The document outlines a laboratory assignment for an undergraduate environmental science course focused on stream morphology. Students are required to construct a physical model of a stream system, conduct experiments, and analyze how human actions impact river ecosystems. The assignment emphasizes the use of the scientific method, including hypothesis formation, experimentation, and data analysis, to understand streamflow characteristics and their environmental implications.