The purpose of this slideshow is to help add
uniformity to the plant reports. I will cover
the report in it’s entirety.
Production & Downtime
First We will cover this area. Obviously write
the date.
You may notice that all times are in 15
minute incremates. This is because the time
tracking system our company uses only goes
to the nearest quarter hour. So whenever
logging time please round it to the nearest
quarter hour.
Another important thing to note is how the
downtime is structured. Please remember to
include what is causing downtime and why.
For morning maintenance periods it is
important to note the projects worked on
during this time.
Lastly, it is imperative that we include
Startup/Inspection time in the report.
5/8/20
5:00 5:30 Safety/Ops Meeting
5:30 7:15 Maint: Housekeeping catwalks
7:15 7:45
Production
1:30 2:45 CR 1: Belt Stopped
2:45 4:30 Production
4:30 5:00 Shutdown
Startup/Inspection
7:45 1:30
Crew & Load Count
This one is pretty straight forward. Note that
this should include everyone except Wayne
and Myself.
Load Count is pretty self explanatory.
Louie
Kyle. R
Kyle. M
Doug
Kenny
Cat
Jon
Robert
Gary
Brent
29
41
5/8/20
5:00 5:30 Safety/Ops Meeting
5:30 7:15 Maint: Housekeeping catwalks
7:15 7:45
Production
1:30 2:45 CR 1: Belt Stopped
2:45 4:30 Production
4:30 5:00 Shutdown
Startup/Inspection
7:45 1:30
Fuel
Starting at the top, mark the tank level down
using U.S. imperial measurements.
Next under the Gen fuel section, it is
extremely important to include the entire
readout, including the decimal and after.
Hours are also self explanatory.
Louie
Kyle. R
Kyle. M
Doug
Kenny
Cat
Jon
Robert
Gary
Brent
29
41
16’8”
78,052.7
77,598.2
5000
4095
5/8/20
5:00 5:30 Safety/Ops Meeting
5:30 7:15 Maint: Housekeeping catwalks
7:15 7:45
Production
1:30 2:45 CR 1: Belt Stopped
2:45 4:30 Production
4:30 5:00 Shutdown
Startup/Inspection
7:45 1:30
Products, Water, & Dust Control
Starting with products:
• Primary: Material that comes off of
Structural belt. Usually Class 6 or Str Fill.
• Secondaries: Anything that comes off of a
belt after cone processing.
Dust Control:
Initial the box to state you have done
inspection. Write down any problems and
corrections that have occurred below. If no
problems write something to the effect of
“All Good”
Water: Loads and load source.
Louie
Kyle. R
Kyle. M
Doug
Kenny
Cat
Jon
Robert
Gary
Brent
29
41
16’8”
78,052.7
77,598.2
5000
4095
Class 6
1/2
1/2
3/4
3/4
Fines
1: Big Tanker
BW
10-4 Rubber Ducky
5/8/20
5:00 5:30 Safety/Ops Meeting
5:30 7:15 Maint: Housekeeping catwalks
7:15 7:45
Production
1:30 2:45 CR 1: Belt Stopped
2:45 4:30 Production
4:30 5:00 Shutdown
Startup/Inspection
7:45 1:30
Repairs Needed
Simply a place to note minor repairs that can
be completed on the next maintenance
period.
Louie
Kyle. R
Kyle. M
Doug
Kenny
Cat
Jon
Robert
Gary
Brent
29
41
16’8”
78,052.7
77,598.2
5000
4095
Class 6
1/2
1/2
3/4
3/4
Fines
1: Big Tanker
BW
10-4 Rubber Ducky
• Flexcos on 8’ Underscreen
• Rubber on CR screen
5/8/20
5:00 5:30 Safety/Ops Meeting
5:30 7:15 Maint: Housekeeping catwalks
7:15 7:45
Production
1:30 2:45 CR 1: Belt Stopped
2:45 4:30 Production
4:30 5:00 Shutdown
Startup/Inspection
7:45 1:30
Here it is fellas
Any Questions?
Louie
Kyle. R
Kyle. M
Doug
Kenny
Cat
Jon
Robert
Gary
Brent
29
41
16’8”
78,052.7
77,598.2
5000
4095
Class 6
1/2
1/2
3/4
3/4
Fines
1: Big Tanker
BW
10-4 Rubber Ducky
• Flexcos on 8’ Underscreen
• Rubber on CR screen
5/8/20
5:00 5:30 Safety/Ops Meeting
5:30 7:15 Maint: Housekeeping catwalks
7:15 7:45
Production
1:30 2:45 CR 1: Belt Stopped
2:45 4:30 Production
4:30 5:00 Shutdown
Startup/Inspection
7:45 1:30

More Related Content

Similar to RCQ Plant Report.pptx

Course project ie6560 group 10_presentation
Course project ie6560 group 10_presentationCourse project ie6560 group 10_presentation
Course project ie6560 group 10_presentation
Nishant Pathak
 
PLC programming example - Paint Spray
PLC programming example - Paint SprayPLC programming example - Paint Spray
PLC programming example - Paint Spray
ACC Automation
 
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
LI HE
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
Lean6Sigma4all
 
TPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSTPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERS
Max Lyons
 
Scheduling by Primavera - Training
Scheduling by Primavera - TrainingScheduling by Primavera - Training
Scheduling by Primavera - Training
Mohammed Feroze
 
IE431 Final Presentation
IE431 Final PresentationIE431 Final Presentation
IE431 Final Presentation
Arnaud Marquet
 
Production Schedule Report 2016-rv
Production Schedule Report 2016-rvProduction Schedule Report 2016-rv
Production Schedule Report 2016-rv
James Thomas
 
Predire presentation Shanghai - Automotive 2016
Predire presentation Shanghai - Automotive 2016Predire presentation Shanghai - Automotive 2016
Predire presentation Shanghai - Automotive 2016
Johnas Rundgren
 
Final Project Presentation on Internship Report 2015, BUFT
Final Project Presentation on Internship Report 2015, BUFT Final Project Presentation on Internship Report 2015, BUFT
Final Project Presentation on Internship Report 2015, BUFT
Md. Sayeed Hossain
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting
shashank tiwari
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
sanjay_asati
 
Factory yearly improvement presention
Factory yearly improvement presentionFactory yearly improvement presention
Factory yearly improvement presention
safiqulislam728
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET Journal
 
Learn How to Manage Backlog from Toyota Kanban Concepts, Agile Roots 2014
Learn How to Manage Backlog from Toyota Kanban Concepts, Agile Roots 2014Learn How to Manage Backlog from Toyota Kanban Concepts, Agile Roots 2014
Learn How to Manage Backlog from Toyota Kanban Concepts, Agile Roots 2014
Yoshifumi Tsuda
 
6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries
VivekSingh140912
 
Tablas militares
Tablas militares Tablas militares
Tablas militares
Mau Lira
 
Landi.2022.Presentation v2.pdf
Landi.2022.Presentation v2.pdfLandi.2022.Presentation v2.pdf
Landi.2022.Presentation v2.pdf
Renan180148
 
HOP Yick BD Ltd SMED
HOP Yick BD Ltd SMEDHOP Yick BD Ltd SMED
HOP Yick BD Ltd SMED
Engr. Mahmudul Khaleque
 
Industrial plants and safety project
Industrial plants and safety projectIndustrial plants and safety project
Industrial plants and safety project
NikoZurabishvili
 

Similar to RCQ Plant Report.pptx (20)

Course project ie6560 group 10_presentation
Course project ie6560 group 10_presentationCourse project ie6560 group 10_presentation
Course project ie6560 group 10_presentation
 
PLC programming example - Paint Spray
PLC programming example - Paint SprayPLC programming example - Paint Spray
PLC programming example - Paint Spray
 
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
TPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSTPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERS
 
Scheduling by Primavera - Training
Scheduling by Primavera - TrainingScheduling by Primavera - Training
Scheduling by Primavera - Training
 
IE431 Final Presentation
IE431 Final PresentationIE431 Final Presentation
IE431 Final Presentation
 
Production Schedule Report 2016-rv
Production Schedule Report 2016-rvProduction Schedule Report 2016-rv
Production Schedule Report 2016-rv
 
Predire presentation Shanghai - Automotive 2016
Predire presentation Shanghai - Automotive 2016Predire presentation Shanghai - Automotive 2016
Predire presentation Shanghai - Automotive 2016
 
Final Project Presentation on Internship Report 2015, BUFT
Final Project Presentation on Internship Report 2015, BUFT Final Project Presentation on Internship Report 2015, BUFT
Final Project Presentation on Internship Report 2015, BUFT
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
 
Factory yearly improvement presention
Factory yearly improvement presentionFactory yearly improvement presention
Factory yearly improvement presention
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
 
Learn How to Manage Backlog from Toyota Kanban Concepts, Agile Roots 2014
Learn How to Manage Backlog from Toyota Kanban Concepts, Agile Roots 2014Learn How to Manage Backlog from Toyota Kanban Concepts, Agile Roots 2014
Learn How to Manage Backlog from Toyota Kanban Concepts, Agile Roots 2014
 
6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries
 
Tablas militares
Tablas militares Tablas militares
Tablas militares
 
Landi.2022.Presentation v2.pdf
Landi.2022.Presentation v2.pdfLandi.2022.Presentation v2.pdf
Landi.2022.Presentation v2.pdf
 
HOP Yick BD Ltd SMED
HOP Yick BD Ltd SMEDHOP Yick BD Ltd SMED
HOP Yick BD Ltd SMED
 
Industrial plants and safety project
Industrial plants and safety projectIndustrial plants and safety project
Industrial plants and safety project
 

Recently uploaded

labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
Ghh
 
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
taqyea
 
Exploring Career Paths in Cybersecurity for Technical Communicators
Exploring Career Paths in Cybersecurity for Technical CommunicatorsExploring Career Paths in Cybersecurity for Technical Communicators
Exploring Career Paths in Cybersecurity for Technical Communicators
Ben Woelk, CISSP, CPTC
 
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdfRECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
AlessandroMartins454470
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
kakomaeric00
 
一比一原版(U-Barcelona毕业证)巴塞罗那大学毕业证成绩单如何办理
一比一原版(U-Barcelona毕业证)巴塞罗那大学毕业证成绩单如何办理一比一原版(U-Barcelona毕业证)巴塞罗那大学毕业证成绩单如何办理
一比一原版(U-Barcelona毕业证)巴塞罗那大学毕业证成绩单如何办理
taqyed
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
Aditya Raghav
 
Andrea Kate Portfolio Presentation.pdf
Andrea Kate  Portfolio  Presentation.pdfAndrea Kate  Portfolio  Presentation.pdf
Andrea Kate Portfolio Presentation.pdf
andreakaterasco
 
'Guidance and counselling- role of Psychologist in Guidance and Counselling.
'Guidance and counselling- role of Psychologist in Guidance and Counselling.'Guidance and counselling- role of Psychologist in Guidance and Counselling.
'Guidance and counselling- role of Psychologist in Guidance and Counselling.
PaviBangera
 
Full Sail_Morales_Michael_SMM_2024-05.pptx
Full Sail_Morales_Michael_SMM_2024-05.pptxFull Sail_Morales_Michael_SMM_2024-05.pptx
Full Sail_Morales_Michael_SMM_2024-05.pptx
mmorales2173
 
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
pxyhy
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
2zjra9bn
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
Ghh
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
yuhofha
 
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
yuhofha
 
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
atwvhyhm
 
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
pxyhy
 
MISS TEEN GONDA 2024 - WINNER ABHA VISHWAKARMA
MISS TEEN GONDA 2024 - WINNER ABHA VISHWAKARMAMISS TEEN GONDA 2024 - WINNER ABHA VISHWAKARMA
MISS TEEN GONDA 2024 - WINNER ABHA VISHWAKARMA
DK PAGEANT
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
Thomas GIRARD BDes
 
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
2zjra9bn
 

Recently uploaded (20)

labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
 
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
 
Exploring Career Paths in Cybersecurity for Technical Communicators
Exploring Career Paths in Cybersecurity for Technical CommunicatorsExploring Career Paths in Cybersecurity for Technical Communicators
Exploring Career Paths in Cybersecurity for Technical Communicators
 
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdfRECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
 
一比一原版(U-Barcelona毕业证)巴塞罗那大学毕业证成绩单如何办理
一比一原版(U-Barcelona毕业证)巴塞罗那大学毕业证成绩单如何办理一比一原版(U-Barcelona毕业证)巴塞罗那大学毕业证成绩单如何办理
一比一原版(U-Barcelona毕业证)巴塞罗那大学毕业证成绩单如何办理
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
 
Andrea Kate Portfolio Presentation.pdf
Andrea Kate  Portfolio  Presentation.pdfAndrea Kate  Portfolio  Presentation.pdf
Andrea Kate Portfolio Presentation.pdf
 
'Guidance and counselling- role of Psychologist in Guidance and Counselling.
'Guidance and counselling- role of Psychologist in Guidance and Counselling.'Guidance and counselling- role of Psychologist in Guidance and Counselling.
'Guidance and counselling- role of Psychologist in Guidance and Counselling.
 
Full Sail_Morales_Michael_SMM_2024-05.pptx
Full Sail_Morales_Michael_SMM_2024-05.pptxFull Sail_Morales_Michael_SMM_2024-05.pptx
Full Sail_Morales_Michael_SMM_2024-05.pptx
 
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
 
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
 
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
 
MISS TEEN GONDA 2024 - WINNER ABHA VISHWAKARMA
MISS TEEN GONDA 2024 - WINNER ABHA VISHWAKARMAMISS TEEN GONDA 2024 - WINNER ABHA VISHWAKARMA
MISS TEEN GONDA 2024 - WINNER ABHA VISHWAKARMA
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
 
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
 

RCQ Plant Report.pptx

  • 1. RCQ Plant Report The purpose of this slideshow is to help add uniformity to the plant reports. I will cover the report in it’s entirety.
  • 2. Production & Downtime First We will cover this area. Obviously write the date. You may notice that all times are in 15 minute incremates. This is because the time tracking system our company uses only goes to the nearest quarter hour. So whenever logging time please round it to the nearest quarter hour. Another important thing to note is how the downtime is structured. Please remember to include what is causing downtime and why. For morning maintenance periods it is important to note the projects worked on during this time. Lastly, it is imperative that we include Startup/Inspection time in the report. 5/8/20 5:00 5:30 Safety/Ops Meeting 5:30 7:15 Maint: Housekeeping catwalks 7:15 7:45 Production 1:30 2:45 CR 1: Belt Stopped 2:45 4:30 Production 4:30 5:00 Shutdown Startup/Inspection 7:45 1:30
  • 3. Crew & Load Count This one is pretty straight forward. Note that this should include everyone except Wayne and Myself. Load Count is pretty self explanatory. Louie Kyle. R Kyle. M Doug Kenny Cat Jon Robert Gary Brent 29 41 5/8/20 5:00 5:30 Safety/Ops Meeting 5:30 7:15 Maint: Housekeeping catwalks 7:15 7:45 Production 1:30 2:45 CR 1: Belt Stopped 2:45 4:30 Production 4:30 5:00 Shutdown Startup/Inspection 7:45 1:30
  • 4. Fuel Starting at the top, mark the tank level down using U.S. imperial measurements. Next under the Gen fuel section, it is extremely important to include the entire readout, including the decimal and after. Hours are also self explanatory. Louie Kyle. R Kyle. M Doug Kenny Cat Jon Robert Gary Brent 29 41 16’8” 78,052.7 77,598.2 5000 4095 5/8/20 5:00 5:30 Safety/Ops Meeting 5:30 7:15 Maint: Housekeeping catwalks 7:15 7:45 Production 1:30 2:45 CR 1: Belt Stopped 2:45 4:30 Production 4:30 5:00 Shutdown Startup/Inspection 7:45 1:30
  • 5. Products, Water, & Dust Control Starting with products: • Primary: Material that comes off of Structural belt. Usually Class 6 or Str Fill. • Secondaries: Anything that comes off of a belt after cone processing. Dust Control: Initial the box to state you have done inspection. Write down any problems and corrections that have occurred below. If no problems write something to the effect of “All Good” Water: Loads and load source. Louie Kyle. R Kyle. M Doug Kenny Cat Jon Robert Gary Brent 29 41 16’8” 78,052.7 77,598.2 5000 4095 Class 6 1/2 1/2 3/4 3/4 Fines 1: Big Tanker BW 10-4 Rubber Ducky 5/8/20 5:00 5:30 Safety/Ops Meeting 5:30 7:15 Maint: Housekeeping catwalks 7:15 7:45 Production 1:30 2:45 CR 1: Belt Stopped 2:45 4:30 Production 4:30 5:00 Shutdown Startup/Inspection 7:45 1:30
  • 6. Repairs Needed Simply a place to note minor repairs that can be completed on the next maintenance period. Louie Kyle. R Kyle. M Doug Kenny Cat Jon Robert Gary Brent 29 41 16’8” 78,052.7 77,598.2 5000 4095 Class 6 1/2 1/2 3/4 3/4 Fines 1: Big Tanker BW 10-4 Rubber Ducky • Flexcos on 8’ Underscreen • Rubber on CR screen 5/8/20 5:00 5:30 Safety/Ops Meeting 5:30 7:15 Maint: Housekeeping catwalks 7:15 7:45 Production 1:30 2:45 CR 1: Belt Stopped 2:45 4:30 Production 4:30 5:00 Shutdown Startup/Inspection 7:45 1:30
  • 7. Here it is fellas Any Questions? Louie Kyle. R Kyle. M Doug Kenny Cat Jon Robert Gary Brent 29 41 16’8” 78,052.7 77,598.2 5000 4095 Class 6 1/2 1/2 3/4 3/4 Fines 1: Big Tanker BW 10-4 Rubber Ducky • Flexcos on 8’ Underscreen • Rubber on CR screen 5/8/20 5:00 5:30 Safety/Ops Meeting 5:30 7:15 Maint: Housekeeping catwalks 7:15 7:45 Production 1:30 2:45 CR 1: Belt Stopped 2:45 4:30 Production 4:30 5:00 Shutdown Startup/Inspection 7:45 1:30