SIX SIGMA
• Problem Solving tool to Improve
Cost, Quality & Cycle time.
VICTORA AUTO PARTS PVT.LTD.
The History of Six Sigma
• Motorola 1987
- 10 X Improvement
- Customer Service Improvement Strategy
VICTORA AUTO PARTS PVT.LTD.
Definition of Six Sigma
• Sigma (σ) represents the standard deviation
of a normally distributed sample from a
population.
VICTORA AUTO PARTS PVT.LTD.
Six Sigma Definition
Sigma is a statistical unit of measure which reflects process capability.
The sigma scale of measure is perfectly correlated to such
characteristics as defects-per-unit, parts-per million
defective.
Sigma Level
Short - Term
PPM
Longt - Term
PPM
Ppk
1 158655.3 691462.5 0.33
2 22750.1 308537.5 0.67
3 1350 66807.2 1
4 31.7 6209.7 1.33
5 0.3 232.7 1.67
6 0 3.4 2
VICTORA AUTO PARTS PVT.LTD.
ST
LT
1st Shift 2nd Shift
3rd Shift
Batch #1 Jan
Short Term vs. Long Term
Step 5:
Determine the
data type (short
or long term)
VICTORA AUTO PARTS PVT.LTD.
Six Sigma Definition
• The Six Sigma level is attained when a total
of Six Standard deviations fit between the
sample mean and the nearest specifications
limit.
LSL USL
Target
6σ level
VICTORA AUTO PARTS PVT.LTD.
LSL USL
Target
Option 1 – Shift The Mean
Option 2 – Reduce the Variation
Option 3 – Combination of shifting the mean and reducing the variation
Option 4 – Move the Specification Limits
LSL USL
Target
Process Variation
VICTORA AUTO PARTS PVT.LTD.
σ (sigma)
5 Phases of a Six Sigma Project
(d-M-A-I-C )
• Phase – 1 Define
• Phase – 2 Measure
• Phase – 3 Analyze
• Phase – 4 Improve
• Phase – 5 Control
VICTORA AUTO PARTS PVT.LTD.
5 Phases of a Six Sigma Project
• Define - - Phase 1
• Complete Project Charter
Define Project
Define Problem Statement
Define Objective Statament
- Establish baseline for metrics
- Pareto Analysis
- Process Map
VICTORA AUTO PARTS PVT.LTD.
5 Phases of a Six Sigma Project
• Measure - - Phase 2
- Process Exploration
Cause & Effect Diagram
Y-X Diagram (Input / Output Matrix)
Preliminary Process FMEA
- Measurement Verification
Attribute or Variable Gage R&R as applicable.
- Capability Analysis.
VICTORA AUTO PARTS PVT.LTD.
5 Phases of a Six Sigma Project
• Analyze - - Phase 3
- Assess the distribution of data collected in phase 1
Histogram
- Paasive KPIV Characterization
Multi-Vari Analysis
Correlation & Regression
- Hpothesis Testing
Attribute Output Testing
Variable Output Testing
VICTORA AUTO PARTS PVT.LTD.
5 Phases of a Six Sigma Project
• Improve - - Phase 4
- Design of Experiment Planning (DOE)
- Screening Experiments on Potential
Casual Factors
- Mathematical Relationships
- Process Optimization
VICTORA AUTO PARTS PVT.LTD.
5 Phases of a Six Sigma Project
• Control - - Phase 5
- Minimize Effect due to KPIV
Robust Process Design
- Automating Effect due to KPIV
Mistake Proofing
New Equipment Characterization
- Control Effect due to KPIV
Control Plan
- Verify Process Capability
VICTORA AUTO PARTS PVT.LTD.
PHASE – 1
DEFINE PHASE
VICTORA AUTO PARTS PVT.LTD.
Project Examples
• Increase
Capacity
• Eliminate rework
• Increase delivery
credibility
• Eliminate waste
• Improve Supplier
quality
• Scrap reductions
• Down/time reduction
• Cycle time reductions
VICTORA AUTO PARTS PVT.LTD.
Project Name
Problem Statement
Objective Statement
Primary Metric
Secondary Metric(s)
Business Impact
(Quality, Cost,
Delivery)
Scope of Project
Rejection % Vs. Time (Month )
Tool Cost Vs. Time ( Month )
It will save cost Rs 335469 Per Annum,(Rs 183552 / Annum in Part 0552494 and Rs 151917 /
Annum in Part 0553087 ).
Horizontal Deployment in Part 0553087 which Avg. Rejection is 4.40%.
TO IMPROVE PRODUCTIVITY OF PART NO. 0552494
At Victora Auto,in Part 0552494 Avg. rejection is 4.52% from Feb. 2005 to Mar. 2005 due to
Centre Shifting only during Bending operation, which cost Rs.25494 per Month to Company.
To reduce rejection by 60% from 4.52% to 1.81% up to Oct. 2005 , which will cost save Rs.
15296 /Month.
Project Charter
VICTORA AUTO PARTS PVT.LTD.
Date
2/28/2005
2/28/2005
2/28/2005
2/28/2005
Phase Start date planned closing date
closing
date
Define 2/21/2005 3/31/2005 3/30/2005
Measure 4/11/2005 5/12/2005 5/11/2005
Analyze 5/23/2005 6/24/2005 6/24/2005
Improve 6/25/2005 9/20/2005 9/17/2005
Control 10/3/2005 10/25/2005 10/25/2005
Name Department
Mr. Khalid Production
Mr. Sandeep Quality Control
Mr. Nag Narayan Production
Project Team
Members
Schedule
Mr. Ramashanker Tool Room
Project Charter
VICTORA AUTO PARTS PVT.LTD.
Problem Statement
• A good problem statement will include
information about the magnitude of the problem
without any reference to possible solutions.
• The problem statement should state :
• - When…..(data timeframe )
• - What is wrong….(defect rate)
• - Where ……(specific location)
• - The Business impact (dollars or quality metric)
VICTORA AUTO PARTS PVT.LTD.
Objective Statement
• The objective statement should S.M.A.R.T.
• Specific – Address the issue of the problem
• Measurable – Quantify the performance
• Achievable – Step change, 50-80% improvement
• Relevant – Business impact
• Time bound and targeted – Identify the expected
timing
VICTORA AUTO PARTS PVT.LTD.
•Primary Metric – Defects per Unit
- Cycle time per Unit
- PPM
- Ppk
•Plotted on a trend chart with the following series
- Baseline performance (historic)
- Actual performance (current)
- Target or performance goal (future)
Primary Metric
VICTORA AUTO PARTS PVT.LTD.
Primary Metric: % Rejection vs. Time (month)
0
1
2
3
4
5
Jan-
05
Feb-
05
Mar-
05
Apr-
05
May-
05
Jun-
05
Jul-
05
Aug-
05
Sep-
05
%
Rejection
Baseline
Target
Actual
To Improveme productivity of Part no.0552494
Primary Metric Trend Chart
VICTORA AUTO PARTS PVT.LTD.
• Measures the negative impact to downstream
processes
• It is OK to have more than one secondary metric
• It is OK to not make improvements on your
secondary metric
Remember that this is a team project, everyone
must have input in defining this metric
Secondary Metric
VICTORA AUTO PARTS PVT.LTD.
Secondary Metric: Tool Cost vs. Time (month)
0
2000
4000
6000
8000
10000
12000
J
a
n
-
0
5
F
e
b
-
0
5
M
a
r
-
0
5
A
p
r
-
0
5
M
a
y
-
0
5
J
u
n
-
0
5
J
u
l
-
0
5
A
u
g
-
0
5
S
e
p
-
0
5
O
c
t
-
0
5
Tool
Cost
(Rs.)
Baseline
Target
Actual
To Improveme productivity of Part no.0552494
Secondary Metric Trend Chart
VICTORA AUTO PARTS PVT.LTD.
Secondary Metric: % Rej. Due to Tube OD under size
vs.Time (Month)
0
0.2
0.4
0.6
0.8
1
Jan-05
Feb-05
M
ar-05
Apr-05
M
ay-05
Jun-05
Jul-05
Aug-05
Sep-05
O
ct-05
Nov-05
Baseline
Target
Actual
To Reduce Rework Cost of Halter
Secondary Metric Trend Chart
VICTORA AUTO PARTS PVT.LTD.
Primary Vs. Secondary
PRIMARY
DPU -----
Down/time -----
On time delivery -----
DPU deptt. 20 -----
SECONDARY
Cycle time
Inventory
Customer returns
DPU deptt. 50
VICTORA AUTO PARTS PVT.LTD.
Pareto Analysis
80 : 20 Rule
• 20% of the time expended produced 80% of the
results
• 20% of the streets handle 80% of the traffic
• 20% of the paper has 80% of the news
• 20% of the people cause 80% of the problems
• 80% of the meals in a restaurant come from 20%
of the menu
• 80% of the problems come from 20% of the cause
VICTORA AUTO PARTS PVT.LTD.
PPM
Percent
PROCESS STEP
Count
1.0
Cum % 48.2 90.5 99.0 100.0
45200 39600 8000 900
Percent 48.2 42.3 8.5
Other
R/M Insp.
Head Forming
Bending
90000
80000
70000
60000
50000
40000
30000
20000
10000
0
100
80
60
40
20
0
PPM BY PROCESS STEP P/N.0552494 FROM FEB.05 TO MAR.05
Project Pareto Chart (Level-1)
VICTORA AUTO PARTS PVT.LTD.
PPM
Percent
Center Shifting
Count 23400 21800
Percent 51.8 48.2
Cum % 51.8 100.0
Dimn.95.50 more
Dimn.95.50 less
50000
40000
30000
20000
10000
0
100
80
60
40
20
0
PPM in Bending process of Center Shifting
Pareto Chart (Level-2)
VICTORA AUTO PARTS PVT.LTD.
Project Process Map
X's Spec's Gages D.P.U. C/T Y's Spec's
(Sec.)
Raw Material Inspection Std. Micrometer
Chemical & ASTM Std. Pin Micrometer 0.008 S.S.Tube 12 * 2 +/- 0.10mm
Physical Report
Gauge
Operator
S.S.Tube Process Sheet Snap Gauge
Traub M/C Work Instructions Vernier 0 13.20 Cut Pcs. As per QA/C1
Gauge
Set-up
Operator
Cut Pcs. Process Sheet Snap Gauge
Hyd. Header Work Instructions Vernier 0.0396 19.2 H / F Pcs. As per QA/C2
Gage
Set-up
Tooling
Operator
0.0452 19.6 Finish Product As Per Rec.Gage
H / F Pcs. Process Sheet Rec. Gage
Hyd. Press Work Instructions
Set-up
Tooling
Rec. Gage
Operator
Operator Inspection Standard Visual 0.0009
Rework
Rework
Start
Head Forming
Cutting
VA
VA
NV
A
VA
Ship
Bending
VA
RM
Inspect
NV
A
Inspect
Inspect
NV
A
Inspect
Final
Inspection
NV
A
VICTORA AUTO PARTS PVT.LTD.

More Related Content

Similar to 6-Sigma Training-Awareness for automobile industries

Six-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxSix-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxWFD02BLR13Outlet
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Ajay_Training_Report[1]
Ajay_Training_Report[1]Ajay_Training_Report[1]
Ajay_Training_Report[1]AJAY KUMAR
 
Zero Defects in Semiconductor Manufacturing for Automotive Applications.pptx
Zero Defects in Semiconductor Manufacturing for Automotive Applications.pptxZero Defects in Semiconductor Manufacturing for Automotive Applications.pptx
Zero Defects in Semiconductor Manufacturing for Automotive Applications.pptxyieldWerx Semiconductor
 
Scrum and Lean : Multiply the Powers by Om Band
Scrum and Lean : Multiply the Powers by Om BandScrum and Lean : Multiply the Powers by Om Band
Scrum and Lean : Multiply the Powers by Om Bandagilencr
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTSUYASH TRIVEDI
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET Journal
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationSanchit Jain
 
Best Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptxBest Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptxsonutyagi20
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operationAngelainBay
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sampleantonioharenas
 
Application of Six-Sigma- A Case Study of an Automobile Lightening Company
Application of Six-Sigma- A Case Study of an Automobile Lightening CompanyApplication of Six-Sigma- A Case Study of an Automobile Lightening Company
Application of Six-Sigma- A Case Study of an Automobile Lightening CompanyIRJET Journal
 

Similar to 6-Sigma Training-Awareness for automobile industries (20)

Six-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxSix-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptx
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Ajay_Training_Report[1]
Ajay_Training_Report[1]Ajay_Training_Report[1]
Ajay_Training_Report[1]
 
Precinmac
PrecinmacPrecinmac
Precinmac
 
Zero Defects in Semiconductor Manufacturing for Automotive Applications.pptx
Zero Defects in Semiconductor Manufacturing for Automotive Applications.pptxZero Defects in Semiconductor Manufacturing for Automotive Applications.pptx
Zero Defects in Semiconductor Manufacturing for Automotive Applications.pptx
 
Scrum and Lean : Multiply the Powers by Om Band
Scrum and Lean : Multiply the Powers by Om BandScrum and Lean : Multiply the Powers by Om Band
Scrum and Lean : Multiply the Powers by Om Band
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
ved_CV- Updated
ved_CV- Updatedved_CV- Updated
ved_CV- Updated
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis Presentation
 
Best Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptxBest Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptx
 
Dmaic
DmaicDmaic
Dmaic
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operation
 
Resume -UD
Resume -UDResume -UD
Resume -UD
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Resume
ResumeResume
Resume
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
 
Application of Six-Sigma- A Case Study of an Automobile Lightening Company
Application of Six-Sigma- A Case Study of an Automobile Lightening CompanyApplication of Six-Sigma- A Case Study of an Automobile Lightening Company
Application of Six-Sigma- A Case Study of an Automobile Lightening Company
 

Recently uploaded

Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full NightCall Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubaikojalkojal131
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCRsoniya singh
 
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESUNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESDineshKumar4165
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
Call Girls in Karachi | +923081633338 | Karachi Call Girls
Call Girls in Karachi  | +923081633338 | Karachi Call GirlsCall Girls in Karachi  | +923081633338 | Karachi Call Girls
Call Girls in Karachi | +923081633338 | Karachi Call GirlsAyesha Khan
 
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /WhatsappsBeautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsappssapnasaifi408
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxDineshKumar4165
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...kexey39068
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technologyquickpartslimitlessm
 
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一mjyguplun
 
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxUNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxDineshKumar4165
 
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一fjjhfuubb
 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHot Call Girls In Sector 58 (Noida)
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一hnfusn
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一ga6c6bdl
 

Recently uploaded (20)

Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full NightCall Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
 
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
 
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESUNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
Call Girls in Karachi | +923081633338 | Karachi Call Girls
Call Girls in Karachi  | +923081633338 | Karachi Call GirlsCall Girls in Karachi  | +923081633338 | Karachi Call Girls
Call Girls in Karachi | +923081633338 | Karachi Call Girls
 
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /WhatsappsBeautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technology
 
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
 
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxUNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
 
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
 

6-Sigma Training-Awareness for automobile industries

  • 1. SIX SIGMA • Problem Solving tool to Improve Cost, Quality & Cycle time. VICTORA AUTO PARTS PVT.LTD.
  • 2. The History of Six Sigma • Motorola 1987 - 10 X Improvement - Customer Service Improvement Strategy VICTORA AUTO PARTS PVT.LTD.
  • 3. Definition of Six Sigma • Sigma (σ) represents the standard deviation of a normally distributed sample from a population. VICTORA AUTO PARTS PVT.LTD.
  • 4. Six Sigma Definition Sigma is a statistical unit of measure which reflects process capability. The sigma scale of measure is perfectly correlated to such characteristics as defects-per-unit, parts-per million defective. Sigma Level Short - Term PPM Longt - Term PPM Ppk 1 158655.3 691462.5 0.33 2 22750.1 308537.5 0.67 3 1350 66807.2 1 4 31.7 6209.7 1.33 5 0.3 232.7 1.67 6 0 3.4 2 VICTORA AUTO PARTS PVT.LTD.
  • 5. ST LT 1st Shift 2nd Shift 3rd Shift Batch #1 Jan Short Term vs. Long Term Step 5: Determine the data type (short or long term) VICTORA AUTO PARTS PVT.LTD.
  • 6. Six Sigma Definition • The Six Sigma level is attained when a total of Six Standard deviations fit between the sample mean and the nearest specifications limit. LSL USL Target 6σ level VICTORA AUTO PARTS PVT.LTD.
  • 7. LSL USL Target Option 1 – Shift The Mean Option 2 – Reduce the Variation Option 3 – Combination of shifting the mean and reducing the variation Option 4 – Move the Specification Limits LSL USL Target Process Variation VICTORA AUTO PARTS PVT.LTD. σ (sigma)
  • 8. 5 Phases of a Six Sigma Project (d-M-A-I-C ) • Phase – 1 Define • Phase – 2 Measure • Phase – 3 Analyze • Phase – 4 Improve • Phase – 5 Control VICTORA AUTO PARTS PVT.LTD.
  • 9. 5 Phases of a Six Sigma Project • Define - - Phase 1 • Complete Project Charter Define Project Define Problem Statement Define Objective Statament - Establish baseline for metrics - Pareto Analysis - Process Map VICTORA AUTO PARTS PVT.LTD.
  • 10. 5 Phases of a Six Sigma Project • Measure - - Phase 2 - Process Exploration Cause & Effect Diagram Y-X Diagram (Input / Output Matrix) Preliminary Process FMEA - Measurement Verification Attribute or Variable Gage R&R as applicable. - Capability Analysis. VICTORA AUTO PARTS PVT.LTD.
  • 11. 5 Phases of a Six Sigma Project • Analyze - - Phase 3 - Assess the distribution of data collected in phase 1 Histogram - Paasive KPIV Characterization Multi-Vari Analysis Correlation & Regression - Hpothesis Testing Attribute Output Testing Variable Output Testing VICTORA AUTO PARTS PVT.LTD.
  • 12. 5 Phases of a Six Sigma Project • Improve - - Phase 4 - Design of Experiment Planning (DOE) - Screening Experiments on Potential Casual Factors - Mathematical Relationships - Process Optimization VICTORA AUTO PARTS PVT.LTD.
  • 13. 5 Phases of a Six Sigma Project • Control - - Phase 5 - Minimize Effect due to KPIV Robust Process Design - Automating Effect due to KPIV Mistake Proofing New Equipment Characterization - Control Effect due to KPIV Control Plan - Verify Process Capability VICTORA AUTO PARTS PVT.LTD.
  • 14. PHASE – 1 DEFINE PHASE VICTORA AUTO PARTS PVT.LTD.
  • 15. Project Examples • Increase Capacity • Eliminate rework • Increase delivery credibility • Eliminate waste • Improve Supplier quality • Scrap reductions • Down/time reduction • Cycle time reductions VICTORA AUTO PARTS PVT.LTD.
  • 16. Project Name Problem Statement Objective Statement Primary Metric Secondary Metric(s) Business Impact (Quality, Cost, Delivery) Scope of Project Rejection % Vs. Time (Month ) Tool Cost Vs. Time ( Month ) It will save cost Rs 335469 Per Annum,(Rs 183552 / Annum in Part 0552494 and Rs 151917 / Annum in Part 0553087 ). Horizontal Deployment in Part 0553087 which Avg. Rejection is 4.40%. TO IMPROVE PRODUCTIVITY OF PART NO. 0552494 At Victora Auto,in Part 0552494 Avg. rejection is 4.52% from Feb. 2005 to Mar. 2005 due to Centre Shifting only during Bending operation, which cost Rs.25494 per Month to Company. To reduce rejection by 60% from 4.52% to 1.81% up to Oct. 2005 , which will cost save Rs. 15296 /Month. Project Charter VICTORA AUTO PARTS PVT.LTD.
  • 17. Date 2/28/2005 2/28/2005 2/28/2005 2/28/2005 Phase Start date planned closing date closing date Define 2/21/2005 3/31/2005 3/30/2005 Measure 4/11/2005 5/12/2005 5/11/2005 Analyze 5/23/2005 6/24/2005 6/24/2005 Improve 6/25/2005 9/20/2005 9/17/2005 Control 10/3/2005 10/25/2005 10/25/2005 Name Department Mr. Khalid Production Mr. Sandeep Quality Control Mr. Nag Narayan Production Project Team Members Schedule Mr. Ramashanker Tool Room Project Charter VICTORA AUTO PARTS PVT.LTD.
  • 18. Problem Statement • A good problem statement will include information about the magnitude of the problem without any reference to possible solutions. • The problem statement should state : • - When…..(data timeframe ) • - What is wrong….(defect rate) • - Where ……(specific location) • - The Business impact (dollars or quality metric) VICTORA AUTO PARTS PVT.LTD.
  • 19. Objective Statement • The objective statement should S.M.A.R.T. • Specific – Address the issue of the problem • Measurable – Quantify the performance • Achievable – Step change, 50-80% improvement • Relevant – Business impact • Time bound and targeted – Identify the expected timing VICTORA AUTO PARTS PVT.LTD.
  • 20. •Primary Metric – Defects per Unit - Cycle time per Unit - PPM - Ppk •Plotted on a trend chart with the following series - Baseline performance (historic) - Actual performance (current) - Target or performance goal (future) Primary Metric VICTORA AUTO PARTS PVT.LTD.
  • 21. Primary Metric: % Rejection vs. Time (month) 0 1 2 3 4 5 Jan- 05 Feb- 05 Mar- 05 Apr- 05 May- 05 Jun- 05 Jul- 05 Aug- 05 Sep- 05 % Rejection Baseline Target Actual To Improveme productivity of Part no.0552494 Primary Metric Trend Chart VICTORA AUTO PARTS PVT.LTD.
  • 22. • Measures the negative impact to downstream processes • It is OK to have more than one secondary metric • It is OK to not make improvements on your secondary metric Remember that this is a team project, everyone must have input in defining this metric Secondary Metric VICTORA AUTO PARTS PVT.LTD.
  • 23. Secondary Metric: Tool Cost vs. Time (month) 0 2000 4000 6000 8000 10000 12000 J a n - 0 5 F e b - 0 5 M a r - 0 5 A p r - 0 5 M a y - 0 5 J u n - 0 5 J u l - 0 5 A u g - 0 5 S e p - 0 5 O c t - 0 5 Tool Cost (Rs.) Baseline Target Actual To Improveme productivity of Part no.0552494 Secondary Metric Trend Chart VICTORA AUTO PARTS PVT.LTD.
  • 24. Secondary Metric: % Rej. Due to Tube OD under size vs.Time (Month) 0 0.2 0.4 0.6 0.8 1 Jan-05 Feb-05 M ar-05 Apr-05 M ay-05 Jun-05 Jul-05 Aug-05 Sep-05 O ct-05 Nov-05 Baseline Target Actual To Reduce Rework Cost of Halter Secondary Metric Trend Chart VICTORA AUTO PARTS PVT.LTD.
  • 25. Primary Vs. Secondary PRIMARY DPU ----- Down/time ----- On time delivery ----- DPU deptt. 20 ----- SECONDARY Cycle time Inventory Customer returns DPU deptt. 50 VICTORA AUTO PARTS PVT.LTD.
  • 26. Pareto Analysis 80 : 20 Rule • 20% of the time expended produced 80% of the results • 20% of the streets handle 80% of the traffic • 20% of the paper has 80% of the news • 20% of the people cause 80% of the problems • 80% of the meals in a restaurant come from 20% of the menu • 80% of the problems come from 20% of the cause VICTORA AUTO PARTS PVT.LTD.
  • 27. PPM Percent PROCESS STEP Count 1.0 Cum % 48.2 90.5 99.0 100.0 45200 39600 8000 900 Percent 48.2 42.3 8.5 Other R/M Insp. Head Forming Bending 90000 80000 70000 60000 50000 40000 30000 20000 10000 0 100 80 60 40 20 0 PPM BY PROCESS STEP P/N.0552494 FROM FEB.05 TO MAR.05 Project Pareto Chart (Level-1) VICTORA AUTO PARTS PVT.LTD.
  • 28. PPM Percent Center Shifting Count 23400 21800 Percent 51.8 48.2 Cum % 51.8 100.0 Dimn.95.50 more Dimn.95.50 less 50000 40000 30000 20000 10000 0 100 80 60 40 20 0 PPM in Bending process of Center Shifting Pareto Chart (Level-2) VICTORA AUTO PARTS PVT.LTD.
  • 29. Project Process Map X's Spec's Gages D.P.U. C/T Y's Spec's (Sec.) Raw Material Inspection Std. Micrometer Chemical & ASTM Std. Pin Micrometer 0.008 S.S.Tube 12 * 2 +/- 0.10mm Physical Report Gauge Operator S.S.Tube Process Sheet Snap Gauge Traub M/C Work Instructions Vernier 0 13.20 Cut Pcs. As per QA/C1 Gauge Set-up Operator Cut Pcs. Process Sheet Snap Gauge Hyd. Header Work Instructions Vernier 0.0396 19.2 H / F Pcs. As per QA/C2 Gage Set-up Tooling Operator 0.0452 19.6 Finish Product As Per Rec.Gage H / F Pcs. Process Sheet Rec. Gage Hyd. Press Work Instructions Set-up Tooling Rec. Gage Operator Operator Inspection Standard Visual 0.0009 Rework Rework Start Head Forming Cutting VA VA NV A VA Ship Bending VA RM Inspect NV A Inspect Inspect NV A Inspect Final Inspection NV A VICTORA AUTO PARTS PVT.LTD.