INSTRUCTIONS FOR FILLING UP CHECKLIST

1. The checklist enumerates items that are to be accomplished in the planning of the project. This is not an
exhaustive list. For some of your projects, a number of items may not be applicable and can therefore be deleted for
the checklists for those projects. For other projects, some items may not be listed and therefore have to be added
to the checklists for those projects. The checklist template is flexible enough to incorporate these additions or
deletions for a specific project.

2. Enter the project start date and project end date in the space allocated for these information. Then enter the
checklist accomplishment date. This accomplishment date will allow you to monitor any changes that arise as a
result of completion of specific items in the checklist during the period between checklist accomplishment dates.

3. For each item, place a check in the Yes or No column depending on whether the item has been accomplished or
not. Enter the planned completion date and planned effort (hours) for each of the items. If you placed a check in
the Yes column for a specific item, enter the actual completion date and actual effort (hours).

4. You can decide to regularly monitor changes to this checklist by identifying schedules on when to update this
checklist. The updates can be monitored through the changing accomplishment dates for the checklist. This will
give the project team (specifically the project manager) an idea of how much is being accomplished throughout the
planning duration.
INFORMATION TECHNOLOGY PROJECT PLANNING CHECKLIST
Project Start Date:                                                           Checklist Accomplishment Date:
Project End Date:
        No.                              Item/Comments                            YES      NO     Planned      Planned      Actual   Actual
                                                                                                 Completion      Effort   Completion Effort
                                                                                                    Date        (hours)      Date    (hours)
         1            Goals and Objectives defined
         2            Scope and Limitations defined
         3            Major Deliverables defined (Deliverables Plan)
         4            Work Breakdown Structure completed
         5            Top-down planning estimates created
         6            Major Milestones defined
         7            Master Integrated Schedule completed
         8            Product and Services Requirements defined
         9            Organization Plan completed
        10            Performance, Evaluation and Test Plan completed
        11            Change Control Plan completed
        12            Problem Tracking Plan completed
        13            Documentation Plan completed
        14            Communication Plan completed
        15            Legal and Regulatory Requirements Plan completed
        16            Risk Management Plan completed
        17            Reliability, Availability, Usability Plan completed
        18            Preliminary Support Plan completed
        19            Resources Plan completed
        20            Project Plan completed
        21            Opportunity Costs calculated
        22            Budget specified
        23            Financial Analysis completed
        24            Functional Deliverables defined
        25            Top-level Architecture Specification completed
        26            High-level Functional Specification(s) completed
        27            Bottom-up task estimates created by Functional Groups
        28            Detailed Functional Planning and Schedules completed
        29            Functional Schedule Critical Path Analysis completed
        30            Master Schedule Critical Path Analysis completed
        31            Master Schedule & Path aligned with Functional Groups
        32            Planning Phase Checklist completed

More Related Content

What's hot

Project Management Body of Knowledge (Scope)
Project Management Body of Knowledge (Scope)Project Management Body of Knowledge (Scope)
Project Management Body of Knowledge (Scope)Jeffrey Cheah
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish RelationsScheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish RelationsRicardo Viana Vargas
 
Ricardo vargas simplified_pmbok_flow_5ed_color_en
Ricardo vargas simplified_pmbok_flow_5ed_color_enRicardo vargas simplified_pmbok_flow_5ed_color_en
Ricardo vargas simplified_pmbok_flow_5ed_color_enJuan Flores
 
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.Kose Jumnichi
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle managementhamza khwaja
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management processKittitouch Suteeca
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Processeklaksh
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-StatementJeremy Heady
 
integration management
 integration management integration management
integration managementsaiftahlawi1
 
Introduction day 2 cert iv scope
Introduction day 2  cert iv scopeIntroduction day 2  cert iv scope
Introduction day 2 cert iv scopeSkript
 
4.project integrationmanagement
4.project integrationmanagement4.project integrationmanagement
4.project integrationmanagementNiranjana K.R.
 

What's hot (20)

Project Management Body of Knowledge (Scope)
Project Management Body of Knowledge (Scope)Project Management Body of Knowledge (Scope)
Project Management Body of Knowledge (Scope)
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish RelationsScheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
 
Ricardo vargas simplified_pmbok_flow_5ed_color_en
Ricardo vargas simplified_pmbok_flow_5ed_color_enRicardo vargas simplified_pmbok_flow_5ed_color_en
Ricardo vargas simplified_pmbok_flow_5ed_color_en
 
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.
 
Project managment 4
Project managment 4Project managment 4
Project managment 4
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle management
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management process
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
 
Project initiation transition checklist
Project initiation transition checklistProject initiation transition checklist
Project initiation transition checklist
 
Project implementation
Project implementationProject implementation
Project implementation
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-Statement
 
Building services planning manual 2007
Building services planning manual 2007Building services planning manual 2007
Building services planning manual 2007
 
integration management
 integration management integration management
integration management
 
Introduction day 2 cert iv scope
Introduction day 2  cert iv scopeIntroduction day 2  cert iv scope
Introduction day 2 cert iv scope
 
Oracle Primavera contract management
Oracle Primavera  contract managementOracle Primavera  contract management
Oracle Primavera contract management
 
Oracle Primavera contractor
Oracle Primavera  contractorOracle Primavera  contractor
Oracle Primavera contractor
 
4.project integrationmanagement
4.project integrationmanagement4.project integrationmanagement
4.project integrationmanagement
 
User acceptance-report
User acceptance-reportUser acceptance-report
User acceptance-report
 

Similar to Project planningchecklist

Project-Review-Checklist.docx
Project-Review-Checklist.docxProject-Review-Checklist.docx
Project-Review-Checklist.docxAddisu15
 
Project mgmt life cycle origination
Project mgmt life cycle originationProject mgmt life cycle origination
Project mgmt life cycle originationMujtaba Masood
 
PM Training Slides
PM Training SlidesPM Training Slides
PM Training SlidesAhmed303
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklistRam Srivastava
 
2. Project Scope Management.ppt
2. Project Scope Management.ppt2. Project Scope Management.ppt
2. Project Scope Management.pptMohamadAGhareb
 
project time management
 project time management project time management
project time managementHira Atiq
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.kNASAPMC
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope ManagementTalha Siddiqui
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
Law.richard
Law.richardLaw.richard
Law.richardNASAPMC
 
File 2 removed word 1
File 2 removed word 1File 2 removed word 1
File 2 removed word 1test prod1
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 

Similar to Project planningchecklist (20)

Project-Review-Checklist.docx
Project-Review-Checklist.docxProject-Review-Checklist.docx
Project-Review-Checklist.docx
 
Project mgmt life cycle origination
Project mgmt life cycle originationProject mgmt life cycle origination
Project mgmt life cycle origination
 
PM Training Slides
PM Training SlidesPM Training Slides
PM Training Slides
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 
PMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time managementPMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time management
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
2. Project Scope Management.ppt
2. Project Scope Management.ppt2. Project Scope Management.ppt
2. Project Scope Management.ppt
 
Project managment 2
Project managment 2Project managment 2
Project managment 2
 
Ch3 proj.mgt
Ch3 proj.mgtCh3 proj.mgt
Ch3 proj.mgt
 
project time management
 project time management project time management
project time management
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope Management
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Guidence M& E
Guidence  M& EGuidence  M& E
Guidence M& E
 
Law.richard
Law.richardLaw.richard
Law.richard
 
File 2 removed word 1
File 2 removed word 1File 2 removed word 1
File 2 removed word 1
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Project Execution
Project ExecutionProject Execution
Project Execution
 

Recently uploaded

Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 

Recently uploaded (20)

Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 

Project planningchecklist

  • 1. INSTRUCTIONS FOR FILLING UP CHECKLIST 1. The checklist enumerates items that are to be accomplished in the planning of the project. This is not an exhaustive list. For some of your projects, a number of items may not be applicable and can therefore be deleted for the checklists for those projects. For other projects, some items may not be listed and therefore have to be added to the checklists for those projects. The checklist template is flexible enough to incorporate these additions or deletions for a specific project. 2. Enter the project start date and project end date in the space allocated for these information. Then enter the checklist accomplishment date. This accomplishment date will allow you to monitor any changes that arise as a result of completion of specific items in the checklist during the period between checklist accomplishment dates. 3. For each item, place a check in the Yes or No column depending on whether the item has been accomplished or not. Enter the planned completion date and planned effort (hours) for each of the items. If you placed a check in the Yes column for a specific item, enter the actual completion date and actual effort (hours). 4. You can decide to regularly monitor changes to this checklist by identifying schedules on when to update this checklist. The updates can be monitored through the changing accomplishment dates for the checklist. This will give the project team (specifically the project manager) an idea of how much is being accomplished throughout the planning duration.
  • 2. INFORMATION TECHNOLOGY PROJECT PLANNING CHECKLIST Project Start Date: Checklist Accomplishment Date: Project End Date: No. Item/Comments YES NO Planned Planned Actual Actual Completion Effort Completion Effort Date (hours) Date (hours) 1 Goals and Objectives defined 2 Scope and Limitations defined 3 Major Deliverables defined (Deliverables Plan) 4 Work Breakdown Structure completed 5 Top-down planning estimates created 6 Major Milestones defined 7 Master Integrated Schedule completed 8 Product and Services Requirements defined 9 Organization Plan completed 10 Performance, Evaluation and Test Plan completed 11 Change Control Plan completed 12 Problem Tracking Plan completed 13 Documentation Plan completed 14 Communication Plan completed 15 Legal and Regulatory Requirements Plan completed 16 Risk Management Plan completed 17 Reliability, Availability, Usability Plan completed 18 Preliminary Support Plan completed 19 Resources Plan completed 20 Project Plan completed 21 Opportunity Costs calculated 22 Budget specified 23 Financial Analysis completed 24 Functional Deliverables defined 25 Top-level Architecture Specification completed 26 High-level Functional Specification(s) completed 27 Bottom-up task estimates created by Functional Groups 28 Detailed Functional Planning and Schedules completed 29 Functional Schedule Critical Path Analysis completed 30 Master Schedule Critical Path Analysis completed 31 Master Schedule & Path aligned with Functional Groups 32 Planning Phase Checklist completed