Quality in management
In this file, you can ref useful information about quality in management such as quality in
managementforms, tools for quality in management, quality in managementstrategies … If you
need more assistant for quality in management, please leave your comment at the end of file.
Other useful material for quality in management:
• qualitymanagement123.com/23-free-ebooks-for-quality-management
• qualitymanagement123.com/185-free-quality-management-forms
• qualitymanagement123.com/free-98-ISO-9001-templates-and-forms
• qualitymanagement123.com/top-84-quality-management-KPIs
• qualitymanagement123.com/top-18-quality-management-job-descriptions
• qualitymanagement123.com/86-quality-management-interview-questions-and-answers
I. Contents of quality in management
==================
Since this manual is aimed at improving the performance of a laboratory, the activities involved focus on
the term "quality". The quality of the product, in the present case analytical results, should obviously be
acceptable. To establish whether the product fulfils the quality requirements these have to be defined first.
Only after that it can be decided if the product is satisfactory or if and what corrective actions need to be
taken.
1.1 What is Quality?
The term "quality" has a relative meaning. This is expressed by the ISO definition: "The totality of
featuresand characteristics of a product or service that bearon its ability to satisfy stated or implied
needs". In simpler words, one can say that a product has good quality when it "complies with the
requirementsspecified by the client". When projected on analytical work, quality can be defined
as "delivery of reliable information within an agreed span of time under agreed conditions, at agreed
costs, and with necessary aftercare". The "agreed conditions" should include a specification as to the
precision and accuracy of the data which is directly related to "fitness of use" and which may differ for
different applications. Yet, in many cases the reliability of data is not questioned and the request for
specifications omitted. Many laboratories work according to established methods and procedures which
are not readily changed and have inherent default specifications. Moreover, not all future uses of the data
and reports can be foreseen so that specifications about required precision and accuracy cannot even be
given. Consequently, this aspect of quality is usually left to the discretion of the laboratory. However,all
too often the embarrassing situation exists that a laboratory cannot evaluate and account for its quality
simply because the necessary documentation is lacking.
In the ensuing discussions numerous activities aimed at maintaining the production of quality are dealt
with. In principle, three levels of organization of these activities can be distinguished. From the top down
these levels are:
1. Quality Management (QM)
2. Quality Assurance (QA)
3. Quality Control (QC)
1.2 Quality Management
Quality Management is the assembly and management of all activities aimed at the production of quality
by organizations of various kinds. In the present case this implies the introduction and proper running of a
"Quality System" in laboratories. A statement of objectives and policy to produce quality should be made
for the organization or department concerned (by the institute's directorate). This statement also identifies
the internal organization and responsibilities for the effective operation of the Quality System.
Quality Management can be considered a somewhat wider interpretation of the concept of "Good
Laboratory Practice"(GLP). Therefore,inevitably the basics of the present Guidelines largely coincide
with those of GLP. These are discussed below in Section 1.5.
Note. An even wider concept of quality management is presently coming into vogue: "Total Quality
Management" (TQM). This concept includes additional aspects such as leadership style, ethics of the
work, social aspects,relation to society, etc. For an introduction to TQM the reader is referred to Parkany
(1995).
1.3 Quality Assurance
Proper Quality Management implies consequent implementation of the next level: Quality
Assurance. The ISO definition reads: "the assembly of all planned and systematic actions necessary to
provide adequate confidence that a product, process, or service will satisfy given quality
requirements." The result of these actions aimed at the production of quality, should ideally be checked
by someone independent of the work: the Quality Assurance Officer. If no QA officer is available, then
usually the Head of Laboratory performs this job as part of his quality management task. In case of
special projects, customers may require special quality assurance measures or a Quality Plan.
1.4 Quality Control
A major part of the quality assurance is the Quality Control defined by ISO as "the operational
techniques and activities that are used to satisfy quality requirements. " An important part of the quality
control is the Quality Assessment: the system of activities to verify if the quality control activities are
effective, in other words: an evaluation of the products themselves.
Quality control is primarily aimed at the prevention of errors. Yet,despite all efforts, it remains inevitable
that errors are be made. Therefore,the control system should have checks to detect them. When errors or
mistakes are suspected or discovered it is essential that the "Five Ws" are trailed:
- what error was made?
- where was it made?
- when was it made?
- who made it?
- why was it made?
Only when all these questions are answered,proper action can be taken to correct the error and prevent
the same mistake being repeated.
The techniques and activities involved in Quality Control can be divided into four levels of operation:
1. First-line control: Instrument performance check.
2. Second-line control: Check of calibration or standardization.
3. Third-line control: Batch control(control sample, identity check).
4. Fourth-line control: Overallcheck (externalchecks: reference samples,interlaboratory exchange
programmes).
Because the first two control levels both apply to the correct functioning of the instruments they are often
taken together and then only three levels are distinguished. This designation is used throughout the
present Guidelines:
1. First-line control: Instrument check / calibration.
2. Second-line control: Batch control
3. Third-line control: Externalcheck
It will be clear that producing quality in the laboratory is a major enterprise requiring a continuous human
effort and input of money. The rule-of-fist is that 10-20% of the total costs of analysis should be spent on
quality control. Therefore,for quality work at least four conditions should be fulfilled:
- means are available (adequate personnel and facilities)
- efficient use of time and means (costs aspect)
- expertise is available (answering questions; aftercare)
- upholding and improving level of output (continuity)
In quality work, management aspects and technical aspects are inherently cobbled together and for a clear
insight and proper functioning of the laboratory these aspects have to be broken down into their
components. This is done in the ensuing chapters of this manual.
1.5 GoodLaboratory Practice (GLP)
Quality Management in the present context can be considered a modem version of the hitherto much used
concept "Good Laboratory Practice"(GLP) with a somewhat wider interpretation. The OECD Document
defines GLP as follows: "Good Laboratory Practice (GLP) is concerned with the organizational process
and the conditionsunderwhich laboratory studies are planned, performed,monitored, recorded,and
reported."
Thus, GLP prescribes a laboratory to work according to a system of procedures and protocols. This
implies the organization of the activities and the conditions under which these take place are controlled,
reported and filed. GLP is a policy for all aspects of the laboratory which influence the quality of the
analytical work. When properly applied, GLP should then:
- allow better laboratory management (including quality management)
- improve efficiency (thus reducing costs)
- minimize errors
- allow quality control (including tracking of errors and their cause)
- stimulate and motivate all personnel
- improve safety
- improve communication possibilities, both internally and externally.
The result of GLP is that the performance of a laboratory is improved and its working effectively
controlled. An important aspect is also that the standards of quality are documented and can be
demonstrated to authorities and clients. This results in an improved reputation for the laboratory (and for
the institute as a whole). In short, the message is:
- say what you do
- do what you say
- do it better
- be able to show what you have done
The basic rule is that all relevant plans, activities, conditions and situations are recorded and that these
records are safely filed and can be produced or retrieved when necessary. These aspects differ strongly in
character and need to be attended to individually.
As an assembly, the involved documents constitute a so-called Quality Manual. This comprises then all
relevant information on:
- Organization and Personnel
- Facilities
- Equipment and Working materials
- Analytical or testing systems
- Quality control
- Reporting and filing of results.
Since institutions having a laboratory are of divergent natures, there is no standard format and each has to
make its own Quality Manual. The present Guidelines contain examples of forms, protocols, procedures
and artificial situations. They need at least to be adapted and many new ones will have to be made
according to the specific needs, but all have to fulfil the basic requirement of usefulness and verifiability.
As already indicated, the guidelines for Quality Management given here are mainly based on the
principles of Good Laboratory Practice as they are laid down in various relevant documents such as ISO
and ISO/IEC guides, ISO 9000 series, OECD and CEN (EN 45000 series) documents, national standards
(e.g. NEN standards)*, as well as a number of text books. The consulted documents are listed in the
Literature. Use is also made of documents developed by institutes which have obtained accreditation or
are working towards this. This concerns mainly so-called Standard Operating Procedures (SOPs) and
Protocols. Sometimes these documents are hard to acquire as they are classified information for reasons
of competitiveness. The institutes and persons which cooperated in the development of these Guidelines
are listed in the Acknowledgements.
* ISO: International Standardization Organization; IEC: International Electrical Commission; OECD:
Organization for Economic Cooperation and Development; CEN: European Committee for
Standardization, EN: European Standard; NEN:Dutch Standard.
==================
III. Quality management tools
1. Check sheet
The check sheet is a form (document) used to collect data
in real time at the location where the data is generated.
The data it captures can be quantitative or qualitative.
When the information is quantitative, the check sheet is
sometimes called a tally sheet.
The defining characteristic of a check sheet is that data
are recorded by making marks ("checks") on it. A typical
check sheet is divided into regions, and marks made in
different regions have different significance. Data are
read by observing the location and number of marks on
the sheet.
Check sheets typically employ a heading that answers the
Five Ws:
 Who filled out the check sheet
 What was collected (what each check represents,
an identifying batch or lot number)
 Where the collection took place (facility, room,
apparatus)
 When the collection took place (hour, shift, day
of the week)
 Why the data were collected
2. Control chart
Control charts, also known as Shewhart charts
(after Walter A. Shewhart) or process-behavior
charts, in statistical process control are tools used
to determine if a manufacturing or business
process is in a state of statistical control.
If analysis of the control chart indicates that the
process is currently under control (i.e., is stable,
with variation only coming from sources common
to the process), then no corrections or changes to
process control parameters are needed or desired.
In addition, data from the process can be used to
predict the future performance of the process. If
the chart indicates that the monitored process is
not in control, analysis of the chart can help
determine the sources of variation, as this will
result in degraded process performance.[1] A
process that is stable but operating outside of
desired (specification) limits (e.g., scrap rates
may be in statistical control but above desired
limits) needs to be improved through a deliberate
effort to understand the causes of current
performance and fundamentally improve the
process.
The control chart is one of the seven basic tools of
quality control.[3] Typically control charts are
used for time-series data, though they can be used
for data that have logical comparability (i.e. you
want to compare samples that were taken all at
the same time, or the performance of different
individuals), however the type of chart used to do
this requires consideration.
3. Pareto chart
A Pareto chart, named after Vilfredo Pareto, is a type
of chart that contains both bars and a line graph, where
individual values are represented in descending order
by bars, and the cumulative total is represented by the
line.
The left vertical axis is the frequency of occurrence,
but it can alternatively represent cost or another
important unit of measure. The right vertical axis is
the cumulative percentage of the total number of
occurrences, total cost, or total of the particular unit of
measure. Because the reasons are in decreasing order,
the cumulative function is a concave function. To take
the example above, in order to lower the amount of
late arrivals by 78%, it is sufficient to solve the first
three issues.
The purpose of the Pareto chart is to highlight the
most important among a (typically large) set of
factors. In quality control, it often represents the most
common sources of defects, the highest occurring type
of defect, or the most frequent reasons for customer
complaints, and so on. Wilkinson (2006) devised an
algorithm for producing statistically based acceptance
limits (similar to confidence intervals) for each bar in
the Pareto chart.
4. Scatter plot Method
A scatter plot, scatterplot, or scattergraph is a type of
mathematical diagram using Cartesian coordinates to
display values for two variables for a set of data.
The data is displayed as a collection of points, each
having the value of one variable determining the position
on the horizontal axis and the value of the other variable
determining the position on the vertical axis.[2] This kind
of plot is also called a scatter chart, scattergram, scatter
diagram,[3] or scatter graph.
A scatter plot is used when a variable exists that is under
the control of the experimenter. If a parameter exists that
is systematically incremented and/or decremented by the
other, it is called the control parameter or independent
variable and is customarily plotted along the horizontal
axis. The measured or dependent variable is customarily
plotted along the vertical axis. If no dependent variable
exists, either type of variable can be plotted on either axis
and a scatter plot will illustrate only the degree of
correlation (not causation) between two variables.
A scatter plot can suggest various kinds of correlations
between variables with a certain confidence interval. For
example, weight and height, weight would be on x axis
and height would be on the y axis. Correlations may be
positive (rising), negative (falling), or null (uncorrelated).
If the pattern of dots slopes from lower left to upper right,
it suggests a positive correlation between the variables
being studied. If the pattern of dots slopes from upper left
to lower right, it suggests a negative correlation. A line of
best fit (alternatively called 'trendline') can be drawn in
order to study the correlation between the variables. An
equation for the correlation between the variables can be
determined by established best-fit procedures. For a linear
correlation, the best-fit procedure is known as linear
regression and is guaranteed to generate a correct solution
in a finite time. No universal best-fit procedure is
guaranteed to generate a correct solution for arbitrary
relationships. A scatter plot is also very useful when we
wish to see how two comparable data sets agree with each
other. In this case, an identity line, i.e., a y=x line, or an
1:1 line, is often drawn as a reference. The more the two
data sets agree, the more the scatters tend to concentrate in
the vicinity of the identity line; if the two data sets are
numerically identical, the scatters fall on the identity line
exactly.
5.Ishikawa diagram
Ishikawa diagrams (also called fishbone diagrams,
herringbone diagrams, cause-and-effect diagrams, or
Fishikawa) are causal diagrams created by Kaoru
Ishikawa (1968) that show the causes of a specific
event.[1][2] Common uses of the Ishikawa diagram are
product design and quality defect prevention, to identify
potential factors causing an overall effect. Each cause or
reason for imperfection is a source of variation. Causes
are usually grouped into major categories to identify these
sources of variation. The categories typically include
 People: Anyone involved with the process
 Methods: How the process is performed and the
specific requirements for doing it, such as policies,
procedures, rules, regulations and laws
 Machines: Any equipment, computers, tools, etc.
required to accomplish the job
 Materials: Raw materials, parts, pens, paper, etc.
used to produce the final product
 Measurements: Data generated from the process
that are used to evaluate its quality
 Environment: The conditions, such as location,
time, temperature, and culture in which the process
operates
6. Histogram method
A histogram is a graphical representation of the
distribution of data. It is an estimate of the probability
distribution of a continuous variable (quantitative
variable) and was first introduced by Karl Pearson.[1] To
construct a histogram, the first step is to "bin" the range of
values -- that is, divide the entire range of values into a
series of small intervals -- and then count how many
values fall into each interval. A rectangle is drawn with
height proportional to the count and width equal to the bin
size, so that rectangles abut each other. A histogram may
also be normalized displaying relative frequencies. It then
shows the proportion of cases that fall into each of several
categories, with the sum of the heights equaling 1. The
bins are usually specified as consecutive, non-overlapping
intervals of a variable. The bins (intervals) must be
adjacent, and usually equal size.[2] The rectangles of a
histogram are drawn so that they touch each other to
indicate that the original variable is continuous.[3]
III. Other topics related to Quality in management (pdf download)
quality management systems
quality management courses
quality management tools
iso 9001 quality management system
quality management process
quality management system example
quality system management
quality management techniques
quality management standards
quality management policy
quality management strategy
quality management books

More Related Content

What's hot

Lab qms lesson one
Lab qms  lesson oneLab qms  lesson one
Lab qms lesson one
ZeinabOmar7
 
Quality Control
Quality ControlQuality Control
Quality Control
Mark John Lado, MIT
 
Quality Management and Accreditation
Quality Management and AccreditationQuality Management and Accreditation
Quality Management and Accreditation
CHRISTIAN MEDICAL COLLEGE AND HOSPITAL
 
Self inspection
Self inspectionSelf inspection
Self inspection
Bangaluru
 
Laboratory quality management notes
Laboratory quality management notesLaboratory quality management notes
Laboratory quality management notes
Merveille TABOUGUIA
 
Implementation of ISO 17025 -summary
Implementation of ISO 17025 -summaryImplementation of ISO 17025 -summary
Implementation of ISO 17025 -summaryChandran Udumbasseri
 
RESPONSIBILITIES, TRAINING & HYGIENE
RESPONSIBILITIES, TRAINING & HYGIENERESPONSIBILITIES, TRAINING & HYGIENE
RESPONSIBILITIES, TRAINING & HYGIENE
hidayath unnisa
 
daada Quality control
daada Quality controldaada Quality control
daada Quality control
Abdulkadir Ahmed
 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspection
Samiksha Sawant
 
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
Dr Ajay Kumar Tiwari
 
Introduction to quality management systems
Introduction to quality management systems Introduction to quality management systems
Introduction to quality management systems
CHRISTIAN MEDICAL COLLEGE AND HOSPITAL
 
Basic concepts of quality assurance
Basic concepts of quality assuranceBasic concepts of quality assurance
Basic concepts of quality assurance
sonaliph
 
Revised Quality Management Basics Texas Histology Society
Revised Quality Management Basics Texas Histology SocietyRevised Quality Management Basics Texas Histology Society
Revised Quality Management Basics Texas Histology SocietyJoelle Weaver
 
Quality management system_Quality Assurance
Quality management system_Quality AssuranceQuality management system_Quality Assurance
Quality management system_Quality Assurance
Bangaluru
 
Quality control
Quality controlQuality control
Quality control
Simran Kaur
 
Auditing for Sterile Production Area
Auditing for Sterile Production AreaAuditing for Sterile Production Area
Auditing for Sterile Production Area
MANIKANDAN V
 
Quality control
Quality controlQuality control
Quality control
Tapeshwar Yadav
 
Quality control
Quality controlQuality control
Quality control
SKYFALL
 
Quality Management System
Quality Management System Quality Management System
Quality Management System
Prasenjit Mitra
 

What's hot (20)

Lab qms lesson one
Lab qms  lesson oneLab qms  lesson one
Lab qms lesson one
 
Quality Control
Quality ControlQuality Control
Quality Control
 
Quality Management and Accreditation
Quality Management and AccreditationQuality Management and Accreditation
Quality Management and Accreditation
 
Self inspection
Self inspectionSelf inspection
Self inspection
 
Quality Manual
Quality ManualQuality Manual
Quality Manual
 
Laboratory quality management notes
Laboratory quality management notesLaboratory quality management notes
Laboratory quality management notes
 
Implementation of ISO 17025 -summary
Implementation of ISO 17025 -summaryImplementation of ISO 17025 -summary
Implementation of ISO 17025 -summary
 
RESPONSIBILITIES, TRAINING & HYGIENE
RESPONSIBILITIES, TRAINING & HYGIENERESPONSIBILITIES, TRAINING & HYGIENE
RESPONSIBILITIES, TRAINING & HYGIENE
 
daada Quality control
daada Quality controldaada Quality control
daada Quality control
 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspection
 
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
QUALITY MANAGEMNT SYSTEMS: Change Control (CC)
 
Introduction to quality management systems
Introduction to quality management systems Introduction to quality management systems
Introduction to quality management systems
 
Basic concepts of quality assurance
Basic concepts of quality assuranceBasic concepts of quality assurance
Basic concepts of quality assurance
 
Revised Quality Management Basics Texas Histology Society
Revised Quality Management Basics Texas Histology SocietyRevised Quality Management Basics Texas Histology Society
Revised Quality Management Basics Texas Histology Society
 
Quality management system_Quality Assurance
Quality management system_Quality AssuranceQuality management system_Quality Assurance
Quality management system_Quality Assurance
 
Quality control
Quality controlQuality control
Quality control
 
Auditing for Sterile Production Area
Auditing for Sterile Production AreaAuditing for Sterile Production Area
Auditing for Sterile Production Area
 
Quality control
Quality controlQuality control
Quality control
 
Quality control
Quality controlQuality control
Quality control
 
Quality Management System
Quality Management System Quality Management System
Quality Management System
 

Viewers also liked

Post graduate diploma in food safety and quality management
Post graduate diploma in food safety and quality managementPost graduate diploma in food safety and quality management
Post graduate diploma in food safety and quality managementselinasimpson1701
 
E-auction by bideg.com
E-auction by bideg.comE-auction by bideg.com
E-auction by bideg.com
bidegbideg
 
Obesity 140110114208-phpapp02
Obesity 140110114208-phpapp02Obesity 140110114208-phpapp02
Obesity 140110114208-phpapp02
lchand
 
Certified quality management system
Certified quality management systemCertified quality management system
Certified quality management systemselinasimpson1701
 
Työnhakukanavia ympäristöasiantuntijoille
Työnhakukanavia ympäristöasiantuntijoilleTyönhakukanavia ympäristöasiantuntijoille
Työnhakukanavia ympäristöasiantuntijoille
Henri Annila
 
OUR ONLY ONE
OUR ONLY ONEOUR ONLY ONE
OUR ONLY ONE
catrixsacramento
 
OCTA LIGHT EN Company Presentation Q3_2016
OCTA LIGHT EN Company Presentation Q3_2016OCTA LIGHT EN Company Presentation Q3_2016
OCTA LIGHT EN Company Presentation Q3_2016Sava Bobchev
 
booklet-Techlaser
booklet-Techlaserbooklet-Techlaser
booklet-Techlaser
Shilin Shilin
 
Quality management systems iso 9001
Quality management systems iso 9001Quality management systems iso 9001
Quality management systems iso 9001selinasimpson1701
 
Order Flow Imbalance Trading Algorithm
Order Flow Imbalance Trading AlgorithmOrder Flow Imbalance Trading Algorithm
Order Flow Imbalance Trading AlgorithmReed Jessen
 
EUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos SilvaEUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos SilvaCarlos Silva
 

Viewers also liked (15)

Post graduate diploma in food safety and quality management
Post graduate diploma in food safety and quality managementPost graduate diploma in food safety and quality management
Post graduate diploma in food safety and quality management
 
Clinical quality management
Clinical quality managementClinical quality management
Clinical quality management
 
E-auction by bideg.com
E-auction by bideg.comE-auction by bideg.com
E-auction by bideg.com
 
Obesity 140110114208-phpapp02
Obesity 140110114208-phpapp02Obesity 140110114208-phpapp02
Obesity 140110114208-phpapp02
 
Certified quality management system
Certified quality management systemCertified quality management system
Certified quality management system
 
Työnhakukanavia ympäristöasiantuntijoille
Työnhakukanavia ympäristöasiantuntijoilleTyönhakukanavia ympäristöasiantuntijoille
Työnhakukanavia ympäristöasiantuntijoille
 
divyesh
divyeshdivyesh
divyesh
 
Business quality management
Business quality managementBusiness quality management
Business quality management
 
OUR ONLY ONE
OUR ONLY ONEOUR ONLY ONE
OUR ONLY ONE
 
OCTA LIGHT EN Company Presentation Q3_2016
OCTA LIGHT EN Company Presentation Q3_2016OCTA LIGHT EN Company Presentation Q3_2016
OCTA LIGHT EN Company Presentation Q3_2016
 
booklet-Techlaser
booklet-Techlaserbooklet-Techlaser
booklet-Techlaser
 
GNS CV
GNS CVGNS CV
GNS CV
 
Quality management systems iso 9001
Quality management systems iso 9001Quality management systems iso 9001
Quality management systems iso 9001
 
Order Flow Imbalance Trading Algorithm
Order Flow Imbalance Trading AlgorithmOrder Flow Imbalance Trading Algorithm
Order Flow Imbalance Trading Algorithm
 
EUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos SilvaEUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos Silva
 

Similar to Quality in management

Document Control Effectiveness in ISO 15189 Accredited Laboratories
Document Control Effectiveness in ISO 15189 Accredited LaboratoriesDocument Control Effectiveness in ISO 15189 Accredited Laboratories
Document Control Effectiveness in ISO 15189 Accredited Laboratories
inventionjournals
 
Auditing in QA and Engineering department.pptx
Auditing in QA and Engineering department.pptxAuditing in QA and Engineering department.pptx
Auditing in QA and Engineering department.pptx
NishiLadhawala
 
Implementing quality management system
Implementing quality management systemImplementing quality management system
Implementing quality management systemselinasimpson341
 
Unit-1_QA.pdf
Unit-1_QA.pdfUnit-1_QA.pdf
Unit-1_QA.pdf
EssamZatout1
 
TOTAL QUALITY MANAGEMENT.pptx
TOTAL QUALITY MANAGEMENT.pptxTOTAL QUALITY MANAGEMENT.pptx
TOTAL QUALITY MANAGEMENT.pptx
Dr. Jagroop Singh
 
Introduction To Qaqc
Introduction To QaqcIntroduction To Qaqc
Introduction To QaqcSAIKATGHOSH58
 
Managing quality
Managing qualityManaging quality
Managing quality
Joseph Moser
 
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION OF MINOR LABORATORY OR I...
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION  OF MINOR LABORATORY OR I...THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION  OF MINOR LABORATORY OR I...
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION OF MINOR LABORATORY OR I...
sonamchuzin
 
Elements of Quality Management System
Elements of Quality Management SystemElements of Quality Management System
Elements of Quality Management System
Shahzeb Pirzada
 
Quality.pptx
Quality.pptxQuality.pptx
Quality.pptx
PrichaMohite
 
Control of Quality
Control of QualityControl of Quality
Control of Quality
Aditya Singh
 
Quality management system processes
Quality management system processesQuality management system processes
Quality management system processesselinasimpson2801
 
Quality assurance and quality management concepts.pptx
Quality assurance and quality management concepts.pptxQuality assurance and quality management concepts.pptx
Quality assurance and quality management concepts.pptx
GayatriBahatkar1
 
Implementation of quality management system
Implementation of quality management systemImplementation of quality management system
Implementation of quality management systemselinasimpson2301
 
Apply quality control
Apply quality controlApply quality control
Apply quality control
Jaleto Sunkemo
 
Managing Quality.pdf
Managing Quality.pdfManaging Quality.pdf
Managing Quality.pdf
GeoffreyOtieno1981
 
Quality management system sample
Quality management system sampleQuality management system sample
Quality management system sampleselinasimpson321
 
Quality management strategy example
Quality management strategy exampleQuality management strategy example
Quality management strategy exampleselinasimpson1201
 
Basic concepts of QA and QC
Basic concepts of QA and QCBasic concepts of QA and QC
Basic concepts of QA and QC
Gargi Nanda
 

Similar to Quality in management (20)

Document Control Effectiveness in ISO 15189 Accredited Laboratories
Document Control Effectiveness in ISO 15189 Accredited LaboratoriesDocument Control Effectiveness in ISO 15189 Accredited Laboratories
Document Control Effectiveness in ISO 15189 Accredited Laboratories
 
Auditing in QA and Engineering department.pptx
Auditing in QA and Engineering department.pptxAuditing in QA and Engineering department.pptx
Auditing in QA and Engineering department.pptx
 
Implementing quality management system
Implementing quality management systemImplementing quality management system
Implementing quality management system
 
Quality process management
Quality process managementQuality process management
Quality process management
 
Unit-1_QA.pdf
Unit-1_QA.pdfUnit-1_QA.pdf
Unit-1_QA.pdf
 
TOTAL QUALITY MANAGEMENT.pptx
TOTAL QUALITY MANAGEMENT.pptxTOTAL QUALITY MANAGEMENT.pptx
TOTAL QUALITY MANAGEMENT.pptx
 
Introduction To Qaqc
Introduction To QaqcIntroduction To Qaqc
Introduction To Qaqc
 
Managing quality
Managing qualityManaging quality
Managing quality
 
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION OF MINOR LABORATORY OR I...
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION  OF MINOR LABORATORY OR I...THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION  OF MINOR LABORATORY OR I...
THE DOCUMENTATION AND QUALITY POLICY IN PREPARATION OF MINOR LABORATORY OR I...
 
Elements of Quality Management System
Elements of Quality Management SystemElements of Quality Management System
Elements of Quality Management System
 
Quality.pptx
Quality.pptxQuality.pptx
Quality.pptx
 
Control of Quality
Control of QualityControl of Quality
Control of Quality
 
Quality management system processes
Quality management system processesQuality management system processes
Quality management system processes
 
Quality assurance and quality management concepts.pptx
Quality assurance and quality management concepts.pptxQuality assurance and quality management concepts.pptx
Quality assurance and quality management concepts.pptx
 
Implementation of quality management system
Implementation of quality management systemImplementation of quality management system
Implementation of quality management system
 
Apply quality control
Apply quality controlApply quality control
Apply quality control
 
Managing Quality.pdf
Managing Quality.pdfManaging Quality.pdf
Managing Quality.pdf
 
Quality management system sample
Quality management system sampleQuality management system sample
Quality management system sample
 
Quality management strategy example
Quality management strategy exampleQuality management strategy example
Quality management strategy example
 
Basic concepts of QA and QC
Basic concepts of QA and QCBasic concepts of QA and QC
Basic concepts of QA and QC
 

More from selinasimpson1701

Quality management system audit checklist
Quality management system audit checklistQuality management system audit checklist
Quality management system audit checklistselinasimpson1701
 
Quality management in the imaging sciences
Quality management in the imaging sciencesQuality management in the imaging sciences
Quality management in the imaging sciencesselinasimpson1701
 
Pharmaceutical quality management system
Pharmaceutical quality management systemPharmaceutical quality management system
Pharmaceutical quality management systemselinasimpson1701
 
Objectives of quality management
Objectives of quality managementObjectives of quality management
Objectives of quality managementselinasimpson1701
 
Example of quality management system
Example of quality management systemExample of quality management system
Example of quality management systemselinasimpson1701
 

More from selinasimpson1701 (9)

Quality management system audit checklist
Quality management system audit checklistQuality management system audit checklist
Quality management system audit checklist
 
Quality management office
Quality management officeQuality management office
Quality management office
 
Quality management in the imaging sciences
Quality management in the imaging sciencesQuality management in the imaging sciences
Quality management in the imaging sciences
 
Pharmaceutical quality management system
Pharmaceutical quality management systemPharmaceutical quality management system
Pharmaceutical quality management system
 
Objectives of quality management
Objectives of quality managementObjectives of quality management
Objectives of quality management
 
Management quality system
Management quality systemManagement quality system
Management quality system
 
Global quality management
Global quality managementGlobal quality management
Global quality management
 
Example of quality management system
Example of quality management systemExample of quality management system
Example of quality management system
 
Crosby quality management
Crosby quality managementCrosby quality management
Crosby quality management
 

Quality in management

  • 1. Quality in management In this file, you can ref useful information about quality in management such as quality in managementforms, tools for quality in management, quality in managementstrategies … If you need more assistant for quality in management, please leave your comment at the end of file. Other useful material for quality in management: • qualitymanagement123.com/23-free-ebooks-for-quality-management • qualitymanagement123.com/185-free-quality-management-forms • qualitymanagement123.com/free-98-ISO-9001-templates-and-forms • qualitymanagement123.com/top-84-quality-management-KPIs • qualitymanagement123.com/top-18-quality-management-job-descriptions • qualitymanagement123.com/86-quality-management-interview-questions-and-answers I. Contents of quality in management ================== Since this manual is aimed at improving the performance of a laboratory, the activities involved focus on the term "quality". The quality of the product, in the present case analytical results, should obviously be acceptable. To establish whether the product fulfils the quality requirements these have to be defined first. Only after that it can be decided if the product is satisfactory or if and what corrective actions need to be taken. 1.1 What is Quality? The term "quality" has a relative meaning. This is expressed by the ISO definition: "The totality of featuresand characteristics of a product or service that bearon its ability to satisfy stated or implied needs". In simpler words, one can say that a product has good quality when it "complies with the requirementsspecified by the client". When projected on analytical work, quality can be defined as "delivery of reliable information within an agreed span of time under agreed conditions, at agreed costs, and with necessary aftercare". The "agreed conditions" should include a specification as to the precision and accuracy of the data which is directly related to "fitness of use" and which may differ for different applications. Yet, in many cases the reliability of data is not questioned and the request for specifications omitted. Many laboratories work according to established methods and procedures which are not readily changed and have inherent default specifications. Moreover, not all future uses of the data and reports can be foreseen so that specifications about required precision and accuracy cannot even be given. Consequently, this aspect of quality is usually left to the discretion of the laboratory. However,all too often the embarrassing situation exists that a laboratory cannot evaluate and account for its quality simply because the necessary documentation is lacking. In the ensuing discussions numerous activities aimed at maintaining the production of quality are dealt with. In principle, three levels of organization of these activities can be distinguished. From the top down these levels are: 1. Quality Management (QM) 2. Quality Assurance (QA) 3. Quality Control (QC)
  • 2. 1.2 Quality Management Quality Management is the assembly and management of all activities aimed at the production of quality by organizations of various kinds. In the present case this implies the introduction and proper running of a "Quality System" in laboratories. A statement of objectives and policy to produce quality should be made for the organization or department concerned (by the institute's directorate). This statement also identifies the internal organization and responsibilities for the effective operation of the Quality System. Quality Management can be considered a somewhat wider interpretation of the concept of "Good Laboratory Practice"(GLP). Therefore,inevitably the basics of the present Guidelines largely coincide with those of GLP. These are discussed below in Section 1.5. Note. An even wider concept of quality management is presently coming into vogue: "Total Quality Management" (TQM). This concept includes additional aspects such as leadership style, ethics of the work, social aspects,relation to society, etc. For an introduction to TQM the reader is referred to Parkany (1995). 1.3 Quality Assurance Proper Quality Management implies consequent implementation of the next level: Quality Assurance. The ISO definition reads: "the assembly of all planned and systematic actions necessary to provide adequate confidence that a product, process, or service will satisfy given quality requirements." The result of these actions aimed at the production of quality, should ideally be checked by someone independent of the work: the Quality Assurance Officer. If no QA officer is available, then usually the Head of Laboratory performs this job as part of his quality management task. In case of special projects, customers may require special quality assurance measures or a Quality Plan. 1.4 Quality Control A major part of the quality assurance is the Quality Control defined by ISO as "the operational techniques and activities that are used to satisfy quality requirements. " An important part of the quality control is the Quality Assessment: the system of activities to verify if the quality control activities are effective, in other words: an evaluation of the products themselves. Quality control is primarily aimed at the prevention of errors. Yet,despite all efforts, it remains inevitable that errors are be made. Therefore,the control system should have checks to detect them. When errors or mistakes are suspected or discovered it is essential that the "Five Ws" are trailed: - what error was made? - where was it made? - when was it made? - who made it? - why was it made? Only when all these questions are answered,proper action can be taken to correct the error and prevent the same mistake being repeated. The techniques and activities involved in Quality Control can be divided into four levels of operation: 1. First-line control: Instrument performance check. 2. Second-line control: Check of calibration or standardization. 3. Third-line control: Batch control(control sample, identity check). 4. Fourth-line control: Overallcheck (externalchecks: reference samples,interlaboratory exchange programmes). Because the first two control levels both apply to the correct functioning of the instruments they are often taken together and then only three levels are distinguished. This designation is used throughout the present Guidelines:
  • 3. 1. First-line control: Instrument check / calibration. 2. Second-line control: Batch control 3. Third-line control: Externalcheck It will be clear that producing quality in the laboratory is a major enterprise requiring a continuous human effort and input of money. The rule-of-fist is that 10-20% of the total costs of analysis should be spent on quality control. Therefore,for quality work at least four conditions should be fulfilled: - means are available (adequate personnel and facilities) - efficient use of time and means (costs aspect) - expertise is available (answering questions; aftercare) - upholding and improving level of output (continuity) In quality work, management aspects and technical aspects are inherently cobbled together and for a clear insight and proper functioning of the laboratory these aspects have to be broken down into their components. This is done in the ensuing chapters of this manual. 1.5 GoodLaboratory Practice (GLP) Quality Management in the present context can be considered a modem version of the hitherto much used concept "Good Laboratory Practice"(GLP) with a somewhat wider interpretation. The OECD Document defines GLP as follows: "Good Laboratory Practice (GLP) is concerned with the organizational process and the conditionsunderwhich laboratory studies are planned, performed,monitored, recorded,and reported." Thus, GLP prescribes a laboratory to work according to a system of procedures and protocols. This implies the organization of the activities and the conditions under which these take place are controlled, reported and filed. GLP is a policy for all aspects of the laboratory which influence the quality of the analytical work. When properly applied, GLP should then: - allow better laboratory management (including quality management) - improve efficiency (thus reducing costs) - minimize errors - allow quality control (including tracking of errors and their cause) - stimulate and motivate all personnel - improve safety - improve communication possibilities, both internally and externally. The result of GLP is that the performance of a laboratory is improved and its working effectively controlled. An important aspect is also that the standards of quality are documented and can be demonstrated to authorities and clients. This results in an improved reputation for the laboratory (and for the institute as a whole). In short, the message is: - say what you do - do what you say - do it better - be able to show what you have done The basic rule is that all relevant plans, activities, conditions and situations are recorded and that these records are safely filed and can be produced or retrieved when necessary. These aspects differ strongly in character and need to be attended to individually. As an assembly, the involved documents constitute a so-called Quality Manual. This comprises then all relevant information on:
  • 4. - Organization and Personnel - Facilities - Equipment and Working materials - Analytical or testing systems - Quality control - Reporting and filing of results. Since institutions having a laboratory are of divergent natures, there is no standard format and each has to make its own Quality Manual. The present Guidelines contain examples of forms, protocols, procedures and artificial situations. They need at least to be adapted and many new ones will have to be made according to the specific needs, but all have to fulfil the basic requirement of usefulness and verifiability. As already indicated, the guidelines for Quality Management given here are mainly based on the principles of Good Laboratory Practice as they are laid down in various relevant documents such as ISO and ISO/IEC guides, ISO 9000 series, OECD and CEN (EN 45000 series) documents, national standards (e.g. NEN standards)*, as well as a number of text books. The consulted documents are listed in the Literature. Use is also made of documents developed by institutes which have obtained accreditation or are working towards this. This concerns mainly so-called Standard Operating Procedures (SOPs) and Protocols. Sometimes these documents are hard to acquire as they are classified information for reasons of competitiveness. The institutes and persons which cooperated in the development of these Guidelines are listed in the Acknowledgements. * ISO: International Standardization Organization; IEC: International Electrical Commission; OECD: Organization for Economic Cooperation and Development; CEN: European Committee for Standardization, EN: European Standard; NEN:Dutch Standard. ================== III. Quality management tools 1. Check sheet The check sheet is a form (document) used to collect data in real time at the location where the data is generated. The data it captures can be quantitative or qualitative. When the information is quantitative, the check sheet is sometimes called a tally sheet. The defining characteristic of a check sheet is that data are recorded by making marks ("checks") on it. A typical check sheet is divided into regions, and marks made in different regions have different significance. Data are read by observing the location and number of marks on the sheet. Check sheets typically employ a heading that answers the Five Ws:
  • 5.  Who filled out the check sheet  What was collected (what each check represents, an identifying batch or lot number)  Where the collection took place (facility, room, apparatus)  When the collection took place (hour, shift, day of the week)  Why the data were collected 2. Control chart Control charts, also known as Shewhart charts (after Walter A. Shewhart) or process-behavior charts, in statistical process control are tools used to determine if a manufacturing or business process is in a state of statistical control. If analysis of the control chart indicates that the process is currently under control (i.e., is stable, with variation only coming from sources common to the process), then no corrections or changes to process control parameters are needed or desired. In addition, data from the process can be used to predict the future performance of the process. If the chart indicates that the monitored process is not in control, analysis of the chart can help determine the sources of variation, as this will result in degraded process performance.[1] A process that is stable but operating outside of desired (specification) limits (e.g., scrap rates may be in statistical control but above desired limits) needs to be improved through a deliberate effort to understand the causes of current performance and fundamentally improve the process. The control chart is one of the seven basic tools of quality control.[3] Typically control charts are used for time-series data, though they can be used for data that have logical comparability (i.e. you want to compare samples that were taken all at the same time, or the performance of different individuals), however the type of chart used to do
  • 6. this requires consideration. 3. Pareto chart A Pareto chart, named after Vilfredo Pareto, is a type of chart that contains both bars and a line graph, where individual values are represented in descending order by bars, and the cumulative total is represented by the line. The left vertical axis is the frequency of occurrence, but it can alternatively represent cost or another important unit of measure. The right vertical axis is the cumulative percentage of the total number of occurrences, total cost, or total of the particular unit of measure. Because the reasons are in decreasing order, the cumulative function is a concave function. To take the example above, in order to lower the amount of late arrivals by 78%, it is sufficient to solve the first three issues. The purpose of the Pareto chart is to highlight the most important among a (typically large) set of factors. In quality control, it often represents the most common sources of defects, the highest occurring type of defect, or the most frequent reasons for customer complaints, and so on. Wilkinson (2006) devised an algorithm for producing statistically based acceptance limits (similar to confidence intervals) for each bar in the Pareto chart. 4. Scatter plot Method
  • 7. A scatter plot, scatterplot, or scattergraph is a type of mathematical diagram using Cartesian coordinates to display values for two variables for a set of data. The data is displayed as a collection of points, each having the value of one variable determining the position on the horizontal axis and the value of the other variable determining the position on the vertical axis.[2] This kind of plot is also called a scatter chart, scattergram, scatter diagram,[3] or scatter graph. A scatter plot is used when a variable exists that is under the control of the experimenter. If a parameter exists that is systematically incremented and/or decremented by the other, it is called the control parameter or independent variable and is customarily plotted along the horizontal axis. The measured or dependent variable is customarily plotted along the vertical axis. If no dependent variable exists, either type of variable can be plotted on either axis and a scatter plot will illustrate only the degree of correlation (not causation) between two variables. A scatter plot can suggest various kinds of correlations between variables with a certain confidence interval. For example, weight and height, weight would be on x axis and height would be on the y axis. Correlations may be positive (rising), negative (falling), or null (uncorrelated). If the pattern of dots slopes from lower left to upper right, it suggests a positive correlation between the variables being studied. If the pattern of dots slopes from upper left to lower right, it suggests a negative correlation. A line of best fit (alternatively called 'trendline') can be drawn in order to study the correlation between the variables. An equation for the correlation between the variables can be determined by established best-fit procedures. For a linear correlation, the best-fit procedure is known as linear regression and is guaranteed to generate a correct solution in a finite time. No universal best-fit procedure is guaranteed to generate a correct solution for arbitrary relationships. A scatter plot is also very useful when we wish to see how two comparable data sets agree with each other. In this case, an identity line, i.e., a y=x line, or an 1:1 line, is often drawn as a reference. The more the two data sets agree, the more the scatters tend to concentrate in the vicinity of the identity line; if the two data sets are numerically identical, the scatters fall on the identity line
  • 8. exactly. 5.Ishikawa diagram Ishikawa diagrams (also called fishbone diagrams, herringbone diagrams, cause-and-effect diagrams, or Fishikawa) are causal diagrams created by Kaoru Ishikawa (1968) that show the causes of a specific event.[1][2] Common uses of the Ishikawa diagram are product design and quality defect prevention, to identify potential factors causing an overall effect. Each cause or reason for imperfection is a source of variation. Causes are usually grouped into major categories to identify these sources of variation. The categories typically include  People: Anyone involved with the process  Methods: How the process is performed and the specific requirements for doing it, such as policies, procedures, rules, regulations and laws  Machines: Any equipment, computers, tools, etc. required to accomplish the job  Materials: Raw materials, parts, pens, paper, etc. used to produce the final product  Measurements: Data generated from the process that are used to evaluate its quality  Environment: The conditions, such as location, time, temperature, and culture in which the process operates 6. Histogram method
  • 9. A histogram is a graphical representation of the distribution of data. It is an estimate of the probability distribution of a continuous variable (quantitative variable) and was first introduced by Karl Pearson.[1] To construct a histogram, the first step is to "bin" the range of values -- that is, divide the entire range of values into a series of small intervals -- and then count how many values fall into each interval. A rectangle is drawn with height proportional to the count and width equal to the bin size, so that rectangles abut each other. A histogram may also be normalized displaying relative frequencies. It then shows the proportion of cases that fall into each of several categories, with the sum of the heights equaling 1. The bins are usually specified as consecutive, non-overlapping intervals of a variable. The bins (intervals) must be adjacent, and usually equal size.[2] The rectangles of a histogram are drawn so that they touch each other to indicate that the original variable is continuous.[3] III. Other topics related to Quality in management (pdf download) quality management systems quality management courses quality management tools iso 9001 quality management system quality management process quality management system example quality system management quality management techniques quality management standards quality management policy quality management strategy quality management books