Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Sutton Oaks Pond Improvements

18 views

Published on

The Sutton Oaks Pond Improvements project is located within the Cub Run Watershed. This project included restoration and improvement of the maintenance access road, extension of the existing principal spillway pipe, extension of an existing storm sewer pipe, removal of sediment from the basin, stabilization of two incoming channels, minor grading of the dam embankment, installation of a forebay using imbricated stones, and stabilization of the emergency spillway.

Published in: Environment
  • Be the first to comment

  • Be the first to like this

Sutton Oaks Pond Improvements

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Contract No. CN19125216 Project No. SD-000033-064 Sully District Tax Map No. 044-4-((04))-A May 9, 2019 Sutton Oaks Pond (0133DP) Improvements
  2. 2. Sutton Oaks Pond (0133DP) Improvements Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch
  3. 3. Project Details Sutton Oaks Pond (0133DP) Improvements Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Description: The Sutton Oaks Pond (0133DP) Improvements project has been substantially completed. The site is located within the Cub Run Watershed. This project included restoration and improvement of the maintenance access road, extension of the existing spillway pipe, extension of an existing storm sewer pipe, removal of sediment from the basin, stabilization of two incoming channels, minor grading of the dam embankment, installation of a forebay using imbricated stones, and stabilization of the emergency spillway. Project Benefits: • Restored basin to original design parameters • Provides dam safety improvements • Provides safe access to basin for maintenance staff • Prevents the erosion of two incoming channels • Forebay will collect debris and sediment to ease future maintenance Project Team: • Project Manager - Ganesh Thapa, Maintenance and Stormwater Management Division • Construction Manager - Scott Bishop, Utilities Design and Construction Division (UDCD) • Construction Inspector - Bharat Khanal, UDCD • Project Inspector - Tony Wall, Land Development Services
  4. 4. Sutton Oaks Pond (0133DP) Improvements Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Poplar Tree Road, Tax Map No. 44-4 PROJECT SITE 0133DP
  5. 5. Before After Maintenance Access Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Sutton Oaks Pond (0133DP) Improvements
  6. 6. Before After Hammerhead Turnaround Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Sutton Oaks Pond (0133DP) Improvements
  7. 7. Before After Pond Floor Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Sutton Oaks Pond (0133DP) Improvements
  8. 8. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Capital Facilities/Utilities Design and Construction Division, Stormwater Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov Sutton Oaks Pond (0133DP) Improvements

×