Short-term and long-term solutions can increase reliability, asset availability, utilization, quality and
capacity, but they’re not easy or simple. Look at the barriers that hold a plant back.
The United States lost 40,000 manufacturing jobs in August. Plants are shutting down everyday.
Companies struggle to find the nonexistent “silver bullet” for increasing reliability and equipment
performance while reducing costs. Short-term and long-term solutions can increase reliability,
asset availability, utilization, quality and capacity, but they’re not easy or simple. Look at the
barriers that hold a plant back.
First is the belief that a failure means the equipment is broken. That’s wrong. A true failure of an
asset is when it no longer meets the function required of it at some known rate or standard. For
example, if a conveyor that’s supposed to operate at 200 meters per minute can’t, it has failed
functionally, thus affecting revenue.
Second, in many cases, when an asset fails, no one in maintenance seems to understand that it
failed. Maintenance doesn’t get involved when quality or production rate issues arise.
Last, many maintenance departments don’t know the equipment’s performance targets and don’t
understand why it’s important to know them. This isn’t a maintenance department failure. It’s a
breakdown revealing misaligned goals.
Overcoming these barriers is essential to rapid reliability improvement. An understanding of and
focus on functional failure by all plant personnel leads to rapid results. Focus on aligning the total
plant on meeting each asset’s performance target. Post the targets and current rates to publicize
performance gaps to both maintenance and operations. Both organizations must accept
responsibility for eliminating the performance gap.
Achieving rapid breakthroughs requires you to define failures properly. A reactive company might
say failure means the conveyor is broken or stopped because of mechanical problem. A proactive
company says the conveyor no longer performs the function required. A partial functional failure
occurs when it’s supposed to operate at 200 meters per minute, but can only run 160 meters per
minute. A total functional failure indicates it stopped because of a mechanical problem (see figure).
Uncover your “hidden plant” that provides the gains you need. If your equipment operates below
defined performance targets, establish a policy of immediately engaging the maintenance
department. Focusing on equipment performance targets is the key to rapid asset reliability gains.
The old saying, “It’s what you don’t know that kills you,” is applicable to reliability issues. Getting to
the rapid breakthroughs in plant performance is just the beginning of a long journey. Don’t be
satisfied with the reliability results you gain by following my advice. Continue onward by applying
Reliability Centered Maintenance (RCM) methodology to zero in on “optimal reliability at optimal
cost.” I didn’t say use RCM; I said RCM methodology, which could be RCM II, Streamlined RCM,
FMEA or MTA. They’re different methodologies, so learn about them and how they can foster rapid
performance gains.
Just remember, some people have made short-term, rapid performance gains. Most, however,
have only sustained their performance. If you would like further information about rapid
breakthroughs in performance, send me an e-mail. My final plea is that America should wake up
before it’s too late.

More Related Content

What's hot

What is the right treadmill for you
What is the right treadmill for you What is the right treadmill for you
What is the right treadmill for you ADEOLUADEDIGBA
 
You Messaging Sucks, Now Let's Go Fix It! PCA14
You Messaging Sucks, Now Let's Go Fix It!   PCA14You Messaging Sucks, Now Let's Go Fix It!   PCA14
You Messaging Sucks, Now Let's Go Fix It! PCA14CompellingPM
 
ChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethIan Elseth
 
ARC's Paula Hollywood Sustain Reliability Presentation @ ARC Industry Forum 2010
ARC's Paula Hollywood Sustain Reliability Presentation @ ARC Industry Forum 2010ARC's Paula Hollywood Sustain Reliability Presentation @ ARC Industry Forum 2010
ARC's Paula Hollywood Sustain Reliability Presentation @ ARC Industry Forum 2010ARC Advisory Group
 

What's hot (6)

What is the right treadmill for you
What is the right treadmill for you What is the right treadmill for you
What is the right treadmill for you
 
You Messaging Sucks, Now Let's Go Fix It! PCA14
You Messaging Sucks, Now Let's Go Fix It!   PCA14You Messaging Sucks, Now Let's Go Fix It!   PCA14
You Messaging Sucks, Now Let's Go Fix It! PCA14
 
ChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian ElsethChemTreat Intro - Ian Elseth
ChemTreat Intro - Ian Elseth
 
Resume tech
Resume techResume tech
Resume tech
 
ARC's Paula Hollywood Sustain Reliability Presentation @ ARC Industry Forum 2010
ARC's Paula Hollywood Sustain Reliability Presentation @ ARC Industry Forum 2010ARC's Paula Hollywood Sustain Reliability Presentation @ ARC Industry Forum 2010
ARC's Paula Hollywood Sustain Reliability Presentation @ ARC Industry Forum 2010
 
Rajesh giri cv
Rajesh giri cvRajesh giri cv
Rajesh giri cv
 

Viewers also liked

SMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAVSMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAVRicky Smith CMRP, CMRT
 
Strategy-focused and value-oriented capabilities
Strategy-focused and value-oriented capabilitiesStrategy-focused and value-oriented capabilities
Strategy-focused and value-oriented capabilitiesDmitry Kudryavtsev
 
Visual Inspection Examples for Mechanical Apparatus
Visual Inspection Examples for Mechanical ApparatusVisual Inspection Examples for Mechanical Apparatus
Visual Inspection Examples for Mechanical ApparatusRicky Smith CMRP, CMRT
 
Tool Box Talk - Resolving Hydraulic Leaks
Tool Box Talk - Resolving Hydraulic LeaksTool Box Talk - Resolving Hydraulic Leaks
Tool Box Talk - Resolving Hydraulic LeaksRicky Smith CMRP, CMRT
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and ProgramRicky Smith CMRP
 
Maintenance PM inspection vs Operator PM inspection
Maintenance PM inspection vs Operator PM inspection Maintenance PM inspection vs Operator PM inspection
Maintenance PM inspection vs Operator PM inspection Ricky Smith CMRP, CMRT
 

Viewers also liked (10)

SMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAVSMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAV
 
Maintenance cost
Maintenance costMaintenance cost
Maintenance cost
 
Strategy-focused and value-oriented capabilities
Strategy-focused and value-oriented capabilitiesStrategy-focused and value-oriented capabilities
Strategy-focused and value-oriented capabilities
 
Toll Box Talk - How Bearings Fail
Toll Box Talk - How Bearings FailToll Box Talk - How Bearings Fail
Toll Box Talk - How Bearings Fail
 
Visual Inspection Examples for Mechanical Apparatus
Visual Inspection Examples for Mechanical ApparatusVisual Inspection Examples for Mechanical Apparatus
Visual Inspection Examples for Mechanical Apparatus
 
Tool Box Talk - Resolving Hydraulic Leaks
Tool Box Talk - Resolving Hydraulic LeaksTool Box Talk - Resolving Hydraulic Leaks
Tool Box Talk - Resolving Hydraulic Leaks
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
 
Mean Time Between Failure Vs Cost
Mean Time Between Failure Vs CostMean Time Between Failure Vs Cost
Mean Time Between Failure Vs Cost
 
Maintenance PM inspection vs Operator PM inspection
Maintenance PM inspection vs Operator PM inspection Maintenance PM inspection vs Operator PM inspection
Maintenance PM inspection vs Operator PM inspection
 
Why Your Pm Program is Not Working
Why Your Pm Program is Not WorkingWhy Your Pm Program is Not Working
Why Your Pm Program is Not Working
 

Similar to Put a Plant Wide Focus on Functional Failures

3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790Jose Quintero
 
Maintenance Reliability_2015
Maintenance Reliability_2015Maintenance Reliability_2015
Maintenance Reliability_2015Ron McGary
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007jrd9234
 
Proactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
Proactive Maintenance: EMAL’s Strategic Solution for Cost CompetitivenessProactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
Proactive Maintenance: EMAL’s Strategic Solution for Cost Competitivenessalcircle.com
 
Maintenance cmms
Maintenance cmmsMaintenance cmms
Maintenance cmmsMuchlis -
 
RCFA Success of Root Cause Failure Analysis
RCFA Success of Root Cause Failure AnalysisRCFA Success of Root Cause Failure Analysis
RCFA Success of Root Cause Failure AnalysisAbdulrahman Alkhowaiter
 
Procedure Based Maintenance White Paper
Procedure Based Maintenance White PaperProcedure Based Maintenance White Paper
Procedure Based Maintenance White PaperRicky Smith CMRP, CMRT
 
CMMS: Necessary evil or angel in disguise
CMMS: Necessary evil or angel in disguiseCMMS: Necessary evil or angel in disguise
CMMS: Necessary evil or angel in disguiseGary F Brown
 
E book for hydraulics
E book for hydraulicsE book for hydraulics
E book for hydraulicsjericfreimuth
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceMANUEL PACINI
 
Managing mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challengesManaging mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challengesMilling and Grain magazine
 
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...Ricky Smith CMRP, CMRT
 
How to Create an Effective Preventive Maintenance Schedule?
How to Create an Effective Preventive Maintenance Schedule?How to Create an Effective Preventive Maintenance Schedule?
How to Create an Effective Preventive Maintenance Schedule?CryotosCMMSSoftware
 

Similar to Put a Plant Wide Focus on Functional Failures (20)

3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
 
Maintenance Reliability_2015
Maintenance Reliability_2015Maintenance Reliability_2015
Maintenance Reliability_2015
 
Mro best practices
Mro best practicesMro best practices
Mro best practices
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
 
Proactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
Proactive Maintenance: EMAL’s Strategic Solution for Cost CompetitivenessProactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
Proactive Maintenance: EMAL’s Strategic Solution for Cost Competitiveness
 
Maintenance cmms
Maintenance cmmsMaintenance cmms
Maintenance cmms
 
Viziya
ViziyaViziya
Viziya
 
RCFA Success of Root Cause Failure Analysis
RCFA Success of Root Cause Failure AnalysisRCFA Success of Root Cause Failure Analysis
RCFA Success of Root Cause Failure Analysis
 
Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 
Procedure Based Maintenance White Paper
Procedure Based Maintenance White PaperProcedure Based Maintenance White Paper
Procedure Based Maintenance White Paper
 
CMMS: Necessary evil or angel in disguise
CMMS: Necessary evil or angel in disguiseCMMS: Necessary evil or angel in disguise
CMMS: Necessary evil or angel in disguise
 
Precision Maintenance
Precision MaintenancePrecision Maintenance
Precision Maintenance
 
Rcm
RcmRcm
Rcm
 
E book for hydraulics
E book for hydraulicsE book for hydraulics
E book for hydraulics
 
The Cost Crisis
The Cost CrisisThe Cost Crisis
The Cost Crisis
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
 
Managing mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challengesManaging mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challenges
 
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...Advanced Maintenance And Reliability  (Maintenance and Reliability Best Pract...
Advanced Maintenance And Reliability (Maintenance and Reliability Best Pract...
 
Maintenance
MaintenanceMaintenance
Maintenance
 
How to Create an Effective Preventive Maintenance Schedule?
How to Create an Effective Preventive Maintenance Schedule?How to Create an Effective Preventive Maintenance Schedule?
How to Create an Effective Preventive Maintenance Schedule?
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Put a Plant Wide Focus on Functional Failures

  • 1. Put a plant-wide focus on functional failures By Ricky Smith, CMRP PlantServices.com Short-term and long-term solutions can increase reliability, asset availability, utilization, quality and capacity, but they’re not easy or simple. Look at the barriers that hold a plant back. The United States lost 40,000 manufacturing jobs in August. Plants are shutting down everyday. Companies struggle to find the nonexistent “silver bullet” for increasing reliability and equipment performance while reducing costs. Short-term and long-term solutions can increase reliability, asset availability, utilization, quality and capacity, but they’re not easy or simple. Look at the barriers that hold a plant back. First is the belief that a failure means the equipment is broken. That’s wrong. A true failure of an asset is when it no longer meets the function required of it at some known rate or standard. For example, if a conveyor that’s supposed to operate at 200 meters per minute can’t, it has failed functionally, thus affecting revenue. Second, in many cases, when an asset fails, no one in maintenance seems to understand that it failed. Maintenance doesn’t get involved when quality or production rate issues arise. Last, many maintenance departments don’t know the equipment’s performance targets and don’t understand why it’s important to know them. This isn’t a maintenance department failure. It’s a breakdown revealing misaligned goals. Overcoming these barriers is essential to rapid reliability improvement. An understanding of and focus on functional failure by all plant personnel leads to rapid results. Focus on aligning the total plant on meeting each asset’s performance target. Post the targets and current rates to publicize performance gaps to both maintenance and operations. Both organizations must accept responsibility for eliminating the performance gap. Achieving rapid breakthroughs requires you to define failures properly. A reactive company might say failure means the conveyor is broken or stopped because of mechanical problem. A proactive company says the conveyor no longer performs the function required. A partial functional failure occurs when it’s supposed to operate at 200 meters per minute, but can only run 160 meters per minute. A total functional failure indicates it stopped because of a mechanical problem (see figure).
  • 2. Uncover your “hidden plant” that provides the gains you need. If your equipment operates below defined performance targets, establish a policy of immediately engaging the maintenance department. Focusing on equipment performance targets is the key to rapid asset reliability gains. The old saying, “It’s what you don’t know that kills you,” is applicable to reliability issues. Getting to the rapid breakthroughs in plant performance is just the beginning of a long journey. Don’t be satisfied with the reliability results you gain by following my advice. Continue onward by applying Reliability Centered Maintenance (RCM) methodology to zero in on “optimal reliability at optimal cost.” I didn’t say use RCM; I said RCM methodology, which could be RCM II, Streamlined RCM, FMEA or MTA. They’re different methodologies, so learn about them and how they can foster rapid performance gains. Just remember, some people have made short-term, rapid performance gains. Most, however, have only sustained their performance. If you would like further information about rapid breakthroughs in performance, send me an e-mail. My final plea is that America should wake up before it’s too late.