6-Sigma Training-Awareness for automobile industries
1. SIX SIGMA
• Problem Solving tool to Improve
Cost, Quality & Cycle time.
VICTORA AUTO PARTS PVT.LTD.
2. The History of Six Sigma
• Motorola 1987
- 10 X Improvement
- Customer Service Improvement Strategy
VICTORA AUTO PARTS PVT.LTD.
3. Definition of Six Sigma
• Sigma (σ) represents the standard deviation
of a normally distributed sample from a
population.
VICTORA AUTO PARTS PVT.LTD.
4. Six Sigma Definition
Sigma is a statistical unit of measure which reflects process capability.
The sigma scale of measure is perfectly correlated to such
characteristics as defects-per-unit, parts-per million
defective.
Sigma Level
Short - Term
PPM
Longt - Term
PPM
Ppk
1 158655.3 691462.5 0.33
2 22750.1 308537.5 0.67
3 1350 66807.2 1
4 31.7 6209.7 1.33
5 0.3 232.7 1.67
6 0 3.4 2
VICTORA AUTO PARTS PVT.LTD.
5. ST
LT
1st Shift 2nd Shift
3rd Shift
Batch #1 Jan
Short Term vs. Long Term
Step 5:
Determine the
data type (short
or long term)
VICTORA AUTO PARTS PVT.LTD.
6. Six Sigma Definition
• The Six Sigma level is attained when a total
of Six Standard deviations fit between the
sample mean and the nearest specifications
limit.
LSL USL
Target
6σ level
VICTORA AUTO PARTS PVT.LTD.
7. LSL USL
Target
Option 1 – Shift The Mean
Option 2 – Reduce the Variation
Option 3 – Combination of shifting the mean and reducing the variation
Option 4 – Move the Specification Limits
LSL USL
Target
Process Variation
VICTORA AUTO PARTS PVT.LTD.
σ (sigma)
8. 5 Phases of a Six Sigma Project
(d-M-A-I-C )
• Phase – 1 Define
• Phase – 2 Measure
• Phase – 3 Analyze
• Phase – 4 Improve
• Phase – 5 Control
VICTORA AUTO PARTS PVT.LTD.
9. 5 Phases of a Six Sigma Project
• Define - - Phase 1
• Complete Project Charter
Define Project
Define Problem Statement
Define Objective Statament
- Establish baseline for metrics
- Pareto Analysis
- Process Map
VICTORA AUTO PARTS PVT.LTD.
10. 5 Phases of a Six Sigma Project
• Measure - - Phase 2
- Process Exploration
Cause & Effect Diagram
Y-X Diagram (Input / Output Matrix)
Preliminary Process FMEA
- Measurement Verification
Attribute or Variable Gage R&R as applicable.
- Capability Analysis.
VICTORA AUTO PARTS PVT.LTD.
11. 5 Phases of a Six Sigma Project
• Analyze - - Phase 3
- Assess the distribution of data collected in phase 1
Histogram
- Paasive KPIV Characterization
Multi-Vari Analysis
Correlation & Regression
- Hpothesis Testing
Attribute Output Testing
Variable Output Testing
VICTORA AUTO PARTS PVT.LTD.
12. 5 Phases of a Six Sigma Project
• Improve - - Phase 4
- Design of Experiment Planning (DOE)
- Screening Experiments on Potential
Casual Factors
- Mathematical Relationships
- Process Optimization
VICTORA AUTO PARTS PVT.LTD.
13. 5 Phases of a Six Sigma Project
• Control - - Phase 5
- Minimize Effect due to KPIV
Robust Process Design
- Automating Effect due to KPIV
Mistake Proofing
New Equipment Characterization
- Control Effect due to KPIV
Control Plan
- Verify Process Capability
VICTORA AUTO PARTS PVT.LTD.
16. Project Name
Problem Statement
Objective Statement
Primary Metric
Secondary Metric(s)
Business Impact
(Quality, Cost,
Delivery)
Scope of Project
Rejection % Vs. Time (Month )
Tool Cost Vs. Time ( Month )
It will save cost Rs 335469 Per Annum,(Rs 183552 / Annum in Part 0552494 and Rs 151917 /
Annum in Part 0553087 ).
Horizontal Deployment in Part 0553087 which Avg. Rejection is 4.40%.
TO IMPROVE PRODUCTIVITY OF PART NO. 0552494
At Victora Auto,in Part 0552494 Avg. rejection is 4.52% from Feb. 2005 to Mar. 2005 due to
Centre Shifting only during Bending operation, which cost Rs.25494 per Month to Company.
To reduce rejection by 60% from 4.52% to 1.81% up to Oct. 2005 , which will cost save Rs.
15296 /Month.
Project Charter
VICTORA AUTO PARTS PVT.LTD.
17. Date
2/28/2005
2/28/2005
2/28/2005
2/28/2005
Phase Start date planned closing date
closing
date
Define 2/21/2005 3/31/2005 3/30/2005
Measure 4/11/2005 5/12/2005 5/11/2005
Analyze 5/23/2005 6/24/2005 6/24/2005
Improve 6/25/2005 9/20/2005 9/17/2005
Control 10/3/2005 10/25/2005 10/25/2005
Name Department
Mr. Khalid Production
Mr. Sandeep Quality Control
Mr. Nag Narayan Production
Project Team
Members
Schedule
Mr. Ramashanker Tool Room
Project Charter
VICTORA AUTO PARTS PVT.LTD.
18. Problem Statement
• A good problem statement will include
information about the magnitude of the problem
without any reference to possible solutions.
• The problem statement should state :
• - When…..(data timeframe )
• - What is wrong….(defect rate)
• - Where ……(specific location)
• - The Business impact (dollars or quality metric)
VICTORA AUTO PARTS PVT.LTD.
19. Objective Statement
• The objective statement should S.M.A.R.T.
• Specific – Address the issue of the problem
• Measurable – Quantify the performance
• Achievable – Step change, 50-80% improvement
• Relevant – Business impact
• Time bound and targeted – Identify the expected
timing
VICTORA AUTO PARTS PVT.LTD.
20. •Primary Metric – Defects per Unit
- Cycle time per Unit
- PPM
- Ppk
•Plotted on a trend chart with the following series
- Baseline performance (historic)
- Actual performance (current)
- Target or performance goal (future)
Primary Metric
VICTORA AUTO PARTS PVT.LTD.
21. Primary Metric: % Rejection vs. Time (month)
0
1
2
3
4
5
Jan-
05
Feb-
05
Mar-
05
Apr-
05
May-
05
Jun-
05
Jul-
05
Aug-
05
Sep-
05
%
Rejection
Baseline
Target
Actual
To Improveme productivity of Part no.0552494
Primary Metric Trend Chart
VICTORA AUTO PARTS PVT.LTD.
22. • Measures the negative impact to downstream
processes
• It is OK to have more than one secondary metric
• It is OK to not make improvements on your
secondary metric
Remember that this is a team project, everyone
must have input in defining this metric
Secondary Metric
VICTORA AUTO PARTS PVT.LTD.
23. Secondary Metric: Tool Cost vs. Time (month)
0
2000
4000
6000
8000
10000
12000
J
a
n
-
0
5
F
e
b
-
0
5
M
a
r
-
0
5
A
p
r
-
0
5
M
a
y
-
0
5
J
u
n
-
0
5
J
u
l
-
0
5
A
u
g
-
0
5
S
e
p
-
0
5
O
c
t
-
0
5
Tool
Cost
(Rs.)
Baseline
Target
Actual
To Improveme productivity of Part no.0552494
Secondary Metric Trend Chart
VICTORA AUTO PARTS PVT.LTD.
24. Secondary Metric: % Rej. Due to Tube OD under size
vs.Time (Month)
0
0.2
0.4
0.6
0.8
1
Jan-05
Feb-05
M
ar-05
Apr-05
M
ay-05
Jun-05
Jul-05
Aug-05
Sep-05
O
ct-05
Nov-05
Baseline
Target
Actual
To Reduce Rework Cost of Halter
Secondary Metric Trend Chart
VICTORA AUTO PARTS PVT.LTD.
25. Primary Vs. Secondary
PRIMARY
DPU -----
Down/time -----
On time delivery -----
DPU deptt. 20 -----
SECONDARY
Cycle time
Inventory
Customer returns
DPU deptt. 50
VICTORA AUTO PARTS PVT.LTD.
26. Pareto Analysis
80 : 20 Rule
• 20% of the time expended produced 80% of the
results
• 20% of the streets handle 80% of the traffic
• 20% of the paper has 80% of the news
• 20% of the people cause 80% of the problems
• 80% of the meals in a restaurant come from 20%
of the menu
• 80% of the problems come from 20% of the cause
VICTORA AUTO PARTS PVT.LTD.
27. PPM
Percent
PROCESS STEP
Count
1.0
Cum % 48.2 90.5 99.0 100.0
45200 39600 8000 900
Percent 48.2 42.3 8.5
Other
R/M Insp.
Head Forming
Bending
90000
80000
70000
60000
50000
40000
30000
20000
10000
0
100
80
60
40
20
0
PPM BY PROCESS STEP P/N.0552494 FROM FEB.05 TO MAR.05
Project Pareto Chart (Level-1)
VICTORA AUTO PARTS PVT.LTD.
28. PPM
Percent
Center Shifting
Count 23400 21800
Percent 51.8 48.2
Cum % 51.8 100.0
Dimn.95.50 more
Dimn.95.50 less
50000
40000
30000
20000
10000
0
100
80
60
40
20
0
PPM in Bending process of Center Shifting
Pareto Chart (Level-2)
VICTORA AUTO PARTS PVT.LTD.
29. Project Process Map
X's Spec's Gages D.P.U. C/T Y's Spec's
(Sec.)
Raw Material Inspection Std. Micrometer
Chemical & ASTM Std. Pin Micrometer 0.008 S.S.Tube 12 * 2 +/- 0.10mm
Physical Report
Gauge
Operator
S.S.Tube Process Sheet Snap Gauge
Traub M/C Work Instructions Vernier 0 13.20 Cut Pcs. As per QA/C1
Gauge
Set-up
Operator
Cut Pcs. Process Sheet Snap Gauge
Hyd. Header Work Instructions Vernier 0.0396 19.2 H / F Pcs. As per QA/C2
Gage
Set-up
Tooling
Operator
0.0452 19.6 Finish Product As Per Rec.Gage
H / F Pcs. Process Sheet Rec. Gage
Hyd. Press Work Instructions
Set-up
Tooling
Rec. Gage
Operator
Operator Inspection Standard Visual 0.0009
Rework
Rework
Start
Head Forming
Cutting
VA
VA
NV
A
VA
Ship
Bending
VA
RM
Inspect
NV
A
Inspect
Inspect
NV
A
Inspect
Final
Inspection
NV
A
VICTORA AUTO PARTS PVT.LTD.