BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
1
COURSE / WORKSHOP
PROJECT MANAGEMENT TOOLS FOR
SHIPYARD PROJECT MANAGERS
shipyardpm@gmail.com
6th March 2017
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
2
COURSE / WORKSHOP OBJECTIVE
To provide Shipyard Project Managers and Shipyard personnel
with project management tools for planning and controlling
projects, using recognized project management standards applied
on ship repair industry. Through this course learning experience
will be improved by practicing concepts through a real-world ship
repair project.
“This will increase the chance of success on your projects”
shipyardpm@gmail.com
6th March 2017
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
3
• Module 0. Project Management Standards and overview (1 hour): Definition of Project
Management. Project Management Standards, Knowledge Areas and Process groups. Project Management
in Shipyard industry overview.
• Module 1. WBS for Ship Repair Projects – (4 hours): What is a WBS?. Components of a WBS. Steps to
create a WBS for a ship repair project. WBS top 4 Benefits in Ship Repair industry. WBS Manual exercise.
Create the WBS for project QUEEN ANDREA using a WBS software.
• Module 2. Critical Path / Ms Project for Ship Repair Projects – (4 to 5 hours): Basic concepts for
project scheduling. What is critical path? How to use it in Ship Repair Projects. Critical path Top 5 benefits.
Aspects on which the Ship Repair Project Manager should focus in project scheduling. Critical Path Exercise.
Steps to Create a project schedule in Ms Project. How to monitor the schedule in Ms Project. Schedule
Accuracy level in ship repair projects based on uncertainty. Create the project schedule for project QUEEN
ANDREA using Ms Project.
COURSE / WORKSHOP CONTENT
shipyardpm@gmail.com
6th March 2017
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
4
• Module 3. Time and Cost Control with EVM Ship Repair Projects – (4 to 5 hours): What is EVM?.
EVM formulas (Variance, KPIs and Forecast). How to use EVM in Ship Repair Projects to control cost and time
(calculations and reports). Relationship between the WBS, Project Schedule (Ms Project) and EVM. Use EVM
calculations and reports for the project QUEEN ANDREA.
• Module 4. Risk Management in Ship Repair Projects – (4 hours): What is Risk Management?. Steps
for risk management in ship repair projects. Understanding the Risk Register and Risk Assessment Matrix for
Ship Repair Projects. Apply Risk Management for project QUEEN ANDREA.
• Module 5. Stakeholders Management in Ship Repair Projects – (4 hours): What is Stakeholder
Management?. Identify and analyze ship repair stakeholders. Manage ship repair stakeholders engagement.
Identify and analyze stakeholders for project QUEEN ANDREA.
COURSE / WORKSHOP CONTENT
shipyardpm@gmail.com
6th March 2017
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
5
• Module 6. Ship Repair Project Manager Soft Skills (1 to 2 hours): The 3 propeller blades of knowledge
for the Ship Repair Project Manager. Recognized Project Management Certifications. Coordination skills.
Overview on negotiation skills.
• Module 7. Multi-Projects (Program) Control using Ms-Project and EVM (3 to 4 hours): What is
Multi-Project / Program Management in the ship repair industry. Planning the Program. Controlling the
Program. The benefits of controlling the program. Then need of a Program or Project Management Manager
in the ship repair industry. Practical exercise using Ms Project and EVM
COURSE / WORKSHOP CONTENT
shipyardpm@gmail.com
6th March 2017
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
6
COURSE / WORKSHOP METHODOLOGY
The course / workshop methodology is based on “experiential
learning”.
Theory + subject specific exercise + real-world ship repair project practice
MV “QUEEN ANDREA”
IMO number: 0000000
Length Overall: 250 m
Breadth: 40.06 m
Gross Tonnage: 120.000
Vessel Type: Tanker
shipyardpm@gmail.com
6th March 2017
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
7
COURSE / WORKSHOP
FOUNDATION
• PMBOK guide from PMI
• My upcoming book “Shipyard Project
Management”
Coming soon May 2017
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
8
EDUCATIONAL BACKGROUND
• Industrial Engineer
• Post Graduate - Diploma in Project Management
• Project Management for Engineering projects course from Delft
University
• Certified as Project Management Professional - PMP by the Project
Management Institute (PMI) since 2011.
EXPERIENCE
• 10 years of experience in the industry
• Positions held: Project Manager, Risk Engineer, Production
Superintendent (Shipbuilding), Marine Maintenance Supervisor.
• 6 years of experience using PMI Standard in Ship Repair Projects
• Author and speaker about Project Management focused on Ship
Repair
6th March 2017shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
9
…… based on PMI Standard
MODULE 0
PROJECT
MANAGEMENT
STANDARDS
AND OVERVIEW
“….What is Project Management about? Project Management is about how to organize yourself, your team
and your project….”
PMBOK - PMI
APMBOK - APM PRINCE2 - AXELOS
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
1
0
…… based on PMI Standard
MODULE 0
PROJECT
MANAGEMENT
STANDARDS
AND OVERVIEW
EXISTING PROJECT
MANAGEMENT WAY
OF THINKING IN
SHIPREPAIR
INDUSTRY
OLD FASHIONED
MANAGEMENT
STYLE
QUALITYMANAGEMENT
HUMANRESOURCEMANAGEMENT
COMMUNICATIONMANAGEMENT
RISKMANAGEMENT
PROCUREMENTMANAGEMENT
STAKEHOLDERMANAGEMENT
Cost
ScopeTime
SHIPS
TECHNICAL
KNOWLEDGE
PROJECT MANAGEMENT STANDARDS
SUSTAINIBILITY
THE CORRECT WAY
TO MANAGE
SHIPREPAIR
PROJECTS
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
11
…… based on PMI Standard
IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE
PLEASE CONTACT ME shipyardpm@gmail.com
MODULE 0
PROJECT
MANAGEMENT
STANDARDS
AND OVERVIEW
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
1
2
…… based on PMI Standard
MODULE 1
WBS – WORK
BREAKDOWN
STRUCTURE
APPLIED TO SHIP
REPAIR
PROJECTS
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
1
3
…… based on PMI Standard
MODULE 1
WBS – WORK
BREAKDOWN
STRUCTURE
APPLIED TO SHIP
REPAIR
PROJECTS
Vessel Location /
Deliverable
Work Packages
Main Deliverable or Project
Figure 13. WBS example
1
1.1
1.1.1
1.2
1.1.2 1.2.1
LEVEL 1
LEVEL 2
LEVEL 3
WBS COMPONENTS
• Deliverable: is what we are going to deliver, either a service or a product requested by the client.
• Work package: is the lowest level of decomposition. As from the work packages you can define the activities
• ID number: is the number located on each component for easy identification
• Level of decomposition: is related how deep you decompose each element
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
14
…… based on PMI Standard
MODULE 1
WBS – WORK
BREAKDOWN
STRUCTURE
APPLIED TO SHIP
REPAIR
PROJECTS
HOW TO CREATE AND USE A WBS FOR SHIP REPAIR PROJECTS
STEP 1.
Collect
input
documents
STEP 2.
Divide ship
per
locations
and systems
STEP 3.
Define the
software to
be used
STEP 4.
Create the
WBS
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
15
…… based on PMI Standard
MODULE 1
WBS – WORK
BREAKDOWN
STRUCTURE
APPLIED TO SHIP
REPAIR
PROJECTS
shipyardpm@gmail.com
IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE
PLEASE CONTACT ME shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
16
…… based on PMI Standard
MODULE 2
CRITICAL PATH –
MS PROJECT
CRITICAL PATH – MS PROJECT
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
17
…… based on PMI Standard
MODULE 2
CRITICAL PATH –
MS PROJECT
CRITICAL PATH METHOD
Critical Path is the longest path from the beginning to the end of the project. A path is a sequence of activities in a
certain time frame and the longest path is the one leading the finish of the project
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
18
…… based on PMI Standard
MODULE 2
CRITICAL PATH –
MS PROJECT
IN WHAT ASPECTS THE SHIPREPAIR PROJECT MANAGER SHOULD FOCUS WHILE PLANNING AND
CONTROLLING THE PROJECT SCHEDULE?
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
19
…… based on PMI Standard
MODULE 2
CRITICAL PATH –
MS PROJECT
STEPS TO CREATE A SCHEDULE IN MS-PROJECT
Transfer WBS information into MS PROJECT
Adjust initial settings: Calendar and Project start date
Define activities and milestones
Define activity duration and sequence the activities
Calculate the critical path
Save baseline
1
2
3
5
6
4
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
20
…… based on PMI Standard
MODULE 2
CRITICAL PATH –
MS PROJECT
STEPS TO CREATE A SCHEDULE IN MS-PROJECT
Define activity duration and sequence the activities4
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
21
…… based on PMI Standard
MODULE 2
CRITICAL PATH –
MS PROJECT
shipyardpm@gmail.com
IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE
PLEASE CONTACT ME shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
22
…… based on PMI Standard
MODULE 3
TIME AND COST
CONTROL WITH
EVM
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
23
…… based on PMI Standard
MODULE 3
TIME AND COST
CONTROL WITH
EVM
Project information
Project estimates: Price / MH /
Materials / Contractor invoice price /
Contractor prices / SC % margin
Monitoring dates: PV, EV, AC,
Variance for Man hours and
Materials
Jobs description +
Control account
Totals: Revenues,
MH, Materials,
Subcontractors
Totals per date: PV,
EV, AC, Variance
for MH and
Materials
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
24
…… based on PMI Standard
MODULE 3
TIME AND COST
CONTROL WITH
EVM
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
25
…… based on PMI Standard
MODULE 3
TIME AND COST
CONTROL WITH
EVM
shipyardpm@gmail.com
IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE
PLEASE CONTACT ME shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
26
…… based on PMI Standard
MODULE 4
RISK
MANAGEMENT
FOR SHIP
REPAIR
PROJECTS
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
27
…… based on PMI Standard
MODULE 4
RISK
MANAGEMENT
FOR SHIP
REPAIR
PROJECTS
STEPS FOR PROJECT RISK MANAGEMENT IN SHIP REPAIR PROJECTS
1. Identify Risks: Once the scope is known a risk identification can be performed. Risk can be identified during
project initiation till the end.
This are the most important aspects to consider when you are identifying Risk and Causes:
• The Risks must be identified based on the Project Objectives
• The Risks cannot be a constraint (a constraint is something that already exists and should be responded with
a contingency plan)
• When the risk is going to be identified you should ask yourself: What can go wrong that can impact the
project objectives?
• The cause of the risk could be a constraint, an assumption, requirement or condition that originates the
unwanted or wished event.
Example 1: Lack of man power, due to interference with other projects, impacting undocking date and departure
date.
Example 2: To not finish Hull blasting on planned date, due to extreme weather conditions on April, impacting
dry-docking time of the vessel
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
28
…… based on PMI Standard
MODULE 4
RISK
MANAGEMENT
FOR SHIP
REPAIR
PROJECTS
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
29
…… based on PMI Standard
MODULE 4
RISK
MANAGEMENT
FOR SHIP
REPAIR
PROJECTS
shipyardpm@gmail.com
IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE
PLEASE CONTACT ME shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
30
…… based on PMI Standard
MODULE 5
STAKEHOLDER
MANAGEMENT
FOR SHIP
REPAIR
PROJECTS
STAKEHOLDER
MANAGEMENT FOR
SHIP REPAIR PROJECTS
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
31
…… based on PMI Standard
MODULE 5
STAKEHOLDER
MANAGEMENT
FOR SHIP
REPAIR
PROJECTS
shipyardpm@gmail.com
Stakeholder Identification
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
32
…… based on PMI Standard
MODULE 5
STAKEHOLDER
MANAGEMENT
FOR SHIP
REPAIR
PROJECTS
Figure 12. Stakeholders Analysis Matrix
shipyardpm@gmail.com
Stakeholder Analysis Matrix
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
33
…… based on PMI Standard
MODULE 5
STAKEHOLDER
MANAGEMENT
FOR SHIP
REPAIR
PROJECTS
shipyardpm@gmail.com
IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE
PLEASE CONTACT ME shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
34
…… based on PMI Standard
MODULE 6
SOFT SKILLS FOR
SHIPREPAIR
PROJECT
MANAGERS
Project Management
TechnicalBusiness
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
35
…… based on PMI Standard
MODULE 6
SOFT SKILLS FOR
SHIPREPAIR
PROJECT
MANAGERS
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
36
…… based on PMI Standard
MODULE 6
SOFT SKILLS FOR
SHIPREPAIR
PROJECT
MANAGERS
shipyardpm@gmail.com
IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE
PLEASE CONTACT ME shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
37
…… based on PMI Standard
MODULE 7
MULTI-
PROJECTS
CONTROL
USING EVM
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
38
…… based on PMI Standard
MODULE 7
MULTI-
PROJECTS
CONTROL
USING EVM
Figure 26. Program planning in MS Project
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
39
…… based on PMI Standard
MODULE 7
MULTI-
PROJECTS
CONTROL
USING EVM
1 765432 1098 1211
13
Figure 27. Program EVM report
shipyardpm@gmail.com
BASIC PROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS
4
0
IF YOU ARE INTERESTED FOR AN ON-SITE TRAINING FOR
ONE OF THE MODULES OR THE ENTIRE COURSE /
WORKSHOP JUST CONTACT ME:
shipyardpm@gmail.com
shipyardpm@gmail.com

PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop

  • 1.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 1 COURSE / WORKSHOP PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS shipyardpm@gmail.com
  • 2.
    6th March 2017 BASICPROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS 2 COURSE / WORKSHOP OBJECTIVE To provide Shipyard Project Managers and Shipyard personnel with project management tools for planning and controlling projects, using recognized project management standards applied on ship repair industry. Through this course learning experience will be improved by practicing concepts through a real-world ship repair project. “This will increase the chance of success on your projects” shipyardpm@gmail.com
  • 3.
    6th March 2017 BASICPROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS 3 • Module 0. Project Management Standards and overview (1 hour): Definition of Project Management. Project Management Standards, Knowledge Areas and Process groups. Project Management in Shipyard industry overview. • Module 1. WBS for Ship Repair Projects – (4 hours): What is a WBS?. Components of a WBS. Steps to create a WBS for a ship repair project. WBS top 4 Benefits in Ship Repair industry. WBS Manual exercise. Create the WBS for project QUEEN ANDREA using a WBS software. • Module 2. Critical Path / Ms Project for Ship Repair Projects – (4 to 5 hours): Basic concepts for project scheduling. What is critical path? How to use it in Ship Repair Projects. Critical path Top 5 benefits. Aspects on which the Ship Repair Project Manager should focus in project scheduling. Critical Path Exercise. Steps to Create a project schedule in Ms Project. How to monitor the schedule in Ms Project. Schedule Accuracy level in ship repair projects based on uncertainty. Create the project schedule for project QUEEN ANDREA using Ms Project. COURSE / WORKSHOP CONTENT shipyardpm@gmail.com
  • 4.
    6th March 2017 BASICPROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS 4 • Module 3. Time and Cost Control with EVM Ship Repair Projects – (4 to 5 hours): What is EVM?. EVM formulas (Variance, KPIs and Forecast). How to use EVM in Ship Repair Projects to control cost and time (calculations and reports). Relationship between the WBS, Project Schedule (Ms Project) and EVM. Use EVM calculations and reports for the project QUEEN ANDREA. • Module 4. Risk Management in Ship Repair Projects – (4 hours): What is Risk Management?. Steps for risk management in ship repair projects. Understanding the Risk Register and Risk Assessment Matrix for Ship Repair Projects. Apply Risk Management for project QUEEN ANDREA. • Module 5. Stakeholders Management in Ship Repair Projects – (4 hours): What is Stakeholder Management?. Identify and analyze ship repair stakeholders. Manage ship repair stakeholders engagement. Identify and analyze stakeholders for project QUEEN ANDREA. COURSE / WORKSHOP CONTENT shipyardpm@gmail.com
  • 5.
    6th March 2017 BASICPROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS 5 • Module 6. Ship Repair Project Manager Soft Skills (1 to 2 hours): The 3 propeller blades of knowledge for the Ship Repair Project Manager. Recognized Project Management Certifications. Coordination skills. Overview on negotiation skills. • Module 7. Multi-Projects (Program) Control using Ms-Project and EVM (3 to 4 hours): What is Multi-Project / Program Management in the ship repair industry. Planning the Program. Controlling the Program. The benefits of controlling the program. Then need of a Program or Project Management Manager in the ship repair industry. Practical exercise using Ms Project and EVM COURSE / WORKSHOP CONTENT shipyardpm@gmail.com
  • 6.
    6th March 2017 BASICPROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS 6 COURSE / WORKSHOP METHODOLOGY The course / workshop methodology is based on “experiential learning”. Theory + subject specific exercise + real-world ship repair project practice MV “QUEEN ANDREA” IMO number: 0000000 Length Overall: 250 m Breadth: 40.06 m Gross Tonnage: 120.000 Vessel Type: Tanker shipyardpm@gmail.com
  • 7.
    6th March 2017 BASICPROJECT MANAGEMENT TOOLS FOR SHIPREPAIR PROJECT MANAGERS 7 COURSE / WORKSHOP FOUNDATION • PMBOK guide from PMI • My upcoming book “Shipyard Project Management” Coming soon May 2017 shipyardpm@gmail.com
  • 8.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 8 EDUCATIONAL BACKGROUND • Industrial Engineer • Post Graduate - Diploma in Project Management • Project Management for Engineering projects course from Delft University • Certified as Project Management Professional - PMP by the Project Management Institute (PMI) since 2011. EXPERIENCE • 10 years of experience in the industry • Positions held: Project Manager, Risk Engineer, Production Superintendent (Shipbuilding), Marine Maintenance Supervisor. • 6 years of experience using PMI Standard in Ship Repair Projects • Author and speaker about Project Management focused on Ship Repair 6th March 2017shipyardpm@gmail.com
  • 9.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 9 …… based on PMI Standard MODULE 0 PROJECT MANAGEMENT STANDARDS AND OVERVIEW “….What is Project Management about? Project Management is about how to organize yourself, your team and your project….” PMBOK - PMI APMBOK - APM PRINCE2 - AXELOS shipyardpm@gmail.com
  • 10.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 1 0 …… based on PMI Standard MODULE 0 PROJECT MANAGEMENT STANDARDS AND OVERVIEW EXISTING PROJECT MANAGEMENT WAY OF THINKING IN SHIPREPAIR INDUSTRY OLD FASHIONED MANAGEMENT STYLE QUALITYMANAGEMENT HUMANRESOURCEMANAGEMENT COMMUNICATIONMANAGEMENT RISKMANAGEMENT PROCUREMENTMANAGEMENT STAKEHOLDERMANAGEMENT Cost ScopeTime SHIPS TECHNICAL KNOWLEDGE PROJECT MANAGEMENT STANDARDS SUSTAINIBILITY THE CORRECT WAY TO MANAGE SHIPREPAIR PROJECTS shipyardpm@gmail.com
  • 11.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 11 …… based on PMI Standard IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE PLEASE CONTACT ME shipyardpm@gmail.com MODULE 0 PROJECT MANAGEMENT STANDARDS AND OVERVIEW shipyardpm@gmail.com
  • 12.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 1 2 …… based on PMI Standard MODULE 1 WBS – WORK BREAKDOWN STRUCTURE APPLIED TO SHIP REPAIR PROJECTS shipyardpm@gmail.com
  • 13.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 1 3 …… based on PMI Standard MODULE 1 WBS – WORK BREAKDOWN STRUCTURE APPLIED TO SHIP REPAIR PROJECTS Vessel Location / Deliverable Work Packages Main Deliverable or Project Figure 13. WBS example 1 1.1 1.1.1 1.2 1.1.2 1.2.1 LEVEL 1 LEVEL 2 LEVEL 3 WBS COMPONENTS • Deliverable: is what we are going to deliver, either a service or a product requested by the client. • Work package: is the lowest level of decomposition. As from the work packages you can define the activities • ID number: is the number located on each component for easy identification • Level of decomposition: is related how deep you decompose each element shipyardpm@gmail.com
  • 14.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 14 …… based on PMI Standard MODULE 1 WBS – WORK BREAKDOWN STRUCTURE APPLIED TO SHIP REPAIR PROJECTS HOW TO CREATE AND USE A WBS FOR SHIP REPAIR PROJECTS STEP 1. Collect input documents STEP 2. Divide ship per locations and systems STEP 3. Define the software to be used STEP 4. Create the WBS shipyardpm@gmail.com
  • 15.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 15 …… based on PMI Standard MODULE 1 WBS – WORK BREAKDOWN STRUCTURE APPLIED TO SHIP REPAIR PROJECTS shipyardpm@gmail.com IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE PLEASE CONTACT ME shipyardpm@gmail.com
  • 16.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 16 …… based on PMI Standard MODULE 2 CRITICAL PATH – MS PROJECT CRITICAL PATH – MS PROJECT shipyardpm@gmail.com
  • 17.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 17 …… based on PMI Standard MODULE 2 CRITICAL PATH – MS PROJECT CRITICAL PATH METHOD Critical Path is the longest path from the beginning to the end of the project. A path is a sequence of activities in a certain time frame and the longest path is the one leading the finish of the project shipyardpm@gmail.com
  • 18.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 18 …… based on PMI Standard MODULE 2 CRITICAL PATH – MS PROJECT IN WHAT ASPECTS THE SHIPREPAIR PROJECT MANAGER SHOULD FOCUS WHILE PLANNING AND CONTROLLING THE PROJECT SCHEDULE? shipyardpm@gmail.com
  • 19.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 19 …… based on PMI Standard MODULE 2 CRITICAL PATH – MS PROJECT STEPS TO CREATE A SCHEDULE IN MS-PROJECT Transfer WBS information into MS PROJECT Adjust initial settings: Calendar and Project start date Define activities and milestones Define activity duration and sequence the activities Calculate the critical path Save baseline 1 2 3 5 6 4 shipyardpm@gmail.com
  • 20.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 20 …… based on PMI Standard MODULE 2 CRITICAL PATH – MS PROJECT STEPS TO CREATE A SCHEDULE IN MS-PROJECT Define activity duration and sequence the activities4 shipyardpm@gmail.com
  • 21.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 21 …… based on PMI Standard MODULE 2 CRITICAL PATH – MS PROJECT shipyardpm@gmail.com IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE PLEASE CONTACT ME shipyardpm@gmail.com
  • 22.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 22 …… based on PMI Standard MODULE 3 TIME AND COST CONTROL WITH EVM shipyardpm@gmail.com
  • 23.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 23 …… based on PMI Standard MODULE 3 TIME AND COST CONTROL WITH EVM Project information Project estimates: Price / MH / Materials / Contractor invoice price / Contractor prices / SC % margin Monitoring dates: PV, EV, AC, Variance for Man hours and Materials Jobs description + Control account Totals: Revenues, MH, Materials, Subcontractors Totals per date: PV, EV, AC, Variance for MH and Materials shipyardpm@gmail.com
  • 24.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 24 …… based on PMI Standard MODULE 3 TIME AND COST CONTROL WITH EVM shipyardpm@gmail.com
  • 25.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 25 …… based on PMI Standard MODULE 3 TIME AND COST CONTROL WITH EVM shipyardpm@gmail.com IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE PLEASE CONTACT ME shipyardpm@gmail.com
  • 26.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 26 …… based on PMI Standard MODULE 4 RISK MANAGEMENT FOR SHIP REPAIR PROJECTS shipyardpm@gmail.com
  • 27.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 27 …… based on PMI Standard MODULE 4 RISK MANAGEMENT FOR SHIP REPAIR PROJECTS STEPS FOR PROJECT RISK MANAGEMENT IN SHIP REPAIR PROJECTS 1. Identify Risks: Once the scope is known a risk identification can be performed. Risk can be identified during project initiation till the end. This are the most important aspects to consider when you are identifying Risk and Causes: • The Risks must be identified based on the Project Objectives • The Risks cannot be a constraint (a constraint is something that already exists and should be responded with a contingency plan) • When the risk is going to be identified you should ask yourself: What can go wrong that can impact the project objectives? • The cause of the risk could be a constraint, an assumption, requirement or condition that originates the unwanted or wished event. Example 1: Lack of man power, due to interference with other projects, impacting undocking date and departure date. Example 2: To not finish Hull blasting on planned date, due to extreme weather conditions on April, impacting dry-docking time of the vessel shipyardpm@gmail.com
  • 28.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 28 …… based on PMI Standard MODULE 4 RISK MANAGEMENT FOR SHIP REPAIR PROJECTS shipyardpm@gmail.com
  • 29.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 29 …… based on PMI Standard MODULE 4 RISK MANAGEMENT FOR SHIP REPAIR PROJECTS shipyardpm@gmail.com IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE PLEASE CONTACT ME shipyardpm@gmail.com
  • 30.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 30 …… based on PMI Standard MODULE 5 STAKEHOLDER MANAGEMENT FOR SHIP REPAIR PROJECTS STAKEHOLDER MANAGEMENT FOR SHIP REPAIR PROJECTS shipyardpm@gmail.com
  • 31.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 31 …… based on PMI Standard MODULE 5 STAKEHOLDER MANAGEMENT FOR SHIP REPAIR PROJECTS shipyardpm@gmail.com Stakeholder Identification
  • 32.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 32 …… based on PMI Standard MODULE 5 STAKEHOLDER MANAGEMENT FOR SHIP REPAIR PROJECTS Figure 12. Stakeholders Analysis Matrix shipyardpm@gmail.com Stakeholder Analysis Matrix
  • 33.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 33 …… based on PMI Standard MODULE 5 STAKEHOLDER MANAGEMENT FOR SHIP REPAIR PROJECTS shipyardpm@gmail.com IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE PLEASE CONTACT ME shipyardpm@gmail.com
  • 34.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 34 …… based on PMI Standard MODULE 6 SOFT SKILLS FOR SHIPREPAIR PROJECT MANAGERS Project Management TechnicalBusiness shipyardpm@gmail.com
  • 35.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 35 …… based on PMI Standard MODULE 6 SOFT SKILLS FOR SHIPREPAIR PROJECT MANAGERS shipyardpm@gmail.com
  • 36.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 36 …… based on PMI Standard MODULE 6 SOFT SKILLS FOR SHIPREPAIR PROJECT MANAGERS shipyardpm@gmail.com IF YOU ARE INTERESTED TO KNOW MORE AND LEARN ABOUT THIS MODULE PLEASE CONTACT ME shipyardpm@gmail.com
  • 37.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 37 …… based on PMI Standard MODULE 7 MULTI- PROJECTS CONTROL USING EVM shipyardpm@gmail.com
  • 38.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 38 …… based on PMI Standard MODULE 7 MULTI- PROJECTS CONTROL USING EVM Figure 26. Program planning in MS Project shipyardpm@gmail.com
  • 39.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 39 …… based on PMI Standard MODULE 7 MULTI- PROJECTS CONTROL USING EVM 1 765432 1098 1211 13 Figure 27. Program EVM report shipyardpm@gmail.com
  • 40.
    BASIC PROJECT MANAGEMENTTOOLS FOR SHIPREPAIR PROJECT MANAGERS 4 0 IF YOU ARE INTERESTED FOR AN ON-SITE TRAINING FOR ONE OF THE MODULES OR THE ENTIRE COURSE / WORKSHOP JUST CONTACT ME: shipyardpm@gmail.com shipyardpm@gmail.com