The document provides an overview of the physical environment of the proposed Hugh Parkey's Belize Adventure Island expansion project located off the coast of Belize City. It describes the meteorology, oceanography, geology, and water quality of the project site area. The climate is tropical with a wet and dry season. Annual rainfall averages 60-80 inches. Ocean currents and tides influence the area. The caye sits on carbonate sediments atop the continental shelf. Water sampling found low turbidity and nutrient levels indicative of an open ocean environment.