SlideShare a Scribd company logo
CURRRICULUM VITAE
Email : Rehman4surveyor@gmail.com
Mob : 00966-597869894, 00966-594906598
Personal information
Name : Muhammad Rahman
Date of birth : 07-04-1986
Religion : Islam
Nationally : Pakistani
Marital Status : Married
Languages knows : 1. English (excellent reading, writing, speaking)
2. Urdu.
3. Arabic (speaking)
Academic Qualification
INTERMEDIATE (2003) Federal Board Islamabad
MATRICUL (2001) Gujranwala Board
Technical Qualification
Passed Diploma of surveying from poly Technical College Lahore Borad.
Computer Skills
Knowledge of operating AutoCAD, Surfer ,Civil 3D, MS Office 97-2007 and General Hardware
Setting.
Summery of work experience
Over 8 years experience in the field of, Surveying like topography, building, Roads Water
line channel, Box culverts box and Real State and Calculating the Quantities.
Also having a very good experience of working in power plants and interior
finishing works, like gypsum, techno glass partitions etc.
WORK EXPERIENCE ( KSA.
1. Company Name. : RUKOON OMYA Est,
Project : Petro Chemicals Plant (Saudi Kayan, Al Jubail)
With SAMSUNG Cont, ON PP&PH Areas
Duration : Sep 2008 to March 2009
Position : Land Surveyor
Duties Involved: -
 Co-ordination with the consultant staff on the site
 Checking levels, alignment, piping system, domestic water network system
 Lay out of footings nick columns & columns
 Process all the taken data of topographic survey according to the required
projection and submit the survey drawings.
………………………………………………………………………
Company Name : REHAB ALOMRAN CONT, Est.
Project; 1. PNU Project (Al Riyadh)
With ALLIED BUILDERS at Railway Station No, 11
2. PNU Project (Al Riyadh)
With Basic Construction at Railway Station No, 04
Duration : April 2009 to Feb 2010
Position : Land Surveyor
Duties Involved: -
 Co-ordination with the consultant staff on the site
 General lay out for building area and preparation control point as per shop
 Checking levels, alignment, piping system, domestic water network syst
 Setting out & leveling work.
…………………………………………………………………………………………………….
Company Name : ASAD SAID Cont. Pvt. Ltd
Project : 1) Power Plant No, 11 (PP11 Al Riyadh)
With Hyundai Heavy Industries Co, Ltd
2) Ras Al-Khair Riyadh Water Transmission System
(SWCC) With Saudi Services Electrical Machinecal Co.Ltd
: 3) Ras Al-Khaire Power and desalination plant phase 1
With Doosan Heavy Industries Co, Ltd
Duration : Jun 2010 to Jun 2012
Position : Land Surveyor
Duties Involved: -
 Co-ordination with the consultant staff on the site
 Did the basic survey of whole project (Fixing of control points,
Topographic survey)
 Calculate and submit (Cut and Fill volume).
 Lay out of footings nick columns & columns
 Fix the layout of all Pump Stations and Reservoirs.
………………………………………………………………………
Company Name : SAUDI OGER LTD.
Project : AL Harmain High Speed Railways
8HRI Jeddah Project
Duration : July 2012 to January 2013
Position : Land Surveyor
Duties Involved: -
 Co-ordination with the consultant staff on the site
 Alignment,setting anchor bolt,
 Checking levels, alignment,
 Cross-section for calculating quantity of projects
 Setting out & leveling wor
………………………………………………………………………
Company Name : RAM CONTRACTING
Projects : Power Plant 132/133 Sabia North
Al haya, Al_Jizzan
Duration : May 2013 to February 2014
Position : Senior Surveyor
Duties Involved: -
 Making Co-ordination in Auto-Cad
 Coo-ordination with the consultant staff on the site
 Did the basic survey of whole project (Fixing of control points,
Topographic survey)
 Checking levels, alignment, piping system, domestic water network
system
 Lay out of footings nick columns & columns
 Process all the taken data of topographic survey according to the
required Dprojection and submit the survey drawings.
 Fix the layout of all Pump Stations and Reservoirs.
………………………………………………………………………………………………………
Company Name : KINNARPS (KPS), RAM CONTRACTING
Project : AL_MALGA RESIDENCE COMPOUND
AL _RIYAHD
Duration : February 2014 to March 2016
Position : Chief Surveyor
Duties Involved: -
 Making Co-ordination in Auto-Cad
 Coo-ordination with the consultant staff on the site
 Did the basic survey of whole project (Fixing of control points,
Topographic survey)
 Calculate and submit (Cut and Fill volume).
 Lay out of footings nick columns & columns
 Process all the taken data of topographic survey according to the
required Dprojection and submit the survey drawings.
………………………………………………………………………………………………………
Company Name : KINNARPS (KPS), RAM CONTRACTING
Project : HUMAN RESOURCE DEVELOPMENT FUND
OLAYA TOWER RIYADH
Duration : September 2015 to Still
Position : Chief Surveyor
Duties Involved: -
 Co-ordination with the consultant staff on the site
 Making Co-ordination in Auto-Cad
 Did the basic survey of whole project (Fixing of control points,
Topographic survey)
 Lay out for partition Gypsum, Glass and Techno Glass,
 Process all the taken data of as built survey according to the required
Dprojection and submit the survey drawings.
WORK EXPERIENCE ( PAK )
Company Name : TRIDENT CONSTRUCTERS Pvt. Ltd,
Position : Site Surveyor
Duties Involved: -
 Profile for earthwork estimation.
 Checking levels, alignment.
Instruments used
Total stations: Leica, Sokkia, Topcon, Trimble
Level Machine Leica, Sokkia, Topcon, Wild
Duties Involved: -
 Co-ordination with the consultant staff on the site
 Making Co-ordination in Auto-Cad
 Did the basic survey of whole project (Fixing of control points,
Topographic survey)
 Lay out for partition Gypsum, Glass and Techno Glass,
 Process all the taken data of as built survey according to the required
Dprojection and submit the survey drawings.
WORK EXPERIENCE ( PAK )
Company Name : TRIDENT CONSTRUCTERS Pvt. Ltd,
Position : Site Surveyor
Duties Involved: -
 Profile for earthwork estimation.
 Checking levels, alignment.
Instruments used
Total stations: Leica, Sokkia, Topcon, Trimble
Level Machine Leica, Sokkia, Topcon, Wild

More Related Content

What's hot

DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
Johannes DeLange
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
Gangadharan Ramakrishnan
 
MNFirdaus Resume
MNFirdaus ResumeMNFirdaus Resume
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
Ramy Emad
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber
 
CV (2)
CV (2)CV (2)
CV (2)
Abdul Waheed
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
arie hidayati jumari marjono
 
Navin singh cv
Navin singh cvNavin singh cv
Navin singh cv
NAVIN SINGH
 
aditi
aditiaditi
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
Babar Sohail Khan
 
JEFFIN K JOSE CV
JEFFIN K JOSE CVJEFFIN K JOSE CV
JEFFIN K JOSE CV
Jeff Jose
 
Gaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical EngineerGaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical Engineer
gaby aoude
 
RAJPAL @cv
RAJPAL @cvRAJPAL @cv
RAJPAL @cv
Rajpal Yadav
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
Mahmoud El-badawy
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
Siva Kumar
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
Sarim Mujtaba
 
Luxman -CV
Luxman -CVLuxman -CV
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
Edward Byrne
 

What's hot (20)

DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
MNFirdaus Resume
MNFirdaus ResumeMNFirdaus Resume
MNFirdaus Resume
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
 
CV (2)
CV (2)CV (2)
CV (2)
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Navin singh cv
Navin singh cvNavin singh cv
Navin singh cv
 
aditi
aditiaditi
aditi
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
JEFFIN K JOSE CV
JEFFIN K JOSE CVJEFFIN K JOSE CV
JEFFIN K JOSE CV
 
Gaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical EngineerGaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical Engineer
 
RAJPAL @cv
RAJPAL @cvRAJPAL @cv
RAJPAL @cv
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Luxman -CV
Luxman -CVLuxman -CV
Luxman -CV
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 

Similar to Rahman cv

new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
ali haider
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
ali haider
 
mathy 2015
mathy 2015mathy 2015
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
Muhammad Amjad
 
CV
CVCV
Malik@ cv
Malik@  cvMalik@  cv
Malik@ cv
Malik Saleem
 
Land surveyor
Land surveyorLand surveyor
Land surveyor
Maniyan Suresh
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
Ali Raza Mughal
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
Eloisa Zuniga-Bonavente
 
CV-Thowfeek
CV-ThowfeekCV-Thowfeek
CV-Thowfeek
Thowfeek Haneefa
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
Manish Ray
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
muhammadmasood75
 
GOPAL
GOPALGOPAL
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
afzaal ahmad
 
muneer qc cv
muneer qc cv muneer qc cv
muneer qc cv
Muneer Muneermk
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
Ali Al-azzawi
 
Land Surveyor Akmal Khan
Land Surveyor Akmal KhanLand Surveyor Akmal Khan
Land Surveyor Akmal Khan
Muhammad Akmal Khan
 
Mostafa Nabil ELBanhawy CV
Mostafa Nabil ELBanhawy CVMostafa Nabil ELBanhawy CV
Mostafa Nabil ELBanhawy CV
Mostafa ElBanhawy
 
Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updated
ramy mikhail
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
SHYAM NIKESH
 

Similar to Rahman cv (20)

new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
mathy 2015
mathy 2015mathy 2015
mathy 2015
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
CV
CVCV
CV
 
Malik@ cv
Malik@  cvMalik@  cv
Malik@ cv
 
Land surveyor
Land surveyorLand surveyor
Land surveyor
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
CV-Thowfeek
CV-ThowfeekCV-Thowfeek
CV-Thowfeek
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
 
GOPAL
GOPALGOPAL
GOPAL
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 
muneer qc cv
muneer qc cv muneer qc cv
muneer qc cv
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
 
Land Surveyor Akmal Khan
Land Surveyor Akmal KhanLand Surveyor Akmal Khan
Land Surveyor Akmal Khan
 
Mostafa Nabil ELBanhawy CV
Mostafa Nabil ELBanhawy CVMostafa Nabil ELBanhawy CV
Mostafa Nabil ELBanhawy CV
 
Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updated
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 

Rahman cv

  • 1. CURRRICULUM VITAE Email : Rehman4surveyor@gmail.com Mob : 00966-597869894, 00966-594906598 Personal information Name : Muhammad Rahman Date of birth : 07-04-1986 Religion : Islam Nationally : Pakistani Marital Status : Married Languages knows : 1. English (excellent reading, writing, speaking) 2. Urdu. 3. Arabic (speaking) Academic Qualification INTERMEDIATE (2003) Federal Board Islamabad MATRICUL (2001) Gujranwala Board Technical Qualification Passed Diploma of surveying from poly Technical College Lahore Borad. Computer Skills Knowledge of operating AutoCAD, Surfer ,Civil 3D, MS Office 97-2007 and General Hardware Setting. Summery of work experience Over 8 years experience in the field of, Surveying like topography, building, Roads Water line channel, Box culverts box and Real State and Calculating the Quantities. Also having a very good experience of working in power plants and interior finishing works, like gypsum, techno glass partitions etc.
  • 2. WORK EXPERIENCE ( KSA. 1. Company Name. : RUKOON OMYA Est, Project : Petro Chemicals Plant (Saudi Kayan, Al Jubail) With SAMSUNG Cont, ON PP&PH Areas Duration : Sep 2008 to March 2009 Position : Land Surveyor Duties Involved: -  Co-ordination with the consultant staff on the site  Checking levels, alignment, piping system, domestic water network system  Lay out of footings nick columns & columns  Process all the taken data of topographic survey according to the required projection and submit the survey drawings. ……………………………………………………………………… Company Name : REHAB ALOMRAN CONT, Est. Project; 1. PNU Project (Al Riyadh) With ALLIED BUILDERS at Railway Station No, 11 2. PNU Project (Al Riyadh) With Basic Construction at Railway Station No, 04 Duration : April 2009 to Feb 2010 Position : Land Surveyor Duties Involved: -  Co-ordination with the consultant staff on the site  General lay out for building area and preparation control point as per shop  Checking levels, alignment, piping system, domestic water network syst
  • 3.  Setting out & leveling work. ……………………………………………………………………………………………………. Company Name : ASAD SAID Cont. Pvt. Ltd Project : 1) Power Plant No, 11 (PP11 Al Riyadh) With Hyundai Heavy Industries Co, Ltd 2) Ras Al-Khair Riyadh Water Transmission System (SWCC) With Saudi Services Electrical Machinecal Co.Ltd : 3) Ras Al-Khaire Power and desalination plant phase 1 With Doosan Heavy Industries Co, Ltd Duration : Jun 2010 to Jun 2012 Position : Land Surveyor Duties Involved: -  Co-ordination with the consultant staff on the site  Did the basic survey of whole project (Fixing of control points, Topographic survey)  Calculate and submit (Cut and Fill volume).  Lay out of footings nick columns & columns  Fix the layout of all Pump Stations and Reservoirs. ……………………………………………………………………… Company Name : SAUDI OGER LTD. Project : AL Harmain High Speed Railways 8HRI Jeddah Project Duration : July 2012 to January 2013
  • 4. Position : Land Surveyor Duties Involved: -  Co-ordination with the consultant staff on the site  Alignment,setting anchor bolt,  Checking levels, alignment,  Cross-section for calculating quantity of projects  Setting out & leveling wor ……………………………………………………………………… Company Name : RAM CONTRACTING Projects : Power Plant 132/133 Sabia North Al haya, Al_Jizzan Duration : May 2013 to February 2014 Position : Senior Surveyor Duties Involved: -  Making Co-ordination in Auto-Cad  Coo-ordination with the consultant staff on the site  Did the basic survey of whole project (Fixing of control points, Topographic survey)  Checking levels, alignment, piping system, domestic water network system  Lay out of footings nick columns & columns  Process all the taken data of topographic survey according to the required Dprojection and submit the survey drawings.  Fix the layout of all Pump Stations and Reservoirs.
  • 5. ……………………………………………………………………………………………………… Company Name : KINNARPS (KPS), RAM CONTRACTING Project : AL_MALGA RESIDENCE COMPOUND AL _RIYAHD Duration : February 2014 to March 2016 Position : Chief Surveyor Duties Involved: -  Making Co-ordination in Auto-Cad  Coo-ordination with the consultant staff on the site  Did the basic survey of whole project (Fixing of control points, Topographic survey)  Calculate and submit (Cut and Fill volume).  Lay out of footings nick columns & columns  Process all the taken data of topographic survey according to the required Dprojection and submit the survey drawings. ……………………………………………………………………………………………………… Company Name : KINNARPS (KPS), RAM CONTRACTING Project : HUMAN RESOURCE DEVELOPMENT FUND OLAYA TOWER RIYADH Duration : September 2015 to Still Position : Chief Surveyor
  • 6. Duties Involved: -  Co-ordination with the consultant staff on the site  Making Co-ordination in Auto-Cad  Did the basic survey of whole project (Fixing of control points, Topographic survey)  Lay out for partition Gypsum, Glass and Techno Glass,  Process all the taken data of as built survey according to the required Dprojection and submit the survey drawings. WORK EXPERIENCE ( PAK ) Company Name : TRIDENT CONSTRUCTERS Pvt. Ltd, Position : Site Surveyor Duties Involved: -  Profile for earthwork estimation.  Checking levels, alignment. Instruments used Total stations: Leica, Sokkia, Topcon, Trimble Level Machine Leica, Sokkia, Topcon, Wild
  • 7. Duties Involved: -  Co-ordination with the consultant staff on the site  Making Co-ordination in Auto-Cad  Did the basic survey of whole project (Fixing of control points, Topographic survey)  Lay out for partition Gypsum, Glass and Techno Glass,  Process all the taken data of as built survey according to the required Dprojection and submit the survey drawings. WORK EXPERIENCE ( PAK ) Company Name : TRIDENT CONSTRUCTERS Pvt. Ltd, Position : Site Surveyor Duties Involved: -  Profile for earthwork estimation.  Checking levels, alignment. Instruments used Total stations: Leica, Sokkia, Topcon, Trimble Level Machine Leica, Sokkia, Topcon, Wild