Hospital construction plan
Dr Randa fouad
Project management Plan construction of hospital
Summary
In a developing country the necessity of a proper health care is unparalleled. Adding
to the contribution of the general population’s health and wellbeing, hospitals are
also important contributors to the economy of the community where it serves. With
a total of 50 + hospitals inthe D.G. Khan, of which most are private hospitals, it
seems that the health situation in the cityis optimal. This however is not the case.
As the state of hospitals and the services being provided to the general public are
not meeting the standards, so building a Multi-specialty hospital in the vicinity of
D.G. Khan and surrounding villages seems not only entirely relevant but also
necessary. The primary objective of the hospital will be to provide affordable and
quality health care to the masses and to uplift community’s health standards.
The report offers an inside view of the analysis of the project using project mapping
tools suchas Network diagrams, Gantt charts, Histograms, and Probability analysis.
Background
Health problems in D.G. Khan roots back to the lack of balance in its
development. It is not a question of debate that the health situations in the rural
parts of the D.G. Khan are worsethan that of its more developed counterparts.
Although programs conducted in the rural areas have been improving the
conditions, it does not have any effect on the migrating population. Atpresent, D.G.
Khan is facing a dire problem of population growth which is having a significant
impact on the health of the entirety of its inhabitants. Inhabitants of outer districts
and zones (mostly from the rural areas) who have relocated themselves in D.G.
Khan find themselves living in locations where facilities are inadequate- the reason
being the inexpensive cost of living in these locations. The idea is to build a multi-
specialty hospital in the proposed location to facilitate the residing population.
Project objectives :
To establish a multispecialty hospital that offers preventive and curative health care
services. The hospital will be 200-beded, modern and technologically advanced,
offering a wide range ofmedical, surgical and diagnostic services.
Project management plan purpose
Project deliverable :
Sr
# General Organization Specialized Safety standards
1
Treatments, cares, Examination
Rooms Operation Theater Electrical installation
2 Administration Rooms Post Operation Unit Gas installation
3 Technical and storage zones Maternity unit Lightening
4 Waste water discharge Unit
Treatment zone with
beds Sanitarian installation
5 Restaurant Radiology Sterilization zone
6 Park Surgical Unit
Storage locals for anesthesia
rooms
7 Parking Medical Shop Ventilation
Project milestones :
Milestone Name Milestone Description
Planning and initiation Planning and initiation
Approvals Obtain official approvals
Design and schedule Prepare construction designs, drawings, specifications and
schedules
Contract document Prepare contract document and bill of quantities
Vendor solicitation Solicitation of proposals from contractors and vendors
Signing of contract
agreement
Evaluation of proposal and signing of contract agreement
Execution of construction
activities
Mobilization of civil contractors and execution of
construction activities
Machinery and equipment Supply, delivery and installation of machinery and
equipment
Installation Supply, delivery and installation of furniture and fittings
Closure of the project Closure of the project
Project cost management :
Cost of the Project Total (in $)
Land cost 25 Acre 110
Construction Cost 217800 sq. feet (5 Acre) 185
Machinery & Equipment 150
Furnishing 35
Vehicle (5 ambulance and others) 5
Contingencies -5% construction cost 5
Recruitments 8
Advertising 2
Total Cost 500 $
Project time management :
Activity Code Predecessor Personnel
Planning and initiation A - 12
Obtain official approvals B - 10
Prepare construction designs, drawings, specifications and
schedules
C A, B 13
Prepare contract document and bill of quantities D C 8
Solicitation of proposals from contractors and vendors E D 9
Evaluation of proposal and signing of contract agreement F E 8
Mobilization of civil contractors and execution of construction
activities
G F 35
Supply, delivery and installation of machinery and equipment H G 8
Supply, delivery and installation of furniture and fittings I G 9
Closure of the project J H, I 12
Work breakdown structure
The network diagram on node is constructed using the value in the table. Along with the duration of
each task, the table also entails the early start and finish, late start and finish times,standard deviation,
variance, optimistic and pessimistic durations.
The relevant data are also used in the calculation of probability. It has been found that the probability of
completion in case of crashing the project in 25 months is only 12.51%, whereasextending the project up
to 29 months allows for an 87.49% chance of completion. . It has also been found that meeting the
targeted project completion time of 25 months has a probabilityof 50%. Further there exists a probability
of 99% if the project is extended up to 31 months
Gantt charts and histograms using both early start- early finish times and late start- late finish times are
constructed and furthermore Gantt chart and Histogram are also used for the purpose of resource
smoothing. The resource smoothing is the result of their existing only two tasks- B and I outside the
critical path. The duration of the two tasks are used to minimize the use of resources during the task B
and I. It can be seen that while there are 10 units of resources used in the task B in the early start and
late start Gantt charts, there are only 5 units of resources used in the resource smoothing Gantt chart for
task B. This has been accomplishedby using the entirety of the duration of the task and using 5 units of
resources in each day similar to case task-1
1. Planning
&Initiating
2.
Obtain
Officia
l
Appro
val
3. Prepare
construction
design,
drawings,
specifications
andschedules
4. Prepare
contract
document
andbill of
Quantities
5.
Solicitation
of proposals
from
contractors
and vendors
6.
Evaluation
of proposal
and signing
of contract
agreement
7.
Mobilization
of civil
contractors
andexecution
of
construction
activities
8. Supply,
Deliveryand
installation of
machinery
equipment
9. Supply,
Delivery
and
installation
offurniture
andfittings
10. Closure
ofthe project
1.1
Company
Registration
2.1 Receive
approvals
for
construction
3.1 Design
and
drawings
8.1 Installation 9.1 Installation 10.1
Project
Audit
1.2
Feasibility
Study
2.2 Receive
approvals
from
Medical
Council
3.2
Specification/
Scheduling
10.2
Preparation
ofproject
report
Network diagram :
Project duration = 27 months
critical path (a,c,d,e,f,g,h,j)
Number
of
Personnel
Resources :
Gant chart (Early Start- Early Finish)
Histogram (Early Start –Early Finish)
Duration in Months
Number of
Personnel
Gant Chart (Late Start- Late Finish)
Histogram (Late Start- Late Finish)
Number
of
Personnel
Duration in Months
time update :
- This report is performed after 15 months after the project has started :
1- Activity A , B , C , D , E, F has finished
2- Activity G has started on the 10 th month , remaining 4 months
3- Activity H duration is adjusted to 4 months
4- activity I is canceled
5- New activity is added K and it’s duration is 3 monthes and IPA =H and ISA = J
The project will be late for 1 month .
Crashing :
Normal condition crash condition
Code cost Time Cost time
A 72 2 90 1
B 54 1 70 0.5
C 102 2 130 1
D 403 3 500 2
E 150 2 180 1
F 200 1 300 0.5
G 375 9 500 7
H 400 6 600 4
I 550 4 650 3
j 485 2 600 1
critical path (a,c,d,e,f,g,h,j)
Code Crash cost /month Available month
A 18 1
B 32 0.5
C 1.27 1
D 1.24 1
E 1.2 1
F 1.5 0.5
G 1.33 2
H 1.5 2
I 1.18 1
j 1.23 1
Activity H will be crashed
Then critical bath will be (a,c,d,e,f,g,I,j)

More Related Content

What's hot

Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH
 
Organizational Chart
Organizational ChartOrganizational Chart
Organizational Chart
Christian Veillette
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
 
Bill resume
Bill resumeBill resume
Bill resume
Awili Bill
 
Jamil Faraj Hassan, PMP CV
Jamil Faraj Hassan, PMP CV Jamil Faraj Hassan, PMP CV
Jamil Faraj Hassan, PMP CV
Jamil Faraj , PMP
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technician
chandrabhushan rao
 
Project-Progress-Presentation.pptx
Project-Progress-Presentation.pptxProject-Progress-Presentation.pptx
Project-Progress-Presentation.pptx
TecnicoItca
 

What's hot (7)

Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Organizational Chart
Organizational ChartOrganizational Chart
Organizational Chart
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Bill resume
Bill resumeBill resume
Bill resume
 
Jamil Faraj Hassan, PMP CV
Jamil Faraj Hassan, PMP CV Jamil Faraj Hassan, PMP CV
Jamil Faraj Hassan, PMP CV
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technician
 
Project-Progress-Presentation.pptx
Project-Progress-Presentation.pptxProject-Progress-Presentation.pptx
Project-Progress-Presentation.pptx
 

Similar to project management hospital construction.docx

Ashoka-CV
Ashoka-CVAshoka-CV
Ashoka-CV
Ashokkumar C
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
todd581
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
Nishant Pandey
 
New Student Recreation Center Project Management Case Study
New Student Recreation Center Project Management Case StudyNew Student Recreation Center Project Management Case Study
New Student Recreation Center Project Management Case Study
Frank Cunha
 
Pittsburgh case study midfield energy system
Pittsburgh case study midfield energy systemPittsburgh case study midfield energy system
Pittsburgh case study midfield energy system
priyang2004
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
HongLc19
 
RISK MANAGEMENT PLAN SCOPE AND IDENTIFICATION5Christopher Mi.docx
RISK MANAGEMENT PLAN SCOPE AND IDENTIFICATION5Christopher Mi.docxRISK MANAGEMENT PLAN SCOPE AND IDENTIFICATION5Christopher Mi.docx
RISK MANAGEMENT PLAN SCOPE AND IDENTIFICATION5Christopher Mi.docx
SUBHI7
 
Sehat hospital final
Sehat hospital finalSehat hospital final
Sehat hospital final
Abhishek Tiwari
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...
meiroc
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...
meiroc
 
Earned_Value_Method_EVM_for_Construction_Projects_.pdf
Earned_Value_Method_EVM_for_Construction_Projects_.pdfEarned_Value_Method_EVM_for_Construction_Projects_.pdf
Earned_Value_Method_EVM_for_Construction_Projects_.pdf
Shashi Ranjan
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
PRIYANSHU KUMAR
 
CONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORTCONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORT
Divyang Choudhary
 
Calculations1. Net present valueEstimated investment of the la
Calculations1. Net present valueEstimated investment of the laCalculations1. Net present valueEstimated investment of the la
Calculations1. Net present valueEstimated investment of the la
TawnaDelatorrejs
 
mazhar_resume
mazhar_resumemazhar_resume
mazhar_resume
Mazhar Andlib
 
HIM360 Assignment RubricsAssignment 1 Project Scope and
HIM360 Assignment RubricsAssignment 1 Project Scope and HIM360 Assignment RubricsAssignment 1 Project Scope and
HIM360 Assignment RubricsAssignment 1 Project Scope and
SusanaFurman449
 
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
MargaritoWhitt221
 
Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016
Redsun Communication
 
4
44
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IRJET Journal
 

Similar to project management hospital construction.docx (20)

Ashoka-CV
Ashoka-CVAshoka-CV
Ashoka-CV
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
New Student Recreation Center Project Management Case Study
New Student Recreation Center Project Management Case StudyNew Student Recreation Center Project Management Case Study
New Student Recreation Center Project Management Case Study
 
Pittsburgh case study midfield energy system
Pittsburgh case study midfield energy systemPittsburgh case study midfield energy system
Pittsburgh case study midfield energy system
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
 
RISK MANAGEMENT PLAN SCOPE AND IDENTIFICATION5Christopher Mi.docx
RISK MANAGEMENT PLAN SCOPE AND IDENTIFICATION5Christopher Mi.docxRISK MANAGEMENT PLAN SCOPE AND IDENTIFICATION5Christopher Mi.docx
RISK MANAGEMENT PLAN SCOPE AND IDENTIFICATION5Christopher Mi.docx
 
Sehat hospital final
Sehat hospital finalSehat hospital final
Sehat hospital final
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...
 
Earned_Value_Method_EVM_for_Construction_Projects_.pdf
Earned_Value_Method_EVM_for_Construction_Projects_.pdfEarned_Value_Method_EVM_for_Construction_Projects_.pdf
Earned_Value_Method_EVM_for_Construction_Projects_.pdf
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
CONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORTCONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORT
 
Calculations1. Net present valueEstimated investment of the la
Calculations1. Net present valueEstimated investment of the laCalculations1. Net present valueEstimated investment of the la
Calculations1. Net present valueEstimated investment of the la
 
mazhar_resume
mazhar_resumemazhar_resume
mazhar_resume
 
HIM360 Assignment RubricsAssignment 1 Project Scope and
HIM360 Assignment RubricsAssignment 1 Project Scope and HIM360 Assignment RubricsAssignment 1 Project Scope and
HIM360 Assignment RubricsAssignment 1 Project Scope and
 
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
 
Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016
 
4
44
4
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 

Recently uploaded

2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
Frederic Leger
 
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij
 
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Dutch Power
 
Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
gharris9
 
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
SkillCertProExams
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
artemacademy2
 
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Dutch Power
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
samililja
 
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdfSupercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Access Innovations, Inc.
 
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPointMẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
1990 Media
 
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie WellsCollapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Rosie Wells
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
amekonnen
 
Gregory Harris' Civics Presentation.pptx
Gregory Harris' Civics Presentation.pptxGregory Harris' Civics Presentation.pptx
Gregory Harris' Civics Presentation.pptx
gharris9
 
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
OECD Directorate for Financial and Enterprise Affairs
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
ToshihiroIto4
 
Updated diagnosis. Cause and treatment of hypothyroidism
Updated diagnosis. Cause and treatment of hypothyroidismUpdated diagnosis. Cause and treatment of hypothyroidism
Updated diagnosis. Cause and treatment of hypothyroidism
Faculty of Medicine And Health Sciences
 
Media as a Mind Controlling Strategy In Old and Modern Era
Media as a Mind Controlling Strategy In Old and Modern EraMedia as a Mind Controlling Strategy In Old and Modern Era
Media as a Mind Controlling Strategy In Old and Modern Era
faizulhassanfaiz1670
 
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
OECD Directorate for Financial and Enterprise Affairs
 
Burning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdfBurning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdf
kkirkland2
 

Recently uploaded (19)

2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
 
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
 
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
Presentatie 8. Joost van der Linde & Daniel Anderton - Eliq 28 mei 2024
 
Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
 
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
 
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
Presentatie 4. Jochen Cremer - TU Delft 28 mei 2024
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
 
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdfSupercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
 
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPointMẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
 
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie WellsCollapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
 
Gregory Harris' Civics Presentation.pptx
Gregory Harris' Civics Presentation.pptxGregory Harris' Civics Presentation.pptx
Gregory Harris' Civics Presentation.pptx
 
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
 
Updated diagnosis. Cause and treatment of hypothyroidism
Updated diagnosis. Cause and treatment of hypothyroidismUpdated diagnosis. Cause and treatment of hypothyroidism
Updated diagnosis. Cause and treatment of hypothyroidism
 
Media as a Mind Controlling Strategy In Old and Modern Era
Media as a Mind Controlling Strategy In Old and Modern EraMedia as a Mind Controlling Strategy In Old and Modern Era
Media as a Mind Controlling Strategy In Old and Modern Era
 
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
 
Burning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdfBurning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdf
 

project management hospital construction.docx

  • 1. Project management Student Name Student ID 1 Ahmed wesam abdou 201900690 2 Mazen ahmed Mahmoud 201900184 3 Mohamed elsayed elnagdy 201900080 4 Abdallah salah abdelmegid 201900033 5 Ali Shindy Ali Shindy 201900004 6 Daniel Nashaat Youssef Gerges 201900192 Hospital construction plan Dr Randa fouad
  • 2. Project management Plan construction of hospital Summary In a developing country the necessity of a proper health care is unparalleled. Adding to the contribution of the general population’s health and wellbeing, hospitals are also important contributors to the economy of the community where it serves. With a total of 50 + hospitals inthe D.G. Khan, of which most are private hospitals, it seems that the health situation in the cityis optimal. This however is not the case. As the state of hospitals and the services being provided to the general public are not meeting the standards, so building a Multi-specialty hospital in the vicinity of D.G. Khan and surrounding villages seems not only entirely relevant but also necessary. The primary objective of the hospital will be to provide affordable and quality health care to the masses and to uplift community’s health standards. The report offers an inside view of the analysis of the project using project mapping tools suchas Network diagrams, Gantt charts, Histograms, and Probability analysis. Background Health problems in D.G. Khan roots back to the lack of balance in its development. It is not a question of debate that the health situations in the rural parts of the D.G. Khan are worsethan that of its more developed counterparts. Although programs conducted in the rural areas have been improving the conditions, it does not have any effect on the migrating population. Atpresent, D.G.
  • 3. Khan is facing a dire problem of population growth which is having a significant impact on the health of the entirety of its inhabitants. Inhabitants of outer districts and zones (mostly from the rural areas) who have relocated themselves in D.G. Khan find themselves living in locations where facilities are inadequate- the reason being the inexpensive cost of living in these locations. The idea is to build a multi- specialty hospital in the proposed location to facilitate the residing population. Project objectives : To establish a multispecialty hospital that offers preventive and curative health care services. The hospital will be 200-beded, modern and technologically advanced, offering a wide range ofmedical, surgical and diagnostic services. Project management plan purpose
  • 4. Project deliverable : Sr # General Organization Specialized Safety standards 1 Treatments, cares, Examination Rooms Operation Theater Electrical installation 2 Administration Rooms Post Operation Unit Gas installation 3 Technical and storage zones Maternity unit Lightening 4 Waste water discharge Unit Treatment zone with beds Sanitarian installation 5 Restaurant Radiology Sterilization zone 6 Park Surgical Unit Storage locals for anesthesia rooms 7 Parking Medical Shop Ventilation Project milestones : Milestone Name Milestone Description Planning and initiation Planning and initiation Approvals Obtain official approvals Design and schedule Prepare construction designs, drawings, specifications and schedules Contract document Prepare contract document and bill of quantities Vendor solicitation Solicitation of proposals from contractors and vendors Signing of contract agreement Evaluation of proposal and signing of contract agreement Execution of construction activities Mobilization of civil contractors and execution of construction activities Machinery and equipment Supply, delivery and installation of machinery and equipment Installation Supply, delivery and installation of furniture and fittings Closure of the project Closure of the project
  • 5. Project cost management : Cost of the Project Total (in $) Land cost 25 Acre 110 Construction Cost 217800 sq. feet (5 Acre) 185 Machinery & Equipment 150 Furnishing 35 Vehicle (5 ambulance and others) 5 Contingencies -5% construction cost 5 Recruitments 8 Advertising 2 Total Cost 500 $ Project time management : Activity Code Predecessor Personnel Planning and initiation A - 12 Obtain official approvals B - 10 Prepare construction designs, drawings, specifications and schedules C A, B 13 Prepare contract document and bill of quantities D C 8 Solicitation of proposals from contractors and vendors E D 9 Evaluation of proposal and signing of contract agreement F E 8 Mobilization of civil contractors and execution of construction activities G F 35 Supply, delivery and installation of machinery and equipment H G 8 Supply, delivery and installation of furniture and fittings I G 9 Closure of the project J H, I 12
  • 6. Work breakdown structure The network diagram on node is constructed using the value in the table. Along with the duration of each task, the table also entails the early start and finish, late start and finish times,standard deviation, variance, optimistic and pessimistic durations. The relevant data are also used in the calculation of probability. It has been found that the probability of completion in case of crashing the project in 25 months is only 12.51%, whereasextending the project up to 29 months allows for an 87.49% chance of completion. . It has also been found that meeting the targeted project completion time of 25 months has a probabilityof 50%. Further there exists a probability of 99% if the project is extended up to 31 months Gantt charts and histograms using both early start- early finish times and late start- late finish times are constructed and furthermore Gantt chart and Histogram are also used for the purpose of resource smoothing. The resource smoothing is the result of their existing only two tasks- B and I outside the critical path. The duration of the two tasks are used to minimize the use of resources during the task B and I. It can be seen that while there are 10 units of resources used in the task B in the early start and late start Gantt charts, there are only 5 units of resources used in the resource smoothing Gantt chart for task B. This has been accomplishedby using the entirety of the duration of the task and using 5 units of resources in each day similar to case task-1 1. Planning &Initiating 2. Obtain Officia l Appro val 3. Prepare construction design, drawings, specifications andschedules 4. Prepare contract document andbill of Quantities 5. Solicitation of proposals from contractors and vendors 6. Evaluation of proposal and signing of contract agreement 7. Mobilization of civil contractors andexecution of construction activities 8. Supply, Deliveryand installation of machinery equipment 9. Supply, Delivery and installation offurniture andfittings 10. Closure ofthe project 1.1 Company Registration 2.1 Receive approvals for construction 3.1 Design and drawings 8.1 Installation 9.1 Installation 10.1 Project Audit 1.2 Feasibility Study 2.2 Receive approvals from Medical Council 3.2 Specification/ Scheduling 10.2 Preparation ofproject report
  • 7. Network diagram : Project duration = 27 months critical path (a,c,d,e,f,g,h,j)
  • 8. Number of Personnel Resources : Gant chart (Early Start- Early Finish) Histogram (Early Start –Early Finish) Duration in Months
  • 9. Number of Personnel Gant Chart (Late Start- Late Finish) Histogram (Late Start- Late Finish) Number of Personnel Duration in Months
  • 10. time update : - This report is performed after 15 months after the project has started : 1- Activity A , B , C , D , E, F has finished 2- Activity G has started on the 10 th month , remaining 4 months 3- Activity H duration is adjusted to 4 months 4- activity I is canceled 5- New activity is added K and it’s duration is 3 monthes and IPA =H and ISA = J The project will be late for 1 month .
  • 11. Crashing : Normal condition crash condition Code cost Time Cost time A 72 2 90 1 B 54 1 70 0.5 C 102 2 130 1 D 403 3 500 2 E 150 2 180 1 F 200 1 300 0.5 G 375 9 500 7 H 400 6 600 4 I 550 4 650 3 j 485 2 600 1 critical path (a,c,d,e,f,g,h,j) Code Crash cost /month Available month A 18 1 B 32 0.5 C 1.27 1 D 1.24 1 E 1.2 1 F 1.5 0.5 G 1.33 2 H 1.5 2 I 1.18 1 j 1.23 1 Activity H will be crashed Then critical bath will be (a,c,d,e,f,g,I,j)