PROJECT MANAGEMENT SYSTEM
Preview Demonstration
Shadab | Ahtesham | Shoheb | Aftab
Guide: Mr. Imran Shaikh 29.01.2019
CONTENTS
What we will try to go over today
Requirements and Technologies
Brief Overview on Hardware Specifications.
HOD Functions
Access of HOD
Project Co-Ordinator Functions
Access of PCO
Group Leader Functions
Access of GL
Guide Functions
Access of Guide.
01
02
03
04
05
01
System Requirements
Brief Overview on Hardware Specifications.
Recommended
Software Requirements
• Operating System: Windows XP or later
• Server Client: Mozilla Firefox or Google
Chrome
Recommended
Hardware
Requirements
• Processor: Intel Core 2 Duo or better
• RAM: 2 GB
• HDD: 10 GB
4 Designated Logins
Each performing their own respected function. All the while isolated from each other.
Group Leader Login
The Group Leader will then
submit the ideas on behalf
of his team.
Project Co-Ordinator
Login
PCO will be responsible for
many tasks such as Group
Code and Guide
Assignment.
HOD Login
The Head of Department
will register the Guides as
per need.
Guide Login
The Guide will submit the
Topic related to his team.
02
HOD Features
Access of the Head of Department.
HOD Login Home Page
Guide Registration Project List
Guide Allotment
03
Group Leader Function
Access of the GL
Group Leader Login
Idea
Submission
04
Project Co-Ordinator Features
Access of PCO
Project Co-Ordinator Login
Group Code
Assigning
Guide Allotment
05
Guide Features
Access of Guide.
Guide Login
Topic Submission
01
02
03
Easy to Use and Easier to Update
Always open for change to accommodate
improvements.
One-Time Investment Technology
No requirement for any new hardware.
Clutter-Free Management
Zero requirement for paper
WHAT MAKES US
DIFFERENT?
In the present scenario, Engineering Institutes work on multiple
student projects manually, so there is a need to manage all these
projects efficiently in term of student management, topic allocation
and project design.
Project Management system from the first of announcements to the
last submission, are managed through this web-based application.
Goes hand-in-hand with Digital India scheme.
Leaves no Carbon Footprint.
Advantages of The Project Management System
What do we give you?
01
THANKS FOR WATCHING
and for your attention
We have tried to me sure that all information displayed are correct
to our ability.
CO6GA YEAR III

Project Management System (Ultimate PPT)

  • 1.
    PROJECT MANAGEMENT SYSTEM PreviewDemonstration Shadab | Ahtesham | Shoheb | Aftab Guide: Mr. Imran Shaikh 29.01.2019
  • 2.
    CONTENTS What we willtry to go over today Requirements and Technologies Brief Overview on Hardware Specifications. HOD Functions Access of HOD Project Co-Ordinator Functions Access of PCO Group Leader Functions Access of GL Guide Functions Access of Guide. 01 02 03 04 05
  • 3.
    01 System Requirements Brief Overviewon Hardware Specifications. Recommended Software Requirements • Operating System: Windows XP or later • Server Client: Mozilla Firefox or Google Chrome Recommended Hardware Requirements • Processor: Intel Core 2 Duo or better • RAM: 2 GB • HDD: 10 GB
  • 4.
    4 Designated Logins Eachperforming their own respected function. All the while isolated from each other. Group Leader Login The Group Leader will then submit the ideas on behalf of his team. Project Co-Ordinator Login PCO will be responsible for many tasks such as Group Code and Guide Assignment. HOD Login The Head of Department will register the Guides as per need. Guide Login The Guide will submit the Topic related to his team.
  • 5.
    02 HOD Features Access ofthe Head of Department. HOD Login Home Page Guide Registration Project List Guide Allotment
  • 6.
    03 Group Leader Function Accessof the GL Group Leader Login Idea Submission
  • 7.
    04 Project Co-Ordinator Features Accessof PCO Project Co-Ordinator Login Group Code Assigning Guide Allotment
  • 8.
    05 Guide Features Access ofGuide. Guide Login Topic Submission
  • 9.
    01 02 03 Easy to Useand Easier to Update Always open for change to accommodate improvements. One-Time Investment Technology No requirement for any new hardware. Clutter-Free Management Zero requirement for paper WHAT MAKES US DIFFERENT? In the present scenario, Engineering Institutes work on multiple student projects manually, so there is a need to manage all these projects efficiently in term of student management, topic allocation and project design. Project Management system from the first of announcements to the last submission, are managed through this web-based application. Goes hand-in-hand with Digital India scheme. Leaves no Carbon Footprint. Advantages of The Project Management System What do we give you? 01
  • 10.
    THANKS FOR WATCHING andfor your attention We have tried to me sure that all information displayed are correct to our ability. CO6GA YEAR III