Deliverable (or Activity)
  • 9. Appendix Project Charter, Process Guide: Internal Policy Development Process
  • 10.
  • 11. Process Guide: Internal Policy Development Program A. Policy Writers 1. Develop and update policies. 2. Save policy to share drive. 3. Notify Assistant to schedule Policy Committee Meeting. 4. Inform Assistant what policy documents needed for meeting. B. Assistant 5. Schedule Policy Committee Meeting. 6. Send email invites to attendees. 7. Print out documents needed for meeting. C. Policy Committee Meeting 8. Review policies and identify any content revision that is needed. 9. Policy Writers to document revisions needed. D. Policy Writers 10. Make policy revisions 11. Save policies to share drive. 12. Notify Assistant that policies are ready to be grammatically edited. E. Assistant 13. Email Policy Committee that policies have been saved to share drive for final content review. F. Policy Committee 14. Review policies for accuracy and notify Assistant or Policy Writers of any revisions that need to be made within 48 hours. G. Assistant 15. Notify CEO of policy updates. H. CEO 16. Add policy updates to board agenda for approval. I. Board of Directors Meeting 17. Approve policies. J. Assistant 18. Create policy finals. 19. Email IT to post on website. K. IT 20. Post policies on website 21. Notify Policy Committee that policies have been posted. L. Policy Writers 22. Review website to verify policies have been added. M. Policy Committee 23. Notify staff and contractors (your email distribution list) of policy updates. N. Policy Writers 24. Review policies posted on website once per month to ensure accuracy and identify if updates are needed.