Case 1
Friendly Assisted Living Facility
1. Identify as well as you can the three iron triangle constraints for this
project: cost, time, and scope.
In order to have an efficient project implementation and achieve
customer satisfaction, a balance among the cost, time, and scope of the
project should be maintained. The following factors should be taken into
consideration:
A. Cost
The entire project cost is estimated to be between 8,500,000 and
11,000,000 for the facility construction. This includes the cost of the land,
furnishings, and sheltered connection to the hospital. Additional but
minimal cost is also incurred during the planning process.
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
B. Time
There is only approximately 7 to 8 months to complete the
construction of the new facility. The project construction can only begin
after the November city elections because two of the Board Members were
running in that election. Furthermore, the Board would like a plan that
would allow the facility to open by July the following year in order to
maximize the trend that many adult and children assist their parents in
finding an alternative to independent living arrangements during the
summer.
C. Scope
The project is to build an assisted living facility on Friendly Medical
Center’s campus. The chosen facility design is a freestanding apartment-
like facility with a sheltered connection to the Hospital. It will have 100
units to be classified into “heavy assisted” for the physically and medically
disabled and “light assisted” for residents that require minor medical and
social interventions.
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
Implication:
The executive team is yet to create the complete project plan. The
following challenges may be encountered during the project
implementation:
 Given the time constraint of the project, detailed examination of the
complete project plan may show higher costs needed to complete the
project since manpower resource should be increased to cope with
the limited project period.
 Political disputes can possibly affect the project and may further
delay the execution.
 Social implications can also become a cause of concern for this
matter.
2. Identify the expected benefits of this project for Friendly Medical Center.
The construction of an assisted living facility on the Friendly Medical
Center campus can bring about potential benefits to the hospital in the
areas of financial, marketing, and human resource.
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
Areas of
Consideration Benefits
Financial  The facility upon operation can generate between
$9,000 to $12,000 per unit per year and an
estimated net cash flow of $1,500,000 annually.
This amount can be used to suffice for the
decreasing income of the hospital since the hospital
board has control over its subsidiary.
 For short term benefit, cash flow from the assisted
living facility may be used to sustain the operation
of Friendly Medical Center.
 Its long term benefit is its ability to provide shelter
and care for what will be the future clients of the
hospital.
Marketing  The facility is designed to cater wider scope of
patients/residents, it has identified a unique market
segment. It will be the only assisted living facility
that will offer physical and occupational therapy
programs and behavior management programs on
top of the usual services offered by other facilities in
the same industry.
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
 Due to the wider market scope of the assisted living
facility, it can attract more patients who could age
in the place until they will be in need of
hospitalization which can be provided by Friendly
Medical Center.
Human
Resources
 Friendly Medical Center is well known for its highly
competent rehabilitation therapy staff and while the
hospital inpatient population is declining, these
competent staff can be re-assigned into the assisted
living facility. This strategy will spare the hospital
from letting go of qualified employees.
3. Comment on the strategic initiatives resulting from the Board’s major
strategic planning retreat. Would you consider this a productive retreat?
The strategic planning retreat of the Board of Directors can be
considered as a productive retreat. On that retreat, it was decided that the
short-run initiative is to be more cost-effective in service delivery while the
long-run strategy is to develop new programs and services that will
capitalize on the existing assets of the hospital. On this premise, Fred
Splient was able to develop his idea on creating an assisted living facility.
The proposal addresses both the short run and long run strategies crafted
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
during the retreat which is an indication that the retreat was effective
because it facilitated the conception of a novel project.
4. What “project selection” procedure was used here? How common do you
think this is? How wise do you think this is?
The project selection process is a combination of Sacred Cow and
Operating/Competitive Necessity. The proposal to establish an assisted
living facility came from the CEO, Fred Splient M.D. His position somehow
may have influenced the Board of Directors’ decision to approve the
concept and present a comprehensive plan. However, majority of the
decision also emanated from the fact that Fred Splient was able to present
a feasible idea. It is not to be overlooked that Fred have employed the
services of a Business Development Team to prepare a rough estimate of
the potential return on the investment. After careful investigation and
assessment of available data and resources, Fred and his team was able
to come up with a business plan which was enough to successfully
convince the Board of Directors that the creation of the assisted living
facility is necessary in order to support the continuity of operations in the
Friendly Medical Center.
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
Case 2
Handstar Inc.
1. Which projects would you recommend Handstar pursue based on the NPV
approach?
Project 1: Integrate
Calendar App with E-
mail App Present Value
Project 2: Update
Expense Report App Present Value
Project 3: Enhance
Existing Portfolio
Tracking App Present Value
Software Development Time 1250 400 750
Rate of Software Developers (per hour) 52 52 52
Initial Fixed Investment 65,000.00 20,800.00 39,000.00
Year 1 750,000.00 669,642.86 250,000.00 223,214.29 500,000.00 446,428.57
Year 2 675,000.00 538,105.87 262,500.00 209,263.39 525,000.00 418,526.79
Year 3 607,500.00 432,406.50 275,625.00 196,184.43 551,250.00 392,368.86
Net Present Value 1,575,155.23 607,862.11 1,218,324.22
Project 4: Develop
Spreadsheet App Present Value
Project 5: Develop
App for Web
Browsing Present Value
Project 6: Trip
Planner App Present Value
Software Development Time 2500 1875 6250
Rate of Software Developers (per hour) 52 52 52
Initial Fixed Investment 130,000.00 97,500.00 1,300,000.00
Year 1 1,000,000.00 892,857.14 2,500,000.00 2,232,142.86 2,500,000.00 2,232,142.86
Year 2 1,100,000.00 876,913.27 2,875,000.00 2,291,932.40 2,625,000.00 2,092,633.93
Year 3 1,210,000.00 861,254.10 3,306,250.00 2,353,323.44 2,756,250.00 1,961,844.31
Net Present Value 2,501,024.51 6,779,898.70 4,986,621.09
Net Present Value Hours Needed
Project 5: Develop App for Web Browsing 6,779,898.70 1875
Project 6: Trip Planner App 4,986,621.09 6250
Project 1: Integrate Calendar App with E-mail Ap 1,575,155.23 1250
Project 2: Update Expense Report App 607,862.11 400
Total 13,949,537.13 9775
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
Using the Net Present Value Approach, Handstar Inc. should pursue the
development of the Application for Web Browsing, the Trip Planner Application,
the Integration of Calendar App with the E-mail App, and the updating of the
Expense Report Application.
As shown in the solution above, the Web Browsing App has the highest
NPV followed by the Trip Planner App and the integration of the Calendar App
with the E-mail App respectively. When done together, the three projects would
require a total of 9,375 software development hours. Handstar Inc. have a
capacity of 10,000 software development hours, which is composed of 4 software
developers who work 2,500 hours annually. The development of the three apps
will leave 625 free hours for the software developers. The remaining hours will
not be enough to do the project with the next highest NPV however, to maximize
these remaining hours it is advisable to pursue the update on the Expense
Report App which only requires 400 hours bringing the total number of software
development hours of the 4 projects to 9,775. These projects also have an
accumulated Net Present Value of 13,949,537.13. The four projects is the best
possible combination when NPV and software development hours are taken into
consideration.
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
2. Assume the founders weigh a project’s NPV twice as much as both
obtaining/retaining a leadership position and making use of the Web. Use
the weighted factor scoring method to rank these projects. Which projects
would you recommend Handstar pursue?
The tables above show the weight of each project when Net Present Value,
Leadership Position, and Web Usage are taken into consideration. Furthermore,
the weight of importance for the NPV of the project is twice as much as the other
Criterion 1 2 3 4 5 6
Net Present Value 2,000,000 and below 2,000,001-3,000,000 3,000,001-4,000,000 4,000,001-5,000,000 5,000,0001-6,000,000 above 6,000,000
Leadership Position VeryLow Probability Low Probability Moderate ModeratelyLikely Almost Certainly High Probability
Web Usage None Little Mild Moderate Extensive OverlyExtensive
> If X represents the importance weight of Leadership Position, then the formula to be used is: 2X + X + X = 1.0
> The value of X is 0.25
Scores
Table 1. Criteria Scales and Equivalent Scores
Projects NPV(0.50)
Leadership
Position (0.25) Web Usage (0.25) Total
Project 1: Integrate Calendar App with E-mail App 0.5 1 1 2.5
Project 2: Update Expense Report App 0.5 1.25 0.5 2.25
Project 3: Enhance Existing Portfolio Tracking App 0.5 1.5 1 3
Project 4: Develop Spreadsheet App 1 0.75 0.25 2
Project 5: Develop App for Web Browsing 3 0.25 1.25 4.5
Project 6: Trip Planner App 2 0.5 1.25 3.75
Table 2. Weighted Total Scores for Each Project
Criteria (and Weights)
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
two factors. It can be seen in Table 2 that the Web Browsing App, Trip Planner
App, Calendar App with E-mail App, and the enhanced Portfolio Tracking App are
the top 4 projects with the highest scores. This implies that the 4 apps are the
more feasible projects to pursue when Net Present Value, Leadership Position,
and Web Usage are the factors considered. Handstar Inc. should pursue these
projects for the current year.
3. In your opinion is hiring an additional software development engineer
justified?
With the current software development capacity of Handstar Inc. of 10,000
hours it can be inferred that the firm is only capable of executing 4 projects
during the year unless additional software development engineers are employed.
Using the Net Present Value Approach, feasible projects to be undertaken are
the development of the Application for Web Browsing, the Trip Planner Application,
the Integration of Calendar App with the E-mail App, and the updating of the
Expense Report Application. Using the Weight Factor Scoring Method, the Web
Browsing App, Trip Planner App, Calendar App with E-mail App, and the enhanced
Portfolio Tracking App are feasible projects. In both cases, two other projects
cannot be pursued with its current capacity but the combined Net Present Value
CAPITOL UNIVERSITY
GRADUATE SCHOOL
GS32-PROJECT MANAGEMENT
of these projects is fairly huge. The Spreadsheet App and the Portfolio Tracking
App have a combined NPV of 3,719,348.73 while the Spreadsheet App and
Expense Report App have a combined NPV of 3,108,886.62. Furthermore,
Handstar Inc. only need to add an additional cost of 157,300 to 260,000 to
complete the other two projects. Therefore, hiring additional software engineers
are justifiable since its benefits outweigh the costs.

More Related Content

Similar to case study.pdf

Project global systems development corporation
Project global systems development corporationProject global systems development corporation
Project global systems development corporation
Reese Boone
 
HR517-B02 Managerial Accounting Assignment #2 1AS.docx
HR517-B02 Managerial Accounting Assignment #2  1AS.docxHR517-B02 Managerial Accounting Assignment #2  1AS.docx
HR517-B02 Managerial Accounting Assignment #2 1AS.docx
pooleavelina
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
todd581
 
1 6Project ProposalThe purpose of this proposal is .docx
1     6Project ProposalThe purpose of this proposal is .docx1     6Project ProposalThe purpose of this proposal is .docx
1 6Project ProposalThe purpose of this proposal is .docx
oswald1horne84988
 
Process Improvement Project official
Process Improvement Project officialProcess Improvement Project official
Process Improvement Project official
Philip Spottswood
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET Journal
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
muhammadyasirsaeedqa
 
The World of Project Management; What is project Management
The World of Project Management; What is project ManagementThe World of Project Management; What is project Management
The World of Project Management; What is project Management
muhammadyasirsaeedqa
 
PMO Manual v2.0 June-18.pptx
PMO Manual v2.0 June-18.pptxPMO Manual v2.0 June-18.pptx
PMO Manual v2.0 June-18.pptx
Ashfaq Ahmad
 
IT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxIT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptx
djualaja88
 
IS6138 PPARS
IS6138 PPARSIS6138 PPARS
IS6138 PPARS
Brendan Mc Sweeney
 
How To Develop A Project Management Plan
How To Develop A Project Management PlanHow To Develop A Project Management Plan
How To Develop A Project Management Plan
Orangescrum
 
ATD MD Healthcare and Public Health Talent Development Community of Practice ...
ATD MD Healthcare and Public Health Talent Development Community of Practice ...ATD MD Healthcare and Public Health Talent Development Community of Practice ...
ATD MD Healthcare and Public Health Talent Development Community of Practice ...
William Brantley, PhD, PMP
 
TODAY 2016_03_31
TODAY 2016_03_31TODAY 2016_03_31
TODAY 2016_03_31
Richard Cole
 
Major Projects Booklet
Major Projects BookletMajor Projects Booklet
Major Projects Booklet
Richard Cole
 
Pm0012 – project finance
Pm0012 – project financePm0012 – project finance
Pm0012 – project finance
smumbahelp
 
LBA SYNOPSIS.pdf
LBA SYNOPSIS.pdfLBA SYNOPSIS.pdf
LBA SYNOPSIS.pdf
MahdeepBisht
 
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docxWRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
odiliagilby
 
GAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfGAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdf
RmsDagi
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association Proposal
Cheryl Litwinczuk
 

Similar to case study.pdf (20)

Project global systems development corporation
Project global systems development corporationProject global systems development corporation
Project global systems development corporation
 
HR517-B02 Managerial Accounting Assignment #2 1AS.docx
HR517-B02 Managerial Accounting Assignment #2  1AS.docxHR517-B02 Managerial Accounting Assignment #2  1AS.docx
HR517-B02 Managerial Accounting Assignment #2 1AS.docx
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
 
1 6Project ProposalThe purpose of this proposal is .docx
1     6Project ProposalThe purpose of this proposal is .docx1     6Project ProposalThe purpose of this proposal is .docx
1 6Project ProposalThe purpose of this proposal is .docx
 
Process Improvement Project official
Process Improvement Project officialProcess Improvement Project official
Process Improvement Project official
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
The World of Project Management; What is project Management
The World of Project Management; What is project ManagementThe World of Project Management; What is project Management
The World of Project Management; What is project Management
 
PMO Manual v2.0 June-18.pptx
PMO Manual v2.0 June-18.pptxPMO Manual v2.0 June-18.pptx
PMO Manual v2.0 June-18.pptx
 
IT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxIT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptx
 
IS6138 PPARS
IS6138 PPARSIS6138 PPARS
IS6138 PPARS
 
How To Develop A Project Management Plan
How To Develop A Project Management PlanHow To Develop A Project Management Plan
How To Develop A Project Management Plan
 
ATD MD Healthcare and Public Health Talent Development Community of Practice ...
ATD MD Healthcare and Public Health Talent Development Community of Practice ...ATD MD Healthcare and Public Health Talent Development Community of Practice ...
ATD MD Healthcare and Public Health Talent Development Community of Practice ...
 
TODAY 2016_03_31
TODAY 2016_03_31TODAY 2016_03_31
TODAY 2016_03_31
 
Major Projects Booklet
Major Projects BookletMajor Projects Booklet
Major Projects Booklet
 
Pm0012 – project finance
Pm0012 – project financePm0012 – project finance
Pm0012 – project finance
 
LBA SYNOPSIS.pdf
LBA SYNOPSIS.pdfLBA SYNOPSIS.pdf
LBA SYNOPSIS.pdf
 
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docxWRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
 
GAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfGAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdf
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association Proposal
 

Recently uploaded

Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......
Sachin Paul
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
ahzuo
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
dwreak4tg
 
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
nuttdpt
 
My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.
rwarrenll
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
mbawufebxi
 
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
sameer shah
 
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
ahzuo
 
原版制作(swinburne毕业证书)斯威本科技大学毕业证毕业完成信一模一样
原版制作(swinburne毕业证书)斯威本科技大学毕业证毕业完成信一模一样原版制作(swinburne毕业证书)斯威本科技大学毕业证毕业完成信一模一样
原版制作(swinburne毕业证书)斯威本科技大学毕业证毕业完成信一模一样
u86oixdj
 
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
mzpolocfi
 
Predictably Improve Your B2B Tech Company's Performance by Leveraging Data
Predictably Improve Your B2B Tech Company's Performance by Leveraging DataPredictably Improve Your B2B Tech Company's Performance by Leveraging Data
Predictably Improve Your B2B Tech Company's Performance by Leveraging Data
Kiwi Creative
 
Intelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicineIntelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicine
AndrzejJarynowski
 
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
zsjl4mimo
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
Bill641377
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
Timothy Spann
 
Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
vikram sood
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
aqzctr7x
 
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
u86oixdj
 
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
74nqk8xf
 
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
74nqk8xf
 

Recently uploaded (20)

Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
一比一原版(BCU毕业证书)伯明翰城市大学毕业证如何办理
 
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
一比一原版(UCSF文凭证书)旧金山分校毕业证如何办理
 
My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.My burning issue is homelessness K.C.M.O.
My burning issue is homelessness K.C.M.O.
 
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
一比一原版(Bradford毕业证书)布拉德福德大学毕业证如何办理
 
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
STATATHON: Unleashing the Power of Statistics in a 48-Hour Knowledge Extravag...
 
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
 
原版制作(swinburne毕业证书)斯威本科技大学毕业证毕业完成信一模一样
原版制作(swinburne毕业证书)斯威本科技大学毕业证毕业完成信一模一样原版制作(swinburne毕业证书)斯威本科技大学毕业证毕业完成信一模一样
原版制作(swinburne毕业证书)斯威本科技大学毕业证毕业完成信一模一样
 
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
一比一原版(Dalhousie毕业证书)达尔豪斯大学毕业证如何办理
 
Predictably Improve Your B2B Tech Company's Performance by Leveraging Data
Predictably Improve Your B2B Tech Company's Performance by Leveraging DataPredictably Improve Your B2B Tech Company's Performance by Leveraging Data
Predictably Improve Your B2B Tech Company's Performance by Leveraging Data
 
Intelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicineIntelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicine
 
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(Harvard毕业证书)哈佛大学毕业证如何办理
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
 
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
06-04-2024 - NYC Tech Week - Discussion on Vector Databases, Unstructured Dat...
 
Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
 
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
原版制作(Deakin毕业证书)迪肯大学毕业证学位证一模一样
 
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
一比一原版(Coventry毕业证书)考文垂大学毕业证如何办理
 
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
一比一原版(Chester毕业证书)切斯特大学毕业证如何办理
 

case study.pdf

  • 1. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT Case Study Analysis for Friendly Assisted Living Facility and Handstar Inc. Orbeta, Rowena DM-1 Dr. Odette Leh V. Caragos Professor
  • 2. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT Case 1 Friendly Assisted Living Facility 1. Identify as well as you can the three iron triangle constraints for this project: cost, time, and scope. In order to have an efficient project implementation and achieve customer satisfaction, a balance among the cost, time, and scope of the project should be maintained. The following factors should be taken into consideration: A. Cost The entire project cost is estimated to be between 8,500,000 and 11,000,000 for the facility construction. This includes the cost of the land, furnishings, and sheltered connection to the hospital. Additional but minimal cost is also incurred during the planning process.
  • 3. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT B. Time There is only approximately 7 to 8 months to complete the construction of the new facility. The project construction can only begin after the November city elections because two of the Board Members were running in that election. Furthermore, the Board would like a plan that would allow the facility to open by July the following year in order to maximize the trend that many adult and children assist their parents in finding an alternative to independent living arrangements during the summer. C. Scope The project is to build an assisted living facility on Friendly Medical Center’s campus. The chosen facility design is a freestanding apartment- like facility with a sheltered connection to the Hospital. It will have 100 units to be classified into “heavy assisted” for the physically and medically disabled and “light assisted” for residents that require minor medical and social interventions.
  • 4. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT Implication: The executive team is yet to create the complete project plan. The following challenges may be encountered during the project implementation:  Given the time constraint of the project, detailed examination of the complete project plan may show higher costs needed to complete the project since manpower resource should be increased to cope with the limited project period.  Political disputes can possibly affect the project and may further delay the execution.  Social implications can also become a cause of concern for this matter. 2. Identify the expected benefits of this project for Friendly Medical Center. The construction of an assisted living facility on the Friendly Medical Center campus can bring about potential benefits to the hospital in the areas of financial, marketing, and human resource.
  • 5. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT Areas of Consideration Benefits Financial  The facility upon operation can generate between $9,000 to $12,000 per unit per year and an estimated net cash flow of $1,500,000 annually. This amount can be used to suffice for the decreasing income of the hospital since the hospital board has control over its subsidiary.  For short term benefit, cash flow from the assisted living facility may be used to sustain the operation of Friendly Medical Center.  Its long term benefit is its ability to provide shelter and care for what will be the future clients of the hospital. Marketing  The facility is designed to cater wider scope of patients/residents, it has identified a unique market segment. It will be the only assisted living facility that will offer physical and occupational therapy programs and behavior management programs on top of the usual services offered by other facilities in the same industry.
  • 6. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT  Due to the wider market scope of the assisted living facility, it can attract more patients who could age in the place until they will be in need of hospitalization which can be provided by Friendly Medical Center. Human Resources  Friendly Medical Center is well known for its highly competent rehabilitation therapy staff and while the hospital inpatient population is declining, these competent staff can be re-assigned into the assisted living facility. This strategy will spare the hospital from letting go of qualified employees. 3. Comment on the strategic initiatives resulting from the Board’s major strategic planning retreat. Would you consider this a productive retreat? The strategic planning retreat of the Board of Directors can be considered as a productive retreat. On that retreat, it was decided that the short-run initiative is to be more cost-effective in service delivery while the long-run strategy is to develop new programs and services that will capitalize on the existing assets of the hospital. On this premise, Fred Splient was able to develop his idea on creating an assisted living facility. The proposal addresses both the short run and long run strategies crafted
  • 7. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT during the retreat which is an indication that the retreat was effective because it facilitated the conception of a novel project. 4. What “project selection” procedure was used here? How common do you think this is? How wise do you think this is? The project selection process is a combination of Sacred Cow and Operating/Competitive Necessity. The proposal to establish an assisted living facility came from the CEO, Fred Splient M.D. His position somehow may have influenced the Board of Directors’ decision to approve the concept and present a comprehensive plan. However, majority of the decision also emanated from the fact that Fred Splient was able to present a feasible idea. It is not to be overlooked that Fred have employed the services of a Business Development Team to prepare a rough estimate of the potential return on the investment. After careful investigation and assessment of available data and resources, Fred and his team was able to come up with a business plan which was enough to successfully convince the Board of Directors that the creation of the assisted living facility is necessary in order to support the continuity of operations in the Friendly Medical Center.
  • 8. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT Case 2 Handstar Inc. 1. Which projects would you recommend Handstar pursue based on the NPV approach? Project 1: Integrate Calendar App with E- mail App Present Value Project 2: Update Expense Report App Present Value Project 3: Enhance Existing Portfolio Tracking App Present Value Software Development Time 1250 400 750 Rate of Software Developers (per hour) 52 52 52 Initial Fixed Investment 65,000.00 20,800.00 39,000.00 Year 1 750,000.00 669,642.86 250,000.00 223,214.29 500,000.00 446,428.57 Year 2 675,000.00 538,105.87 262,500.00 209,263.39 525,000.00 418,526.79 Year 3 607,500.00 432,406.50 275,625.00 196,184.43 551,250.00 392,368.86 Net Present Value 1,575,155.23 607,862.11 1,218,324.22 Project 4: Develop Spreadsheet App Present Value Project 5: Develop App for Web Browsing Present Value Project 6: Trip Planner App Present Value Software Development Time 2500 1875 6250 Rate of Software Developers (per hour) 52 52 52 Initial Fixed Investment 130,000.00 97,500.00 1,300,000.00 Year 1 1,000,000.00 892,857.14 2,500,000.00 2,232,142.86 2,500,000.00 2,232,142.86 Year 2 1,100,000.00 876,913.27 2,875,000.00 2,291,932.40 2,625,000.00 2,092,633.93 Year 3 1,210,000.00 861,254.10 3,306,250.00 2,353,323.44 2,756,250.00 1,961,844.31 Net Present Value 2,501,024.51 6,779,898.70 4,986,621.09 Net Present Value Hours Needed Project 5: Develop App for Web Browsing 6,779,898.70 1875 Project 6: Trip Planner App 4,986,621.09 6250 Project 1: Integrate Calendar App with E-mail Ap 1,575,155.23 1250 Project 2: Update Expense Report App 607,862.11 400 Total 13,949,537.13 9775
  • 9. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT Using the Net Present Value Approach, Handstar Inc. should pursue the development of the Application for Web Browsing, the Trip Planner Application, the Integration of Calendar App with the E-mail App, and the updating of the Expense Report Application. As shown in the solution above, the Web Browsing App has the highest NPV followed by the Trip Planner App and the integration of the Calendar App with the E-mail App respectively. When done together, the three projects would require a total of 9,375 software development hours. Handstar Inc. have a capacity of 10,000 software development hours, which is composed of 4 software developers who work 2,500 hours annually. The development of the three apps will leave 625 free hours for the software developers. The remaining hours will not be enough to do the project with the next highest NPV however, to maximize these remaining hours it is advisable to pursue the update on the Expense Report App which only requires 400 hours bringing the total number of software development hours of the 4 projects to 9,775. These projects also have an accumulated Net Present Value of 13,949,537.13. The four projects is the best possible combination when NPV and software development hours are taken into consideration.
  • 10. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT 2. Assume the founders weigh a project’s NPV twice as much as both obtaining/retaining a leadership position and making use of the Web. Use the weighted factor scoring method to rank these projects. Which projects would you recommend Handstar pursue? The tables above show the weight of each project when Net Present Value, Leadership Position, and Web Usage are taken into consideration. Furthermore, the weight of importance for the NPV of the project is twice as much as the other Criterion 1 2 3 4 5 6 Net Present Value 2,000,000 and below 2,000,001-3,000,000 3,000,001-4,000,000 4,000,001-5,000,000 5,000,0001-6,000,000 above 6,000,000 Leadership Position VeryLow Probability Low Probability Moderate ModeratelyLikely Almost Certainly High Probability Web Usage None Little Mild Moderate Extensive OverlyExtensive > If X represents the importance weight of Leadership Position, then the formula to be used is: 2X + X + X = 1.0 > The value of X is 0.25 Scores Table 1. Criteria Scales and Equivalent Scores Projects NPV(0.50) Leadership Position (0.25) Web Usage (0.25) Total Project 1: Integrate Calendar App with E-mail App 0.5 1 1 2.5 Project 2: Update Expense Report App 0.5 1.25 0.5 2.25 Project 3: Enhance Existing Portfolio Tracking App 0.5 1.5 1 3 Project 4: Develop Spreadsheet App 1 0.75 0.25 2 Project 5: Develop App for Web Browsing 3 0.25 1.25 4.5 Project 6: Trip Planner App 2 0.5 1.25 3.75 Table 2. Weighted Total Scores for Each Project Criteria (and Weights)
  • 11. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT two factors. It can be seen in Table 2 that the Web Browsing App, Trip Planner App, Calendar App with E-mail App, and the enhanced Portfolio Tracking App are the top 4 projects with the highest scores. This implies that the 4 apps are the more feasible projects to pursue when Net Present Value, Leadership Position, and Web Usage are the factors considered. Handstar Inc. should pursue these projects for the current year. 3. In your opinion is hiring an additional software development engineer justified? With the current software development capacity of Handstar Inc. of 10,000 hours it can be inferred that the firm is only capable of executing 4 projects during the year unless additional software development engineers are employed. Using the Net Present Value Approach, feasible projects to be undertaken are the development of the Application for Web Browsing, the Trip Planner Application, the Integration of Calendar App with the E-mail App, and the updating of the Expense Report Application. Using the Weight Factor Scoring Method, the Web Browsing App, Trip Planner App, Calendar App with E-mail App, and the enhanced Portfolio Tracking App are feasible projects. In both cases, two other projects cannot be pursued with its current capacity but the combined Net Present Value
  • 12. CAPITOL UNIVERSITY GRADUATE SCHOOL GS32-PROJECT MANAGEMENT of these projects is fairly huge. The Spreadsheet App and the Portfolio Tracking App have a combined NPV of 3,719,348.73 while the Spreadsheet App and Expense Report App have a combined NPV of 3,108,886.62. Furthermore, Handstar Inc. only need to add an additional cost of 157,300 to 260,000 to complete the other two projects. Therefore, hiring additional software engineers are justifiable since its benefits outweigh the costs.