Re-bridging the
Digital Divide:
Academic Libraries as a Source
for Digital Equity
Jacqueline Frank
Instruction & Accessibility Librarian
Hannah McKelvey
E-Resources & Discovery Services Librarian
Rachelle McLain
Collection Development Librarian
Meghan Salsbury
Instructional Technology Librarian
Speakers
Meghan Salsbury
Instructional Technology Librarian
Jacqueline Frank
Instruction & Accessibility Librarian
Rachelle McLain
Collection Development Librarian
Hannah McKelvey
E-Resources & Discovery Services Librarian
Agenda
• Defining Digital Equity and Digital Inclusion
• Access as an Essential Student Need
• Removing Access Barriers with Instructional Technology
• Ensuring Access through Purchasing Resources
• Digital Accessibility - How it all ties together!
Who is watching?
There will be a few poll questions throughout the presentation. You
can simply pause the video and complete each question as it comes
up or complete the survey at the end of the recording.
Survey link: https://montana.libwizard.com/f/eli2021
Digital Equity
and Digital
Inclusion
Digital equity is a condition in which all
individuals and communities have the
information technology capacity needed for
full participation in our society, democracy
and economy.
NDIA Definitions
Digital inclusion refers to the activities
necessary to ensure that all individuals and
communities…have access to and use of
Information and Communication
Technologies (ICTs).
NDIA Definitions
The digital divide is the gulf between those who
have ready access to computers and the
internet [and the skills to use them], and those
who do not.
Oxford Languages
Internet Access in Montana
• 63.6% of population have broadband available
• Average cost of internet access per month is $91.54
• 21% have no home internet access
• Less than 50% of the population have access to broadband internet in 20+
counties
• 23% of the Blackfeet Tribe of the Blackfeet Indian Reservation of Montana
have access to wired broadband
• 72% of the populations on Montana reservations have wired broadband
access
https://www.imls.gov/data/data-catalog/imls-indicators-workbook-economic-status-and-broadband-availability-and-adoption
Access as an
Essential
Student Need
All information resources that are
provided directly or indirectly by the
library... should be readily, equally, and
equitably accessible to all library
users.
American Library Association Core Values
Users in general prefer not to come to
the library and expect access to library
materials from remote sites. They
expect to access all the resources
seamlessly.
Sunithaland & Sreekumar
Ithaka S+R US Library Survey 2019
ITHAKA S+R U.S.
Library Survey 2019
What percentage of your library's
materials budget is spent on the
following items?
Ithaka S+R US Library Survey 2019
Pt. 2
ITHAKA S+R U.S.
Library Survey 2019
How much of a priority is each of the
following functions in your library?
Access as an Essential Need
• Libraries require support from campus information technology departments in
order to provide remote access.
• Many of the remote authentication methods available to libraries require
interfacing with campus Enterprise Resource Planning (ERP) software (e.g.,
Banner, PeopleSoft, Jenzabar).
• Federated access to library resources is becoming more popular, but this
requires library providers to use campus federated network memberships (e.g.,
InCommon).
• The biggest barrier is still the lack of access to the internet.
Hotspot Lending Program
• Funded by NNLM Technology Innovation Grant and IMLS Grant funds
via the Montana State Library.
• Seventeen hotspots with unlimited data plans available to students for
medium- to long-term checkouts (2 weeks to full semester).
• 30+ check-outs from mid-October 2020 through April 2021 ranging
from 2 weeks to 16 weeks. All student grade classifications
(undergraduate and graduate) represented.
• Goal - obtain continued funding to extend the pilot program for another
year to obtain more data.
Internet Speed Test
If you are completing the poll questions as we go, then it's
time to complete an Internet speed test.
Go to speedtest.org and find out your upload and
download speeds.
Removing Barriers with
Instructional Technology
Low-Bandwidth Options
• Downloadable transcripts for all videos
• Reducing the number of participants on video calls
• Turning off cameras and screen sharing during synchronous sessions
• Allowing call-in options for WebEx or Zoom meetings
• Provide independent student learning options (readings, podcasts,
worksheets) that can be downloaded for offline access
• Use collaborative tools like Google Docs
• Limit the use of animations and transitions
https://edredesign.org/files/edredesign/files/low_bandwidth_teaching_strategies_2.pdf?m=1596823789
Mobile Optimized Learning
Removing Barriers with
Instructional Technology
Mobile Optimized Learning
• Collapse content to one or two columns
• Insert section breaks so students do not miss important information
• Reduce the number of clicks required to access materials
• Keep navigation obvious and simple
• Scale media to limit download size
• Clearly indicate interactive elements as there is no cursor or hover function
• Chunk your content in a way that can be divided into various arrangements
• Maximize space with icons
https://elearningindustry.com/mobile-learning-8-responsive-design-techniques-optimize
Purchasing Resources for
Library Users
• Work with vendors who are reliable, responsive, and affordable
• Determine that the resource will work with our current authentication
methods
• Ensure the resource meets our accessibility standards
• Determine if the resource can be integrated into our discovery layer
Questions to Consider for
Purchasing
• Unlimited number of simultaneous users?
• How long is length of license?
• Closed-captioning and transcripts
• Free of Digital Rights Management for ease of use
• Hosted by platform or will the library need to host?
Is the library letting our users down?
• Gap in library service
• Small staff
• Managing film license purchases
• Library staff requires guidance from Library IT
staff
Library Hosted Film Licenses
What Could Go Wrong...and How Can The Library Get it Right?
• Poor quality videos
• Extra maintenance required
• Library staff + Library IT staff + Campus-wide IT staff
Digital Accessibility
• Underlying access is Digital Accessibility
• Shared and distributed responsibility
• Library + Campus-wide IT + Instructors + ...
Accessibility Impacts Access
• Access impacts success
⚬ Even with a device and the internet, the resources still might not meet a
users accessibility needs
• What works for one person, does not work for another
⚬ Following accessibility best practices is a fundamental first step to
ensuring access
• Improving accessibility helps to advance digital equity and inclusion
by removing barriers that inhibit student access
The Prevalence of Disability
• Disabilities can be invisible
• Students are not required to disclose a disability
• 26% of the U.S. live with disability (CDC)
• 19% of undergraduate students report a disability (NCES)
• 100%, of people will experience a disability (Sethfors)
• Disability can be permanent, temporary, or situational (Shum et
al.)
Accessibility
Benefits
Everyone
Accessibility is, and should remain,
focused on users with disabilities
Henry, Abou-Zahra, & Brewer
However, following the Web Content
Accessibility Guidelines will benefit
everyone in the end
W3C
Promoting Accessibility
• Accessibility takes time
• It's easier and faster to incorporate accessibility
best practices from the start (Gerard & Bronsema)
• Libraries + IT can promote accessibility
• Shared goals, shared conversations
Conclusion:
Access is
Critical
• Access is a critical component of
digital equity and digital inclusion
• Libraries are a critical point of
access for students
• Libraries + campus IT can help
support digital equity and inclusion
by facilitating access & removing
barriers
• Libraries should be involved in
conversations with the campus IT
community
Strategies to Support Digital
Equity & Inclusion
The library + IT can support access through:
• Facilitate remote authentication
• Provide technology checkouts & hotspots to enable access
• Offer low-bandwidth solutions for students with access barriers
• Maximize mobile accessibility
• Suggest ways to maximize bandwidth, such as downloading resources rather
than streaming
• Ask questions when procuring resources to ensure they are accessible
• Offer on-demand library acquisitions in the preferred format of the user for print
or digital; etc.
Strategies to Support Digital
Equity & Inclusion Cont.
The library + IT can support access through:
• Follow digital accessibility best practices
• Utilize the UDL Framework when developing instruction
• Expand in-person services to offer remote options as well
• Offer the option for users to submit accessibility requests to get material in a
more accessible format
• Form a committee to help implement and/or advance accessibility, digital equity
and digital inclusion
• Get direct feedback from users, including how to help improve their access and
address any barriers
References
American Librarian Association. (2019). Core Values of Librarianship.
http://www.ala.org/advocacy/intfreedom/corevalues
CDC. (2020, September 16, 2020). Disability Impacts All of Us. Centers for Disease Control and Prevention.
https://www.cdc.gov/ncbddd/disabilityandhealth/infographic-disability-impacts-all.html
Frederick, K. & Wolff-Eisenberg. (2019). Ithaka S+R US Library Survey 2019.
https://sr.ithaka.org/wp-content/uploads/2020/04/SR-Report-US-Library-Directors-Survey-2019-040220.pdf
Henry, S., Abou-Zahra, S., & Brewer, J. (2014). The role of accessibility in a universal web. In International Cross
Disciplinary Conference on Web Accessibility (pp. 1-4): ACM.
Institute of Museum and Library Services. (2020). IMLS indicators workbook: Economic status and broadband
availability and adoption. https://www.imls.gov/data/data-catalog/imls-indicators-workbook-economic-status-and
-broadband-availability-and-adoption
LoBue, A. (2020). Low-bandwidth teaching strategies in response to the COVID-19 pandemic: Addressing technology
access inequity in distance learning and online education. The Education Redesign Lab: Harvard Graduate
School of Education.
https://edredesign.org/files/edredesign/files/low_bandwidth_teaching_strategies_2.pdf?m=1596823789
References Continued
NCES. (2018). Digest of Education Statistics. https://nces.ed.gov/programs/digest/d18/ch_3.asp
Sethfors, H. (2017). Statistics on disabilities – the one stat you need to know. Axess Lab.
https://axesslab.com/statistics-on-disabilities/
Shum, A., Holmes, K., Woolery, K., Price, M., Kim, D., Dvorkina, E., & Malekzadeh, S. (2016). Inclusive: a microsoft
design toolkit. https://download.microsoft.com/download/b/0/d/b0d4bf87-09ce-4417-8f28-d60703d672ed/
inclusive_toolkit_manual_final.pdf
Spencer, T. (2019, June 11). 8 responsive design techniques to optimize mobile learning. eLearning Industry.
https://elearningindustry.com/mobile-learning-8-responsive-design-techniques-optimize
Sunithal, T., & Sreekumar, M. G. (2011, February). A Single-Sign-On and a Remote Login Solution to Library E
Journals and E-Resources. In International Conference on Digital Libraries and Knowledge Organization (ICDK
2011) (pp. 14-16).
W3C. (2019). Introduction to Web Accessibility. https://www.w3.org/WAI/fundamentals/accessibility-intro/
Take Away
For the last poll question, please tell us your biggest take
away from this session.
Contact Us
Jacqueline Frank - jacqueline.frank@montana.edu
Instruction & Accessibility Librarian
Hannah McKelvey - hannah.mckelvey@montana.edu
E-Resources & Discovery Services Librarian
Rachelle McLain - rachelle.mclain@montana.edu
Collection Development Librarian
Meghan Salsbury - meghan.salsbury@montana.edu
Instructional Technology Librarian
This presentation leaves copyright of the content to the presenter. Unless otherwise noted in the materials,
uploaded content carries the Creative Commons Attribution 4.0 International (CC BY 4.0), which grants usage to
the general public, with appropriate credit to the author.

Re-Bridging the Digital Divide: Academic Libraries as a Source for Digital Equity

  • 1.
    Re-bridging the Digital Divide: AcademicLibraries as a Source for Digital Equity Jacqueline Frank Instruction & Accessibility Librarian Hannah McKelvey E-Resources & Discovery Services Librarian Rachelle McLain Collection Development Librarian Meghan Salsbury Instructional Technology Librarian
  • 2.
    Speakers Meghan Salsbury Instructional TechnologyLibrarian Jacqueline Frank Instruction & Accessibility Librarian Rachelle McLain Collection Development Librarian Hannah McKelvey E-Resources & Discovery Services Librarian
  • 3.
    Agenda • Defining DigitalEquity and Digital Inclusion • Access as an Essential Student Need • Removing Access Barriers with Instructional Technology • Ensuring Access through Purchasing Resources • Digital Accessibility - How it all ties together!
  • 4.
    Who is watching? Therewill be a few poll questions throughout the presentation. You can simply pause the video and complete each question as it comes up or complete the survey at the end of the recording. Survey link: https://montana.libwizard.com/f/eli2021
  • 5.
    Digital Equity and Digital Inclusion Digitalequity is a condition in which all individuals and communities have the information technology capacity needed for full participation in our society, democracy and economy. NDIA Definitions Digital inclusion refers to the activities necessary to ensure that all individuals and communities…have access to and use of Information and Communication Technologies (ICTs). NDIA Definitions The digital divide is the gulf between those who have ready access to computers and the internet [and the skills to use them], and those who do not. Oxford Languages
  • 6.
    Internet Access inMontana • 63.6% of population have broadband available • Average cost of internet access per month is $91.54 • 21% have no home internet access • Less than 50% of the population have access to broadband internet in 20+ counties • 23% of the Blackfeet Tribe of the Blackfeet Indian Reservation of Montana have access to wired broadband • 72% of the populations on Montana reservations have wired broadband access https://www.imls.gov/data/data-catalog/imls-indicators-workbook-economic-status-and-broadband-availability-and-adoption
  • 7.
    Access as an Essential StudentNeed All information resources that are provided directly or indirectly by the library... should be readily, equally, and equitably accessible to all library users. American Library Association Core Values Users in general prefer not to come to the library and expect access to library materials from remote sites. They expect to access all the resources seamlessly. Sunithaland & Sreekumar
  • 8.
    Ithaka S+R USLibrary Survey 2019 ITHAKA S+R U.S. Library Survey 2019 What percentage of your library's materials budget is spent on the following items?
  • 9.
    Ithaka S+R USLibrary Survey 2019 Pt. 2 ITHAKA S+R U.S. Library Survey 2019 How much of a priority is each of the following functions in your library?
  • 10.
    Access as anEssential Need • Libraries require support from campus information technology departments in order to provide remote access. • Many of the remote authentication methods available to libraries require interfacing with campus Enterprise Resource Planning (ERP) software (e.g., Banner, PeopleSoft, Jenzabar). • Federated access to library resources is becoming more popular, but this requires library providers to use campus federated network memberships (e.g., InCommon). • The biggest barrier is still the lack of access to the internet.
  • 11.
    Hotspot Lending Program •Funded by NNLM Technology Innovation Grant and IMLS Grant funds via the Montana State Library. • Seventeen hotspots with unlimited data plans available to students for medium- to long-term checkouts (2 weeks to full semester). • 30+ check-outs from mid-October 2020 through April 2021 ranging from 2 weeks to 16 weeks. All student grade classifications (undergraduate and graduate) represented. • Goal - obtain continued funding to extend the pilot program for another year to obtain more data.
  • 12.
    Internet Speed Test Ifyou are completing the poll questions as we go, then it's time to complete an Internet speed test. Go to speedtest.org and find out your upload and download speeds.
  • 13.
    Removing Barriers with InstructionalTechnology Low-Bandwidth Options • Downloadable transcripts for all videos • Reducing the number of participants on video calls • Turning off cameras and screen sharing during synchronous sessions • Allowing call-in options for WebEx or Zoom meetings • Provide independent student learning options (readings, podcasts, worksheets) that can be downloaded for offline access • Use collaborative tools like Google Docs • Limit the use of animations and transitions https://edredesign.org/files/edredesign/files/low_bandwidth_teaching_strategies_2.pdf?m=1596823789
  • 14.
    Mobile Optimized Learning RemovingBarriers with Instructional Technology Mobile Optimized Learning • Collapse content to one or two columns • Insert section breaks so students do not miss important information • Reduce the number of clicks required to access materials • Keep navigation obvious and simple • Scale media to limit download size • Clearly indicate interactive elements as there is no cursor or hover function • Chunk your content in a way that can be divided into various arrangements • Maximize space with icons https://elearningindustry.com/mobile-learning-8-responsive-design-techniques-optimize
  • 15.
    Purchasing Resources for LibraryUsers • Work with vendors who are reliable, responsive, and affordable • Determine that the resource will work with our current authentication methods • Ensure the resource meets our accessibility standards • Determine if the resource can be integrated into our discovery layer
  • 16.
    Questions to Considerfor Purchasing • Unlimited number of simultaneous users? • How long is length of license? • Closed-captioning and transcripts • Free of Digital Rights Management for ease of use • Hosted by platform or will the library need to host?
  • 17.
    Is the libraryletting our users down? • Gap in library service • Small staff • Managing film license purchases • Library staff requires guidance from Library IT staff
  • 18.
    Library Hosted FilmLicenses What Could Go Wrong...and How Can The Library Get it Right? • Poor quality videos • Extra maintenance required • Library staff + Library IT staff + Campus-wide IT staff
  • 19.
    Digital Accessibility • Underlyingaccess is Digital Accessibility • Shared and distributed responsibility • Library + Campus-wide IT + Instructors + ...
  • 20.
    Accessibility Impacts Access •Access impacts success ⚬ Even with a device and the internet, the resources still might not meet a users accessibility needs • What works for one person, does not work for another ⚬ Following accessibility best practices is a fundamental first step to ensuring access • Improving accessibility helps to advance digital equity and inclusion by removing barriers that inhibit student access
  • 21.
    The Prevalence ofDisability • Disabilities can be invisible • Students are not required to disclose a disability • 26% of the U.S. live with disability (CDC) • 19% of undergraduate students report a disability (NCES) • 100%, of people will experience a disability (Sethfors) • Disability can be permanent, temporary, or situational (Shum et al.)
  • 22.
    Accessibility Benefits Everyone Accessibility is, andshould remain, focused on users with disabilities Henry, Abou-Zahra, & Brewer However, following the Web Content Accessibility Guidelines will benefit everyone in the end W3C
  • 23.
    Promoting Accessibility • Accessibilitytakes time • It's easier and faster to incorporate accessibility best practices from the start (Gerard & Bronsema) • Libraries + IT can promote accessibility • Shared goals, shared conversations
  • 24.
    Conclusion: Access is Critical • Accessis a critical component of digital equity and digital inclusion • Libraries are a critical point of access for students • Libraries + campus IT can help support digital equity and inclusion by facilitating access & removing barriers • Libraries should be involved in conversations with the campus IT community
  • 25.
    Strategies to SupportDigital Equity & Inclusion The library + IT can support access through: • Facilitate remote authentication • Provide technology checkouts & hotspots to enable access • Offer low-bandwidth solutions for students with access barriers • Maximize mobile accessibility • Suggest ways to maximize bandwidth, such as downloading resources rather than streaming • Ask questions when procuring resources to ensure they are accessible • Offer on-demand library acquisitions in the preferred format of the user for print or digital; etc.
  • 26.
    Strategies to SupportDigital Equity & Inclusion Cont. The library + IT can support access through: • Follow digital accessibility best practices • Utilize the UDL Framework when developing instruction • Expand in-person services to offer remote options as well • Offer the option for users to submit accessibility requests to get material in a more accessible format • Form a committee to help implement and/or advance accessibility, digital equity and digital inclusion • Get direct feedback from users, including how to help improve their access and address any barriers
  • 27.
    References American Librarian Association.(2019). Core Values of Librarianship. http://www.ala.org/advocacy/intfreedom/corevalues CDC. (2020, September 16, 2020). Disability Impacts All of Us. Centers for Disease Control and Prevention. https://www.cdc.gov/ncbddd/disabilityandhealth/infographic-disability-impacts-all.html Frederick, K. & Wolff-Eisenberg. (2019). Ithaka S+R US Library Survey 2019. https://sr.ithaka.org/wp-content/uploads/2020/04/SR-Report-US-Library-Directors-Survey-2019-040220.pdf Henry, S., Abou-Zahra, S., & Brewer, J. (2014). The role of accessibility in a universal web. In International Cross Disciplinary Conference on Web Accessibility (pp. 1-4): ACM. Institute of Museum and Library Services. (2020). IMLS indicators workbook: Economic status and broadband availability and adoption. https://www.imls.gov/data/data-catalog/imls-indicators-workbook-economic-status-and -broadband-availability-and-adoption LoBue, A. (2020). Low-bandwidth teaching strategies in response to the COVID-19 pandemic: Addressing technology access inequity in distance learning and online education. The Education Redesign Lab: Harvard Graduate School of Education. https://edredesign.org/files/edredesign/files/low_bandwidth_teaching_strategies_2.pdf?m=1596823789
  • 28.
    References Continued NCES. (2018).Digest of Education Statistics. https://nces.ed.gov/programs/digest/d18/ch_3.asp Sethfors, H. (2017). Statistics on disabilities – the one stat you need to know. Axess Lab. https://axesslab.com/statistics-on-disabilities/ Shum, A., Holmes, K., Woolery, K., Price, M., Kim, D., Dvorkina, E., & Malekzadeh, S. (2016). Inclusive: a microsoft design toolkit. https://download.microsoft.com/download/b/0/d/b0d4bf87-09ce-4417-8f28-d60703d672ed/ inclusive_toolkit_manual_final.pdf Spencer, T. (2019, June 11). 8 responsive design techniques to optimize mobile learning. eLearning Industry. https://elearningindustry.com/mobile-learning-8-responsive-design-techniques-optimize Sunithal, T., & Sreekumar, M. G. (2011, February). A Single-Sign-On and a Remote Login Solution to Library E Journals and E-Resources. In International Conference on Digital Libraries and Knowledge Organization (ICDK 2011) (pp. 14-16). W3C. (2019). Introduction to Web Accessibility. https://www.w3.org/WAI/fundamentals/accessibility-intro/
  • 29.
    Take Away For thelast poll question, please tell us your biggest take away from this session.
  • 30.
    Contact Us Jacqueline Frank- jacqueline.frank@montana.edu Instruction & Accessibility Librarian Hannah McKelvey - hannah.mckelvey@montana.edu E-Resources & Discovery Services Librarian Rachelle McLain - rachelle.mclain@montana.edu Collection Development Librarian Meghan Salsbury - meghan.salsbury@montana.edu Instructional Technology Librarian This presentation leaves copyright of the content to the presenter. Unless otherwise noted in the materials, uploaded content carries the Creative Commons Attribution 4.0 International (CC BY 4.0), which grants usage to the general public, with appropriate credit to the author.

Editor's Notes

  • #2 Hi, and welcome to Re-bridging the Digital Divide: Academic Libraries as a Source of Digital Equity.
  • #3 My name is Meghan Salsbury, and I will be presenting with my colleagues, Jacqueline Frank, Hannah McKelvey, and Rachelle McLain. We are librarians at Montana State University in Bozeman, MT.
  • #4 Today we would like to share with you how we are working to advance digital equity and inclusion for our users by removing barriers that inhibit student access. We’ll look at how access—or lack of access—to resources impacts student success in remote learning environments, including personal device ownership, access to internet or cell service, remote authentication, and digital accessibility. The session will outline a variety of ways academic libraries are connected to information technology, such as through online instruction, acquisitions and remote access to resources, and public and digital accessibility services in order to show how libraries serve as an integral IT access point for many students, faculty, and staff, and libraries in higher education.
  • #5 There will be a few short poll questions to answer as the presentation progresses. Please note the URL listed on this slide. Feel free to pause the video and answer the questions when directed, or you can complete the poll in its entirety at the end of the presentation.
  • #6 According to the National Digital Inclusion Alliance (NDIA), “digital inclusion refers to the activities necessary to ensure that all individuals and communities…have access to and use of Information and Communication Technologies (ICTs)” while “digital equity is a condition in which all individuals and communities have the information technology capacity needed for full participation in our society, democracy and economy” (NDIA Definitions, n.d.). Though great strides have been made to increase digital equity and inclusion over the past decade, the sudden shift to remote learning by many US higher education institutions in March 2020, highlighted a lack of awareness of the ongoing digital divide in higher education. The divide is especially prevalent in vulnerable student populations, and impacted student success for these populations in remote learning environments.
  • #7 The IMLS Indicators Workbook: Economic Status and Broadband Availability and Adoption shows in the presenters’ home state of Montana, only 63.6% of the population has access to broadband (this is 12th lowest in the nation), and the average cost of internet access per month is $91.54 (the 3rd highest in the nation). 21% have no home internet access, which is higher than the national, and in more than twenty counties, less than 50% of the population have access to broadband internet. Tribal members on Montana’s reservations suffer even further from lack of access. Only 23% of the Blackfeet Tribe of the Blackfeet Indian Reservation have access to wired broadband. Other tribes have higher individual access rates, but in total, only 72% of the populations on reservations have wired broadband access and there is no low-cost access available. Though these numbers are not specific to students enrolled in a Montana college or university, 61% of students at Montana State University are in-state residents and 4.3% are American Indian/Alaska Natives, and as such, these students are affected by the limited internet options throughout the state.
  • #8 19.06.2023
  • #9 19.06.2023
  • #11 19.06.2023
  • #12 The Wi-Fi Hotspot Lending program at MSU Library was funded by a Network of the National Library of Medicine (NNLM) Technology Innovation Grant and supplemented by the Montana State Library Hotspot Lending Program. The library was able to acquire seventeen Wi-Fi hotspots and data plans to increase access to the internet for those students most in need. The Wi-Fi hotspots were loaned to students on medium to long-term check-outs to enable them access to their course content either as on-campus or online students. The hotspots all have an unlimited data plan and can be checked out for 2 weeks up to the full semester depending on student needs. Since October, the seventeen hotspots have seen over 30 checkouts ranging from 2 weeks to the full semester, and all students who have completed the user survey upon returning the hotspot agree the library should continue or expand the program. In order to do this, funding proposals have been submitted to extend the pilot from another fiscal year.
  • #13 Time for a speed test! Go to speedtest.org and find out your download and upload speeds. Please answer the corresponding questions in the poll.
  • #14 Access to course materials is key to student success, and in an online course, that success is sometimes blocked by poor internet connections as certain high-bandwidth objects are unavailable to students with poor internet connections and those using smartphones. Streaming a high-definition video uses approximately 2.5GB/hour and joining an hour long Zoom or WebEx video call can use somewhere between 540MB and 1.62GB of data per hour. In order for every student to succeed, instructors need to implement the use of low-bandwidth solutions for students with access barriers such as: Downloadable transcripts for all videos Reducing the number of participants on video calls Turning off cameras and screen sharing during synchronous sessions Allowing call-in options for WebEx or Zoom meetings Provide independent student learning options (readings, podcasts, worksheets) that can be downloaded for offline access Use collaborative tools like Google Docs or Forms Limit the use of animations and transitions in presentations
  • #15 With the outbreak of the COVID-19 pandemic and the abrupt switch to remote learning, many students were forced to use smartphones to complete their online courses as “reliance on smartphones for online access is especially common among younger adults, non-whites and lower-income Americans”. Because of the unplanned transition, many instructors did not have the opportunity to optimize their course material for mobile learning which inhibited students from accessing required resources. Now that instructors have had time to begin rethinking course design for online learning, they can utilize design techniques to maximize mobile accessibility: Collapse content to one or two columns Insert section breaks so students do not miss important information Reduce the number of clicks required to access materials Keep navigation obvious and simple Scale media to limit download size Clearly indicate interactive elements as there is no cursor or hover function Chunk your content in a way that can be divided into various arrangements Maximize space with icons Now Rachelle will share how the library helps faculty obtain course content for their students.
  • #16 19.06.2023
  • #17 19.06.2023
  • #18 19.06.2023
  • #19 19.06.2023
  • #20 19.06.2023
  • #21 19.06.2023
  • #22 19.06.2023
  • #23 19.06.2023
  • #24 19.06.2023
  • #25 19.06.2023
  • #26 19.06.2023
  • #30 Thanks for watching our presentation! Please take a moment to complete the final poll question.
  • #31 Feel free to contact any one of us with questions or comments!